This document is a financial proposal form for a Request for Proposals (RFP) issued by the Maryland Department of Health (MDH) for a Software as a Service (SaaS) solution for Electronic Health Records (EHR) and revenue-cycle management. The RFP seeks proposals for an EHR solution to be implemented across eleven healthcare facilities operated by MDH. The financial proposal form provides instructions for submitting pricing information, including turnkey implementation costs and annual SaaS subscription fees for each facility over a 7-year period. The form also includes a section for offerors to submit hourly labor rates for various technical labor categories required for the contract. The RFP solicitation number is MDH/OCMP-22-18251.
The financial proposal form requires offerors to provide detailed pricing broken down by each facility and EHR module. Pricing must be fully loaded and include all costs and expenses. The form indicates that the total evaluated proposed price will not include the labor rates, which will be evaluated separately using a formula to determine the overall average labor rate. The RFP states that the contract will be a labor hour contract with a total not-to-exceed labor dollar amount.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions Attachment B - 1: FINANCIAL PROPOSAL INSTRUCTIONS
Solicitation Number: 22-18251/eMMA# BPM__________ Solicitation Name: EHR
In order to assist Offerors in the preparation of their Financial Proposal and to comply with the requirements of this solicitation, Financial Proposal Instructions and a Financial Proposal Form have been prepared. Offerors shall submit their Financial Proposal on the Financial Proposal Form in accordance with the instructions on the Financial Proposal Form and as specified herein. Do not alter the Financial Proposal Form or the Proposal may be determined to be not reasonably susceptible of being selected for award. The Financial Proposal Form is to be signed and dated, where requested, by an individual who is authorized to bind the Offeror to the prices entered on the Financial Proposal Form.
The Financial Proposal Form is used to calculate the Offeror’s TOTAL Proposal PRICE. Follow these instructions carefully when completing your Financial Proposal Form:
A. All Unit and Extended Prices must be clearly entered in dollars and cents, e.g., $24.15. Make your decimal points clear and distinct.
B. All Unit Prices must be the actual price per unit the State will pay for the specific item or service identified in this RFP and may not be contingent on any other factor or condition in any manner.
C. All calculations shall be rounded to the nearest cent, e.g., .344 shall be .34 and .345 shall be .35.
D. Any goods or services required through this RFP and proposed by the vendor at No Cost to the State must be clearly entered in the Unit Price, if appropriate, and Extended Price with $0.00.
| E. Every blank in every Financial Proposal Form shall be filled in. Any changes or corrections made to the Financial Proposal Form by the Offeror prior to submission shall be initialed and dated. |
| F. Except as instructed on the Financial Proposal Form, nothing shall be entered on or attached to the Financial Proposal Form that alters or proposes conditions or contingencies on the prices. Alterations and/or conditions may render the Proposal not reasonably susceptible of being selected for award. |
G. It is imperative that the prices included on the Financial Proposal Formhave been entered correctly and calculated accurately by the Offeror and that the respective total prices agree with the entries on the Financial Proposal Form. Any incorrect entries or inaccurate calculations by the Offeror will be treated as provided in COMAR 21.05.03.03.F, and may cause the Proposal to be rejected.
H. If option years are included, Offerors must submit pricing for each option year. Any option to renew will be exercised at the sole discretion of the State and comply with all terms and conditions in force at the time the option is exercised. If exercised, the option period shall be for a period identified in the RFP at the prices entered in the Financial Proposal Form.
I. All Financial Proposal prices including labor rates entered below are to be fully loaded prices that include all costs/expenses associated with the provision of services as required by the RFP. The Financial Proposal price shall include, but is not limited to, all: labor, profit/overhead, general operating, administrative, and all other expenses and costs necessary to perform the work set forth in the solicitation. No other amounts will be paid to the Contractor. If labor rates are requested, those amounts shall be fully-loaded rates; no overtime amounts will be paid.
J. Unless indicated elsewhere in the RFP, sample amounts used for calculations on the Financial Proposal Form are typically estimates for evaluation purposes only. Unless stated otherwise in the RFP, the DDA does not guarantee a minimum or maximum number of units or usage in the performance of the Contract.
K. Failure to adhere to any of these instructions may result in the Proposal being determined not reasonably susceptible of being selected for award.
L. The Financial Proposal Form shall contain all price information in the format specified on these pages. Complete the Financial Proposal Form only as provided in the Financial Proposal Instructions. Do not amend, alter or leave blank any items on the Financial Proposal Form. If option years are included, Offerors must submit pricing for each option year. Failure to adhere to any of these instructions may result in the Proposal being determined not reasonably susceptible of being selected for awar
Table 1 - Summary
| Attachment B - Financial Proposal - Electronic Health Records RFP #MDH/OPASS 22-18251 | |||||||||
| Table 1 - Summary: Total Turnkey Implementation & Annual SaaS Subscription Costs by Facility | |||||||||
| Facility/Hospital/Center of Implementation | Full Implementation Costs (Turnkey) | Year 1 SaaS costs | Year 2 SaaS costs | Year 3 SaaS costs | Year 4 SaaS costs | Year 5 SaaS costs | Option Year 6 SaaS costs | Option Year 7 SaaS costs | Total Project Costs Per Facility |
| Springfield | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Spring Grove | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Potomac Center | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Finan Center | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| CT Perkins | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Western Maryland Hospital Ctr | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Holly Center | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| RICA Baltimore | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Eastern Shore | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Deer's Head | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| JLG RICA Rockville | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| OCEP Dept | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| MDH Reimbursements Dept | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Evaluated Proposed Price for all Facilities | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| CLARIFICATION : LABOR RATES MUST BE SUBMITTED ON THE TAB LABELED "LABOR RATES"ONLY. Labor Rates ARE NOT a part the Total Evaluated Proposed Price for this solication. Unless stated otherwise in the RFP, MDH does not guarantee a minimum or maximum number of Labor Hours in the performance of the Contract. |
TOTAL EVALUATED PROPOSED PRICE Table 1 - Summary Total Turnkey - all Facilities $0.00
| OVERALL AVERAGE LABOR RATE(S) FOR ALL CATEGORIES - YRS 1-7 (NOT included in Total Evaluated Proposed Price) | $0.00 |
| Name of Offeror: |
Signature:
Date:
Address of Offeror:
Offeror FEIN:
Table 2 - Spring Grove
| Attachment B - Financial Proposal - Electronic Health Records RFP #MDH/OPASS 22-18251 | |||||||||
| EHR Module (Based on Appendix 4 - Functional and Business Requirements) | Table 2 - Facility/Hospital/Center of Implementation | ||||||||
| Spring Grove | |||||||||
| Implementation (Turn-key) | Year 1 Operations | Year 2 Operations | Year 3 Operations | Year 4 Operations | Year 5 Operations | Year 6 Operations | Year 7 Operations | Total Project Costs Per EHR Module | |
| General | $0.00 | ||||||||
| Electronic Health Records | $0.00 | ||||||||
| Revenue Cycle | $0.00 | ||||||||
| Pharmacy | $0.00 | ||||||||
| Forensic | $0.00 | ||||||||
| Laboratory | $0.00 | ||||||||
| Total Costs for Facility | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Table 3 - Springfield
| Attachment B - Financial Proposal - Electronic Health Records RFP #MDH/OPASS 22-18251 | |||||||||
| EHR Module (Based on Appendix 4 - Functional and Business Requirements) | Table 3 - Facility/Hospital/Center of Implementation | ||||||||
| Springfield | |||||||||
| Implementation (Turn-key) | Year 1 Operations | Year 2 Operations | Year 3 Operations | Year 4 Operations | Year 5 Operations | Year 6 Operations | Year 7 Operations | Total Project Costs Per EHR Module | |
| General | $0.00 | ||||||||
| Electronic Health Records | $0.00 | ||||||||
| Revenue Cycle | $0.00 | ||||||||
| Pharmacy | $0.00 | ||||||||
| Forensic | $0.00 | ||||||||
| Laboratory | $0.00 | ||||||||
| Total Costs for Facility | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Table 4 - Eastern Shore
| Attachment B - Financial Proposal - Electronic Health Records RFP #MDH/OPASS 22-18251 | |||||||||
| EHR Module (Based on Appendix 4 - Functional and Business Requirements) | Table 4 - Facility/Hospital/Center of Implementation | ||||||||
| Eastern Shore | |||||||||
| Implementation (Turn-key) | Year 1 Operations | Year 2 Operations | Year 3 Operations | Year 4 Operations | Year 5 Operations | Year 6 Operations | Year 7 Operations | Total Project Costs Per EHR Module | |
| General | $0.00 | ||||||||
| Electronic Health Records | $0.00 | ||||||||
| Revenue Cycle | $0.00 | ||||||||
| Pharmacy | $0.00 | ||||||||
| Forensic | $0.00 | ||||||||
| Laboratory | $0.00 | ||||||||
| Total Costs for Facility | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Table 5 - Deers Head
| Attachment B - Financial Proposal - Electronic Health Records RFP #MDH/OPASS 22-18251 | |||||||||
| EHR Module (Based on Appendix 4 - Functional and Business Requirements) | Table 5 - Facility/Hospital/Center of Implementation | ||||||||
| Deers Head | |||||||||
| Implementation (Turn-key) | Year 1 Operations | Year 2 Operations | Year 3 Operations | Year 4 Operations | Year 5 Operations | Year 6 Operations | Year 7 Operations | Total Project Costs Per EHR Module | |
| General | $0.00 | ||||||||
| Electronic Health Records | $0.00 | ||||||||
| Revenue Cycle | $0.00 | ||||||||
| Pharmacy | $0.00 | ||||||||
| Forensic | $0.00 | ||||||||
| Laboratory | $0.00 | ||||||||
| Total Costs for Facility | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Table 6 - Holly
| Attachment B - Financial Proposal - Electronic Health Records RFP #MDH/OPASS 22-18251 | |||||||||
| EHR Module (Based on Appendix 4 - Functional and Business Requirements) | Table 6 - Facility/Hospital/Center of Implementation | ||||||||
| Holly Center | |||||||||
| Implementation (Turn-key) | Year 1 Operations | Year 2 Operations | Year 3 Operations | Year 4 Operations | Year 5 Operations | Year 6 Operations | Year 7 Operations | Total Project Costs Per EHR Module | |
| General | $0.00 | ||||||||
| Electronic Health Records | $0.00 | ||||||||
| Revenue Cycle | $0.00 | ||||||||
| Pharmacy | $0.00 | ||||||||
| Forensic | $0.00 | ||||||||
| Laboratory | $0.00 | ||||||||
| Total Costs for Facility | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Table 7 - Western MD
| Attachment B - Financial Proposal - Electronic Health Records RFP #MDH/OPASS 22-18251 | |||||||||
| EHR Module (Based on Appendix 4 - Functional and Business Requirements) | Table 7 - Facility/Hospital/Center of Implementation | ||||||||
| Western MD | |||||||||
| Implementation (Turn-key) | Year 1 Operations | Year 2 Operations | Year 3 Operations | Year 4 Operations | Year 5 Operations | Year 6 Operations | Year 7 Operations | Total Project Costs Per EHR Module | |
| General | $0.00 | ||||||||
| Electronic Health Records | $0.00 | ||||||||
| Revenue Cycle | $0.00 | ||||||||
| Pharmacy | $0.00 | ||||||||
| Forensic | $0.00 | ||||||||
| Laboratory | $0.00 | ||||||||
| Total Costs for Facility | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Table 8 - Potomac CenterSETT
| Attachment B - Financial Proposal - Electronic Health Records RFP #MDH/OPASS 22-18251 | |||||||||
| EHR Module (Based on Appendix 4 - Functional and Business Requirements) | Table 8 - Facility/Hospital/Center of Implementation | ||||||||
| Potomac Center/SETT (DDA) | |||||||||
| Implementation (Turn-key) | Year 1 Operations | Year 2 Operations | Year 3 Operations | Year 4 Operations | Year 5 Operations | Year 6 Operations | Year 7 Operations | Total Project Costs Per EHR Module | |
| General | $0.00 | ||||||||
| Electronic Health Records | $0.00 | ||||||||
| Revenue Cycle | $0.00 | ||||||||
| Pharmacy | $0.00 | ||||||||
| Forensic | $0.00 | ||||||||
| Laboratory | $0.00 | ||||||||
| Total Costs for Facility | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Table 9 - CT Perkins
| Attachment B - Financial Proposal - Electronic Health Records RFP #MDH/OPASS 22-18251 | |||||||||
| EHR Module (Based on Appendix 4 - Functional and Business Requirements) | Table 9 - Facility/Hospital/Center of Implementation | ||||||||
| CT Perkins | |||||||||
| Implementation (Turn-key) | Year 1 Operations | Year 2 Operations | Year 3 Operations | Year 4 Operations | Year 5 Operations | Year 6 Operations | Year 7 Operations | Total Project Costs Per EHR Module | |
| General | $0.00 | ||||||||
| Electronic Health Records | $0.00 | ||||||||
| Revenue Cycle | $0.00 | ||||||||
| Pharmacy | $0.00 | ||||||||
| Forensic | $0.00 | ||||||||
| Laboratory | $0.00 | ||||||||
| Total Costs for Facility | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Table 10 - Finan Center
| Attachment B - Financial Proposal - Electronic Health Records RFP #MDH/OPASS 22-18251 | |||||||||
| EHR Module (Based on Appendix 4 - Functional and Business Requirements) | Table 10 - Facility/Hospital/Center of Implementation | ||||||||
| Finan Center | |||||||||
| Implementation (Turn-key) | Year 1 Operations | Year 2 Operations | Year 3 Operations | Year 4 Operations | Year 5 Operations | Year 6 Operations | Year 7 Operations | Total Project Costs Per EHR Module | |
| General | $0.00 | ||||||||
| Electronic Health Records | $0.00 | ||||||||
| Revenue Cycle | $0.00 | ||||||||
| Pharmacy | $0.00 | ||||||||
| Forensic | $0.00 | ||||||||
| Laboratory | $0.00 | ||||||||
| Total Costs for Facility | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Table 11 - OCEP Dept
| Attachment B - Financial Proposal - Electronic Health Records RFP #MDH/OPASS 22-18251 | |||||||||
| EHR Module (Based on Appendix 4 - Functional and Business Requirements) | Table 11 - Facility/Hospital/Center of Implementation | ||||||||
| Office of Court-Ordered Evaluations and Placements (OCEP) | |||||||||
| Implementation (Turn-key) | Year 1 Operations | Year 2 Operations | Year 3 Operations | Year 4 Operations | Year 5 Operations | Year 6 Operations | Year 7 Operations | Total Project Costs Per EHR Module | |
| General | $0.00 | ||||||||
| Electronic Health Records | $0.00 | ||||||||
| Revenue Cycle | $0.00 | ||||||||
| Pharmacy | $0.00 | ||||||||
| Forensic | $0.00 | ||||||||
| Laboratory | $0.00 | ||||||||
| Total Costs for Facility | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Table 12 - JLG RICA Rockville
| Attachment B - Financial Proposal - Electronic Health Records RFP #MDH/OPASS 22-18251 | |||||||||
| EHR Module (Based on Appendix 4 - Functional and Business Requirements) | Table 12 - Facility/Hospital/Center of Implementation | ||||||||
| JLG RICA Rockville | |||||||||
| Implementation (Turn-key) | Year 1 Operations | Year 2 Operations | Year 3 Operations | Year 4 Operations | Year 5 Operations | Year 6 Operations | Year 7 Operations | Total Project Costs Per EHR Module | |
| General | $0.00 | ||||||||
| Electronic Health Records | $0.00 | ||||||||
| Revenue Cycle | $0.00 | ||||||||
| Pharmacy | $0.00 | ||||||||
| Forensic | $0.00 | ||||||||
| Laboratory | $0.00 | ||||||||
| Total Costs for Facility | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Table 13 - RICA Baltimore
| Attachment B - Financial Proposal - Electronic Health Records RFP #MDH/OPASS 22-18251 | |||||||||
| EHR Module (Based on Appendix 4 - Functional and Business Requirements) | Table 13 - Facility/Hospital/Center of Implementation | ||||||||
| RICA Baltimore | |||||||||
| Implementation (Turn-key) | Year 1 Operations | Year 2 Operations | Year 3 Operations | Year 4 Operations | Year 5 Operations | Year 6 Operations | Year 7 Operations | Total Project Costs Per EHR Module | |
| General | $0.00 | ||||||||
| Electronic Health Records | $0.00 | ||||||||
| Revenue Cycle | $0.00 | ||||||||
| Pharmacy | $0.00 | ||||||||
| Forensic | $0.00 | ||||||||
| Laboratory | $0.00 | ||||||||
| Total Costs for Facility | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Table 14MDH Reimbursements Dept
| Attachment B - Financial Proposal - Electronic Health Records RFP #MDH/OPASS 22-18251 | |||||||||
| EHR Module (Based on Appendix 4 - Functional and Business Requirements) | Table 14 - Facility/Hospital/Center of Implementation | ||||||||
| MDH Reimbursements Department | |||||||||
| Implementation (Turn-key) | Year 1 Operations | Year 2 Operations | Year 3 Operations | Year 4 Operations | Year 5 Operations | Year 6 Operations | Year 7 Operations | Total Project Costs Per EHR Module | |
| General | $0.00 | ||||||||
| Electronic Health Records | $0.00 | ||||||||
| Revenue Cycle | $0.00 | ||||||||
| Pharmacy | $0.00 | ||||||||
| Forensic | $0.00 | ||||||||
| Laboratory | $0.00 | ||||||||
| Total Costs for Facility | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
LABOR RATES
| Appendix 6 - Labor Categories/Rates | ||||||||
| Electronic Health Records RFP | ||||||||
| Solicitation #: MDH/OCMP 22-18251 | ||||||||
| Labor Catgories for Work Order Process | ||||||||
| This is a Labor Contract as described in 21.06.03.05.A (1). Labor Hour contract means a contract which only provides for the payment of labor performed. The Contractor will paid the hourly rate(s) quoted in Appendix 6 for the actual hours worked by each respective individual listed. A Total Not-to-Exceed (NTE) Labor dollar Amount will be included in the contract. NTE amount to be determind by MDH. Additional payments above the Total Not-to-Exceed (NTE) Labor Amount will not be paid. Offeror should review Section 4.1 of the Attachment M. Labor Rates are NOT a part of the Total Evaluated Proposed Price - Attachment B. | ||||||||
| All prices entered below must be fully loaded prices that include all costs/expenses associated with the provision of services as required by the RFP. The price shall include, but is not limited to, all: labor, profit/overhead, general operating, administrative, and all other expenses and costs necessary to perform the work set forth in the solicitation. No other amounts will be paid to the Contractor. No overtime amounts will be paid. | ||||||||
| Per Section 6.3.1.B MDH will use the following formula to EVALUATE Labor Rates –Sum of Hourly Labor Rates (LR) Per year (5 base years/2 option years) = Overall Total Average Labor Rate for 1-7 Years (i.e., Yr. 1- $275.00/hr.,Yr. 2- 395.00/hr., Year 3- $200.00/hr. = Overall Total Evaluated Average Labor Rate of $290.00/hr.) ALL Qualified Offerors (see Section 6.5.2.D) will be ranked from the lowest (most advantageous) to the highest (least advantageous) price based on the criteria listed in the above guidelines set forth in this RFP as submitted on Attachment B - Financial Proposal Form. Sample Evaluation - Name of Offeror(s)/Total Average Evaluated Labor Rates/Ranking | ||||||||
| Offeror 1- | #1 – (Lowest Total Evaluated Average Labor Rate), Offeror 2- #2 – (2nd Lowest Total Evaluated Average Labor Rate), etc. | |||||||
| Labor Categories are not guaranteed and are on an "If Needed" basis. Offerors should review Section 6.2.5 and 4.1 of Attachment M. | ||||||||
| Labor Category (Section 3.10.4) | Hourly Rate Year 1 | Hourly Rate Year 2 | Hourly Rate Year Year 3 | Hourly Rate Year Year 4 | Hourly Rate Year Year 5 | Hourly Rate Option Year 1 | Hourly Rate Option Year 2 | |
| Project Manager, Functional | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Architect, Application (Senior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Engineer, Systems | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Engineer, Systems (Senior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Testing Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Training Specialist/Instructor | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Computer Software/Integration Analyst (Senior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Applications Development Expert | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Applications Programmer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Helpdesk Manager | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Computer Specialist (Senior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Database Manager | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Helpdesk Specialist (Junior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Helpdesk Manager (Senior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Quality Assurance Specialist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Network Administrator | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Network Manager | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Subject Matter Expert | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Subject Matter Expert (Senior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Technical Writer/Editor | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Database Management Specialist (Junior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Information Technology Architect (Senior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Systems Design Architect | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Information Security Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Network Security Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Computer Systems Analyst (Junior) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Total Average Labor Rate Per Year | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Overall Evaluated Total Average Labor Rate for Yrs. 1-7 | $0.00 |