Preliminary Bid Results~70.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Steel Bridge Ramp - Girder Strengthening
Solicitation number
S-73000-00015265
Issued by
Multnomah County, Oregon

About this file

This is a Preliminary Bid Results tabulation for an Invitation to Bid (ITB) #S-73000-00015265 issued by the Oregon Department of Transportation (ODOT) for a steel bridge ramp girder strengthening project located in Multnomah County on Pacific Highway West near the Steel Bridge in Portland. The project scope includes installing 224 internal shear anchors, implementing crack sealing across 150 linear feet, establishing temporary work zone traffic control, and developing a pollution control plan. The bid closing date was January 15, 2026, at 2:00 p.m., with the project requiring substantial completion by June 19, 2026, and final completion by June 30, 2026. Liquidated damages are assessed at $700 per calendar day for missed substantial completion dates and $500 per 15-minute increment for unauthorized lane closures.

Seven contractors submitted bids for consideration: Lee Contractors LLC ($173,300.00), Farline Bridge Inc. ($185,333.33), Wildish Standard Paving Co. ($228,861.00), Hamilton Construction Co. ($234,290.00), HP Civil Inc. ($259,555.55), Oregon State Bridge Construction Inc. ($363,128.00), and DallumBuildCo LLC ($461,300.00). The bid results demonstrate significant price variation among bidders, with mobilization costs ranging from $15,000 to $36,300 and temporary traffic control ranging from $18,000 to $122,500. Contractors were required to provide bid security equal to 10 percent of their total bid amount, maintain performance and payment bonds at 100 percent of contract value, and comply with State Buy America provisions, Oregon prevailing wage rates for BOLI Region 2 in Multnomah County, and commercial general liability insurance with minimum limits of $1,000,000 per occurrence. The project is estimated to be valued between $250,000 and $500,000 for bonding purposes and will be funded through state funds, contingent upon ODOT receiving sufficient appropriations.

View the file

Other files

File Type Posted
Revised Exhibit 6 - Plans.pdf PDF
Clarification One.docx DOCX document
00015265_Question and Answer One.docx DOCX document
Clarification Two.docx DOCX document
Exhibit 5 - Specifications.pdf PDF
Revised Exhibit 5 - Specifications.pdf PDF
Att A Form A-2 - Bid Prcing Form.xlsx XLSX spreadsheet
00015265_Invitation to Bid.docx DOCX document
Exhibit 6 - Plans.pdf PDF
ORBuys S-44300-00015266 OHA 6195 RFQ Notice of Award.pdf PDF
00015265_Addendum One.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Date Issued:1/15/26
ITB No.S-73000-00015265BIDDER
NAME:Lee Contractors, LLCFarline Bridge, Inc.Wildish Standard Paving Co.Hamilton Construction CoHP Civil Inc.Oregon State Bridge Construction, Inc.DallumBuildCo LLC
Bid Closing:January 15, 2026 2:00 pmCITY/STATE:
Description:Steel Bridge Ramp - Girder StrengtheningCCB#:
This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration.
Bid Item #DescriptionEst
QTYUNITUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL

PRICE

1MOBILIZATION1LS$ 15,000.00$ 15,000.00$ 18,533.33$ 18,533.33$ 22,000.00$ 22,000.00$ 23,400.00$ 23,400.00$ 25,955.55$ 25,955.55$ 36,300.00$ 36,300.00$ 22,000.00$ 22,000.00
2TEMPORARY WORK ZONE TRAFFIC CONTROL, COMPLETE1LS$ 30,000.00$ 30,000.00$ 18,000.00$ 18,000.00$ 20,000.00$ 20,000.00$ 35,000.00$ 35,000.00$ 75,000.00$ 75,000.00$ 122,500.00$ 122,500.00$ 45,000.00$ 45,000.00
3POLLUTION CONTROL PLAN1LS$ 500.00$ 500.00$ 500.00$ 500.00$ 111.00$ 111.00$ 1,500.00$ 1,500.00$ 250.00$ 250.00$ 7,000.00$ 7,000.00$ 13,000.00$ 13,000.00
4INTERNAL SHEAR ANCHORS, TOP224EACH$ 450.00$ 100,800.00$ 575.00$ 128,800.00$ 750.00$ 168,000.00$ 735.00$ 164,640.00$ 650.00$ 145,600.00$ 747.00$ 167,328.00$ 1,200.00$ 268,800.00
5INJECT AND SEAL CRACKS150FOOT$ 180.00$ 27,000.00$ 130.00$ 19,500.00$ 125.00$ 18,750.00$ 65.00$ 9,750.00$ 85.00$ 12,750.00$ 200.00$ 30,000.00$ 750.00$ 112,500.00
TOTAL$ 173,300.00$ 185,333.33$ 228,861.00$ 234,290.00$ 259,555.55$ 363,128.00$ 461,300.00

File details come from the government source that posted it. Updated .