00015265_Question and Answer One.docx

DOCX document 38 KB Posted

Attached to
Steel Bridge Ramp - Girder Strengthening
Solicitation number
S-73000-00015265
Issued by
Multnomah County, Oregon

About this file

This is a Question and Answer document issued by the Oregon Department of Transportation (ODOT) for Invitation to Bid (ITB) No. S-73000-00015265 concerning a steel bridge ramp girder strengthening project located near the Steel Bridge in Portland, Multnomah County. The project scope includes installing 224 internal shear anchors, implementing crack sealing across 150 linear feet, and completing temporary work zone traffic control. Bid Item 5 specifically requires epoxy injection of cracks in girders as detailed on project sheet J01. The ITB closing date is December 4, 2025, at 2:00 pm, with bids submitted electronically through OregonBuys. Substantial completion is required by June 19, 2026, and final completion by June 30, 2026. Liquidated damages are assessed at $700 per calendar day for missed substantial completion dates and $500 per 15-minute increment for unauthorized lane closures.

The first Q&A response clarifies that contractors are responsible for coordinating with the City of Portland regarding access to girders beneath the bridge, which are currently obstructed by event materials stored by the City. Under the State of Oregon General Conditions for Public Improvement Contracts Section B.4, the contractor must obtain all necessary permits and licenses for construction work, temporary obstructions, and street openings, excluding those specifically exempted in the Supplemental General Conditions. ODOT will provide contact information for the City representative responsible for the event materials. The project requires bid security equal to 10 percent of the total bid amount, performance and payment bonds at 100 percent of the contract award, and compliance with State Buy America provisions for all steel, iron, coatings, and manufactured products. The project is estimated between $250,000 and $500,000 for bonding purposes and will be funded through state funds, contingent on ODOT receiving sufficient appropriation.

View the file

Other files

File Type Posted
Revised Exhibit 6 - Plans.pdf PDF
Clarification One.docx DOCX document
Clarification Two.docx DOCX document
Exhibit 5 - Specifications.pdf PDF
Revised Exhibit 5 - Specifications.pdf PDF
Att A Form A-2 - Bid Prcing Form.xlsx XLSX spreadsheet
00015265_Invitation to Bid.docx DOCX document
Exhibit 6 - Plans.pdf PDF
ORBuys S-44300-00015266 OHA 6195 RFQ Notice of Award.pdf PDF
Preliminary Bid Results~70.xlsx XLSX spreadsheet
00015265_Addendum One.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE:
November 19, 2025
OREGON DEPARTMENT OF TRANSPORTATION

INVITATION TO BID

Q & A NO. 1

ITB NO.:
S-73000-00015265
CLOSING DATE:
December 4, 2025
TIME:
2:00 pm
DESCRIPTION:
Steel Bridge Ramp - Girder Strengthening
BUYER:
Ivory Williams
EMAIL:
Ivory.williams@odot.oregon.gov
PHONE:
503-910-9609

Question #1 - Bid Item 5 is Inject and Seal Cracks and Sheet J01 Note 1 says epoxy inject cracks in girders, as required. The underside of the bridge is currently protected by steel grating wall panels and full of what appears to be City of Portland event materials. In order to perform the crack injection, we would need access to the girders under the bridge. Who is going to move those materials and when? Have arrangements been made with the City to move the materials? Is there any requirement for the contractor to handle, secure, or coordinate anything related to those materials?

Answer #1 – The Contractor will need to coordinate with the City on any access needs. Per the State of Oregon General Conditions for Public Improvement Contracts (GCs), Section B.4 Permits states the Contractor is required to “obtain and pay for all necessary permits and licenses, except for those specifically excluded in the Supplemental General Conditions, for the construction of the Work, for temporary obstructions, enclosures, opening of streets for pipes, walls, utilities, environmental Work, etc., as required for the project.”. ODOT will provide contact information for the City representative for the event materials.

ITB_ADDENDUM, S006-G031521