This is a Trane water-cooled chiller installation guide for the HDWA Agility model with Symbio Controls, specifically the PC 747 model revised in May 2025. The document serves as a technical manual for qualified personnel responsible for the disassembly, reassembly, and installation of these 500-ton water-cooled chillers, which are relevant to the DeLand Courthouse Chiller Energy Plant (CEP) Upgrades project in Volusia County, Florida. The guide provides comprehensive procedural instructions for equipment preparation, de-energizing, disassembly sequences, and reassembly protocols, with particular emphasis on safety protocols for qualified technicians handling refrigerants, electrical components, and heavy equipment weighing up to 10,760 pounds for the condenser half and 8,303 pounds for the evaporator half. The manual includes detailed torque specifications ranging from 54-66 inch-pounds for M5-0.8 metric fasteners to 288-348 foot-pounds for M20-2.5 fasteners, as well as comprehensive tool requirements, weight tables for various subassemblies, and specialized procedures for both marine and non-marine waterbox hinge assembly installations with specific gap tolerances of 0.000-0.005 inches.
The document emphasizes strict adherence to safety requirements including personal protective equipment (PPE), proper field wiring and grounding per National Electrical Code (NEC), responsible refrigerant handling in compliance with the Federal Clean Air Act Section 608 and applicable state regulations, and Environmental Health and Safety (EHS) policies. All disassembly and reassembly procedures are designed to allow the 500-ton chillers to be separated into condenser and evaporator halves for transport through space-constrained locations such as the DeLand Courthouse, with detailed instructions for lifting, securing, and separating primary subassemblies using appropriate rigging equipment rated for the specific unit weights. The guide specifies that technicians must be certified according to local rules for refrigerant handling, with particular attention to proper lubrication of O-ring face seal tube fittings using refrigerant-compatible grease or oil, and includes appendices with complete torque charts, wrench sizes, rigging requirements, and weight specifications for all major components and subassemblies.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X39641413003
SAFETY WARNING
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that are attached to the equipment.
May 2025 HDWA-SVN003C-EN
Installation Guide Agility® Water-cooled Chillers With Symbio™ Controls Disassembly and Reassembly
Model Number: HDWA PC 747
©2025 Trane HDWA-SVN003C-EN
Introduction Read this manual thoroughly before operating or servicing this unit.
Warnings, Cautions, and Notices Safety advisories appear throughout this manual as required. Your personal safety and the proper operation of this machine depend upon the strict observance of these precautions.
The three types of advisories are defined as follows:
WARNING
Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury.
CAUTION
Indicates a potentially hazardous situation which, if not avoided, could result in minor or moderate injury. It could also be used to alert against unsafe practices.
NOTICE
Indicates a situation that could result in equipment or property-damage only accidents.
Important Environmental Concerns Scientific research has shown that certain man-made chemicals can affect the earth’s naturally occurring stratospheric ozone layer when released to the atmosphere. In particular, several of the identified chemicals that may affect the ozone layer are refrigerants that contain Chlorine, Fluorine and Carbon (CFCs) and those containing Hydrogen, Chlorine, Fluorine and Carbon (HCFCs). Not all refrigerants containing these compounds have the same potential impact to the environment. Trane advocates the responsible handling of all refrigerants.
Important Responsible Refrigerant Practices Trane believes that responsible refrigerant practices are important to the environment, our customers, and the air conditioning industry. All technicians who handle refrigerants must be certified according to local rules. For the USA, the Federal Clean Air Act (Section 608) sets forth the requirements for handling, reclaiming, recovering and recycling of certain refrigerants and the equipment that is used in these service procedures. In addition, some states or municipalities may have additional requirements that must also be adhered to for responsible management of refrigerants. Know the applicable laws and follow them.
WARNING
Proper Field Wiring and Grounding Required!
Failure to follow code could result in death or serious injury.
All field wiring MUST be performed by qualified personnel. Improperly installed and grounded field wiring poses FIRE and ELECTROCUTION hazards. To avoid these hazards, you MUST follow requirements for field wiring installation and grounding as described in NEC and your local/state/national electrical codes.
WARNING
Personal Protective Equipment (PPE) Required!
Failure to wear proper PPE for the job being undertaken could result in death or serious injury.
Technicians, in order to protect themselves from potential electrical, mechanical, and chemical hazards, MUST follow precautions in this manual and on the tags, stickers, and labels, as well as the instructions below:
• Before installing/servicing this unit, technicians MUST put on all PPE required for the work being undertaken (Examples; cut resistant gloves/ sleeves, butyl gloves, safety glasses, hard hat/ bump cap, fall protection, electrical PPE and arc flash clothing). ALWAYS refer to appropriate Safety Data Sheets (SDS) and OSHA guidelines for proper PPE.
• When working with or around hazardous chemicals, ALWAYS refer to the appropriate SDS and OSHA/GHS (Global Harmonized System of Classification and Labelling of Chemicals) guidelines for information on allowable personal exposure levels, proper respiratory protection and handling instructions.
• If there is a risk of energized electrical contact, arc, or flash, technicians MUST put on all PPE in accordance with OSHA, NFPA 70E, or other country-specific requirements for arc flash protection, PRIOR to servicing the unit. NEVER
PERFORM ANY SWITCHING, DISCONNECTING,
OR VOLTAGE TESTING WITHOUT PROPER
ELECTRICAL PPE AND ARC FLASH CLOTHING.
ENSURE ELECTRICAL METERS AND
EQUIPMENTARE PROPERLY RATED FOR
INTENDED VOLTAGE.
HDWA-SVN003C-EN 3
WARNING
Follow EHS Policies!
Failure to follow instructions below could result in death or serious injury.
• All Trane personnel must follow the company’s Environmental, Health and Safety (EHS) policies when performing work such as hot work, electrical, fall protection, lockout/tagout, refrigerant handling, etc. Where local regulations are more stringent than these policies, those regulations supersede these policies.
• Non-Trane personnel should always follow local regulations.
WARNING
Cancer and Reproductive Harm!
This product can expose you to chemicals including lead and bisphenol A (BPA), which are known to the State of California to cause cancer and birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov.
Copyright This document and the information in it are the property of Trane, and may not be used or reproduced in whole or in part without written permission. Trane reserves the right to revise this publication at any time, and to make changes to its content without obligation to notify any person of such revision or change.
Trademarks All trademarks referenced in this document are the trademarks of their respective owners.
Revision History
• Added 500 ton data in Draining the Drive Cooling
System, Additional Disassembly, and Appendix A:
Tools, Weights, Lubrication, Torques chapters.
• Replaced the image of Removing the Economizer subsection of Additional Disassembly chapter.
Introduction https://www.p65warnings.ca.gov/
4 HDWA-SVN003C-EN
Preparing, De-energizing, Locking out, and Securing from Tipping
Draining the Drive Cooling System
Removing the Upper and Lower Cross- Ties
Removing the Motor Terminal Box and Disconnecting the Motor Terminals
Removing the Check Valve
Disconnecting the Global Connectors
Disconnecting the Condenser Drain Line
Moving the Lifting Brackets to the Common Shell (both ends)
Disconnecting the Conduit Connections at the Back of the Electrical Panel
Disconnecting and Plugging the Drive Cooling Lines from the Braze Plate Heat Exchanger (BPHE)
Separating the Primary Subassemblies
Transferring One Half to the New Location and Securing
Additional Disassembly Removing the Cross-tie Brackets
Removing the Condenser Liquid Line Removing the Condenser Discharge Pipe Removing the Motor Terminal Box Removing the Evaporator Main EXV Line Removing the Economizer to Compressor Line Removing the Compressor Interstage Line Removing the Condenser Liquid Level Sensor Removing the Options Panel (if present) Removing the Drive Panel Removing the Compressor Removing the Economizer
Reassembly Instructions for HDWA Installation Instructions for Non-Marine Waterbox Hinge Assembly Installation Instructions for Marine Waterbox Hinge Assembly Disassembly Instructions Marine and Non- Marine Waterboxes
Appendix A : Tools, Weights, Lubrication, Torques
Table of Contents
HDWA-SVN003C-EN 5
Preparing, De-energizing, Locking out, and Securing from Tipping
WARNING
Heavy Object!
Failure to follow instructions below could result in unit dropping which could result in death or serious injury, and equipment or property-only damage.
Ensure that all the lifting equipment used is properly rated for the weight of the unit being lifted. Each of the cables (chains or slings), hooks, and shackles used to lift the unit must be capable of supporting the entire weight of the unit. Lifting cables (chains or slings) may not be of the same length. Adjust as necessary for even unit lift.
WARNING
Hazardous Voltage w/Capacitors!
Failure to disconnect power and discharge capacitors before servicing could result in death or serious injury.
Disconnect all electric power, including remote disconnects and discharge all motor start/run capacitors before servicing. Follow proper lockout/ tagout procedures to ensure the power cannot be inadvertently energized. For variable frequency drives or other energy storing components provided by Trane or others, refer to the appropriate manufacturer’s literature for allowable waiting periods for discharge of capacitors. Verify with a CAT III or IV voltmeter rated per NFPA 70E that all capacitors have discharged.
WARNING
Live Electrical Components!
Failure to follow all electrical safety precautions when exposed to live electrical components could result in death or serious injury.
When it is necessary to work with live electrical components, have a qualified licensed electrician or other individual who has been properly trained in handling live electrical components perform these tasks.
WARNING
Improper Unit Lift!
Failure to properly lift unit in a LEVEL position could result in unit dropping and possibly crushing operator/ technician which could result in death or serious injury, and equipment or property-only damage.
Test lift unit approximately 24 inches (61 cm) to verify proper center of gravity lift point. To avoid dropping of unit, reposition lifting point if unit is not level.
1. If the unit has been previously installed and connected to a power source, disconnect from the power source prior to disassembly and observe the following electrical requirements:
• Follow all lockout/tagout procedures prior to performing installation and/or service on the unit.
• Always wear appropriate personal protective equipment.
• Wait the required time to allow the capacitor(s) to discharge; this could be up to 30 minutes.
• Verify that all capacitors are discharged prior to service using a properly rated volt meter.
• Use appropriate capacitor discharge tool when necessary.
• Comply with the safety practices recommended in
Discharging Capacitors in HVAC Systems Service Bulletin (PROD-SVB06*-EN).
• Remove any wireless device from the top of the AFD panel (if present), and place inside the panel.
6 HDWA-SVN003C-EN
2. Verify the unit is secure from tipping using one of the following (or similar) methods:
• Secure to dunnage
• Secure to building.
• Add 2-inch schedule 40 pipes as shown in Figure 1,
p. 6.
Tools:
• 24 mm wrench or ratchet (ratcheting box end wrenches recommended)
• Two 2 in. x 72 in. schd 40 steel pipe
• Four 1-in.–10T rigging shackles
• Four 16 mm Heavy Duty Swivel Hoist Rings #4000 capacity
• Four rigging straps
• Hooks
• Hoists
Figure 1. Stabilizing pipes
2-inch schedule 40 pipes for stabilization
3. Reclaim the refrigerant.
Units selected for disassembly will arrive with a 5 PSI nitrogen charge. Units shipped with a refrigerant charge need to have the refrigerant re-claimed before disassembly. Unit valve locations shown in Figure 3, p. 7.
Note: Tools and procedures are as required by the application and facility.
4. If nitrogen holding charge is present, vent the nitrogen to the atmosphere as show in Figure 2, p. 6.
The best practice is to assure ventilation is on. Also residual refrigerant may be in the vessel if it was factory or lab, or special run-tested.
Important: New units that have been factory run–tested contain residual refrigerant; vent discharge outdoors.
Note: Tools and procedures are as required by the application and facility.
Figure 2. Heat exchanger fill valve
Preparing, De-energizing, Locking out, and Securing from Tipping
HDWA-SVN003C-EN 7
The following table shows the callouts for Figure 3, p. 7
Callout Description
A Evaporator fill valve, with gauge port; 3/4 flare fitting
B Condenser fill valve, with gauge port; 3/4 flare fitting
C Condenser lower piping drain valve; 5/8 flare fitting
D Condenser shell drain valve; 5/8 flare fitting
E Evaporator lower piping drain valve; 5/8 flare fitting
Figure 3. Service valves
Preparing, De-energizing, Locking out, and Securing from Tipping
8 HDWA-SVN003C-EN
Draining the Drive Cooling System
1. Remove the drain plug as shown in Figure 4, p. 8.
Tools: Clean 5-gallon bucket, 1-1/8-inch wrench, 48-inch hose with 3/4 NPT fitting on the one end.
Figure 4. Cooling system drain plug
Drain plug
2. Remove the vent plug and reservoir cap to release any vacuum pockets as shown in Figure 5, p. 8.
Tools: 1-1/8-inch wrench
3. Install the hose on the drain valve as shown in Figure 6,
p. 8.
4. Place the hose in the bucket.
5. Open the drain valve.
Drive cooling fluid volumes are dependent on VFD frame size (SRRL).
Table 1. Drive cooling fluid
SRRL NTON gal L
243 to 362 200 1.3 4.9
238 to 532 300/400/500 1.0 3.8
675 400/500 1.4 5.3
Figure 5. Cooling system vent
Vent plug Reservoir cap
Note: Vent plug is only available on dual drive units.
6. Once drained, re-install the vent and drain plugs, and close the drain valve.
Tools: 1-1/8-inch wrench Note: Do not disconnect the coolant lines from the BPHE at this time.
Figure 6. Cooling system drain
HDWA-SVN003C-EN 9
Removing the Upper and Lower Cross-Ties
WARNING
Heavy Object!
Failure to follow instructions below could result in unit dropping which could result in death or serious injury, and equipment or property-only damage.
Ensure that all the lifting equipment used is properly rated for the weight of the unit being lifted. Each of the cables (chains or slings), hooks, and shackles used to lift the unit must be capable of supporting the entire weight of the unit. Lifting cables (chains or slings) may not be of the same length. Adjust as necessary for even unit lift.
1. Match mark the brackets to the shell joints before removing the brackets.
Tools:marker Note: Match mark to allow for correct re-assembly.
Brackets need to be reinstalled in the same location.
Figure 7. Upper cross brackets
Leave center fasteners in place and tight
Remove end fasteners from one side only at this time
Match mark
2. Remove a total of sixteen (16) M16 bolts and nuts from one side of the cross brackets (four bolts from one side of all four cross bracket locations.
Tools: 24 mm wrench or ratchet.
Notes:
• Do not remove the center fasteners. This helps to maintain proper spacing during reassembly.
They can be used for additional adjustment if needed.
• Verify removed fasteners are properly stored to prevent loss or incorrect reassembly.
Figure 8. Lower cross brackets
Match mark Leave center bolts in place and tight
Remove end bolts One side only at this time
10 HDWA-SVN003C-EN
Removing the Motor Terminal Box and Disconnecting the Motor Terminals
WARNING
Heavy Object!
Failure to follow instructions below could result in unit dropping which could result in death or serious injury, and equipment or property-only damage.
Ensure that all the lifting equipment used is properly rated for the weight of the unit being lifted. Each of the cables (chains or slings), hooks, and shackles used to lift the unit must be capable of supporting the entire weight of the unit. Lifting cables (chains or slings) may not be of the same length. Adjust as necessary for even unit lift.
1. Remove the covers as shown in Figure 9, p. 10.
Tools: 10 mm wrench or ratchet.
Figure 9. Motor terminal covers
Note: Do not remove at this time.
2. Disconnect the terminals using backing wrench.
3. Disconnect the motor terminal box from the panel box.
Remove the motor terminal box as shown in Figure 10, p.
10.
Tools: (2) 3/4-inch wrenches or wrench and socket.
Figure 10. Removing the motor terminal box.
Note: Remove this box and cover
HDWA-SVN003C-EN 11
Removing the Check Valve
WARNING
Heavy Object!
Failure to follow instructions below could result in unit dropping which could result in death or serious injury, and equipment or property-only damage.
Ensure that all the lifting equipment used is properly rated for the weight of the unit being lifted. Each of the cables (chains or slings), hooks, and shackles used to lift the unit must be capable of supporting the entire weight of the unit. Lifting cables (chains or slings) may not be of the same length. Adjust as necessary for even unit lift.
1. Remove the 6 upper studs as shown in Figure 11, p. 11.
Tools: 24 mm wrenches or ratchets, hoist and strap.
2. Loosen the lower 6 studs but do not remove. Figure 11. Check valve removal
3. Remove the check valve and gaskets.
• Use a strap and lifting assist.
• Use care not to damage the internal valve mechanisms.
4. Remove the remaining 6 studs.
Note: Verify removed fasteners are properly stored to prevent loss or incorrect reassembly.
12 HDWA-SVN003C-EN
Disconnecting the Global Connectors
1. Disconnect the global bus crossover cable.
Note: This is the only connector that needs to be disconnected to split unit in half.
Figure 12. Global connector disconnect
Connector to disconnect
2. Secure all loose cables.
HDWA-SVN003C-EN 13
Disconnecting the Condenser Drain Line
WARNING
Heavy Object!
Failure to follow instructions below could result in unit dropping which could result in death or serious injury, and equipment or property-only damage.
Ensure that all the lifting equipment used is properly rated for the weight of the unit being lifted. Each of the cables (chains or slings), hooks, and shackles used to lift the unit must be capable of supporting the entire weight of the unit. Lifting cables (chains or slings) may not be of the same length. Adjust as necessary for even unit lift.
Figure 13. Disconnecting the economizer EXV line from the condenser return line
1. Disconnect the economizer EXV line from the condenser return line. See Figure 13, p. 13.
2. Disconnect the condenser drain line from the economizer by removing the 4 bolts. See Figure 14, p. 13.
3. Verify removed fasteners are properly stored to prevent loss or incorrect reassembly.
Tools: 19 mm wrench, 1–5/8 wrench, 1–1/2 wrench.
Figure 14. Disconnecting the condenser drain line from the economizer
14 HDWA-SVN003C-EN
Moving the Lifting Brackets to the Common Shell (both ends)
WARNING
Heavy Object!
Failure to follow instructions below could result in unit dropping which could result in death or serious injury, and equipment or property-only damage.
Ensure that all the lifting equipment used is properly rated for the weight of the unit being lifted. Each of the cables (chains or slings), hooks, and shackles used to lift the unit must be capable of supporting the entire weight of the unit. Lifting cables (chains or slings) may not be of the same length. Adjust as necessary for even unit lift.
1. Remove the bolts securing the lifting bracket and remove the lifting bracket from the unit half not being rigged (both ends) as shown in Figure 15, p. 14.
2. Remove only the bolts needed to install the lifting bracket from waterbox from the unit half being rigged in the location show (both ends) as shown in Figure 15, p. 14.
3. Move lifting bracket to half being rigged as shown and reinstalled hardware (both ends). Torque fasteners to 90 ft/lbs.
Notes:
• Verify removed fasteners are properly stored to prevent loss or incorrect reassembly.
• The 150 psi waterbox is shown and has 4 bolts per lifting bracket. The 300 psi waterbox has 8 bolts per lifting bracket
Figure 15. Waterbox bolts
Bolts to remove to reposition lifting bracket
HDWA-SVN003C-EN 15
4. Replace the bolts in the rigging brackets.
Torque to 90 ft/lbs.
Note: The 150 psi waterbox is shown and has 4 bolts per lifting bracket. The 300 psi waterbox has 8 bolts per lifting bracket.
Figure 16. Repositioning lifting bracket
Moving the Lifting Brackets to the Common Shell (both ends)
16 HDWA-SVN003C-EN
Disconnecting the Conduit Connections at the Back of the Electrical Panel
1. Remove the cover from the rear connector panel.
2. Disconnect the conduits at the panel as shown in Figure 18, p. 16.
Not all conduits need to be disconnected at this time.
Figure 17. Rear connector panel cover
Figure 18. Disconnecting the conduits
NOTICE
Electrostatic Discharge!
Electrostatic discharge can short equipment circuitry.
Ensure that you are properly grounded before handling sensitive electronic equipment.
3. Secure the two conduits to the compressor. Secure the high pressure cutout conduit to the compressor discharge pipe.
Do not disconnect the MBC at the compressor.
Tools: Screwdriver, tie wraps.
Figure 19. Securing conduits with compressor
HDWA-SVN003C-EN 17
Disconnecting and Plugging the Drive Cooling Lines from the Braze Plate Heat Exchanger (BPHE)
WARNING
Heavy Object!
Failure to follow instructions below could result in unit dropping which could result in death or serious injury, and equipment or property-only damage.
Ensure that all the lifting equipment used is properly rated for the weight of the unit being lifted. Each of the cables (chains or slings), hooks, and shackles used to lift the unit must be capable of supporting the entire weight of the unit. Lifting cables (chains or slings) may not be of the same length. Adjust as necessary for even unit lift.
Figure 20. Disconnecting the cooling lines
Remove hoses from these 2 �ttings
1. Remove the 2 hose clamps at the braze place heat exchanger as shown in Figure 20, p. 17.
2. Disconnect hoses 1 at a time and insert temporary plugs into ends of hoses (3/4-inch barbed hose plugs) as shown in Figure 21, p. 17.
3. Secure hoses to the back of the drive panel.
Tools:
• 3/4-inch barbed hose plugs
• Pinch clamp pliers
• Pinch clamps or hose clamps (if desired)
• Zip ties
Figure 21. Plugging cooling lines
18 HDWA-SVN003C-EN
Separating the Primary Subassemblies
WARNING
Heavy Object!
Failure to follow instructions below could result in unit dropping which could result in death or serious injury, and equipment or property-only damage.
Ensure that all the lifting equipment used is properly rated for the weight of the unit being lifted. Each of the cables (chains or slings), hooks, and shackles used to lift the unit must be capable of supporting the entire weight of the unit. Lifting cables (chains or slings) may not be of the same length. Adjust as necessary for even unit lift.
Notes:
• Use appropriate hoist, spreader bar shackles, and straps or slings.
• Six ton lifting capability is acceptable. If a more accurate value is required, contact Trane support with specific unit identification.
1. If moving evaporator half, loosely attach an anti-roll strap from the compressor to the spreader bar.
If moving condenser half, loosely attach an anti-roll strap from an AFD lifting point to the spreader bar.
Notes:
• This is not used for lifting, this line should have some slack.
• Rigging points are above the center of gravity;
however, this provides some additional protection against tipping the unit over within the rigging.
Figure 22. Evaporator/compressor half
HDWA-SVN003C-EN 19
2. Remove the items securing the unit.
1. Check to confirm any items securing the halves together have been separated.
2. Check that the half being moved is no longer secured to the floor or the dunnage.
3. Check that the half remaining stationary is well-secured to prevent tipping during and after separation.
Figure 23. Condenser/AFD half
Secure this line if left in place
3. Lift the unit slightly, approximately 1/2-inch to verify proper rigging and separation.
Tools: (4) 1-in.-10Tshacles, (1 to 4) M16 swivel “D” rings, chains or straps, spreader bar.
The unit can now be separated for movement or to provide easier access for further disassembly.
Separating the Primary Subassemblies
20 HDWA-SVN003C-EN
Transferring One Half to the New Location and Securing
WARNING
Heavy Object!
Failure to follow instructions below could result in unit dropping which could result in death or serious injury, and equipment or property-only damage.
Ensure that all the lifting equipment used is properly rated for the weight of the unit being lifted. Each of the cables (chains or slings), hooks, and shackles used to lift the unit must be capable of supporting the entire weight of the unit. Lifting cables (chains or slings) may not be of the same length. Adjust as necessary for even unit lift.
Figure 24. Securing condenser liquid line
Secure this line if left in place
Note: If installing the unit in halves, complete the following steps:
1. Secure the condenser liquid line to the discharge pipe or condenser cross bracket to prevent damage as shown in Figure 24, p. 20.
2. Replace the motor terminal box cover to protect the motor terminals as shown in Figure 25, p. 20.
Note: If further disassembly is required, additional items can now be removed to further reduce the envelope of the unit.
Figure 25. Replacing the motor terminal box cover
HDWA-SVN003C-EN 21
Additional Disassembly Note: The following sections describe disassembly of additional components or sub-assemblies. These procedures are to be performed as needed depending on the application.
Removing the Cross-tie Brackets
1. Removing the cross-tie brackets (16) 16 mm bolts.
Tools: 24 mm wrench or ratchet.
Figure 26. Removing cross-tie brackets
Cross-tie brackets to remove
22 HDWA-SVN003C-EN
Removing the Condenser Liquid Line
1. Remove the condenser drain line, (4) 12 mm bolts.
Tools: 19 mm wrench or ratchet.
Figure 27. Removing the condenser liquid line
Removing the Condenser Discharge Pipe
1. Remove the condenser discharge pipe, (8) 12 mm bolts.
Tools: 19 mm wrench or ratchet, lifting strap.
Note: Use caution to not damage pressure sensor or high pressure cutout switch on pipe during removal of pipe.
Figure 28. Removing the condenser discharge pipe
Discharge pipe bolts
HDWA-SVN003C-EN 23
Removing the Motor Terminal Box
1. Remove the remaining control panel motor terminal cover, seven 6 mm bolts. See Figure 29, p. 23.
The conduit does not need to be removed. The cover can be placed along side the output filter and secured.
Tools: 10 mm wrench or ratchet, zip ties.
2. Disconnect PT wiring by disconnecting spade connections. Disconnect the thermister switch on top of the inductor (if equipped) using a screw driver. See Figure 30, p. 23. For units not equipped with an output inductor, the thermister switch wires are terminated with a lever nut. In this case, clip the wire tie holding them to the side of the transition box. See Figure 31, p. 23
3. Disconnect the conduit fitting from the enclosure and secure conduit to back panel.
4. Remove remaining enclosure, three 6 mm bolts. See Figure 29, p. 23.
Figure 29. Removing control panel terminal box
Cover to remove
Additional enclosure to remove
Figure 30. PT and thermister wiring
Figure 31. Wire tie clip
24 HDWA-SVN003C-EN
Removing the Evaporator Main EXV Line
1. Remove the evaporator main EXV line (8) 12 mm bolts.
See Figure 32, p. 24.
Tools: 19 mm wrench or ratchet, 1.5-inch wrench.
Figure 32. Main evaporator EXV line
HDWA-SVN003C-EN 25
Removing the Economizer to Compressor Line
1. Remove the economizer to compressor line
(8) 12 mm bolts. See Figure 33, p. 25.
Tools: 19 mm wrench.
Figure 33. Economizer to compressor line
Removing the Compressor Interstage Line
1. Remove the compressor interstage (18) 16 mm bolts.
See Figure 34, p. 25.
Tools: 24 mm wrench or ratchet.
Figure 34. Compressor interstage line
Compressor wrap pipe
26 HDWA-SVN003C-EN
Removing the Condenser Liquid Level Sensor
1. Remove the condenser liquid level sensor (2) 8 mm bolts,
(2) Fittings.
Tools: 1.125 wrench. See Figure 35, p. 26 and Figure 36, p. 26, 13 mm wrench or ratchet.
Figure 35. Removing the liquid level sensor (hardware)
Figure 36. Removing the liquid level sensor (fittings)
HDWA-SVN003C-EN 27
Removing the Options Panel (if present)
1. If the options panel is present remove the top panel shear plate. (6) 16 mm bolts as shown in Figure 37, p. 27.
Tools: 24 mm wrench or ratchet.
Figure 37. Shear plate bolts and rigging hole
Rigging hole
6 shear plate bolts
2. Secure the options panel to the overhead lifting device as shown in Figure 38, p. 27.
Tools: (4) 16 mm swivel “D” rings and shackles or straps.
Figure 38. Rigging holes
Rigging holes
3. Disconnect the internal wiring between the main and option panels. Wiring will vary depending upon the options package.
Note: This includes main power, fan power, and possible control wiring. Mark wires as removed to verify proper reassembly.
28 HDWA-SVN003C-EN
4. Remove the (6) 16 mm base bolts as shown in Figure 39, p. 28.
Tools: 24 mm wrench or ratchet.
Figure 39. Removing base bolts
WARNING
Heavy Objects!
Failure to follow these instructions could result in death, serious injury, and property damage.
Always lift the options panel and the control panel separately. NEVER lift them together as it could cause them to come crashing down.
5. The options panel can now be removed using four lifting points on top of the panel.
Figure 40. Removing the options panel
HDWA-SVN003C-EN 29
Removing the Drive Panel
1. Secure the main AFD panel to the overhead lifting device. Figure 41. Lifting locations for the control panel
2. Lifting locations for control panel as shown in Figure 41,
p. 29.
Tools: (4) M16 swivel “D” rings, chains or straps.
30 HDWA-SVN003C-EN
3. Remove the (6) 16 mm bolts from the front of the base of the main AFD panel as shown in Figure 42, p. 30.
Tools: 24 mm wrench or ratchet.
Figure 42. AFD front fasteners
HDWA-SVN003C-EN 31
4. Remove the (6) 16 mm bolts from the brackets at the rear base of the main panel as shown in Figure 43, p. 31.
Tools: 24 mm wrench or ratchet.
Figure 43. AFD rear fasteners
Fastener locations in rear of AFD main panel back brackets (do not remove back brackets from AFD)
Leave rear brackets in place (move with main panel)
5. The brackets should not be removed from the back of the panel.
The main panel can now be removed.
Tools: (4) 16 mm swivel “D-rings, shackles and straps or chains.
Removing the Compressor
1. The height of the evaporator can be reduced by removing the compressor and economizer. Disconnect the motor cooling lines from the compressor as shown in Figure 44, p. 31. Leave them attached to the economizer.
Tools: 1.875-inch wrench.
Figure 44. Compressor cooling line removal
Cooling lines
Compressor mounting bolts
32 HDWA-SVN003C-EN
2. If not already removed, remove four M12 bolts securing economizer to compressor second stage piping. This pipe may be left attached to the compressor and secured with block and strap as shown in Figure 45, p. 32 and Figure 46, p. 32.
Figure 45. Disconnecting economizer to compressor line from economizer
Figure 46. Securing economizer line to compressor
HDWA-SVN003C-EN 33
3. Disconnect the pressure sensor on suction elbow and remove (12) M12 bolts securing the base of the suction elbow in Figure 47, p. 33 and Figure 48, p. 33.
Note: It is recommended to leave the suction elbow attached to the compressor and remove the compressor/ suction elbow as an assembly.
Figure 47. Disconnecting pressure sensor
Figure 48. Removing suction elbow
34 HDWA-SVN003C-EN
4. Attach the compressor to the overhead lifting device as shown in Figure 49, p. 34.
Tools: (2) 16 mm swivel “D rings, shackles, straps or chains.
Figure 49. Attaching rigging to compressor
5. Tape any compressor base shims in place as shown in Figure 50, p. 34.
Tools: Tape.
Figure 50. Compressor base shims
Compressor base shims
6. Remove the (4) 16 mm bolts from the compressor base.
The compressor can now be removed from the unit.
Tools: 24 mm wrench or ratchet.
7. Block the compressor as shown in Figure 51, p. 34 to prevent damage to the suction elbow.
Figure 51. Blocking the compressor
Blocking
HDWA-SVN003C-EN 35
8. Cover openings. Secure cover to prevent it from being pulled into the unit as shown in Figure 52, p. 35 and Figure 53, p. 35.
Figure 52. Covering openings
Figure 53. Securing cover
Removing the Economizer
1. Attach rigging to the lifting point at the top of the economizer mounting bracket.
2. If water flow control (WFC) option is installed, disconnect the tubing at waterboxes and coil onto sensor bracket.
Leave WFC sensor assembly attached to the economizer. Remove the two 16 mm bolts and the base.
36 HDWA-SVN003C-EN
3. Remove the clamps or ties securing the motor cooling lines to the unit. Support the lines during removal of the economizer.
Note: Lift the economizer and set aside.
Figure 54. Unbolting the economizer 2
4. Unbolt the economizer. Figure 55. Unbolting the economizer 1
HDWA-SVN003C-EN 37
5. Lift the economizer using lift points as shown in Figure 56, p. 37.
Figure 56. Economizer lift points
Economizer assembly lift points
6. The economizer subassembly can now be removed.
Further disassembly is possible but the unit is now at its minimum dimensions.
Tools: Tape, zip ties, straps, 24 mm wrench or ratchet.
38 HDWA-SVN003C-EN
Reassembly Instructions for HDWA
WARNING
Heavy Object!
Failure to follow instructions below could result in unit dropping which could result in death or serious injury, and equipment or property-only damage.
Ensure that all the lifting equipment used is properly rated for the weight of the unit being lifted. Each of the cables (chains or slings), hooks, and shackles used to lift the unit must be capable of supporting the entire weight of the unit. Lifting cables (chains or slings) may not be of the same length. Adjust as necessary for even unit lift.
Important:
• Reassembly is the reverse of disassembly.
• The unit is intended to be assembled in halves, condenser and evaporator, then assembled as a complete unit.
• Sufficient clearance is designed into the unit such that doweling and pinning is unnecessary and potentially detrimental.
The assembly should be fitted loose until all piping for the “half” is installed then the “half” can be tightened. Only a few components cross over between “halves”;
the condenser drain, the compressor discharge pipe, the cross tie brackets, global bus connector, HUBA hoses and wiring (if present), and the motor cooling glycol lines. Since reassembly is primarily the reverse of disassembly for the “halves” Fitting the compressor discharge pipe, condenser drain line and the cross tie brackets are what the reassembly should focus on.
Reinstall drive cooling hoses using new pinch clamps.
Traditional hose clamps are also acceptable. Refill the coolant from the reservoir. See Agility™ Water-cooled Chillers With Symbio™ Controls Service Guide (HDWA- SVG002*-EN) for the glycol fill procedure.
Installation Instructions for Non- Marine Waterbox Hinge Assembly Figure 57. Non-marine waterbox hinge assembly
Tubesheet
Waterbox flange
Lower snap ring Lower washer
Lower knuckle
Lower hinge bracket
Lower jack bolt
Center knuckle
Pin
Upper hinge bracket
Upper knuckle
Upper snap ring
Upper washer
Upper jack bolt
1. Install each (lower and upper) hinge bracket to tubesheet with three M8 x 35 mm bolts as shown in the following figure. (See the following table for torque values.)
Figure 58. Installing hinge bracket to waterbox
Table 2. Torque details
Part Numbers Descriptions
Torque Descriptions Torque
X25030215070 SCREW; M8 HEX
CAP, M8 X 35 MM 19 +/- 1 ft-lb
X25030215050 SCREW; M8 X 25
MM, HEX CAP 19 +/- 1 ft-lb
HDWA-SVN003C-EN 39
Table 2. Torque details (continued)
Part Numbers Descriptions
Torque Descriptions Torque
X25030218090 SCREW; M16 X 60
MM, HEX CAP 163 +/- 10 ft-lb
X25030215100 SCREW; M8 X 50
MM, HEX CAP 19 +/- 1 ft-lb
2. Move hinge assembly into position. See the following figure. Install all fasteners for the hinge assembly but keep loose. Torque sequence is shown in the following steps. See Table 2, p. 38 for torque values.
Figure 59. Installing the fasteners for the hinge assembly
3. Torque center knuckle of hinge to waterbox flange with M8 x 25 mm bolt and washer as shown in below figure.
See Table 2, p. 38 for torque values.
Figure 60. Torque center knuckle of hinge
4. Lift the hinge lower knuckle to contact the center knuckle and torque the M16 x 90 mm bolts and nuts with washers on both sides as shown in the following figure. See Table 2, p. 38 for torque values.
Note: Verify the Jackbolt is not contacting the hinge bracket, if it is back out the Jackbolt.
Figure 61. Jackbolt not contacting the hinge bracket
Note: Verify the minimum gap is no greater than 0.005-inch gap or less after tightening the fasteners between center knuckle and lower knuckle as shown in the following figure.
Figure 62. Minimum gap between center knuckle and lower knuckle
(0.000-0.005)
5. Lift the hinge upper knuckle until it contacts the upper washer.
6. Tighten the jack bolt M8 x 50 mm of upper knuckle.
Figure 63. Tightening the jack bolt
Jack bolt
7. Verify the jack bolt is tightened as mentioned in previous step and torque the M16 x 90 mm bolts and nuts with washers on both sides. See Table 2, p. 38 for torque values.
Note: Verify 0.005-inch gap or less after tightening the fasteners between upper knuckle and upper washer as shown in the following figure.
40 HDWA-SVN003C-EN
Figure 64. Tightening the fasteners between upper knuckle and upper washer (0.000-0.005)
Installation Instructions for Marine Waterbox Hinge Assembly Figure 65. Marine waterbox hinge assembly
Waterbox cover
Waterbox flange
Lower hinge bracket
Lower snap ring
Lower washer
Lower knuckle
Lower jack bolt
Center knuckle
Pin
Upper hinge bracket
Upper knuckle
Upper snap ring
Upper washer
Upper jack bolt
1. Install each (lower and upper) Hinge Bracket to waterbox flange with three M8 x 35 mm bolts as shown in the following figure. See Table 2, p. 38 for torque values.
Figure 66. Installing hinge bracket to waterbox
2. Move Hinge assembly into position. See the following figure. Install all fasteners for the hinge assembly but keep loose. Torque sequence is shown in the following steps. See Table 2, p. 38 for torque values.
Figure 67. Installing the fasteners for the hinge assembly
3. Torque center knuckle of hinge to waterbox cover with M8 x 25 mm bolt and washer as shown in below figure.
See Table 2, p. 38 for torque values.
Figure 68. Torque center knuckle of hinge
4. Lift the hinge lower knuckle to contact the center knuckle and torque the M16 x 90 mm bolts and nuts with washers on both sides as shown in below figure.
See Table 2, p. 38 for torque values.
Note: Verify the Jackbolt is not contacting the Hinge bracket, if it is back out the Jackbolt.
HDWA-SVN003C-EN 41
Figure 69. Jackbolt not contacting the hinge bracket
Note: Verify the minimum gap is no greater than 0.005-inch gap or less after tightening the fasteners between center knuckle and lower knuckle as shown in Figure 62, p. 39.
5. Lift the hinge upper knuckle until it contacts the upper washer.
6. Tighten the Jack bolt M8 x 50 mm of upper knuckle.
See Table 2, p. 38 for torque values.
Figure 70. Tightening the jack bolt
Jack bolt
7. Verify the jack bolt is tightened as mentioned in previous step and torque the M16 x 90 mm bolts and nuts with washers on both sides. See Table 2, p. 38 for torque values.
Note: Verify 0.005-inch gap or less after tightening the fasteners between upper knuckle and upper washer as shown in Figure 64, p. 40.
Disassembly Instructions Marine and Non-Marine Waterboxes
WARNING
Heavy Object!
Failure to follow instructions below could result in unit dropping which could result in death or serious injury, and equipment or property-only damage.
Ensure that all the lifting equipment used is properly rated for the weight of the unit being lifted. Each of the cables (chains or slings), hooks, and shackles used to lift the unit must be capable of supporting the entire weight of the unit. Lifting cables (chains or slings) may not be of the same length. Adjust as necessary for even unit lift.
The following instructions shows how to disassemble either marine or non-marine waterboxes:
1. Handle with care, the hinge weight is 44 lbs.
2. Loosen the jack bolt M8 X 50 mm of upper knuckle.
3. Loosen the M16 fasteners of upper knuckle.
4. Loosen the M16 fasteners of lower knuckle.
5. Verify the complete weight is supported, and carefully remove the M8 fasteners of center knuckle.
6. If necessary, remove hinge brackets (top and bottom) from tube sheet by loosening the M8 fasteners.
Figure 71. Non-marine waterbox hinge
Figure 72. Marine waterbox hinge
42 HDWA-SVN003C-EN
Appendix A : Tools, Weights, Lubrication, Torques Table 3. Torque chart
Application Thread/Size Torque (Dry unless otherwise specified) Wrench
Size Notes ft-lb (UOS) N-m
Electrical Terminals
3/8-in. -16 UNC 132-156 15-18 9/16-inch
Use of a backing wrench is recommended1/2-in. -13 UNC 18-22 24-30 3/4-inch
5/8-in. -11 UNC 32-36 43-49 15/16-inch
O-Ring Face Seal Tube Fittings SAE J1453 Steel
Fittings Only
4 18-20 24-27 11/16-inch
Use of a backing wrench, where applicable, is recommended O-ring to be lubricated with grease or oil compatible with the refrigerant in use. If threads are lubricated reduce torque value by 25%.
6 29-31 40-44 13/16-inch
8 38-42 52-57 15/16-inch
10 60-66 82-90 1-1/8-inch
12 85-95 115-126 1-3/8-inch
16 110-122 149-164 1-5/8-inch
20 153-167 207-228 1-7/8-inch
24 230-254 312-343 2-1/4-inch
32 375-413 508-559 2-7/8-inch
Grade 8.8 Metric Fasteners
M5-0.8 54-66 (in-lb) 6-8 8 mm
If threads are lubricated reduce torque value by 25%.
M6-1.0 86-105 (in-lb) 10-12 10 mm
M8-1.25 17-21 23-28 13 mm
M10-1.5 34-42 46-57 16 mm
M12-1.75 60-72 81-98 19 mm
M14-2.0 95-115 129-156 21 mm
M16-2.0 148-180 200-244 24 mm
M18-2.5 203-247 275-335 30 mm
M20-2.5 288-348 390-472 36 mm
Table 4. Wrench and sockets
Size Notes
3/4-inch Motor terminal wiring (recommended)
9/16-inch Water flow control tubing
1-1/8-inch
Open ended wrench and "crow's foot for torque wrench, SAE tube fittings, refrigerant fill fittings.1-1/2-inch
1-7/8-inch
10 mm Motor terminal cover
13 mm Liquid level sensor
16 mm Water flow control fitting
19 mm Suction elbow, discharge pipe
24 mm Multiple - the majority of fasteners this size. Some joints require 2.
HDWA-SVN003C-EN 43
Table 5. Torque wrenches
Imperial (ft-lb) SI (n-m)
40-200 (in-lb) 4-25
20-100 25-135
50-250 65-350
Table 6. Rigging
Rigging Notes
(4) 2 in. x 72 in. SCHD 40 pipes Tip over insurance while separated. Alignment during reassembly.
(4) M16 heavy duty swivel hoist rings Drive, options panel, and compressor lifting #4000 capacity
(4) 10 ton rigging shackles Unit lifting
Lifting straps or chains Capacity dependent upon specific unit and rigging configuration
Spreader bar Capacity dependent upon specific unit and rigging configuration
Table 7. Miscellaneous
Misc. Notes
Large adjustable wrenches Can be used in place of the large open ended wrenches
Breaker bars Large impact (250 ft-lb) is helpful
Ratchet Small battery impact is helpful
Screwdrivers Small electrical components
Pinch bar Align parts during reassembly
Pinch clamp tool Remove and reinstall drive cooling hoses
5 gallon bucket Draining the drive cooling system
Large zip lock bags Storing fasteners
Painter's masking tape Secure compressor shims and other parts during separation
Large garbage bags Covering openings
12-in. zip ties Secure parts during separation
Permanent marker or china marker Match marking assemblies and bags of fasteners
Oil or grease compatable with the refrigerant O-Ring lubrication
Separation gasket kit Shipped with the unit if ordered as separable
1-1/8-in. Pinch Clamps Other clamp styles compatible with barbed fittings are acceptable.
44 HDWA-SVN003C-EN
Table 8. Half unit split weight
Shell side Shell size (CDSZ or
EVSZ)
Weight range Weight range
Min (lb) Max (lb) Min (kg) Max (kg)
Condenser 020A 4296 8098 1953 3681
Condenser 040A/040B 5640 10760 2563 4891
Evaporator 020A 5549 5601 2522 2546
Evaporator 040A/040B 6834 8303 3106 3774
Notes:
• Weight varies significantly with configuration and degree of disassembly. if a more accurate estimation is needed, use the combined weights from the tables. Evaporator weight includes compressor.
• Condenser half weight includes main drive panel.
Table 9. Shell weight
Shell type Shell size (CDSZ or EVSZ) Bundle (CDBS or EVBS)
Weight lb kg
Condenser 020A A 2290 1041
Condenser 020A B 2188 995
Condenser 020A C 2088 949
Condenser 040A/040B A 3582 1628
Condenser 040A/040B B 3374 1534
Condenser 040A/040B C 3176 1444
Condenser 040A/040B X 3799 1727
Evaporator 020A A 1997 908
Evaporator 020A B 1945 884
Evaporator 040A/040B A 2917 1326
Evaporator 040A/040B B 2794 1270
Evaporator 040A/040B C 2687 1221
Evaporator 040A/040B D 2593 1179
Evaporator 040A/040B E 2496 1135
Evaporator 040A/040B X 2977 1353
Table 10. Economizer
Evaporator size (EVSZ) Weight lb kg
020A 143 65
040A 179 81
040B 218 99
HDWA-SVN003C-EN 45
Table 11. Compressor
NTON
Weight lb kg
200 2638 1199
300-400 3057 1390
500 3199 1454
Table 12. Suction elbow
Evaporator shell (EVSZ) Weight lb kg
020A 95 43
040A/040B 111 50
Table 13. Control panel
Voltage SRRL Weight lb kg
208 238-440 3802 1728
380-480 238-440 1808 822
380-480 532 1508 685
380-480 675 2310 1050
575-600 238-440 3352 1524
575-600 532 3073 1397
575-600 675 3861 1755
Table 14. Options panel
Volt SRRL Weight lb kg
380-480 238–363 726 330
380-480 439-533 777 353
380-480 675 1247 567
575-600 238-440 700 318
575-600 532-675 1000 454
208 238-363 1600 726
208 362-440 1600 726
Table 15. Small piping wiring, etc
Evaporator size (EVSZ) Weight lb kg
020A 870 395
040A/040B 1185 539
46 HDWA-SVN003C-EN
Table 16. Water boxes
Shell size (CDSZ or EVSZ) Shell Head
Weight lb kg
020A Either Return 98 45
020A Condenser Non-marine supply 167 76
020A Evaporator Non-marine supply 195 89
020A Either Marine supply 358 165
020A Either Marine cover 253 162
040A/040B Either Return 148 67
040A/040B Condenser Non-marine supply 215 98
040A/040B Evaporator Non-marine supply 250 114
040A/040B Either Marine supply 659 300
040A/040B Either Marine cover 395 179
Table 17. Drive cooling fluid
SRRL NTON gal L
243 to 362 200 1.3 4.9
238 to 532 300/400 1.0 3.8
675 400 1.4 5.3
HDWA-SVN003C-EN 47
Notes
Trane - by Trane Technologies (NYSE: TT), a global innovator - creates comfortable, energy efficient indoor environments for commercial and residential applications. For more information, please visit trane.com or tranetechnologies.com.
Trane has a policy of continuous product and product data improvements and reserves the right to change design and specifications without notice. We are committed to using environmentally conscious print practices.
HDWA-SVN003C-EN 26 May 2025
Supersedes HDWA-SVN003B-EN (November 2022) ©2025 Trane
| Preparing, De-energizing, Locking out, and Securing from Tipping |
| Draining the Drive Cooling System |
| Removing the Upper and Lower Cross-Ties |
| Removing the Motor Terminal Box and Disconnecting the Motor Terminals |
| Removing the Check Valve |
| Disconnecting the Global Connectors |
| Disconnecting the Condenser Drain Line |
| Moving the Lifting Brackets to the Common Shell (both ends) |
| Disconnecting the Conduit Connections at the Back of the Electrical Panel |
| Disconnecting and Plugging the Drive Cooling Lines from the Braze Plate Heat Exchanger (BPHE) |
| Separating the Primary Subassemblies |
| Transferring One Half to the New Location and Securing |
| Additional Disassembly |
| Removing the Cross-tie Brackets |
| Removing the Condenser Liquid Line |
| Removing the Condenser Discharge Pipe |
| Removing the Motor Terminal Box |
| Removing the Evaporator Main EXV Line |
| Removing the Economizer to Compressor Line |
| Removing the Compressor Interstage Line |
| Removing the Condenser Liquid Level Sensor |
| Removing the Options Panel (if present) |
| Removing the Drive Panel |
| Removing the Compressor |
| Removing the Economizer |
| Reassembly Instructions for HDWA |
| Installation Instructions for Non-Marine Waterbox Hinge Assembly |
| Installation Instructions for Marine Waterbox Hinge Assembly |
| Disassembly Instructions Marine and Non-Marine Waterboxes |
Appendix A : Tools, Weights, Lubrication, Torques
File details come from the government source that posted it. Updated .