Preventative Maintenance Checklist.pdf

PDF 121 KB Posted

Attached to
Y1DA--PN: 636A6-26-201, Patient Ceiling Lifts Install & Testing (DM) AP: 36C263-26-AP-1431
Solicitation number
36C26326R0059
Issued by

About this file

This is a Corrective and Preventive Maintenance Checklist for Ceiling Mounted Patient Lifts used by the Department of Veterans Affairs (VA). The checklist (Revision 2.1) serves as a commissioning and inspection template for patient ceiling lift systems installed in VA Medical Centers (VAMCs), with a critical safety restriction that such lifts cannot be installed in treatment units with actively suicidal patients.

The checklist is organized into four primary inspection categories: Structure, Rails/Tracks and End Stops, Lift Unit and Straps, and Load Testing. The Structure section requires visual verification of proper connections to the building structure, ceiling interface installation, and structural component sizing. The Rails/Tracks and End Stops section mandates inspection of fastener tightness, gap verification, debris clearance, and proper end stop installation. The Lift Unit and Straps section includes casing inspection, charging verification, hand control activation testing, indicator light confirmation, emergency function verification, strap extension inspection, and spreader bar assessment. The Load Testing section verifies soft start/stop features with specified speed limits (2.5 inches per second unloaded, 1.5 inches per second at maximum capacity), deflection testing at rated capacity, emergency stop function, and emergency lowering capability. Completion requires sign-off from the Inspector, VA Representative, and Manager of the Service Using the Ceiling Mounted Lifts, with each responsible party confirming that all checklist items and manufacturer documentation requirements have been satisfied and that staff training and ongoing training processes are established.

View the file

Other files

File Type Posted
36C26326R0059 0003.docx DOCX document
Final PWS_636A-26-201.docx DOCX document
36C26326R0059 0002.docx DOCX document
36C26326R0059 0001.docx DOCX document
Phase 1 Question and Answers.docx DOCX document
Bldg 1 Full Set_Part2.pdf PDF
Bldg 1 Full Set_Part3.pdf PDF
Bldg 1 Full Set_Part6.pdf PDF
Bldg 1 W Full Set.pdf PDF
Bldg 4 Full Set.pdf PDF
Bldg 12 Full Set_Part7.pdf PDF
Bldg 12 Full Set_Part8.pdf PDF
Bldg 25 Architectural 2.pdf PDF
Bldg 25 Plumbing.pdf PDF
Bldg 25 Structural Drawings.pdf PDF
Directive 1611.pdf PDF
ICRA Table.docx DOCX document
PPQ Form.pdf PDF
Letter of Commitment for Design Firm Teaming Arrangement.pdf PDF
VAAR 852.219-75 LoS.docx DOCX document
Bldg 1 Full Set_Part1.pdf PDF
Bldg 1 Full Set_Part5.pdf PDF
Bldg 12 Full Set_Part4.pdf PDF
Bldg 12 Full Set_Part6.pdf PDF
Bldg 25 Architectural 1.pdf PDF
Bldg 25 Electrical.pdf PDF
Equipment Compliance Matrix.pdf PDF
Installation Relocation Checklist.pdf PDF
Specifications 636A626201.pdf PDF
Wage Determination IA20250071 05.18.2026.pdf PDF
Key Personnel Resume Form.pdf PDF
Bldg 12 Full Set_Part3.pdf PDF
Bldg 25 Medical Gas.pdf PDF
Letter of Commitment for Key Personnel.pdf PDF
36C26326R0059.docx DOCX document
Bldg 1 Full Set_Part4.pdf PDF
Bldg 12 Full Set_Part1.pdf PDF
Bldg 12 Full Set_Part2.pdf PDF
Bldg 12 Full Set_Part5.pdf PDF
Bldg 25 HVAC.pdf PDF
Copy of Ceiling Lifts Replacements and Additions-CI.pdf PDF
Letter of Commitment Key Subcontractors.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revision 2.1 1 of 2 Serial #: ____________________

PASS FAIL

PASS FAIL

The commissioning for a patient ceiling lift system(s) shall include, but not be limited to, the following points as components of the commissioning procedures.

NOTE: Ceiling mounted patient lifts are not to be installed in treatment units with actively suicidal patients.

Lift Location:

VAMC Contact's Phone Number:

Installer:

VAMC Contact:

Manufacturer:

Model:

Facility: Work Order:

Serial Number: EE Number:

Installer's Phone Number:

Structure

Rails/Tracks and End Stops

NOTES:

Lift Unit and Straps

NOTES:

Perform a visual inspection to verify structural component sizing and physical installation to ensure that the correct structural system is in place and properly installed to support the lift.

Verification that all fasteners and set screws are properly tightened on the trollies and rails/tracks.

Ensure that the rail/track is free of gaps (unless required by design). If included in installation, verify rail turntable function, exchanger function, gate alignment, and safety block installation.

Confirm track is clean and clear of all debris. (Use manufacturer’s recommended cleaning materials to avoid damage to the motor case and other components.)

Verification that all manufacturer specified end stops or docking gates are properly installed.

Inspection of lift unit casing for cracks and alignment.

Inspection and activation of hand control for full operation (e.g., up, down, left, right) and “return to charge” function if applicable.

Corrective and Preventive Maintenance Checklist for Ceiling Mounted Patient Lifts

Mfgr Contact's Phone Number:

Date:

Mfgr Contact:

Confirm any and all lift unit indicator lights are functioning. (e.g., red service warning light, charging state light) Inspection and verification of all emergency functions of the lift unit.

Inspection of spreader bar and clips for cracks and for loose or missing rings or cotter pins.

Full extension and inspection of lift strap for loose threads or frays.

Complete

Verification that the lift unit charges properly.

Perform a visual inspection to verify proper connections of the lift's structural system to the building’s structure (including seismic bracing if applicable).

Perform a visual inspection to verify proper interface at the ceiling (hard deck or soft tile) and proper installation of all protective features around the support rods and rails/tracks.

Revision 2.1 2 of 2 Serial #: ____________________

PASS FAIL

NOTES:

After the activities listed in the above checklist and in the manufacturer's installation/operations/owner’s manual(s) have been completed, the inspector shall release the ceiling mounted lift installation to VA representative.

SIGNATURE:

After the activities listed in the above checklist and in the manufacturer's installation/operations/owner’s manual(s) have been completed, the manager of the service using the ceiling mounted lifts confirms that the current staff have received initial training on ceiling mounted lifts and that there is a process in place to provide ongoing training on the proper use of ceiling mounted lifts.

SIGNATURE:

TITLE:

Manager of the Service Using the Ceiling Mounted Lifts COMPLETE

TITLE:

VA Representative After the activities listed in the above checklist and in the manufacturer's installation/operations/owner’s manual(s) have been completed, the VA representative shall review those items with the inspector prior to releasing the ceiling mounted lift back into service to ensure completion of all requirements.

SIGNATURE:

COMPLETE

Inspector COMPLETE

DATE:

DATE:

DATE:

Verification of any “soft start” or “soft stop” features and that lifting speed does not exceed 2.5 inches per second with “zero” load.

Verification of load testing and deflection testing at the manufacturer's specified maximum rated lift capacity.

Verification of any “soft start” and “soft stop” features and that lifting speed does not exceed 1.5 inches per second under maximum rated lift capacity.

Verification of emergency lowering feature at maximum rated lift capacity.

TITLE:

Verification of function of emergency stop at maximum rated lift capacity.

NOTES:

Load Testing

Inspection

Facility:
Work Order:
Manufacturer:
Lift Location:
Model:
VAMC Contact:
Serial Number:
EE Number:
VAMC Contacts Phone Number:
Mfgr Contact:
Installer:
Mfgr Contacts Phone Number:
Installers Phone Number:
Date:
NOTES:
NOTES_2:
Serial:
NOTES_3:
NOTES_4:
DATE:
TITLE:
DATE_2:
TITLE_2:
DATE_3:
TITLE_3:
Serial_2:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Off
Check Box30: Off
Check Box31: Off
Check Box32: Off
Check Box33: Off
Check Box34: Off
Check Box35: Off
Check Box36: Off
Check Box37: Off
Check Box38: Off

File details come from the government source that posted it. Updated .