PRICING_PROPOSAL-23-1128(reference_only).pdf
PDF 194 KB Posted
- Attached to
- STAR Center Chiller 2 Replacement STEP 2
- Solicitation number
- 23-1128-ITB-C STEP 2
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
This document is an Invitation to Bid - Construction (ITB-C) #23-1128-ITB-C for the STAR Center Chiller 2 Replacement project. The bid solicits a turn-key replacement of one water-cooled chiller, including all associated equipment such as pumps, piping, isolation valves, and supports. The project includes a 10-year warranty covering parts, refrigerant, and labor, along with 10 years of preventative maintenance service. The bid also requires the installation of new Trane direct digital controls to integrate with existing Trane control systems.
The pricing proposal is structured in two tables, with a total of four line items in Table 1. The primary scope of work is listed as a lump sum with $0.00 cost, followed by digital controls integration at $0.00, an estimated building permit at $1,000.00, and a contingency allocation of $50,000.00. Table 2 includes an unspecified hourly labor rate for unforeseen conditions, with the rate to be determined by the bidder. The bid allows for flexibility in addressing potential unexpected work requirements through the contingency and hourly labor rate provisions.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Invitation to Bid - Construction (ITB-C) #23-1128-ITB-C Title: STAR Center Chiller 2 Replacement
9. PRICING PROPOSAL
TABLE 1
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 Provide all equipment, materials, labor, and permitting to complete the turn-key addition of one (1) new water cooled chiller and all associated pump, piping, isolation valves, supports, etc. along with year 10 warranty including parts, refrigerant, & Labor. Provide 10 year preventative maintenance service. List Direct
Digital Controls cost below which will be included in the total bid.
1 Lump sum $0.00
2 Provide new Trane direct digital controls to tie into the existing Trane controls.
1 Lump sum $0.00
3 Estimated Building Permit 1 Lump sum $1,000.00
4 Contingency 1 Lump Sum $50,000.00
TOTAL
TABLE 2
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 Unspecified Hourly Labor Rate for unforseen conditions 1 $/hr
TOTAL
File details come from the government source that posted it. Updated .