PRIME-SUB_FORM.xls

XLS spreadsheet 38 KB Posted

Attached to
Main Street Bridge No. 794004 Repairs - Cleaning and Painting
Solicitation number
26-B-121KW
Issued by
Volusia County, Florida

About this file

This is a Prime/Subcontractor Form associated with Invitation to Bid (ITB) No. 26-B-121KW, Contract No. C-2094, issued by the County of Volusia, Department of Public Works for the Main Street Bridge No. 794004 Repairs project located in Daytona Beach, Florida. The project scope encompasses cleaning and painting all structural steel on the bascule and flacking spans, installing web repair plates, replacing bolts and rivets, removing abandoned air buffers and strike plates, and disassembling, cleaning, and re-packing bearings with grease at the auxiliary drive for span drive machinery. The selected contractor must provide all labor, materials, equipment, and services necessary for completion, including traffic control, maintenance of channel traffic, pollution controls, environmental testing, functional checks with span balancing, operation and maintenance manuals, and restoration and as-built surveys and drawings. The form requires bidders to submit this document as a condition of bid responsiveness, with failure to complete and return it potentially resulting in a non-responsive bid designation.

The Prime/Subcontractor Form requires bidders to list all anticipated subcontractors and their respective dollar values and percentages of work, with specific discipline categories identified including maintenance of traffic, bridge balance testing and counterweight adjustment, steel cleaning and preparation, painting, and soil testing. The prime contractor is responsible for ensuring all subcontractors maintain appropriate licenses, and any changes to subcontractors during project completion require prior approval from the County Project Manager. The County reserves the right to request clarification regarding subcontractors but will not permit changes to the total submitted base bid pricing. All dollar values assigned to prime and subcontractors must be entered in green-shaded cells, with the total allocation equaling 100 percent of the project cost. This form also serves to determine local preference eligibility in accordance with Section 2.8, D of the solicitation documents.

View the file

Other files

File Type Posted
Main_Street_Bridge_No._794004_Repairs_-_Cleaning_and_Painting_(Addendum_#3_Revision).pdf PDF
Exhibit_G_-_Bid_Price_Sheet_-_REVISION_1.xls XLS spreadsheet
Main_Street_Bridge_No._794004_Repairs_-_Cleaning_and_Painting_(Addendum_#2_Revision).pdf PDF
Exhibit_C_-_Draft_Contract_26-B-121KW.pdf PDF
Main_Street_Bridge_No._794004_Repairs_-_Cleaning_and_Painting.pdf PDF
Bid_Price_Sheet.xls XLS spreadsheet
USCG_NOTIFICATION_BRIDGE_PRE-CONSTRUCTION_CHECKLIST_-_JAX.pdf PDF
Metals_Analysis_Report_Volusia_County_Main_Street_Bridge_23-04-01994.pdf PDF
Draft_Contract_26-B-121KW.pdf PDF
Sales_Tax_Exemption_Procedures.pdf PDF
Technical_Specifications.pdf PDF
Construction_Plans.pdf PDF
Required_Types_and_Limits_of_Insurance.pdf PDF
4.Construction_Plans_Main_Street_Bridge_794004_Cleaning_and_Painting_6-30-2026.pdf PDF
8._USCG_NOTIFICATION_BRIDGE_PRE-CONSTRUCTION_CHECKLIST_-_JAX.pdf PDF
6.Technical_Specification_T465_Moveable_Bridges_Main_Street_Bridge_6-30-2026.pdf PDF
7.Metals_Analysis_Report_Volusia_County_Main_Street_Bridge_23-04-01994.pdf PDF
9._PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls XLS spreadsheet
5.Bid_Price_Sheet_Main_St_Bridge_794004_Cleaning_&_Painting.xls XLS spreadsheet
2.Scope_of_Work_and_General_Notes_Main_St_Bridge_No_794004.pdf PDF
3.General_Notes_Supplement_Main_St_Bridge_No_794004.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contract No. C-2094ITB No. 26-B-121KW
PRIME/SUBCONTRACTOR FORM
FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID
Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing.
TOTAL BID$ - 0This number should match the Total Bid Price

(inclusive of performance/payment bond, if applicable) as listed on Exhibit G - Bid Price Sheet 26-B-121KW

PRIME CONTRACTORCompany name and complete addressDollar Value performed by Prime Contractor% of Work performed by Contractor
$ - 00.00%
List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation.
Anticipated Subcontractor Disciplines required for this project.Company name and complete addressDollar Value performed by Subcontractor(s)% of Work performed by Subcontractor
(Examples: Electrical, HVAC, Plumbing,
Landscaping, etc. for your project)$ - 00.00%
Maintenance of Traffic$ - 00.00%
Bridge Balance Testing -
Counterweight Adjustment$ - 00.00%
Steel Cleaning, Prep & Painting$ - 00.00%
Soil Testing$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100%$ - 00%

Sheet2

Sheet3

File details come from the government source that posted it. Updated .