GE_breaker-CKT_for_new_CH-2.jpg
JPG image 3 MB Posted
- Attached to
- STAR Center Chiller 2 Replacement STEP 2
- Solicitation number
- 23-1128-ITB-C STEP 2
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
The file is an image (GE_breaker-CKT_for_new_CH-2.jpg) related to a chiller replacement project for the STAR Center in Florida. The project involves the turn-key installation of a new 900-ton water-cooled chiller to replace a failed existing chiller #2 at the Central Energy plant. The replacement is critical to maintaining current operating conditions and providing reliable air conditioning services to the STAR Center and its tenants.
The project addresses an urgent infrastructure need, with the existing chiller having exceeded its operational life. The replacement chiller is designed to be energy-efficient and will ensure continuous utility services for the facility. While specific pricing details are not provided in the available documentation, the project appears to be driven by operational necessity and the requirement to maintain essential cooling infrastructure for the STAR Center's operations.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .