This document is a comprehensive architectural and engineering design package for a federal building addition and remodel project, specifically Phase 2 of work at an undisclosed Des Moines, Iowa facility under the Office of Construction and Facilities Management.

The project encompasses mechanical, electrical, and plumbing (MEP) design specifications and detailed construction drawings for HVAC systems, including air handling units, chilled water cooling coils, hot water heating coils, air filters, pumps, ductwork, and associated terminal units. The documents include multiple technical schedules detailing equipment specifications such as air handler unit schedules, chilled water cooling coil schedules, hot water heating coil schedules, air filter schedules, HVAC pump schedules, rotary air-to-air heat exchanger schedules, single duct air terminal unit schedules, diffuser and grille schedules, fan schedules, duct pressure class tables, steam humidifier schedules, expansion tank schedules, hot water unit heater schedules, air flow measuring device schedules, duct leakage classification tables, and sound attenuating units schedules. The design includes flexible duct connections for terminal units, round duct hangers, square vaned elbows, exhaust and return branch ductwork, and low, medium, and high-pressure duct riser supports. The drawings are dated 24/23/2011 and prepared by LEDADAY architects and engineers in collaboration with unnamed consultants for the Des Moines facility. The project represents a substantial MEP infrastructure upgrade with detailed specifications for all major HVAC components and supporting systems necessary for facility operations.

View the file

Other files

File Type Posted
36C26326R0059 0003.docx DOCX document
36C26326R0059 0002.docx DOCX document
Final PWS_636A-26-201.docx DOCX document
36C26326R0059 0001.docx DOCX document
Phase 1 Question and Answers.docx DOCX document
36C26326R0059.docx DOCX document
Bldg 1 Full Set_Part4.pdf PDF
Bldg 12 Full Set_Part1.pdf PDF
Bldg 12 Full Set_Part2.pdf PDF
Bldg 12 Full Set_Part5.pdf PDF
Bldg 25 HVAC.pdf PDF
Copy of Ceiling Lifts Replacements and Additions-CI.pdf PDF
Letter of Commitment Key Subcontractors.pdf PDF
Bldg 1 Full Set_Part1.pdf PDF
Bldg 1 Full Set_Part5.pdf PDF
Bldg 12 Full Set_Part4.pdf PDF
Bldg 12 Full Set_Part6.pdf PDF
Bldg 25 Architectural 1.pdf PDF
Bldg 25 Electrical.pdf PDF
Equipment Compliance Matrix.pdf PDF
Installation Relocation Checklist.pdf PDF
Specifications 636A626201.pdf PDF
Wage Determination IA20250071 05.18.2026.pdf PDF
Key Personnel Resume Form.pdf PDF
Bldg 1 Full Set_Part2.pdf PDF
Bldg 1 Full Set_Part6.pdf PDF
Bldg 1 W Full Set.pdf PDF
Bldg 4 Full Set.pdf PDF
Bldg 12 Full Set_Part7.pdf PDF
Bldg 12 Full Set_Part8.pdf PDF
Bldg 25 Architectural 2.pdf PDF
Bldg 25 Plumbing.pdf PDF
Bldg 25 Structural Drawings.pdf PDF
Directive 1611.pdf PDF
ICRA Table.docx DOCX document
PPQ Form.pdf PDF
Letter of Commitment for Design Firm Teaming Arrangement.pdf PDF
VAAR 852.219-75 LoS.docx DOCX document
Bldg 12 Full Set_Part3.pdf PDF
Bldg 25 Medical Gas.pdf PDF
Preventative Maintenance Checklist.pdf PDF
Letter of Commitment for Key Personnel.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .