PRIME-SUB_FORM_for_Contractors.xls
XLS spreadsheet 38 KB Posted
- Solicitation number
- 26-B-24LL
- Issued by
- Volusia County, Florida
About this file
This is a Prime/Subcontractor Form for the DeLand Courthouse Chiller Energy Plant (CEP) Upgrades and Efficiency Improvements project administered by Volusia County, Florida. The project involves the replacement of existing chiller plant infrastructure, including two 500-ton water-cooled chillers, primary and secondary chilled water pumps, and associated mechanical, electrical, and control system components. Bidders must complete this form to list all proposed subcontractors for the project, with completion and submission required by the electronic bid deadline of February 19, 2026, at 3:01 pm through the County's eProcurement Portal. A non-mandatory pre-bid meeting is scheduled for January 22, 2026, at 10:30 am at the courthouse loading dock. The contract duration is 180 days upon award. Failure to complete and return this form may result in a non-responsive bid.
The form requires bidders to assign dollar values and percentage allocations across prime contractor and subcontractor work categories, including HVAC/Mechanical, Electrical, BAS/Controls, and Masonry/Structural disciplines. The total bid price must equal 100% of all allocated work, with the prime contractor responsible for ensuring all subcontractors maintain appropriate licenses. Any subcontractor changes during project completion require prior approval from the County Project Manager. The County's evaluation criteria include conformance to requirements, bidder and subcontractor qualifications, proportional work performed, previous contract performance, and maintenance capabilities. Local business preference provisions apply, offering a 3% preference for prime contractors with permanent locations in specified Central Florida counties for at least six months, or a 2% preference if 51% or more of subcontracted work is performed by local businesses, with a maximum combined preference of 5%. The estimated project cost is $1,750,000.00.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2060 | ITB No. 26-B-24LL | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor |
| $ - 0 | 0.00% | ||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | |||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor |
| HVAC/Mechanical | $ - 0 | 0.00% | |
| Electrical | $ - 0 | 0.00% | |
| BAS/ Controls | $ - 0 | 0.00% | |
| Masonry/Structural | $ - 0 | 0.00% | |
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .