Summary: Deland Courthouse CEP Upgrades Construction Documents
This document comprises 100% construction documents prepared by SGM Engineering for the Volusia County Government's DeLand Courthouse Chiller Plant Efficiency and Performance (CEP) upgrades project located at 101 N. Alabama Avenue, DeLand, Florida, 32724. The project scope involves the replacement of two existing water-cooled chillers and all associated equipment, including two primary chilled water pumps, two secondary chilled water pumps, and related piping, controls, and components to enhance system efficiency and reliability while maintaining continuous cooling to the courthouse. The mechanical work includes providing new HVAC controls integrated with the existing building Energy Management System (EMS), expanding the existing concrete pad for new equipment as required, and providing temporary connections for equipment isolation. Electrical work encompasses providing power to all new equipment, extending existing feeders with conduit and wiring as necessary, and installing Variable Frequency Drives (VFDs) with appropriate disconnect switches. The construction documents include detailed mechanical floor plans, electrical floor plans, control diagrams, equipment schedules, piping details, and specifications for all work, with design by SGM Engineering's Bobak Shahnami (FL License 78419) and electrical design by Justin Lowe Mundell (FL License 70700), and structural consultation by Bliss & Nyitray with Alejandra Martinez McCombie (FL License 87411).
The project specifications mandate compliance with the 2023 Florida Building Code and all applicable local codes, including NFPA 70 National Electrical Code (2020 Edition) and NFPA 72 National Fire Code (2019 Edition). The water-cooled chillers are specified as Trane HDWA 500-ton units using R-513A refrigerant with a minimum efficiency of 0.3454 kW/ton, equipped with factory-mounted circuit breakers, enhanced flow management, and BACnet IP communications capability. All hydronic pumps are specified as Taco end-suction, split-coupled, base-mounted units with Variable Frequency Drives, non-overloading motors, and stainless steel flexible connections. The project includes comprehensive testing and balancing of existing HVAC systems in accordance with AABC or NEBB standards, initial performance testing, and final commissioning reports. The contractor must demonstrate system performance in the presence of the owner's project manager, coordinate work schedules to minimize disruption to courthouse operations, and provide shop drawings for review prior to fabrication. All work must comply with design drawings and specifications without deviation or material substitution unless approved by the engineer of record, with the contractor bearing full responsibility for field verification of existing conditions, site utilities, and coordination with other trades.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SGM
ENGINEERING
5301 Waterford District Dr Miami, Fl. 33126
Tel: 954-421-1944 Fax: 954-421-1944
CA-00006208
Copyright © 2024 SGM Engineering, Inc.
www.sgmengineering.com
STATE OF
ENEIL
ADIROL
F
No. 78419
R O
FES
OI NA
S
L E N
N
G I
E E
C S
R
P
B O
B A
K S H A H N
A M
I
Issue: 100% CONSTRUCTION DOCUMENTS 2025-10-15
Project Name:
State Project Number: Drawing File Name:
Scale:
Design By:
Drawn By:
Checked By:
Engineer of Record:
License Number:
Sheet Name:
Sheet Number:
Seal:
BOBAK SHAHNAMI
FL 78419
N
A
L A
B A
M A
A V
E N
U E
D E
L A
N D
F L
SGM # 2024-358
/1
/2
:3
:0
A
M C
U s e rs
\r o a n \D o c u m e n ts
\B a s e m e n t H
V A
C M
E
R
R
O A
N G
E
S U
.r v t
2024-358
T001
TITLE SHEET
Volusia County Government
- Deland Courthouse - CEP Upgrades
V O
L U
S
IA
C O
U N
T Y
C L
E R
K O
F T
H E
C
IR
C U
IT
C
O U
R T
COLIN LENKEIT
PROJECT MANAGER
COLIN@PPMCO.NET
CORPORATE OFFICE
OFFICE@PPMCO.NET
Ft Lauderdale, FL 33314
Office- (855) 272 - 8458 EXT. 100
HTTPS://PPMCO.NET/CONTACT/
MECHANICAL AND ELECTRICAL
PROJECT LOCATION
PPM PROJECT MANAGER PRIME CONSULTANT
VOLUSIA COUNTY GOVERNMENT - DELAND
COURTHOUSE CEP UPGRADES
101 N ALABAMA AVENUE, DELAND FL, 32724
100% CONSTRUCTION DOCUMENTS
NO. DESCRIPTION DATE
GENERAL SCOPE OF WORK
COVER
T001 COVER SHEET
MECHANICAL
M001 MECHANICAL SYMBOLS AND SPECIFICATION
M002 MECHANICAL GENERAL NOTES
MD201 MECHANICAL DEMO FLOOR PLAN
M201 MECHANICAL FLOOR PLAN
M401 MECHANICAL ENLARGED PLANS
M601 MECHANICAL CONTROL DRAWINGS
M602 MECHANICAL CONTROL DRAWINGS
M701 MECHANICAL SCHEDULES
M801 MECHANICAL DETAILS
ELECTRICAL
E001 ELECTRICAL GENERAL NOTES & SYMBOL LIST
E002 ELECTRICAL SPECIFICATIONS
ED301 ELECTRICAL DEMO FLOOR PLAN
E301 ELECTRICAL FLOOR PLAN
E801 ELECTRICAL DETAILS
INDEX OF DRAWINGS
THIS BRIEF DESCRIPTION OF THE SCOPE OF WORK IN NOT ALL INCLUSIVE AND IS
COMPLEMENTED BY THE SET OF CONSTRUCTION DOCUMENTS AND SPECIFICATIONS
• REMOVE AND REPLACE EXISTING DEDICATED CHILLERS AND PUMPS AND ALL ASSOCIATED
EQUIPMENT
STRUCTURAL
S101 STRUCTURAL NOTES
S200 BASEMENT FLOOR PLAN
S201 TYPICAL DETAILS
ARCHITECTURAL
A101 ARCHITECTURAL DOOR INSTALLATION
RETURN GRILLE
LEAVING DRY BULB
KILOWATT
INSIDE DIAMETER
HERTZ (CYCLES PER SECOND)
MAXIMUM
MANUAL DAMPER
NUMBER, NORMALLY OPEN
NOT APPLICABLE
NOT TO SCALE
LOR LIMIT OF REMOVAL
OUTSIDE DIAMETER
OPPOSED BLADE DAMPER
OUTSIDE AIR
OUTSIDE AIR DIFFUSER
REGISTER
RETURN FAN
RETURN AIR
POUNDS PER SQUARE INCH GAUGE
POUNDS PER SQUARE INCH
MASTER BUILDING CONTROLLER
THOUSAND BTU PER HOUR
LEAVING WET BULB
SUPPLY AIR
REHEAT COIL
SMOKE/FIRE DAMPER
TEMPERATURE
TEMP./HUMIDITY SENSOR
SUPPLY FAN
VERTICAL
VOLUME DAMPER
WET BULB
VENT, VOLT
THREE WAY BLOW
TWO WAY BLOW
ONE WAY BLOW
WATER PRESSURE DROP
TERMINAL EQUIPMENT CONTROLLER
RELATIVE HUMIDITY
HEATING HOT WATER SUPPLY&RETURN
HOURHR
AND AIR CONDITIONING
HEATING VENTILATINGHVAC
GALLONS PER MINUTE
HORSEPOWER, HEAT PUMP
HAND-OFF-AUTOMATIC
FIRE/SMOKE DAMPER
FEET PER SECOND
GALLONS PER HOUR
FIRE DAMPER, FLOOR DRAIN
ENTERING WET BULB
FEET PER MINUTE
FAHRENHEIT
FEETFT
HHWS&R
HOA
HP
GPH
GPM
FPM
FPS
F/SD
EWB
F
FD
3WB
2WB
1WB
WPD
WB
VERT
V
VD
CHILLED WATER SUPPLY & RETURN
ENERGY MANAGEMENT SYSTEM
EXISTING RETURN GRILLE
DOMESTIC HOT WATER
DISCONNECT
DELIVERY
ENTERING AIR TEMPERATURE
ENTERING
EXHAUST FAN
ELEVATION
EFFICIENCY
ENTERING DRY BULB
EXHAUST AIR, EACH
EAT
ELEV
ERG
ENT
EMS
EDB
EFF
EF
DN
EA
DISC
DHW
DELIV
DOWN
CLEAN OUT
DRY BULB, DOWN BLOW
DOMESTIC COLD WATER
CONDENSATE
BRITISH THERMAL UNIT
BACKFLOW PREVENTER
CUBIC FEET PER MINUTE
CELSIUS, DEGREE CELSIUS
CENTRIFUGAL
CEILINGCLG
DEG
DCW
DB
COND
CO
DEGREE
CHWS&R
CFM
CENT
BTU
BFP
C
SF
TEC
TS
TEMP
S/FD
T
TEMPERATURE SENSOR
RM
SA
RHC
RRC
RH
ROOM
REG
RF
RA
PSIG
PSI
NO OR #
OA
OBD
ODD
OD
NTS
MECHANICAL ABBREVIATIONS
AUTOMATIC TEMPERATURE CONTROL
AAV AUTOMATIC AIR VENT
ABOVE FINISHED GRADE
ABOVE FINISHED FLOOR
ACCESS DOOR, AIR DRYER
AIR CONDITIONING UNIT
BACK DRAFT DAMPER
AIR VENT
ACCESS PANEL
AIR PRESSURE DROP
AIR HANDLING UNIT
ALUMINUM
AIR CONDITIONING
ALUM
AV
BOT
BDD
ATC
APD
AP
BOTTOM
AFF
AHU
AFG
ACU
AC
AD
A AIR
MAX
NA
N
MIN
MBH
MBC
MD
NORTH
MINIMUM
LDB
LWB
ID
KW
IN INCH
HZ
EMS ENERGY MANAGEMENT SYSTEM
FLEXIBLE ROUND DUCT
CO CARBON DIOXIDE SENSOR
A-350
FIRE DAMPER AND ACCESS DOOR.
DAMPER, WITH ACCESS DOOR.
COMBINATION FIRE AND SMOKE
ROUND DUCT, DIAMETER SHOWN
F
SD SD
T TEMPERATURE /HUMIDITY SENSOR
FIRE STAT
SMOKE DETECTOR
VOLUME DAMPER
SPIN-IN COLLAR WITH
M
BD
FSD
24X12
FD
BACKDRAFT DAMPER
MOTORIZED DAMPER
FIGURE IS SIDE SHOWN
RECTANGULAR DUCT, FIRST
AIR DISTRIBUTION DESIGNATION
EXHAUST AIR REGISTER/GRILLE
RETURN AIR REGISTER/GRILLE
SQUARE SUPPLY AIR DIFFUSER
SIDEWALL REGISTER OR GRILLE
AIR QUANTITY
TYPE
DUCT CONNECTION
FLEXIBLE CONNECTION
CEILING DIFFUSER - SIDE
4-WAY DISCHARGE
SUPPLY AIR DUCT - SECTION
UP
DN
ELBOW TURNED DOWN
CEILING DIFFUSER -
STANDARD BRANCH TAKEOFF
BOTTOM DUCT CONNECTION
FLOOR/CEILING ASSEMBLY
FLOOR/CEILING ASSEMBLY
EXHAUST AIR DUCT - SECTION
SUPPLY DUCT UP THRU ROOF OR
RETURN DUCT UP THRU ROOF OR
RETURN AIR DUCT - SECTION
OFFSET IN DUCTWORK - UP
OFFSET IN DUCTWORK - DOWN
TEE WITH DOUBLE THICKNESS
MANUAL DAMPER
RADIUS ELBOW
MITERED ELBOW - WHERE USED PROVIDE TURNING VANES
ELBOW TURNED UP
DUCTWORK
MECHANICAL SYMBOLS LEGEND
NEW WORK
MECHANICAL LEGEND
-CHILLED WATER SUPPLYCHWS
-CHILLED WATER RETURNCHWR
-CONDENSATE DRAINCD
-REFRIGERANT LIQUIDRL
-REFRIGERANT SUCTIONRS
-GATE VALVE
-BALL VALVE
-CALIBRATE BALANCING VALVE
-BUTTERFLY VALVE
-GAS COOK
-UNION
-STRAINER
-PSI REG.
-CHECK VALVE
-CONNECTION, BOTTOM
-CONNECTION, TOP
-ELBOW, TURNED UP
-ELBOW,TURNED DOWN
-REDUCER, CONCENTRIC
-REDUCER, ECCENTRIC STRAIGHT CROWN
-CAP
SECTION TAG
HWS
HWR
-HOT WATER SUPPLY
-HOT WATER RETURN
HATCH INDICATES DEMO ITEM
EXISTING DUCTWORK AND/OR PIPING
BALL VALVEBV
TYP TYPICAL
DPS DIFFERENTIAL PRESSURE SWITCH
PRESSURE GAUGEPG
WIRE MESH SCREENWMS
SMOKE DAMPER
FIRE/SMOKE DAMPER
FIRE DAMPER
STR MOTOR STARTER
VFD VARIABLE FREQUENCY DRIVE
ENLARGED PLAN TAG, FLOOR PLAN REFERENCE
ENLARGED PLAN REFERENCE
FLOOR PLAN:
ENLARGED PLAN:
SP STATIC PRESSURE SENSOR
OPERATINGOPER
POINT OF CONNECTION
POINT OF DISCONNECTION
MECHANICAL SCOPE OF WORK:
RETURN TRANSFER GRILLTG
CONDENSER WATER SUPPLY & RETURNCDWS&R
EXISTING PIPING
NEW PIPING
1 - PROVIDE NEW HVAC CONTROLS ASSOCIATED TO NEW EQUIPMENT AND
2 - REPLACE 2 EXISTING WATER COOLED CHILLERS AND ASSOCIATED COMPONENTS
3 - REPLACE 2 EXISTING SECONDARY PUMPS AND ASSOCIATED COMPONENTS
TIE IT TO EXISTING BUILDING EMS.
4- EXPAND EXISTING CONCRETE PAD FOR NEW HVAC EQUIPMENT AS REQUIRED
3 - REPLACE 2 EXISTING PRIMARY PUMPS AND ASSOCIATED COMPONENTS
SGM
ENGINEERING
5301 Waterford District Dr Miami, Fl. 33126
Tel: 954-421-1944 Fax: 954-421-1944
CA-00006208
Copyright © 2024 SGM Engineering, Inc.
www.sgmengineering.com
STATE OF
ENEIL
ADIROL
F
No. 78419
R O
FES
OI NA
S
L E N
N
G I
E E
C S
R
P
B O
B A
K S H A H N
A M
I
Issue: 100% CONSTRUCTION DOCUMENTS 2025-10-15
Project Name:
State Project Number: Drawing File Name:
Scale:
Design By:
Drawn By:
Checked By:
Engineer of Record:
License Number:
Sheet Name:
Sheet Number:
Seal:
BOBAK SHAHNAMI
FL 78419
N
A
L A
B A
M A
A V
E N
U E
D E
L A
N D
F L
SGM # 2024-358
/1
/2
:3
:5
A
M C
U s e rs
\r o a n \D o c u m e n ts
\B a s e m e n t H
V A
C M
E
R
R
O A
N G
E
S U
.r v t
2024-358
M001
MECHANICAL SYMBOLS
AND SPECIFICATION
Volusia County Government
- Deland Courthouse - CEP Upgrades
V O
L U
S
IA
C O
U N
T Y
C L
E R
K O
F T
H E
C
IR
C U
IT
C
O U
R T
NO. DESCRIPTION DATE
MECHANICAL GENERAL NOTES SPECIFICATION FOR EXISTING CONDITIONS
1. THE CONTRACTOR SHALL DEMONSTRATE EACH HVAC SYSTEMS PERFORMANCE IN THE PRESENCE OF THE OWNER'S PROJECT
MANAGER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COST OF ANY ADDITIONAL SYSTEM TEST REQUIRED IF IN THE
OPINION OF THE ARCHITECT AND THE OWNERS PROJECT MANAGER THE SYSTEMS DO NOT PERFORM AS SPECIFIED.
2. IF, THE INTENT OF ARCHITECT/ ENGINEER WITH REGARD TO ANY DETAIL IS NOT CLEAR, OR IS CAPABLE OF MORE THAN ONE
INTERPRETATION, SUCH MATTERS WILL BE BROUGHT TO THE ATTENTION OF THE ENGINEER IN WRITING BEFORE THE SUBMISSION
OF BIDS, AND THE ENGINEER SHALL MAKE CORRECTION OR EXPLANATION IN WRITING. OTHERWISE, NO EXTRA CHARGE WILL BE
ALLOWED FOR THE WORK OR MATERIAL WHICH THE ARCHITECT/ENGINEER WILL REQUIRE, PROVIDED THAT IT COMES WITHIN A
REASONABLE INTERPRETATION OF THE DRAWINGS AND SPECIFICATIONS.
3. THE PLANS AND SPECIFICATIONS ARE INTENDED AS A GENERAL DESCRIPTION OF THE WORK TO BE PERFORMED. ALL ITEMS NOT
SPECIFICALLY MENTIONED OR SHOWN, BUT NECESSARY FOR THE COMPLETION OF THE INSTALLATION, SHALL BE FURNISHED AND
INSTALLED BY THIS CONTRACTOR. THIS CONTRACTOR SHALL THOROUGHLY ACQUAINT HIMSELF WITH THE MECHANICAL, ARCHITECTURAL, STRUCTURAL AND ELECTRICAL PLANS BEFORE SUBMITTING HIS FINAL BID. NO ADDITIONAL COMPENSATION WILL
BE ALLOWED DUE TO THE CONTRACTOR'S FAILURE TO FAMILIARIZE HIMSELF WITH THE PLANS.
4. UNFORESEEN CONDITIONS MAY EXIST AND WORK MAY NOT BE FIELD LOCATED EXACTLY AS SHOWN ON THE DRAWINGS.
COOPERATION WITH OTHER TRADES IN ROUTING AND/OR BURIAL DEPTHS AS DETERMINED DURING CONSTRUCTION AND AS
DIRECTED BY THE ARCHITECT/ENGINEER MAYBE NECESSARY. IT IS INTENDED THAT SUCH DEVIATIONS SHALL BE CONSIDERED AS
PART OF THIS CONTRACT. SUCH DEVIATIONS MAY NOT BE CONSIDERED AS PART OF THIS CONTRACT WHEN PROPERLY
DOCUMENTED IN WRITING. THE PLANS ARE NOT COMPLETELY TO SCALE. CONTRACTOR IS TO FIELD VERIFY DIMENSIONS OF ALL
SITE UTILITIES ECT PRIOR TO BID AND INCLUDE ANY DEVIATIONS IN THE CONTRACT.
5. ALL WORK SHALL BE IN ACCORDANCE WITH THE 2023 FLORIDA BUILDING CODE AND ALL LOCAL CODES.
6. THE SIZE AND LOCATION OF EQUIPMENT INSTALLED UNDER DIVISION 23 MECHANICAL SHALL BE COORDINATED WITH OTHER
TRADES. CONNECTION TO EQUIPMENT SHALL BE VERIFIED WITH MANUFACTURER'S CERTIFIED DRAWINGS. TRANSITIONS TO ALL
EQUIPMENT SHALL BE VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED.
7. VERIFY EXISTING CONDITIONS IN FIELD AND COORDINATE WITH ALL TRADES INCLUDING, BUT NOT LIMITED TO, ARCHITECTURAL, STRUCTURAL, LIGHTING, POWER, SYSTEMS, PLUMBING, FIRE PROTECTION AND OTHER EXISTING AND NEW WORK.
8. INTERRUPTION OF EXISTING SERVICES SHALL BE MINIMAL AND SHALL BE FULLY COORDINATED WITH THE OWNER AND ALL TRADES
IN ADVANCE TO SCHEDULE ALL INTERRUPTIONS DURING NON-CRITICAL TIMES.
9.
S
R
COORDINATION DRAWINGS: CONTRACTOR SHALL SUBMIT WITH SHOP DRAWINGS TO INCLUDE THE
ROOM LAYOUT (ROOF LAYOUT IF ITS ROOF TOP UNITS) AND RELATIONSHIPS BETWEEN COMPONENTS
AND ADJACENT STRUCTURAL AND ELECTRICAL/MECHANICAL/PLUMBING AND / OR FIRE SPRINKLER
ELEMENTS.
SHOW PHYSICAL CLEARANCE IN FRONT AND ON EACH-SIDE OF EQUIPMENT. SUPPORT LOCATIONS, TYPE OF SUPPORT, AND WEIGHT ON EACH SUPPORT. INDICATE AND CERTIFY FIELD MEASUREMENTS.
UNLESS ITS SPECIFIED IN THE CONSTRUCTION DOCUMENTS, THERE WILL BE NO DEVIATION OR
MATERIAL SUBSTITUTE WILL BE ACCEPTED UNTIL IT RECEIVES STAMP SHOP DRAWING FROM
ENGINEER OF RECORD
DIVISION 02 – EXISTING CONDITIONS
GENERAL:
IN GENERAL, FOLLOW THE GUIDELINES BELOW WHEN DEALING WITH EXISTING CONDITIONS. UNLESS
SPECIFICALLY INDICATED OTHERWISE, THESE GUIDELINES ARE NOT INTENDED TO RESTRICT OR REPLACE
PROFESSIONAL JUDGMENT:
1. USE OF HAZARDOUS CHEMICALS IN DEMOLITION IS PROHIBITED.
2. WHERE “DESTRUCTIVE” TYPE INVESTIGATIONS ARE REQUIRED, COORDINATE SCHEDULE, EXTENT OF
“DESTRUCTION” AND REPAIR/PATCHING WORK WITH “OWNER” PRIOR TO COMMENCEMENT OF THESE
INVESTIGATIONS.
3. SGM ENGINEERING PROVIDED INFORMATION IS SCHEMATIC IN NATURE PROVIDING AN APPROXIMATE
EXISTING CONDITION HOWEVER IS NOT GUARANTEED TO BE ACCURATE. THE CONTRACTOR SHALL PERFORM ALL
FIELD REVIEWS AND INVESTIGATION NECESSARY TO PERFORM THEIR SERVICES PRIOR TO COMMENCING WORK.
THE FOLLOWING REVIEWS WILL BE REQUIRED:
A. REVIEW OF CONSTRUCTION DOCUMENTS TITLE – “EXISTING CONDITION”
B. PHYSICAL FIELD VERIFICATION OF EXISTING CONDITIONS. CONTRACTOR SHALL COORDINATE THE
VERIFICATION IN PRESENCE OF OWNER OR DESIGNATED STAFF.
C. REVIEW THE DEMOLITION DRAWINGS AND ALLOW FOR UNFORESEEN CONDITIONS SUCH AS
UNDERGROUND OR ABOVE GROUND UTILITIES AND / OR IN CONCEALED SPACE NOT VISIBLE TO “NAKED
EYES”.
4. SITE EXAMINATION IS REQUIRED BY THE CONTRACTOR PRIOR TO COMMENCEMENT OF ANY WORK.
SUBCONTRACTORS WILL ALSO BE REQUIRED TO FIELD VISIT AND VERIFY EXISTING CONDITIONS PRIOR TO
COMMENCING WORK. ANY UNFORESEEN CONDITIONS MUST BE REPORTED TO OWNER AND ENGINEER PRIOR TO
COMMENCEMENT.
5. AT OWNER’S DISCRETION: CONTRACTORS MAY BE REQUIRED, OR ELECT, TO PHOTOGRAPHICALLY DOCUMENT
EXISTING CONDITIONS OR INVESTIGATIONS. COPIES, IN ELECTRONIC FORMAT AND HARDCOPY, OF ALL
PHOTOGRAPHS BY THE CONTRACTOR SHALL BE PROVIDED TO THE OWNER FOR RECORD PURPOSES.
6. PRIOR TO REMOVAL OF ANY EXISTING MATERIALS / OR DEVICES, COORDINATE WITH THE OWNER AND CLEARLY
DEFINE WHAT ITEMS SHALL BE SALVAGED AND TURNED OVER TO THE OWNER.
SECTION 02 30 00 SUBSURFACE INVESTIGATION
1. THE CONTRACTOR SHALL PROVIDE SITE OR SUBSURFACE INVESTIGATION JUDGED NECESSARY IN ACCORDANCE
WITH THE ENGINEER’S PROJECT WORK SCOPE. SERVICES MAY INCLUDE:
A. CONTRACTOR SHALL ENGAGE “UTILITY LOCATE” SERVICES FOR UNDERGROUND UTILITY LINES, SUCH AS POWER, COMMUNICATION, WATER, SANITARY STORM, CHILLED WATER, GAS AND OTHER RELATED UTILITY LINES.
2. AS-BUILD DRAWINGS- INFORMATION FURNISHED BY THE ENGINEER SHALL BE FOR CONTRACTORS REFERENCE
ONLY, AND THE ENGINEER SHALL IN NO WAY BE HELD RESPONSIBLE FOR ACCURACY OF THE INFORMATION.
HOWEVER: IF THERE IS NO CONFIRMATION FOR AS-BUILD DRAWINGS TO BE ACCURATE OR NOT, THEREFORE: ITS
CONTRACTOR’S RESPONSIBILITY TO ISSUE RFI'S DURING BIDDING SHOULD ANY EXISTING CONDITION DOES NOT
SHOW CLEAR UNDERSTANDING FOR SCOPE OF WORK.
3. PROTECTION OF EXISTING SITE AND BUILDINGS: PROTECT ALL BUILDINGS, DRIVES, UNDERGROUND AND ABOVE
GROUND UTILITY LINES, PARKING AREAS, TREES, WALKS, AND PLANTED AREAS DURING SUBSURFACE AND
UNDERGROUND INVESTIGATIONS. ALL EXISTING SITE ELEMENTS SHALL BE LEFT IN THEIR ORIGINAL CONDITION.
COORDINATE ALL WORK WITH THE “OWNER” PROJECT MANAGER.
4. PREPARATION OF PLANS FOR BORINGS: IN THE PREPARATION OF PLANS FOR BORING LOCATIONS, THE
CONTRACTOR SHALL STUDY PLANS OF EXISTING UNDERGROUND UTILITIES AND SHALL LOCATE BORINGS
TO AVOID THESE UTILITIES. DO NOT BEGIN ANY WORK UNTIL IS CLEARED AND APPROVED BY THE “OWNER”.
SECTION 02 41 16 STRUCTURE DEMOLITION
1. DEMOLITION OF FOUNDATIONS: EXTENT OF FOUNDATION DEMOLITION SHALL BE VERIFIED WITH THE
“OWNER” PRIOR TO WORK. WHERE NEW STRUCTURES WILL REPLACE EXISTING STRUCTURES, THE
ENTIRE FOUNDATION STRUCTURE SHALL BE REMOVED. SEE STRUCTURAL DRAWINGS FOR COORDINATION PRIOR
TO COMMENCEMENT.
SECTION 02 41 19 SELECTIVE STRUCTURE DEMOLITION
1. CONTRACTOR SHALL CLEARLY REVIEW AND UNDERSTAND ON THE CONSTRUCTION DOCUMENTS THE EXTENT OF
SELECTIVE DEMOLITION. PROVIDE COST ALLOWANCE FOR ANY DEMOLITION SHOWS ON THE FLOOR PLANS, ELEVATIONS, OR DETAILS TO CLEARLY IDENTIFY WHAT IS SCHEDULED FOR REMOVAL AND WHAT IS SCHEDULED TO
REMAIN.
2. IDENTIFY ON THE DEMOLITION PLANS OR SCHEDULE AS TO WHAT ITEMS SHALL BE TEMPORARILY REMOVED AND
RE-USED, AND THOSE ITEMS WHICH SHALL BE TURNED OVER TO THE OWNER.
3. IDENTIFY ON THE DEMOLITION PLANS THOSE ITEMS WHICH SHALL BE APPROPRIATELY REMOVED FOR
RECYCLING.
SECTION 02 44 00 EQUIPMENT MOVING
1. RELOCATED EQUIPMENT: SPECIAL CONCERN SHALL BE TAKEN WITH EQUIPMENT RELOCATED FROM
EXISTING INSTALLATIONS FOR REINSTALLATION. CONTRACTOR SHALL ESTABLISH A SCHEDULE FOR
REMOVAL AND REINSTALLATION AND COORDINATE WITH THE OWNER. RELOCATION OF EXISTING EQUIPMENT SHALL
INCLUDE:
A. DISCONNECTING AND MOVING TO NEW LOCATION.
B. RESTORATION AND CAPPING OF UTILITIES AT THE OLD LOCATION.
C. SPECIFY THAT THE CONTRACTOR RECORD EXISTING UTILITY PIPING ARRANGEMENTS TO FACILITATE
INSTALLATION.
D. AS SHOWN ON THE CONSTRUCTION DOCUMENT DRAWINGS, THE CONTRACTOR SHALL BE REQUIRED TO REPLACE
UNSALVAGEABLE PIPING, DUCTWORK, AND WIRING, AND FURNISH ANY NEW PIPING, DUCTWORK, AND WIRING AS
REQUIRED TO COMPLETE REINSTALLATION, WITHOUT ADDITIONAL COST TO THE OWNER.
SECTION 01 33 0 SUBMITTAL PROCEDURES
17. CONTRACTOR RESPONSIBILITIES
E. DO NOT SHIP APPARATUS OR EQUIPMENT FROM STOCK OR FABRICATE UNTIL SHOP DRAWINGS HAVE BEEN
REVIEWED AND APPROVED BY PROJECT CONSULTANT
TESTING OF EXISTING AIR AND WATER SYSTEMS
GENERAL PROCEDURES FOR INITIAL TESTING AND BALANCE READINGS
PERFORM “AS-IS” TESTING OF EXISTING HVAC SYSTEMS AS DEFINED ON THE DRAWINGS, ACCORDING TO THE
PROCEDURES CONTAINED IN AABC'S "NATIONAL STANDARDS FOR TOTAL SYSTEM BALANCE", NEBB'S
"PROCEDURAL STANDARDS FOR TESTING, ADJUSTING, AND BALANCING OF ENVIRONMENTAL SYSTEMS" OR
SMACNA'S "HVAC SYSTEMS - TESTING, ADJUSTING, AND BALANCING" AND IN THIS SECTION.
WORK TO BE PERFORMED BY A FIRM CERTIFIED BY AABC OR NEBB.
IDENTIFY ANY CONDITIONS THAT NEED TO BE CORRECTED IN ORDER TO OBTAIN READINGS OR CONDITIONS
OBSERVED THAT REQUIRE REPAIR WHERE READINGS THAT ARE BEYOND THE TOLERANCES IN THE
SPECIFICATION FOR ORIGINAL DOCUMENTS.
WHERE THE REPAIR CAN BE DONE EASILY AND ALLOW THE WORK TO CONTINUE THE TEST AND BALANCE
CONTRACTOR WILL COORDINATE WITH THE MECHANICAL CONTRACTOR TO PERFORM THE WORK.
ALL IDENTIFIED DEFICIENCIES THAT ARE NOT ADDRESSED WILL BE INCLUDED IN THE FINAL REPORT.
TAKE AND REPORT TESTING AND BALANCING MEASUREMENTS IN UNITS INDICATED IN THE SPECIFICATIONS.
PROCEDURES FOR AIR SYSTEMS:
THIS APPLIES TO AIR HANDLING UNITS, ROOF TOP UNITS, UNIT VENTILATORS, DX SPLIT SYSTEMS, FAN COIL
UNITS AND EXHAUST AND SUPPLY FANS. FOR VARIABLE VOLUME SYSTEMS MEASURE WITH ALL TERMINAL
UNITS AT MAXIMUM AIRFLOW SET POINT (DO NOT CORRECT FOR DIVERSITY).
CHECK
OUTSIDE AIR DAMPER OPERATION OPEN/CLOSE
LOCATION AND CALIBRATION OF DUCT STATIC PRESSURE SENSOR
BALANCE DAMPERS ARE INSTALLED IN BRANCH DUCTS (10% RANDOM SAMPLING)
OUTSIDE AIR FLOW
STATIC PRESSURE
MEASURE
SUPPLY AIR FLOW AT AHU DISCHARGE BY TRAVERSE
OUTSIDE AIR FLOW- DESIGN
OUTSIDE AIR DAMPER LEAKAGE, UNIT ON, DAMPER CLOSED
STATIC PRESSURE AT AHU DISCHARGE
STATIC PRESSURE AT AHU INLET
MEASURE MOTOR VOLTAGE AND AMPERAGE COMPARED TO NAMEPLATE DATA
MEASURE AIR OUTLETS AND INLETS WITHOUT MAKING ADJUSTMENTS.
MEASURE ALL SUPPLY OUTLETS
MEASURE ALL RETURN GRILLES
MEASURE ALL EXHAUST GRILLES
INITIAL CONDITION REPORT:
GENERAL: PREPARE A CERTIFIED WRITTEN REPORT; TABULATE AND DIVIDE THE REPORT INTO SEPARATE
SECTIONS FOR TESTED SYSTEMS AND BALANCED SYSTEMS.
INCLUDE A CERTIFICATION SHEET AT THE FRONT OF THE REPORT'S BINDER, SIGNED AND SEALED BY THE
CERTIFIED TESTING AND BALANCING ENGINEER.
INCLUDE ALL CERTIFIED FIELD-REPORT DATA.
EXISTING DESIGN DATA AS PROVIDED ON DRAWINGS WHEN AVAILABLE.
REPORT DEFICIENCIES DISCOVERED DURING PERFORMANCE OF TAB PROCEDURES.
SEPARATE SCOPE OF WORK TO BE PREPARED.
ADINGS.
O PROVIDE 72 HOURS ADVANCE NOTICE TO
ESS WORK IN PROGRESS.
INSPECTIONS, THE LICENSED DESIGN PROFESSIONAL,
R OR APPROVED AGENCY SHALL PROVIDENCE EVIDENCE
ND COMPETITION IN ACCORDANCE WITH THE PROVISIONS
CTION C408, SPECIFICATIONS SECTION 01818 IN THE
NER'S PROJECT REQUIREMENTS. (2020 FBC-ENERGY
D BY A LICENSED DESIGN PROFESSIONAL, MECHANICAL
ENGINEER, ELECTRICAL ENGINEER OR APPROVED AGENCY AND SHALL INCLUDE THE FOLLOWING
ITEMS;
1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL BE ACCOMPLISHED DURING EACH
PHASE OF COMMISSIONING, INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH ACTIVITIES
2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR SYSTEM TO BE TESTED AND A
DESCRIPTION OF THE TEST TO BE PERFORMED,
3. FUNCTION TO BE TESTED INCLUDING BUT NOT LIMITED TO, CALIBRATIONS AND ECONOMIZER
CONTROL.
4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED . TESTING SHALL AFFIRM WINTER AND
SUMMER DESIGN CONDITIONS AND FULL OUTSIDE AIR CONDITIONS.
5. MEASURABLE CRITERIA FOR PERFORMANCE (2020 FBC-ENERGY CONSERVATION)
A PRELIMINARY REPORT OF COMMISSIONING TEST PROCEDURES AND RESULTS SHALL BE COMPLETED
AND CERTIFIED BY THE LICENSED DESIGN PROFESSIONAL, ELECTRICAL ENGINEER , MECHANICAL
ENGINEER OR APPROVED AGENCY AND PROVIDED TO THE OWNER OR OWNER'S AUTHORIZED AGENT .
THE REPORT SHALL BE ORGANIZED WITH MECHANICAL AND SERVICE HOT WATER FINDINGS IN
SEPARATE SECTIONS TO ALLOW INDEPENDENT REVIEW. THE REPORT SHALL BE IDENTIFIED AS
"PRELIMINARY COMMISSIONING REPORT" AND SHALL IDENTIFY;
1. ITEMIZATION OF DEFICIENCIES FOUND DURING TESTING REQUIRED BY THIS THIS SECTION THAT
HAS NOT BEEN CORRECTED AT THE TIME OF REPORT PREPARATION.
2. DEFERRED TEST THAT CANNOT BE PERFORMED AT THE TIME OF THE REPORT PREPARATION
BECAUSE CLIMATIC CONDITIONS.
3. CLIMATIC CONDITIONS REQUIRED FOR PERFORMANCE OF THE DEFERRED TEST. ACCEPTANCE OF
REPORT BUILDING, OR PORTIONS THEREOF, SHALL NOT BE CONSIDERED ACCEPTABLE FOR A FINAL
INSPECTION PURSUANT O SECTION C104.3 UNTIL THE CODE OFFICIAL HAS RECEIVED A LETTER OF
TRANSMITTAL FROM BUILDING OWNER ACKNOWLEDGING THAT THE BUILDING OWNER OR OWNER'S
AUTHORIZED AGENT HAS RECEIVED THE PRELIMINARY COMMISSIONING REPORT. COPY OF REPORT
THE CODE OFFICIAL SHALL BE PERMITTED TO REQUIRE THAT A COPY OF PRELIMINARY COMMISSIONING
REPORT BE MADE AVAILABLE FOR REVIEW BY THE CODE OFFICIAL. (2023 FBC-ENERGY CONSERVATION, THE CONSTRUCTION DOCUMENTS SHALL SPECIFY THAT THE DOCUMENTS DESCRIBED IN THIS SECTION
BE PROVIDED TO THE BUILDING OWNER OR OWNER'S AUTHORIZED AGENT WITHIN 90 DAYS OF THE
DATE OF RECEIPT OF THE CERTIFICATE OF OCCUPANCY.(2023 FBC-ENERGY CONSERVATION)
A REPORT OF TEST PROCEDURES AND RESULTS IDENTIFIED AS "FINAL COMMISIONING REPORT" SHALL
BE DELIVERED TO THE BUILDING OWNER OR OWNER'S AUTHORIZED AGENT. THE REPORT SHALL BE
ORGANIZED WITH MECHANICAL SYSTEM AND SERVICE HOT WATER SYSTEM FINDING IN SEPARATE
SECTIONS TO ALLOW INDEPENDENT REVIEW . THE REPORT SHALL INCLUDE THE FOLLOWING;
1. RESULTS OF FUNCTIONAL PERFORMANCE TEST
2. DISPOSITION OF DEFICIENCIES FOUND DURING TESTING INCLUDING DETAIL OF CORRECTIVE
MEASURES USED OR PROPOSED
3. FUNCTIONAL PERFORMANCE TEST PROCEDURES USED DURING THE COMMISSIONING PROCESS
INCLUDING MEASURABLE CRITERIA FOR TEST ACCEPTANCE, PROVIDE HEREIN FOR REPEATABILITY.
EXCEPTION: DEFERRED TEST THAT CANNOT BE PERFORMED AT THE TIME OF REPORT PREPARATION
DUE TO CLIMATIC CONDITIONS.(2023 FBC-ENERGY CONSERVATION)
T&B FOR EXISTING SYSTEMS
NOTES
SGM
ENGINEERING
5301 Waterford District Dr Miami, Fl. 33126
Tel: 954-421-1944 Fax: 954-421-1944
CA-00006208
Copyright © 2024 SGM Engineering, Inc.
www.sgmengineering.com
STATE OF
ENEIL
ADIROL
F
No. 78419
R O
FES
OI NA
S
L E N
N
G I
E E
C S
R
P
B O
B A
K S H A H N
A M
I
Issue: 100% CONSTRUCTION DOCUMENTS 2025-10-15
Project Name:
State Project Number: Drawing File Name:
Scale:
Design By:
Drawn By:
Checked By:
Engineer of Record:
License Number:
Sheet Name:
Sheet Number:
Seal:
BOBAK SHAHNAMI
FL 78419
N
A
L A
B A
M A
A V
E N
U E
D E
L A
N D
F L
SGM # 2024-358
/1
/2
:3
:5
A
M C
U s e rs
\r o a n \D o c u m e n ts
\B a s e m e n t H
V A
C M
E
R
R
O A
N G
E
S U
.r v t
2024-358
M002
MECHANICAL SYMBOLS
AND SPECIFICATION
Volusia County Government
- Deland Courthouse - CEP Upgrades
V O
L U
S
IA
C O
U N
T Y
C L
E R
K O
F T
H E
C
IR
C U
IT
C
O U
R T
NO. DESCRIPTION DATE
10. DISCONNECT SWITCHES REQUIRED FOR THE MECHANICAL EQUIPMENT SHALL BE PROVIDED BY DIVISION 26 ELECTRICAL EXCEPT
WHEN INDICATED ON SCHEDULE.
11. ALL EQUIPMENT, PIPING, ETC., SHALL BE SUPPORTED AS DETAILED AND/OR SPECIFIED. PROVIDE ADDITIONAL SUPPORTS AS
REQUIRED TO PROVIDE A VIBRATION-FREE, RIGID INSTALLATION. SUPPORT ALL OBJECTS FROM STRUCTURE WITHOUT
PENETRATING THE CEILING.
12. SLEEVE AND SEAL ALL PIPING PENETRATIONS THROUGH BUILDING PARTITIONS. PROVIDE MANUAL AIR VENTS AT ALL HIGH POINT
IN CHILLED WATER PIPING.
13. REFER TO TYPICAL DETAILS FOR PIPING AND INSTALLATION OF EQUIPMENT.
14. CONDENSATE DRAINS FROM ALL MECHANICAL EQUIPMENT SHALL BE COORDINATED FOR PROPER DRAINAGE TO SUIT EQUIPMEN
FURNISHED. FOLLOW MANUFACTURER'S RECOMMENDATIONS.
15. ALL CONDENSATE DRAIN LINES SHALL BE INSULATED AND INSTALLED WITH A 'P' TRAP AT THE UNIT WITH A MINIMUM DEPTH OF 2"
OR PER MANUFACTURER'S INSTRUCTIONS, WHICHEVER IS GREATER.
16. UNLESS OTHERWISE NOTED, ALL EQUIPMENT AND VALVE DRAINS SHALL BE INDEPENDENTLY PIPED FULL SIZE TO THE NEAREST
PLUMBING DRAIN OR DRY WELL.
17. BEFORE FABRICATION, VERIFY AND COORDINATE ALL DIMENSIONS IN FIELD. DUCT SIZES AND ALL OPENINGS THROUGH BUILDING
CONSTRUCTION SHALL SUIT EQUIPMENT FURNISHED.
18. ALL WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN DUCTS AND PIPING (INCLUDING DIVIDING DUCTS)
AND TRANSITIONS AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST.
19. ALL DUCTWORK AND PIPING IS SHOWN SCHEMATICALLY. PROVIDE ALL TRANSITIONS, ELBOWS, FITTINGS, ETC., TO ALLOW SMOOT
FLOWS. ALL SPLIT DUCT FITTINGS SHALL TRANSITION TO FULL SIZE OF THE SUM OF BOTH BRANCHES UPSTREAM OF SPLIT.
20. ACCESS PANELS IN DUCTWORK AND CEILINGS SHALL BE PROVIDED WHERE REQUIRED FOR OPERATION, BALANCING AND
MAINTENANCE OF ALL MECHANICAL EQUIPMENT.
21. MAINTAIN CLEARANCE OF A MINIMUM OF 6" BETWEEN DUCTWORK, PIPING, EQUIPMENT, ETC., AND ALL FIRE RATED AND
FIRE/SMOKE RATED PARTITIONS TO ALLOW FOR INSPECTIONS OF RATED WALLS.
22. ALL CONTROL WIRING AND HARDWARE TO COMPLETE THE HVAC CONTROL SYSTEM SHALL BE FURNISHED AND INSTALLED UNDER
DIVISION 23 MECHANICAL OF THESE CONTRACT DOCUMENTS UNLESS INDICATED OTHERWISE ON DRAWINGS.
23. WATER PRESSURE DROPS THROUGH COIL CONTROL VALVES SHALL NOT EXCEED 5 PSI.
24. ALL HVAC EQUIPMENT LOCATIONS AND WEIGHTS SHALL BE COORDINATED AND APPROVED BY THE CONTRACTOR AND OWNER
PRIOR TO PURCHASE AND INSTALLATION.
25. PROVIDE ALL MANUFACTURER INSTALLATION AND MAINTENANCE MANUALS FOR EQUIPMENT INSTALLED FOR ENGINEER REVIEW
BEFORE RELEASE TO THE OWNER.
26. PROVIDE ALL MANUFACTURER INSTALLATION AND MAINTENANCE FOR EQUIPMENT INSTALLED FOR ENGINEER REVIEW BEFORE
RELEASE TO THE OWNER.
CONTRACTOR SHALL FIELD VERIFY ALL EXISTING MATERIALS, EQUIPMENT, APPLIANCES AND DEVICES THAT ARE TO BE REUSED
SHALL BE RECONDITIONED, TESTED AND PLACED IN GOOD AND PROPER WORKING CONDITION AND APPROVED. ANY
DISCREPANCIES MUST BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO BID.
BASEMENT HVAC
SCP-1(E)
PCP-2(E)
PCP-1(E)
SCP-2(E)
SCP-1(E)
TP-2(E)
TP-1(E)
CH-2(E)
CH-1(E)
MD201
SGM
ENGINEERING
5301 Waterford District Dr Miami, Fl. 33126
Tel: 954-421-1944 Fax: 954-421-1944
CA-00006208
Copyright © 2024 SGM Engineering, Inc.
www.sgmengineering.com
STATE OF
ENEIL
ADIROL
F
No. 78419
R O
FES
OI NA
S
L E N
N
G I
E E
C S
R
P
B O
B A
K S H A H N
A M
I
Issue: 100% CONSTRUCTION DOCUMENTS 2025-10-15
Project Name:
State Project Number: Drawing File Name:
Scale:
Design By:
Drawn By:
Checked By:
Engineer of Record:
License Number:
Sheet Name:
Sheet Number:
Seal:
BOBAK SHAHNAMI
FL 78419
N
A
L A
B A
M A
A V
E N
U E
D E
L A
N D
F L
SGM # 2024-358
/1
/2
:3
:0
A
M
As indicated
C U s e rs
\r o a n \D o c u m e n ts
\B a s e m e n t H
V A
C M
E
R
R
O A
N G
E
S U
.r v t
2024-358
MD201
MECHANICAL DEMO
FLOOR PLAN
Volusia County Government
- Deland Courthouse - CEP Upgrades
V O
L U
S
IA
C O
U N
T Y
C L
E R
K O
F T
H E
C
IR
C U
IT
C
O U
R T
1/4" = 1'-0"MD201
1 MECHANICAL DEMO FLOOR PLAN
A. REFER TO SHEET M001 FOR MECHANICAL GENERAL NOTES
AND SYMBOLS LEGEND.
B. REFER TO PROJECT SPECIFICATIONS.
C. COORDINATE WORK SCHEDULE WITH PROJECT MANAGER.
DISRUPTION OF COOLING TO THE ADJACENT SPACES OR CAMPUS
IS NOT ALLOWED.
D. CONTRACTOR SHALL FIELD VERIFY EXISTING EQUIPMENT
PRIOR TO DEMO. EXISTING DRAWINGS ARE FOR INFORMATION
ONLY AND MAY NOT DEPICT EXISTING CONDITIONS.
E.
1. DEMOLISH EXISTING WATER COOLED CHLLER AND
ASSOCIATED COMPONETS.
2. DEMOLISH EXISTING PRIMARY CHILLED WATER PUMP AND
ASSOCIATED COMPONETS.
3. DEMOLISH EXISTING SECONDARY CHILLED WATER PUMP AND
ASSOCIATED COMPONETS.
4. DEMOLISH EXISTING PIPING UP TO POINT OF DISCONNECTION.
5. EXISTING PUMPS AND ASSSOCIATED COMPONENTS TO
REMAIN AS INSTALLED.
6. DEMOLISH REFRIGERANT VENT UP TO POINT OF DISCONNECTION.
7. DEMOLISH EXISTING WALL, OPENING SIZE SHALL BE FIELD COORDINATED
TO REMOVAL OF EXISTING CHILLERS AND INSTALLATION OF NEW CHILLERS,
REFER TO STRUCTURAL DETAIL FOR FURTHER REFERENCE. AFTER THE
INSTALLATION OF THE NEW CHILLERS, THE WALL SHALL BE PATCH, SEALED
AND PAINTED TO MATCH EXISTING CONDITIONS
PLAN KEY NOTES: #
GENERAL NOTES:
3/8" = 1'-0"MD201
2 DEMOLISH WALL SECTION VIEW
NO. DESCRIPTION DATE
CONTRACTOR TO PROVIDE NEW INSULATION TO NEW F.
PIPING AND TO ALL EXISTING PIPING DISTURBED DURING
DEMOLITION PHASE
10"CWS
10"CWS
10"CWR
10"CWR
10"CHWR
10"CHWS
14"CHWS
10"CHWR
10"CHWR
PCHWP-1-2
PCHWP-1-1
SCHWP-1-2
SCHWP-1-1
CH-1-1
CH-1-2
TP-2(E)
TP-1(E)
10"CHWR
SGM
ENGINEERING
5301 Waterford District Dr Miami, Fl. 33126
Tel: 954-421-1944 Fax: 954-421-1944
CA-00006208
Copyright © 2024 SGM Engineering, Inc.
www.sgmengineering.com
STATE OF
ENEIL
ADIROL
F
No. 78419
R O
FES
OI NA
S
L E N
N
G I
E E
C S
R
P
B O
B A
K S H A H N
A M
I
Issue: 100% CONSTRUCTION DOCUMENTS 2025-10-15
Project Name:
State Project Number: Drawing File Name:
Scale:
Design By:
Drawn By:
Checked By:
Engineer of Record:
License Number:
Sheet Name:
Sheet Number:
Seal:
BOBAK SHAHNAMI
FL 78419
N
A
L A
B A
M A
A V
E N
U E
D E
L A
N D
F L
SGM # 2024-358
/1
/2
:3
:0
A
M
1/4" = 1'-0"
C U s e rs
\r o a n \D o c u m e n ts
\B a s e m e n t H
V A
C M
E
R
R
O A
N G
E
S U
.r v t
2024-358
M201
MECHANICAL FLOOR
PLAN
Volusia County Government
- Deland Courthouse - CEP Upgrades
V O
L U
S
IA
C O
U N
T Y
C L
E R
K O
F T
H E
C
IR
C U
IT
C
O U
R T
1/4" = 1'-0"M201
1 MECHANICAL FLOOR PLAN
A.REFER TO SHEET M001 FOR MECHANICAL
GENERAL NOTES AND SYMBOLS LEGEND.
B. REFER TO PROJECT SPECIFICATIONS FOR
EQUIPMENT AND INSTALLATION REQUIREMENTS.
IF THERE IS ANY DISCREPANCY BETWEEN
SPECIFICATIONS AND DRAWINGS, THE MOST
STRINGENT REQUIREMENT SHALL APPLY.
C. COORDINATE WORK SCHEDULE WITH
PROJECT MANAGER. DISRUPTION OF COOLING TO
THE ADJACENT SPACES IS NOT ALLOWED.
D. DRAWINGS ARE DIAGRAMMATIC AND
REPRESENT THE GENERAL LAYOUT OF
MECHANICAL COMPONENTS, FOR EXACT BUILDING
DIMENSIONS SEE ARCHITECTURAL AND
STRUCTURAL DRAWINGS.
E. LOCATE EQUIPMENT SO THAT
MANUFACTURER SERVICE CLEARANCES ARE
MAINTAINED.
F. COORDINATE WITH ELECTRICAL
CONTRACTOR LOCATION OF DISCONNECTS. DO
NOT BLOCK SERVICE CLEARANCE TO EQUIPMENT.
G. CONTRACTOR TO PROVIDE NEW INSULATION
TO ALL NEW PIPING AND TO EXISTING PIPING
DISRUPTED DURING DEMOLITION PHASE
1. PROVIDE NEW WATER COOLED CHILLER, REFER
TO MECHANICAL SCHEDULES AND DETAILS
FOR FURTHER REFERENCES. REFRIGERANT ALARM
SHALL BE NEW AND TIED TO EXISTING EXHAUST FAN.
2. PROVIDE NEW PRIMARY CHILLED WATER PUMP. AND ASSOCIATED COMPONETS
INCLUDING BUT NOT LIMITED TO VFD AND INERTIA PAD. REFER TO MECHANICAL
SCHEDULE AND DETAL FOR FURTHER REFERENCES
3. PROVIDE NEW SECONDARY CHILLED WATER PUMP. AND ASSOCIATED COMPONETS
INCLUDING BUT NOT LIMITED TO VFD AND INERTIA PAD. REFER TO MECHANICAL
SCHEDULE AND DETAL FOR FURTHER REFERENCES
4. PROVIDE NEW CHW PIPING UP TO POINT OF CONNECTION.
5. PROVIDE NEW CONDENSATE WATER PIPING UP TO POINT OF CONNECTION.
6. PROVIDE NEW REFRIGERANT VENT LINE TIE IT TO EXISTING REFRIGERANT
VENT LINE. IT SHALL BE SIZED PER MANUFACTURER RECOMMENDATIONS. .
7. EXTEND EXISTING CONCRETE PAD 6" BEYOND THE PERIMETER OF THE NEW EQUIPMENT.
REFER TO MECHANICAL DETAIL FOR FURTHER REFERENCES
8. PROVIDE 10" FLANGED TEMPORARY CONNECTION WITH ISLOTAION VALVE.
9. PROVIDE NEW 30"X30" SECURED WEATHER PROOF ACCESS PANEL, 3'AFF.
PLAN KEY NOTES
GENERAL NOTES
1 7
1 7
SGM
ENGINEERING
5301 Waterford District Dr Miami, Fl. 33126
Tel: 954-421-1944 Fax: 954-421-1944
CA-00006208
Copyright © 2024 SGM Engineering, Inc.
www.sgmengineering.com
STATE OF
ENEIL
ADIROL
F
No. 78419
R O
FES
OI NA
S
L E N
N
G I
E E
C S
R
P
B O
B A
K S H A H N
A M
I
Issue: 100% CONSTRUCTION DOCUMENTS 2025-10-15
Project Name:
State Project Number: Drawing File Name:
Scale:
Design By:
Drawn By:
Checked By:
Engineer of Record:
License Number:
Sheet Name:
Sheet Number:
Seal:
BOBAK SHAHNAMI
FL 78419
N
A
L A
B A
M A
A V
E N
U E
D E
L A
N D
F L
SGM # 2024-358
/1
/2
:3
:0
A
M C
U s e rs
\r o a n \D o c u m e n ts
\B a s e m e n t H
V A
C M
E
R
R
O A
N G
E
S U
.r v t
2024-358
M401
MECHANICAL ENLARGED
PLANS
Volusia County Government
- Deland Courthouse - CEP Upgrades
V O
L U
S
IA
C O
U N
T Y
C L
E R
K O
F T
H E
C
IR
C U
IT
C
O U
R T
NO. DESCRIPTION DATE
M401
4 CEP EQUPMENT AND PIPING
M401
1 CEP ISOMETRIC VIEW 1
M401
CEP MAIN HVAC AND ELECTRICAL
EQUIPMENT
M401
2 CEP ISOMETRIC VIEW 2
CWR
AI TEMPERATURE
CHWS
CHWR
FM
FLOW METER
(BY-PASS)
T
T
PCHWP-1 (NEW)
DP
PCHWP-2 (NEW)
DP
SCHWP-1 (NEW)
VFD
BACNET INTERFACE STATUS FROM VFD
T
(BTU METER)
FM
DP
CT
CT
(MAGNETIC ONICON, BI-DIRECTIONAL)
CT-2 (EXISTING)
M
M
CT-1 (EXISTING)
VFD
T
AI TEMPERATURE
M
M
CWP-2 (TP EXISTING)
CT
CONDENSER
EVAPORATOR
CH-2 (NEW)
BACNET INTERFACE
ES
CV
ES
CV
CONDENSER
EVAPORATOR
CH-1 (NEW)
BACNET INTERFACE
ES
CV
ES
CV
SCHWP-2 (NEW)
VFD
CV
CV
CV
CWP-1 (TP EXISTING)
CT
CV
T
AI TEMPERATURE
T
CWR
AI TEMPERATURE
POWER
VFD
VFD
WATER COOLED CHILLER (PRIMARY-SECONDARY) WATER
SYSTEM CONTROL DIAGRAM
NTS
G R
A P
H
IC
INPUT
T E
M P
E R
A T
U R
E
P R
E S
S U
R E
D
IF
F P
R E
S S
U R
E
K W
G P
M
C F
M
P P
M
P E
R C
E N
T
P E
R C
E N
T R
LA
S E
T P
O
IN
T A
D J.
P N
E U
. T R
A N
S D
U C
E R
S T
A T
U S
O N
O
F F
F
IL
T E
R S
T A
T U
S
S T
A T
U S
O P
E N
C
LS
D
S T
A T
U S
O F
F
O N
O P
E N
C
LO
S
E D
M A
X C
A P
A C
IT
Y
E N
A B
LE
D
IS
A B
LE
LI
M
IT
W
A R
N
IN
G
H
IG
H A
N A
LO
G
LO
W
A N
A
LO
G
B
IN
A R
Y
IN
T
E R
P R
O C
E S
S F
A
IL
S E
N S
O R
F A
IL
F
LO
W F
A
IL
C O
M M
. F A
IL
D
IA
G N
O S
T
IC
S
F
LO
W O
V E
R R
ID
E
T
IM
E S
C H
E D
U
LI
N G
O P
T . S
T A
R T
S
T O
P
D E
M A
N D
L
IM
IT
IN
G
R E
S E
T
E V
E N
T P
R O
G R
A M
D D
C
A
LA
R M
IN
S
T R
U C
T
M A
IN
T
. W K
. O R
D E
R
R U
N T
IM
E
E X
P . M
E S
S A
G E
S E
T B
A C
K
S E
T U
P
T E
N A
N T
B
IL
LI
N
G
C H
IL
LE
R S
E Q
U E
N C
IN
G
T O
T A
LI
Z
IN
G
T
IM
E D
O V
E R
R
ID
E
D D
C
OUTPUT OUTPUTINPUT ALARMS PROGRAMS
ANALOG
CHILLER UNIT CONTROL PANEL
CHILLED WATER PUMP
LEAVING CHILLED WATER
ENTERING CHILLED WATER
LEAVING CONDENSER WATER
ENTERING CONDENSER WATER
CURRENT LIMIT
CONDENSER WATER PUMP
COOLING TOWER ENABLE
SYSTEM CHILLED WATER SUPPLY
UNIT % RUN LOAD AMPS
SYSTEM CHILLED WATER RETURN
LEAVING CHILLED WATER
ENTERING CHILLED WATER
LEAVING CONDENSER WATER
ENTERING CONDENSER WATER
ADJUSTABLE FREQ. DRIVE
BASE LOAD
SOFT LOADING
OUTDOOR AIR
BEARING
OIL
EVAPORATOR APPROACH
CONDENSER APPROACH
EVAPORATOR REFRIGERANT
CONDENSER REFRIGERANT
CHILLER PERFORMANCE
MOTOR
PHASE REVERSAL
PHASE IMBALANCE
STARTER
PHASE LOSS
CENTRIFUGAL
CHILLER
CCPTS1
SYSTEM POINT
DESCRIPTION BINARY SYSTEM FEATURES
SYSTEM POINT LIST
EVAPORATOR REFRIGERANT
CONDENSER REFRIGERANT
SOLID STATE STARTER
DISTRIBUTION FAULT
GENERAL NOTES: 1. ONLY ONE SYSTEM TEMPERATURE INPUT PER CHILLER.
2. ONLY ONE SYSTEM WATER PRESSURE WHEN THE PRESSURE IS LESS THAN OR EQUAL TO 150 PSI; OTHERWISE
WHEN THE PRESSURE IS GREATER THAT 150 PSI, PROVIDED DELTA P ONLY.
X X X X X X X X
XXXX
X X X X X
XXXX
X X X X
XXXX
X X
X X X X X
X
X X XX
X X
XXXX
X
X
X
X
X X
XXX
X X X
X X
XX X
XXX X X X
X
X
X
X
XXX
X X X X X X X X X
X
X
X
X
X
X
X
X
XX
X X
XXX
X
X
X X
NOTES
OPTIONAL
ALL 3 PHASE
3. OPTIONAL HEAT SINK TEMPERATURE
CHWS
CHWR
DP
AS-1 (EXISTING)
(CONTRACTOR TO REMOVE EXISTING
STARTER AND PROVIDE NEW VFD)
PROVIDE A SYSTEM DIFFERENTIAL
PRESSURE SENSOR AT APPROXIMATELY
3 OF FARTHEST POINT IN THE
CHIILLED WATER PIPING SYSTEM.
ALARM
POWER
VFD
ALARM
SGM
ENGINEERING
5301 Waterford District Dr Miami, Fl. 33126
Tel: 954-421-1944 Fax: 954-421-1944
CA-00006208
Copyright © 2024 SGM Engineering, Inc.
www.sgmengineering.com
STATE OF
ENEIL
ADIROL
F
No. 78419
R O
FES
OI NA
S
L E N
N
G I
E E
C S
R
P
B O
B A
K S H A H N
A M
I
Issue: 100% CONSTRUCTION DOCUMENTS 2025-10-15
Project Name:
State Project Number: Drawing File Name:
Scale:
Design By:
Drawn By:
Checked By:
Engineer of Record:
License Number:
Sheet Name:
Sheet Number:
Seal:
BOBAK SHAHNAMI
FL 78419
N
A
L A
B A
M A
A V
E N
U E
D E
L A
N D
F L
SGM # 2024-358
/1
/2
:3
:0
A
M C
U s e rs
\r o a n \D o c u m e n ts
\B a s e m e n t H
V A
C M
E
R
R
O A
N G
E
S U
.r v t
2024-358
M601
MECHANICAL CONTROL
DRAWINGS
Volusia County Government
- Deland Courthouse - CEP Upgrades
V O
L U
S
IA
C O
U N
T Y
C L
E R
K O
F T
H E
C
IR
C U
IT
C
O U
R
C
C
C
C
C
C
VFD
VFD
VFD
VFD
VFD
VFD
PCHWP-1-2
PCHWP-1-1
SCHWP-1-2
SCHWP-1-1
CH-1-2
CH-1-1
CHILLER 2(E)CHILLER 1(E)
CHILLER 1
CHILLER 2
SGM
ENGINEERING
5301 Waterford District Dr Miami, Fl. 33126
Tel: 954-421-1944 Fax: 954-421-1944
CA-00006208
Copyright © 2024 SGM Engineering, Inc.
www.sgmengineering.com
STATE OF
ENEIL
ADIROL
F
No. 70700
R O
FES
OI NA
S
L E N
N
G I
E E
C S
R
P
J U
S T
I N
L OWE MUNDE
L L
Issue: 100% CONSTRUCTION DOCUMENTS 2025-10-15
Project Name:
State Project Number: Drawing File Name:
Scale:
Design By:
Drawn By:
Checked By:
Engineer of Record:
License Number:
Sheet Name:
Sheet Number:
Seal:
JUSTIN LOWE MUNDELL
FL 70700
N
A
L A
B A
M A
A V
E N
U E
D E
L A
N D
F L
SGM # 2024-358
/1
/2
:3
:5
A
M
1/4" = 1'-0"
C U s e rs
\r o a n \D o c u m e n ts
\B a s e m e n t H
V A
C M
E
R
R
O A
N G
E
S U
.r v t
2024-358
E301
ELECTRICAL FLOOR
PLAN
Volusia County Government
- Deland Courthouse - CEP Upgrades
V O
L U
S
IA
C O
U N
T Y
C L
E R
K O
F T
H E
C
IR
C U
IT
C
O U
R T
a. REFER TO SHEET E001 FOR ELECTRICAL GENERAL
NOTES AND SYMBOLS LEGEND.
b. ALL ITEMS SHOWN IN 'LIGHT' COLOR INDICATE
EXISTING TO REMAIN.
c. ALL ITEMS SHOWN IN 'DARK' COLOR INDICATE
NEWLY ADDED OR MODIFIED DEVICES.
1. PROVIDE POWER TO NEW PUMP AND ALL
ASSOCIATED DEVICES. EXTEND EXISTING FEEDER
(CONDUIT AND WIRE) AS REQUIRED TO THE NEW
EQUIPMENT. PROVIDE ANY NECESSARY POWER FOR
HIGH VOLTAGE CABLING.
2. PROVIDE POWER TO NEW CHILLER AND ALL
ASSOCIATED DEVICES. EXTEND EXISTING FEEDER
(CONDUIT AND WIRE) AS REQUIRED TO THE NEW
EQUIPMENT. PROVIDE ANY NECESSARY POWER FOR
HIGH VOLTAGE CABLING.
PLAN KEY NOTES
GENERAL NOTES
1/4" = 1'-0"E301
1 ELECTRICAL FLOOR PLAN
CHILLED WATER SYSTEM SEQUENCE OF OPERATION
WATER COOLED CHILLER(S) SYSTEM CONTROL
A. GENERAL: THE STANDALONE MICROPROCESSOR BASED CHILLER CONTROL PANEL
SHALL MONITOR AND CONTROL THE CHILLER(S) IN A STANDALONE MODE OR AS
DIRECTED BY THE CHILLER SEQUENCING SOFTWARE.
B. THE CHILLER PLANT CONTROL PROGRAM SHALL BE FULLY EDITABLE AND SET-UP
VIA POINT AND CLICK ON A STANDARD WINDOWS SCREEN. IT SHALL NOT REQUIRE
SPECIAL SOFTWARE TOOLS OR A BAS TECHNICIAN TO OPERATE AND MODIFY CHILLER
SEQUENCING CONTROL.
C. THE CHILLER SEQUENCING SOFTWARE SHALL PERFORM THE FOLLOWING CONTROL
STRATEGIES:
1. CHILLER PLANT SYSTEM SCHEDULING
2. CHILLER SEQUENCING
3. CHILLER PLANT DEMAND LIMITING
4. COLOR GRAPHIC BASED CHILLER PLANT STATUS SCREENS
5. COLOR GRAPHIC BASED CHILLER STATUS SCREENS
6. SYSTEM AND CHILLER DIAGNOSTIC MESSAGES
7. SYSTEM AND CHILLER REPORTS
8. COOLING TOWER SEQUENCING AND CONTROL
9. COOLING TOWER / CHILLER ENTERING WATER TEMPERATURE SETPOINT OPTIMIZATION.
10. PUMPS SEQUENCING
D. SYSTEM SCHEDULING: THE CHILLER SEQUENCING SOFTWARE WILL START THE
CHILLER SYSTEM BASED UPON AN GRAPHICAL CALENDAR TIME OF DAY SCHEDULING
APPLICATION WITH THE OPTION TO USE OUTSIDE AMBIENT TEMPERATURE LOCKOUT.
1. THE CHILLER PLANT SHALL START IN RESPONSE TO THE OPTIMUM START, NIGHT
SETBACK OR TIMED OVERRIDE OPERATION OF ANY SYSTEM AIR HANDLER.
2. UPON THE START OF THE CHILLER SYSTEM THE CHILLER PLANT CONTROL SYSTEM
SHALL AUTOMATICALLY START TREND LOG REPORTS TO INCLUDE:
a. HOURLY LOGGING OF SYSTEM SHALL INCLUDE THE FOLLOWING POINTS:
OUTDOOR AIR TEMPERATURE
SYSTEM CHILLED WATER SETPOINT
SYSTEM CHILLED WATER SUPPLY TEMPERATURE
SYSTEM CHILLED WATER RETURN TEMPERATURE
SYSTEM CONDENSER WATER SUPPLY TEMPERATURE
SYSTEM CONDENSER WATER RETURN TEMPERATURE
OPERATING STATUS OF EACH CHILLER
OPERATING STATUS OF SYSTEM PUMPS
E. CHILLER SEQUENCING - THE CHILLER SEQUENCING SOFTWARE WILL START AND STOP
SYSTEM WATER PUMPS AND CHILLERS BASED UPON SYSTEM LOAD.
1. WHEN THE CHILLED WATER SYSTEM IS ENABLED THE CHILLER SYSTEM CONTROL
WILL:
A. START THE SYSTEM (SECONDARY) CHILLED WATER PUMP. PUMP SHALL OPERATE TO
MAINTAIN DIFFERENTIAL PRESSURE AT THE
3 POINT SYSTEM DIFFERENTIAL PRESSURE
SENSOR.
B. START THE LEAD CHILLER CHILLED WATER PUMP AND PROVE FLOW THROUGH THE
EVAPORATOR.
C. ALLOW THE CHILLER TO START THE CONDENSER WATER PUMP.
D. START THE LEAD CHILLER AFTER BOTH CHILLED WATER AND CONDENSER WATER
PUMP FLOW ARE PROVEN.
2. UPON THE START OF EACH CHILLER THE CHILLER PLANT CONTROL SYSTEM SHALL
AUTOMATICALLY START CHILLER SPECIFIC TREND LOG REPORTS TO INCLUDE:
a. HOURLY LOGGING OF CHILLER
UNIT CHILLED WATER SETPOINT
COMPRESSOR(S) RLA
EVAPORATOR ENTERING WATER TEMP.
EVAPORATOR LEAVING WATER TEMP.
CONDENSER ENTERING WATER TEMP.
CONDENSER LEAVING WATER TEMP.
CONDENSER REFRIGERANT/WATER APPROACH TEMP
b. FIVE-MINUTE LOGGING OF CHILLER:
UNIT CHILLED WATER SETPOINT
COMPRESSOR(S) RLA
EVAPORATOR ENTERING WATER TEMP.
EVAPORATOR LEAVING WATER TEMP.
CONDENSER ENTERING WATER TEMP.
CONDENSER LEAVING WATER TEMP.
F. SEQUENCING FOR SYSTEMS WITH DECOUPLED PUMPING
(PRIMARY-SECONDARY) AND CHILLERS IN PARALLEL
1. THE CHILLER SEQUENCING SOFTWARE SHALL CONSIDER STARTING ANOTHER CHILLER
WHENEVER THERE IS DEFICIT FLOW IN THE PRIMARY-SECONDARY DECOUPLER (BYPASS)
PIPE AS INDICATED BY THE SUPPLY WATER TEMPERATURE.
2. WHEN DEFICIT FLOW EXISTS CONTINUOUSLY FOR AN
OPERATOR-SPECIFIED LENGTH OF TIME, THE CHILLER SEQUENCING
SOFTWARE SHALL INITIATE THE START OF THE NEXT CHILLER IN THE
SEQUENCE.
A. LAG CHILLERS SHALL START IN A SIMILAR MANNER TO THE LEAD
CHILLER START SEQUENCE.
B. THE CHILLER SEQUENCING SOFTWARE WILL UNLOAD OPERATING
CHILLERS TO AN OPERATOR EDITABLE CURRENT LIMIT PRIOR TO
STARTING A LAG CHILLER.
C. THE BAS SHALL CONTROL EACH CHILLERS' SETPOINT TO EQUALIZE
THE CHILLER UNLOADING AND MEET SYSTEM DEMANDS AS THE SYSTEM
LOAD VARIES.
3. THE CHILLER SEQUENCING SOFTWARE SHALL CONSIDER STOPPING
ANOTHER CHILLER WHENEVER THE "SUBTRACT CHILLED WATER ERROR"
EXCEEDS AN OPERATOR SPECIFIED LIMIT. THE "SUBTRACT CHILLED WATER
ERROR" SHALL BE A CALCULATION TAKING INTO ACCOUNT SYSTEM WATER
DELTA T, CAPACITY OF SYSTEM FOLLOWING SHUTDOWN OF NEXT CHILLER
AND SYSTEM STABILITY. THE CALCULATION SHALL ACCOUNT FOR THE
SYSTEM DESIGN AS VARIABLE OR CONSTANT FLOW.
A. WHEN THE "CHILLED WATER ERROR" VALUE EXCEEDS THE SPECIFIED
CHILLER SUBTRACT LIMIT CONTINUOUSLY FOR AN OPERATOR SPECIFIED
LENGTH OF TIME THE CHILLER SEQUENCING SOFTWARE SHALL INITIATE
THE SHUTDOWN OF THE NEXT CHILLER IN THE SEQUENCE.
4. THE CHILLER SEQUENCING SOFTWARE WILL NOT SHUTDOWN THE
CHILLER PUMP UNTIL IT HAS CONFIRMED THAT THE CHILLER
COMPRESSOR HAS SHUTDOWN.
5. THE CHILLER SEQUENCING SOFTWARE SHALL CONTROL INDIVIDUAL
CHILLER SETPOINTS TO THE SYSTEM SUPPLY WATER TEMPERATURE
SETPOINT.
6. THE SYSTEM SETPOINT SHALL BE 42 DEGREES F AND EDITABLE BY
THE OPERATOR. CHILLED WATER RESET SHALL NOT BE USED BECAUSE
OF ITS AFFECT ON SECONDARY CHILLED WATER PUMPING POWER.
7. PRIOR TO THE START OF ANOTHER CHILLER ALL OPERATING
CHILLERS SHALL BE UNLOADED. THIS IS DONE TO PREVENT FLOW
DISTURBANCES CAUSED BY THE STARTING OF ANOTHER PUMP FROM
AFFECTING CHILLER OPERATION. FOLLOWING CONFIRMATION OF THE
ADDITIONAL CHILLER OPERATION ALL CHILLERS SHALL BE ALLOWED TO
RELOAD.
8. THE CHILLER SEQUENCING SOFTWARE SHALL OPTIMIZE OPERATION OF
A SYSTEM WITH A LOWER EFFICIENCY OR BACKUP CHILLER BY PEAK
LOADING THAT CHILLER.
A. IT SHALL BE OPERATED IN A LAST ON FIRST OFF SEQUENCE WHILE
CONTINUING TO AUTOMATICALLY ROTATE THE SEQUENCE OF OTHER
CHILLERS.
B. THE OPERATOR SHALL BE ABLE TO CHANGE THE PEAKING CHILLER
OPERATION FROM PEAK TO STANDARD SEQUENCE WITH A POINT AND
CLICK DIALOG BOX ON A STANDARD WINDOWS SCREEN. IT SHALL NOT
REQUIRE SPECIAL SOFTWARE TOOLS OR A BAS TECHNICIAN TO MODIFY
CHILLER SEQUENCING CONTROL.
9. UPON SENSING A CHILLER FAILURE THE CHILLER SEQUENCING
SOFTWARE SHALL LOCKOUT THAT CHILLER AND PUMP AND IMMEDIATELY
INITIATE THE START OF THE NEXT CHILLER IN THE ROTATION SEQUENCE.
10. AUTOMATIC ROTATION OF CHILLER OPERATION WILL EQUALIZE
CHILLER RUN TIME.
A. ROTATION SHALL BE INITIATED BASED ON AN OPERATOR ENTERED
DAY INTERVAL OR BY THE CYCLING OF A BINARY POINT.
B. THE METHOD OF SEQUENCE SHALL BE OPERATOR SELECTABLE.
CHILLERS MAYBE FORCED INTO A NEW ROTATION SEQUENCE BY CYCLING
CHILLERS AT THE TIME OF INITIATION. ALTERNATIVELY CHILLER CYCLING
CAUSED BY NORMAL SYSTEM LOAD FLUCTUATIONS SHALL CAUSE THE
CHILLERS TO CHANGE ROTATION SEQUENCE THEREFORE ELIMINATING
UNNECESSARILY CHILLER CYCLING.
11. CHILLER SOFT START - THE CHILLER SEQUENCING SOFTWARE WILL
PROVIDE A USER ADJUSTABLE LOADING TIME AT SYSTEM START-UP.
THIS PREVENTS THE UNNECESSARY OPERATION OF CHILLERS AND
LIMITS SYSTEM ELECTRICAL DEMAND DURING CHILLED WATER LOOP
PULL-DOWN.
12. CHILLER SYSTEM OPERATOR INTERFACE - THE CHILLER CONTROL
PROGRAM SHALL INCLUDE THE FOLLOWING OPERATOR INTERFACE
ELEMENTS
A. CHILLER PLANT CONTROL APPLICATION OPERATIONAL STATUS SCREEN
TO INCLUDE:
1. CHILLER SYSTEM STATUS (OFF/SOFT START/NORMAL/AMBIENT
LOCKOUT/SHUTDOWN IN PROGRESS)
2. CHILLER PLANT SUPPLY WATER SETPOINT
3. CHILLED WATER SYSTEM SUPPLY WATER TEMPERATURE
4. CHILLED WATER SYSTEM RETURN WATER TEMPERATURE
5. PREDICTION CHILLER ADDITION/SUBTRACTION STATUS MESSAGES
(I.E NEXT CHILLER TO ADD WILL BE ADDED IF THE SYSTEM SUPPLY
WATER TEMP. EXCEEDS SETPOINT PLUS OFFSET FOR 15 (ADJUSTABLE)
MINUTES OR NEXT CHILLER TO SUBTRACT WILL BE SUBTRACTED IF
THERE IS NO ADD REQUEST AND THE ACTUAL SYSTEM DELTA T IS LESS
THAN AN ADJUSTABLE LIMIT FOR 15 (ADJ.) MINUTES.)
6. INDIVIDUAL CHILLER FAILURE RESET (PUSH BUTTON)
7. ALL CHILLER FAILURE RESET (PUSH BUTTON)
8. SYSTEM PUMP FAILURE RESET (PUSH BUTTON)
9. MANUAL ADDITION OF CHILLER (PUSH BUTTON)
10. MANUAL SUBTRACTION OF CHILLER (PUSH BUTTON)
11. MANUAL ROTATION OF CHILLER SEQUENCE (PUSH BUTTON)
B. CHILLER PLANT CONTROL PROGRAM SHALL INCLUDE A SCREEN(S) THAT
ALLOWS EDITING OF THE FOLLOWING DATA WITHOUT ENTERING PROGRAM
CODE EDITOR:
1. SUPPLY WATER SETPOINT
2. SYSTEM SOFT LOADING SETPOINTS
3. AMBIENT LOCKOUT SETPOINTS
4. CHILLER ADDITION SETPOINTS
5. CHILLER SUBTRACTION SETPOINTS
6. AUTO ROTATION SETPOINTS
7. ALARM HANDLING SETUP
8. SECURITY SETUP
C. INDIVIDUAL CHILLER STATUS GRAPHIC SCREEN(S)
1. CHILLER NAME
2. CHILLER OPERATING MODE
3. CHILLED WATER SETPOINT %
4. CHILLER RLA
5. CHILLER NUMBER OF STARTS
6. CHILLER RUN HOURS
7. ENTERING CHILLER WATER TEMPERATURE
8. LEAVING CHILLED WATER TEMPERATURE
9. EVAPORATOR FLOW STATUS
10. CONDENSER FLOW STATUS
11. PURGE UNIT STATUS (LOW PRESSURE MACHINES ONLY)
12. PURGE COMPRESSOR DAILY RUN TIME (LOW PRESSURE MACHINES
ONLY)
13. COMPRESSOR PHASE VOLTAGES 1/2/3
14. COMPRESSOR PHASE AMPERAGES % OF FLA 1/2/3
15. COMPRESSOR MOTOR WINDING TEMPERATURES 1/2/3
13. CHILLER STATUS REPORT - PROVIDE AN OPERATING STATUS REPORT
FOR EACH CHILLER. THE REPORT(S) SHALL PROVIDE THE PRESENT STATUS
FOR THE FOLLOWING INFORMATION TO PROVIDE THE OPERATOR WITH
CRITICAL CHILLER OPERATING DATA.
A. COMPRESSOR ON/OFF STATUS.
B. COMPRESSOR STARTS/RUN HOURS
C. COMPRESSOR PHASE 1/2/3 PERCENT RLA - SEPARATE FOR EACH
COMPRESSOR
D. COMPRESSOR CURRENT DRAW - RLA PERCENT
E. ACTIVE CHILLER DIAGNOSTICS OR ALARMS
F. LEAVING CHILLED WATER TEMPERATURE
G. ENTERING CHILLED WATER TEMPERATURE
H. CONDENSER WATER ENTERING/LEAVING TEMPERATURES
I. CHILLED WATER SETPOINT.
J. REFRIGERANT TEMPERATURE EVAPORATOR/CONDENSER - SEPARATE FOR
EACH CIRCUIT
K. OPERATING MODE
L. CHILLER MODEL AND SERIAL NUMBER
M. DIAGNOSTICS/PROTECTION - THE BAS SYSTEM SHALL BE ABLE TO
ALARM FROM ALL SENSED POINTS AND DIAGNOSTIC ALARMS SENSED BY
THE CHILLER CONTROLLER.
1. ALARM LIMITS SHALL BE DESIGNATED FOR ALL SENSED POINTS.
2. SENSED DIAGNOSTIC POINTS SHALL INCLUDE THE FOLLOWING AT A
MINIMUM:
A. SYSTEM CHILLED WATER SUPPLY TEMPERATURE
B. SYSTEM CHILLED WATER RETURN TEMPERATURE
N. SYSTEM DIAGNOSTIC AND ALARM INDICATION
1. THE CHILLER PLANT CONTROL SYSTEM CONTRACTOR SHALL PROVIDE
A LIST OF ALL SYSTEM AND CHILLER DIAGNOSTICS AND ALARMS TO THE
ENGINEER WITH THE BID PACKAGE FOR THIS PROJECT.
2. THE CHILLER PLANT CONTROL SYSTEM SHALL DISPLAY THE CHILLER
PLANT DIAGNOSTIC AND ALARM STATUS AT THE OPERATOR PC WORKSTATION.
THE PC WORKSTATION DIAGNOSTIC AND ALARM DISPLAY SHALL INCLUDE AN
ENGLISH LANGUAGE DESCRIPTION, INDICATION AS TO WHETHER THE ALARM IS
AN INDIVIDUAL CHILLER ALARM OR A CHILLER SYSTEM ALARM, AND THE
TIME AND DATE OF THE ALARM.
A. INDIVIDUAL CHILLER AND CHILLER PLANT SYSTEM ALARMS
SHALL BE CLASSIFIED AS EITHER MANUAL RESET DIAGNOSTIC, AUTO RESET
DIAGNOSTIC OR INFORMATIONAL WARNING. BOTH MANUAL RESET DIAGNOSTICS
AND AUTO RESET DIAGNOSTICS WILL SHUT DOWN THE CHILLER.
B. MANUAL RESET DIAGNOSTICS AND AUTO RESET DIAGNOSTICS
WILL CAUSE AN ALARM MESSAGE TO BE PRINTED ON THE OPTIONAL SYSTEM
PRINTER, AND WILL AUTOMATICALLY LOG THE ALARM MESSAGE IN THE EVENT
LOG.
C. THE CHILLER PLANT CONTROL SYSTEM SHALL HAVE AN
"AUDIBLE ALARM" FEATURE WHICH, WHEN ACTIVATED BY THE OPERATOR,
WILL GENERATE AN AUDIBLE TONE AT THE OPERATOR WORKSTATION AND
INITIATE AN AUTO DIAL SEQUENCE VIA AN AUTO DIAL MODEM WHEN A
LATCHING ALARM OCCURS.
D. LATCHING ALARMS SHALL ONLY BE RESETTABLE AT THE CHILLER UNIT
CONTROL PANEL. THE CHILLER PLANT CONTROL SYSTEM SHALL AUTOMATICALLY
RECORD A "RETURN-TO-NORMAL" MESSAGE IN THE SOFTWARE EVENT LOG WHEN A
LATCHING ALARM IS RESET BY THE OPERATOR.
E. THE CHILLER PLANT CONTROL SYSTEM SHALL HAVE A "PRINT CHANGES"
AND "SAVE CHANGES" FEATURE WHICH, WHEN ACTIVATED BY THE OPERATOR, WILL
CAUSE MESSAGES FOR AUTO RESET DIAGNOSTICS TO BE PRINTED OR
AUTOMATICALLY LOGGED IN THE EVENT LOG.
3. INDIVIDUAL CHILLER DIAGNOSTIC AND ALARM STATUES SHALL INCLUDE THE
FOLLOWING MANUAL RESET ITEMS FOR EACH CHILLER:
A. LEAVING EVAPORATOR SENSOR FAILURE
B. ENTERING EVAPORATOR SENSOR FAILURE
C. LOW CHILLED WATER TEMPERATURE
D. COMPRESSOR OVERLOAD TRIP - SEPARATE FOR EACH COMPRESSOR
E. COMPRESSOR HIGH MOTOR TEMPERATURE - SEPARATE FOR EACH
COMPRESSOR
F. COMPRESSOR CONTACTOR FAILURE - SEPARATE FOR EACH COMPRESSOR
G. COMPRESSOR HIGH OIL TEMPERATURE - SEPARATE FOR EACH COMPRESSOR
H. COMPRESSOR OIL TEMPERATURE SENSOR FAILURE - SEPARATE FOR EACH
COMPRESSOR
I. COMPRESSOR OIL SYSTEM FAULT - SEPARATE FOR EACH COMPRESSOR
J. LOW PRESSURE CUTOUT - SEPARATE FOR EACH CIRCUIT
K. HIGH PRESSURE CUTOUT - SEPARATE FOR EACH CIRCUIT
L. SOLENOID VALVE FAILURE - SEPARATE FOR EACH CIRCUIT
M. PHASE LOSS
N. EXTERNAL INTERLOCK STATUS
O. UNIT CONTROLLER STATUS
4. INDIVIDUAL CHILLER DIAGNOSTIC AND ALARM STATUES SHALL INCLUDE THE
FOLLOWING AUTO RESET AND INFORMATIONAL WARNINGS FOR EACH CHILLER:
A. LEAVING CONDENSER SENSOR FAILURE
B. ENTERING EVAPORATOR SENSOR FAILURE
C. OUTDOOR AIR TEMPERATURE SENSOR FAILURE
D. ZONE TEMPERATURE SENSOR FAILURE
E. HIGH VOLTAGE
F. LOW VOLTAGE
G. PHASE REVERSAL
H. CHILLER WATER FLOW INTERLOCK
I. UNIT COMMUNICATION LOSS
J. LOW CHILLED WATER TEMPERATURE (UNIT OFF)
K. CIRCUIT 1 - PUMPDOWN TIMEOUT
L. CIRCUIT 2 - PUMPDOWN TIMEOUT
G COOLING TOWER CONTROL
1. COOLING TOWER PUMP CONTROL
ISOLATION VALVES:
1. COOLING TOWERS SHALL OPERATE WITH CONDENSER PUMPS.
2. WHEN A SINGLE PUMP IS ENERGIED, BOTH TOWER ISOLATION VALVES SHALL OPEN.
BYPASS VALVE:
1. WHEN THE CONDENSER WATER SYSTEM IS ENABLED, THE COOLING TOWERS SHALL MAINTAIN THE CHILLER
ENTERNG CONDENSER WATER TEMPERATURE BY FIRST MODULATING THE 3-WAY BYPASS VALVE.
2. WHEN THE VALVE IS IN FULL TOWER BYPASS AND THE ENTERING CONDENSER WATER TEMPERATURE IS GREATER THAN THE ENTERING CONDENSER WATER TEMPERATURE SETROINT MINUS 2'F (ADJUSTABLE), THE BYPASS VALVE SHALL BEGIN TO CLOSE SENDING WATER TO THE COOLNE TOWERS, THE BYPASS VALVE SHALL CONTINUE TO MODULATE CLOSED TO MAINTAN THE ENTERING CONDENSER WATER TEMPERATURE TO
ITS SETPOINT WITHOUT THE TOWER FANS
3. WHEN THE BYPASS VALVE IS FULLY CLOSED AND THE ENTERING CONDENSER WATER TEMPERATURE REACHES CONDENSER WATER TEMPERATURE SETPONT PLUS 2'F (ADJUSTABLE) THE CONDENSER WATER TEMPERATURE SHALL BE MAINTANED BY OPERATING THE COOLING TOWER FANS TO MAINTAIN THE ENTERING CONDENSER
WATER TEMPERATURE TO IT'S SETPONE.
START STOP:
1. THE SYSTEM SHALL COMMAND A TOWER FAN ON THROUGH A CONTACT CLOSURE OF THE FAN'S VARIABLE
SPEED DRIVE RUN-ENABLE CONTACTS. THE SYSTEM SHALL DETECT TOWER FAN STATUS BY A VARIABLE
SPEED DRIVE CURRENT SWITCH.
TOWER CONTROL:
1. BOTH TOWERS SHALL OPERATE AT A SINGLE TIME.
2. WHEN A CHLLER IS OPERATING AND THE COOLING TOWER LEAVING WATER TEMPERATURE RISES TO 2'F
(AD/USTABLE) ABOVE THE CONDENSER WATER TEMPERATURE SETPOINT 95'F (ADJUSTABLE), BOTH COOLING TOWER FANS SHALL BE COMMANDED ON AT MINNUM SPEED AND THE COOLING PLANT SYSTEM CONTROLLER SHALL MODULATE THE TOWERS FAN SPEED TO MANTAN THE CONDENSER WATER TO ITS SETPOINT.
3. WHEN THE TOWER FANS ARE RUNNING AT MINIMUM SPEED, AND THE COOLING TOWER LEAVING WATER TEMPERATURE FALLS TO 5'F (ADJUSTABLE) BELOW CONDENSER WATER TEMPERATURE SETPOINT, THE COOLING TOWER FANS SHALL BE COMMANDED OFF. COOLING TOWER FANS SHALL HAVE A 3 MINUTE
(ADJUSTABLE) MINIMUM ON AND OFF AND SPEED CHANGE DELAYS.
TOWER FALURE:
4. IF A TOWER FAN…