About this file

This is a Key Personnel Resume Form template used for federal contract proposals. The form requires submission of qualifications for five key positions: the prime contractor's Project Manager responsible for design and construction, Architect of Record, Project Site Superintendent, Safety and Site Health Officer (SSHO), and Construction Quality Manager (CQM). Each position requires a separate sheet of information.

The form requests standardized information including the individual's name and title, assignment on the project, firm name, years of experience with the current firm and other firms, educational degrees with year and specialization, active professional registrations (number, state, and registration years), type of registration (such as P.E., R.A., or LEED-AP), and a detailed description of specific experience and qualifications relevant to the project. While the exact form is not mandatory, the same information must be provided, and continuation sheets may be used if additional space is needed.

View the file

Other files

File Type Posted
36C26326R0059 0003.docx DOCX document
Final PWS_636A-26-201.docx DOCX document
36C26326R0059 0002.docx DOCX document
Phase 1 Question and Answers.docx DOCX document
36C26326R0059 0001.docx DOCX document
Bldg 1 Full Set_Part1.pdf PDF
Bldg 1 Full Set_Part5.pdf PDF
Bldg 12 Full Set_Part4.pdf PDF
Bldg 12 Full Set_Part6.pdf PDF
Bldg 25 Architectural 1.pdf PDF
Bldg 25 Electrical.pdf PDF
Equipment Compliance Matrix.pdf PDF
Installation Relocation Checklist.pdf PDF
Specifications 636A626201.pdf PDF
Wage Determination IA20250071 05.18.2026.pdf PDF
Bldg 12 Full Set_Part3.pdf PDF
Bldg 25 Medical Gas.pdf PDF
Preventative Maintenance Checklist.pdf PDF
Letter of Commitment for Key Personnel.pdf PDF
Bldg 1 Full Set_Part2.pdf PDF
Bldg 1 Full Set_Part3.pdf PDF
Bldg 1 Full Set_Part6.pdf PDF
Bldg 1 W Full Set.pdf PDF
Bldg 4 Full Set.pdf PDF
Bldg 12 Full Set_Part7.pdf PDF
Bldg 12 Full Set_Part8.pdf PDF
Bldg 25 Architectural 2.pdf PDF
Bldg 25 Plumbing.pdf PDF
Bldg 25 Structural Drawings.pdf PDF
Directive 1611.pdf PDF
ICRA Table.docx DOCX document
PPQ Form.pdf PDF
Letter of Commitment for Design Firm Teaming Arrangement.pdf PDF
VAAR 852.219-75 LoS.docx DOCX document
36C26326R0059.docx DOCX document
Bldg 1 Full Set_Part4.pdf PDF
Bldg 12 Full Set_Part1.pdf PDF
Bldg 12 Full Set_Part2.pdf PDF
Bldg 12 Full Set_Part5.pdf PDF
Bldg 25 HVAC.pdf PDF
Copy of Ceiling Lifts Replacements and Additions-CI.pdf PDF
Letter of Commitment Key Subcontractors.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment

Key Personnel Resume Form While this exact form is not required, the same information must be provided. Provide information, listed below, on separate sheets showing qualifications of: prime contractor’s Project Manager responsible for design and construction, Architect of Record, Project Site Superintendent, SSHO, and Construction Quality Manager (CQM).

Use a continuation sheet, if needed.

(a) Your Name and Title

(b) Your Assignment on this Project

(c) Name of Your Firm

(d) No. of Years: With this Firm__________ With other Firms____________

(e) Education: Degree(s)/Year/Specialization

(f) Active Registration, if any: No._______, State(s) ______, First Year/ Current Year ______/______

(g) Type of Registration __________________________ (P.E., R.A., LEED-AP, etc.)

(h) Describe Your Specific Experience and Qualifications Relevant to this Project:

File details come from the government source that posted it. Updated .