This document set comprises the Construction Documents for the "Correct HVAC Deficiencies" federal contract project at 4101 Woolworth Ave, Omaha, NE 68105 (Project 636-25-301), issued by the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management. The documents include architectural, mechanical, and electrical construction drawings, schedules, and specifications for HVAC system upgrades and corrections across multiple buildings.

The mechanical scope includes replacement of internal components for Air Handling Units (AHU-1 and AHU-3), with AHU-3 as the base bid and AHU-1 priced as Additive Bid Item I. Building 6 boiler replacement work is priced as Additive Bid Item II. The mechanical work encompasses new electric boiler installation (75 KW output, 256 MBH, Lattner Space Saver model B-6-1), two redundant heating water pumps (P-6-1 and P-6-2, 35 GPM each) with Variable Frequency Drives, humidifier system (H-6-1, 36 lb/hr capacity), expansion tank (ET-6-1, 75 gallons), combination air and dirt separator (AS-6-1), and associated piping, insulation, and controls. The electrical scope includes provision of power connections to new HVAC equipment, Variable Frequency Drives for pump and fan motors, fire alarm integration with smoke dampers, UV lighting arrays for AHU units, and construction of temporary air handling systems during renovation. The project requires coordination among mechanical, electrical, and controls contractors, with multiple service shutdowns to existing switchboard MDP-17 requiring minimum 30-day advance notice to VA COR. Construction documents reflect fully sprinklered systems and compliance with Building 17 lightning protection requirements extending to adjacent Building 1 AHU tower facilities.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOILER WATER HEATER WATER SOFTENER

CONDENSATE PUMP

HEAT EXCHANGER

TO DRAIN

DRAINDOWN

1" BF

1" BF

3/4" NPCW

2" VENT

1 1/4" LPR

1 1/4" LPR

1"

1"

3/4"

2" LPS

1" LPS

1 1/4" LPR

1" LPR

1/2" DHWC

1 1/2"

3/4"

1 1/2"

1 1/2"

2" SHW

2" DHW

1/2"

3/4" DCW

3/4" DHW

3/4" DCW

2" DCW

1 1/2"

1 1/2"

1 1/4"

EAST

WALL

EAST

WALL

EAST

WALL

WEST

WALL

EAST

WALL

TO FIRST

LEVEL

SOUTH

WALL

SOUTH

WALL

NORTH

WALL

IN-LINE HOT

WATER PUMP

HOT WATER

CIRCULATION PUMP

WEST

WALL

3 1/2"

1"

EXPANSION

TANK

3/4"

1. WATER HEATER TO BE RELOCATED. REFER TO DEMOLITION AND NEW PLANS.

2. CAP LINE FOR CONNECTION TO NEW WORK.

KEY NOTES:

SOUTH

WALL

S

WATER HEATER WATER SOFTENER

1/2" DHWC

1 1/2"

3/4"

1 1/2"

1 1/2"

2" SHW

2" DHW

1/2"

3/4" DCW

3/4" DHW

3/4" DCW

2" DCW

EAST

WALL

EAST

WALL

1 1/4" HWR

THROUGH

WEST WALL

EAST

WALL

TO FIRST

LEVEL

1 1/2" HWS

THROUGH

SOUTH WALL

1 1/4" HWR

THROUGH

NORTH WALL

HOT WATER

CIRCULATION PUMP

ET-6-1

B-6-1

HWS

HWR

P-6-2

P-6-1

1 1/4" HWS

TO AHU

1 1/4" HWR

FROM AHU2"

2"

CHEMICAL POT

FEEDER

AS-6-1

3. WATER HEATER TO BE RELOCATED. REFER TO DEMOLITION AND NEW PLANS.

KEY NOTES:

ET-6-1

BT-6-1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234

Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520

NE COA NUMBER: CA-1620

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

NE COA NUMBER: CA-0721

on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

A

B

C

D

E

F

12/24/2025A u to d e s k D o c s /1

-2

-3

A E

C o rr e c t H

V A

C D e fi c ie n c ie s /6

-3

.B

.M E

P .R

.r v t

/2 /2

:3

:4

A

M

6-MP503

BUILDING 06 - HEATING HOT WATER

SCHEMATICS - ADDITIVE BID ITEM II

Correct HVAC Deficiencies

4101 Woolworth Ave, Omaha, NE 68105

636-25-301

12/24/2025 JMM ETD

NO SCALE1

EXISTING HEATING HOT WATER SCHEMATIC

NO SCALE2

NEW HEATING HOT WATER SCHEMATIC

Mark Revisions: Date:

REMARKS:

1. PROVIDE IN ACCORDANCE WITH ALL MANUFACTURER INSTALLATION INSTRUCTIONS FOR THE LOCATION AND APPLICATION SHOWN ON THE PLANS.

2. PROVIDE FIELD INSTALLED UNISTRUT OR FACTORY PROVIDED SUPPORT LEGS.

3. PROVIDE STAINLESS STEEL PIPE BETWEEN STEAM GENERATOR AND HUMIDIFIER MANIFOLD. INSTALL A WATER TIGHT SEAL TRAP AT DISCHARGE FROM HUMIDIFIER.

4. INSTALL MANIFOLD IN AIR HANDLING UNIT. VERIFY DIMENSIONS. SEAL AROUND MANIFOLD AIRTIGHT.

5. PROVIDE A DRAIN LINE COOLER FOR STEAM GENERATOR AND HUMIDIFIER MANIFOLD. DRISTEAM “DRAIN KOOLER” OR EQUIVALENT.

6. “SCCR” - VALUE INDICATED IS AVAILABLE SHORT CIRCUIT CURRENT (SCC) IN KILOAMPS AT THE EQUIPMENT BASED ON PRELIMINARY DESIGN PHASE CALCULATIONS. EQUIPMENT SCCR SHALL BE MINIMUM 120% OF THE AVAILABLE SCC. RATING SHALL BE

ADJUSTED OK IF REQUIRED BASED ON FINAL SCC CALCULATION. EQUIPMENT INDICATED WITH FIVE KA MAY BE PROVIDED WITH 5KA SCCR. REVIEW SCCR WITH ELECTRICAL CONTRACTOR PRIOR TO ORDERING EQUIPMENT.

7. PROVIDE FACTORY INSULATION AND DISPERSION TUBE AND HEADER.

REMARKS:

1. PERFORMANCE BASED ON FLUID AND CONDITIONS INDICATED IN THIS SCHEDULE.

2. PROVIDE WITH THE FOLLOWING ACCESSORIES: DISCONNECT, CHECK VALVE, VENTURI FLOW MEASURING DEVICE, FLEXIBLE CONNECTORS, UNIONS, AND TEMPERATURE AND PRESSURE GAUGES ON EACH CONNECTION.

3. PROVIDE BACNET INTERFACE.

4. "SCCR" - VALUE INDICATED IS AVAILABLE SHORT CIRCUIT CURRENT (SCC) IN KILOAMPS AT THE EQUIPMENT BASED ON PRELIMINARY DESIGN PHASE CALCULATIONS. EQUIPMENT SCCR SHALL BE MINIMUM 120% OF THE AVAILABLE SCC. RATING SHALL BE ADJUSTED IF

REQUIRED BASED ON FINAL SCC CALCULATION. EQUIPMENT INDICATED WITH 5 KA MAY BE PROVIDED WITH 5 KA SCCR. REVIEW SCCR WITH ELECTRICAL CONTRACTOR PRIOR TO ORDERING EQUIPMENT.

REMARKS:

1. BOILER PERFORMANCE BASED ON FLUID AND CONDITIONS INDICATED IN THIS SCHEDULE.

2. MOUNT AND ANCHOR BOILER TO EXISTING HOUSEKEEPING PAD.

3. PROVIDE BOILER PUMP (P-6-3).

4. BOILER AND FUEL SYSTEM SHALL BE CSD-1 AND FM COMPLIANT. PROVIDE ALL ACCESSORIES AND CONTROLS REQUIRED.

5. "SCCR" - VALUE INDICATED IS AVAILABLE SHORT CIRCUIT CURRENT (SCC) IN KILOAMPS AT THE EQUIPMENT BASED ON PRELIMINARY DESIGN PHASE CALCULATIONS. EQUIPMENT SCCR SHALL BE MINIMUM 120% OF THE AVAILABLE SCC. RATING SHALL BE ADJUSTED IF REQUIRED

BASED ON FINAL SCC CALCULATION. EQUIPMENT INDICATED WITH 5 KA MAY BE PROVIDED WITH 5 KA SCCR. REVIEW SCCR WITH ELECTRICAL CONTRACTOR PRIOR TO ORDERING EQUIPMENT.

REMARKS:

1. CONTRACTOR TO PIPE UNIT AS INDICATED FROM FACTORY, COUNTERFLOW.

ABBREVIATIONS: MF = MINERAL FIBER/FIBERGLASS, E = ELASTOMERIC, CG = CELLULAR GLASS, ASJ = ALL SERVICE JACKET, SSL = SELF SEALING LAP

REMARKS:

1. NCIIS (NATIONAL COMMERCIAL AND INDUSTRIAL INSULATION STANDARD) PLATE NUMBER REFERENCED ARE PROVIDED TO CLARIFY THE SCOPE OF INSTALLATION. INSTALL INSULATION AND ACCESSORY COMPONENTS PER APPLICABLE NCIIS AND

MANUFACTURERS RECOMMENDATIONS.

2. “JACKET TYPE” IS FOR INSULATION ONLY, REFER TO SPECIFICATIONS FOR INSTALLATIONS REQUIRING ADDITIONAL FIELD APPLIED JACKETING SUCH AS METAL OR PVC.

3. HOT WATER SYSTEM TEMPERATURES EXCEEDING 200 DEG F TO BE TREATED FOR APPROPRIATE TEMPERATURE RANGE AS LISTED UNDER LPS OR HPS.

4. INCLUDES AIR CONDITIONING CONDENSATE, P-TRAPS FOR FLOOR DRAINS/SINKS RECEIVING AIR CONDITIONING CONDENSATE OR ICE MAKER DRAIN PIPING, AND SANITARY DRAINAGE PIPING FROM ELECTRIC WATER COOLERS TO MAIN.

5. INSULATION PRODUCT TO BE PLENUM RATED AND FULLY COMPLIANT PER APPLICABLE MECHANICAL AND PLUMBING CODES AS A UL LISTED AND LABELED PIPE INSULATION, UL CATEGORY: INSULATED PLASTIC PIPE ASSEMBLIES (BSMP) FOR

INSTALLATION OVER POLYMER PIPES (I.E. PVC, POLYETHYLENE AND POLYPROPYLENE).

HWS

HWR

HWR

SEQUENCE OF OPERATION

DESCRIPTION: THE HEATING SYSTEM CONSISTS OF ONE ELECTRIC BOILER, TWO SECONDARY PUMPS WITH VFDS AND TWO PERIMETER HEAT CONTROL VALVES THAT SERVE THE BUILDINGS PERIMETER HEATING SYSTEM AS WELL AS THE AIR HANDLING UNIT HEATING COIL.

BOILER CONTROL:

• SENSE HEATING WATER SUPPLY TEMPERATURE IN THE COMMON SUPPLY PIPING BETWEEN THE BOILER AND THE PUMPS. SENSE THE HEATING WATER RETURN TEMPERATURE

IN THE COMMON RETURN PIPING BEFORE THE BOILER. TEMPERATURE SENSORS IN THE COMMON PIPING SHALL BE INDEPENDENT OF THE BOILER SYSTEM CONTROLS.

• WIRE AND INSTALL HEATING WATER SUPPLY AND RETURN TEMPERATURE SENSORS FOR THE BOILER SYSTEM CONTROLS.

• THE DDC SYSTEM SHALL START THE BOILER SYSTEM WHEN THE OUTSIDE AIR TEMPERATURE IS BELOW 70 DEGREES F (ADJUSTABLE) AND THERE IS A CALL FOR HEAT FROM

THE AHU-1 CONTROLLER.

• THE BOILER SYSTEM CONTROLS SHALL BE ENABLED AND MODULATE THE BOILER AS REQUIRED TO MAINTAIN THE HEATING WATER SUPPLY TEMPERATURE SETPOINT. THE DDC

SYSTEM SHALL MONITOR BOILER STATUS AND BOILER RUNTIME.

• PROVIDE INTERLOCK WIRING BETWEEN BOILER AND ASSOCIATED LEAD PUMP SO THE PUMP RUNS CONTINUOUSLY WHEN THE BOILER IS ENABLED. INTERLOCK WIRING SHALL

BE INDEPENDENT OF THE BMS. PROVIDE A CURRENT STATUS SWITCH FOR PUMP TO PROVE OPERATION. IF THE CURRENT STATUS SWITCH DOES NOT PROVE OPERATION, SEND

AN ALARM TO THE OPERATOR INTERFACE.

• THE TEMPERATURE OF THE HEATING WATER SUPPLY SHALL BE CONTROLLED TO MAINTAIN A SETPOINT AS DETERMINED BY THE OUTDOOR AIR DRY BULB TEMPERATURE. THE SETPOINT SHALL CORRESPOND LINEARLY BASED ON THE FOLLOWING CORRESPONDING POINTS (SCHEDULE SETPOINTS SHALL BE ADJUSTABLE):

OAT HWS TEMPERATURE

60°F 120°F 10°F 160°F

HEATING WATER PUMP CONTROL:

• THE DIRECT DIGITAL CONTROL (DDC) SYSTEM SHALL START THE LEAD PUMP VIA THE VFD AND SHALL RUN CONTINUOUSLY WHEN THE BOILER PLANT IS ENABLED. THE LAG

PUMP SHALL REMAIN OFF.

• IN CASE OF VFD FAULT DETECTION, THE DDC SYSTEM SHALL WAIT 30 SECONDS (ADJUSTABLE.) AND THEN CALL THE VFD TO START. IF THE VFD DOES NOT START, THE DDC

SYSTEM SHALL CALL A SECOND TIME. IF THE VFD STILL HAS NOT STARTED, AN ALARM SHALL BE SENT TO THE OPERATOR INTERFACE.

• INSTALL A CURRENT STATUS SWITCH TO PROVE LEAD AND LAG PUMP OPERATION. LOCATE SWITCHES SO THEY SENSE PUMP STATUS WHEN OPERATED BY THE VFD. IF THE

LEAD PUMP CURRENT STATUS SWITCH DOES NOT PROVE OPERATION, AN ALARM SHALL BE SENT TO THE OPERATOR INTERFACE AND THE DDC SYSTEM SHALL START THE LAG PUMP VIA THE VFD. IF THE LAG PUMP CURRENT STATUS SWITCH DOES NOT PROVE OPERATION, A SECOND ALARM SHALL BE SENT TO THE OPERATOR INTERFACE. THE SEQUENCE SHALL BE REPEATED TWICE. IF SYSTEM DOES NOT PROVE OPERATION, THE LAG PUMP SHALL REMAIN ON.

• THE DDC SYSTEM SHALL CONTROL THE OPERATING PUMP VFD FROM THE DIFFERENTIAL PRESSURE. INITIAL SETPOINT SHALL BE 5 PSIG (ADJUSTABLE). FINAL SETPOINT SHALL

BE OPTIMIZED BY THE BALANCING CONTRACTOR.

• THE DDC SYSTEM SHALL ALTERNATE THE LEAD/LAG STATUS OF THE PUMPS ON A WEEKLY (ADJUSTABLE) BASIS.

BUILDING 6 AHU-1 HEATING HOT WATER COIL AND HUMIDIFIER CONTROL

• ADD THE FOLLOWING CONTROL SEQUENCES TO AHU-1 CONTROL:

• ON A CALL FOR HEATING FROM THE EXISTING AHU-1 DDC CONTROLLER, THE HEATING HOT WATER THREE-WAY VALVE SHALL MODULATE OPEN TO MEET SETPOINT.

• PROVIDE A HUMIDITY SENSOR IN THE RETURN DUCT OF AHU-1, WHEN RETURN HUMIDITY DROPS BELOW 25% SEND A SIGNAL TO THE NEW HUMIDIFICATION STEAM GENERATOR CONTROLLER TO INITIATE STEAM GENERATION. THE STEAM GENERATOR WILL MODULATE TO MAINTAIN RETURN RELATIVE HUMIDITY AT 30%. PROVIDE A HUMIDITY SENSOR IN THE DOWNSTREAM DUCTWORK THE DDC SYSTEM SHALL OVERRIDE THE SIGNAL TO THE HUMIDIFIER CONTROL VALVE TO LIMIT THE SUPPLY AIR RELATIVE HUMIDITY TO 70% (ADJUSTABLE). IF THE SUPPLY AIR RELATIVE HUMIDITY EXCEEDS 75% (ADJUSTABLE) THE STEAM GENERATOR SHALL STOP AND AN ALARM SHALL BE SENT TO THE ENERGY COMMAND CENTER. WHENEVER THE OUTDOOR AIR TEMPERATURE IS ABOVE 40 DEGREES F(ADJUSTABLE), THE DDC SYSTEM SHALL SEND A SIGNAL TO THE STEAM

GENERATOR TO BE OFF.

FLOW METER:

• INSTALL FLOW METER AS INDICATED.

• FLOW METER SHALL MONITOR FLOW RATE TO TRACK PEAK MBH CONSUMPTION AND TOTALIZE BUILDING BTU CONSUMPTION.

GENERAL NOTES

1. SERVICE DISCONNECT PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR SHALL BE LOCATED WITHIN 6 FEET OF CONTROLLER.

2. CONTROLLER SHALL HAVE A MINIMUM SERVICE CLEARANCE OF 36 INCHES.

3. WIRE ALL SENSORS AND CONTROL DEVICES BACK TO CONTROLLER.

4. ALL SENSORS SHALL BE INSTALLED IN TEES OR THREAD-O-LETS. PRESSURE/TEMPERATURE (P/T) PLUGS ARE NOT ACCEPTABLE.

5. DIFFERENTIAL PRESSURE SENSOR SHALL BE LOCATED IN THE SUPPLY AND RETURN PIPING APPROXIMATELY 2/3 OF THE RUN AWAY FROM THE BOILERS (VERIFY LOCATION WITH

ENGINEER PRIOR TO INSTALLATION).

BOILER

HWR HWS

HWS

T

T F

DP2

3 4

NORTH PERIMETER HEAT

WEST PERIMETER HEAT

AHU CONTROL VALVE

P-6-2

P-6-1

VFD

VFD

17 14

16 15

19 1

REMARKS:

1. E = ELECTRIC P = PNEUMATIC BO = BY OTHERS S = REFERENCED POINT FROM HARDWIRE ELSEWHERE ON DDC NETWORK

2. A = ANALOG B = BINARY

3. I = INPUT O = OUTPUT

4. G = GENERAL C = CRITICAL H = HIGH LIMIT L = LOW LIMIT F = FAILURE

5. T = TRENDING EH = EVENT HISTORY AR = ARCHIVE TT = TOTALIZATION GP = GRAPHICAL POINT

POINTS LIST GENERAL NOTE:

ALL POINTS LISTS ARE PROVIDED TO CLARIFY INTENT AND ASSIST THE CONTRACTOR

IN UNDERSTANDING CONTROLS BIDDING REQUIREMENTS. NOT ALL POINTS REQUIRED

FOR THE PROJECT ARE COVERED BY THE POINTS LISTS. THE SPECIFICATIONS,

SEQUENCES OF OPERATIONS AND ANY SCHEMATICS PROVIDED ARE TO BE USED IN

CONJUNCTION WITH THE POINTS LIST FOR THE BASIS OF THE CONTRACTORS BID. ANY

DISCREPANCIES BETWEEN THE POINTS LISTS AND THE OTHER CONTROLS

DOCUMENTS NOTED DEFAULT TO THE MORE STRINGENT REQUIREMENT.

REMARKS:

1. PROVIDE WITH INTEGRAL DISCONNECT AND EMI/RFI FILTER.

2. MAINTAIN ALL CLEARANCES PER NFPA 70(NEC) AND MANUFACTURER RECOMMENDATIONS.

3. VERIFY MOTOR HORSEPOWER, AMPERAGE, VOLTAGE, AND PHASE PRIOR TO PURCHASE.

4. "SCCR" - VALUE INDICATED IS AVAILABLE SHORT CIRCUIT CURRENT (SCC) IN KILOAMPS AT THE EQUIPMENT BASED ON PRELIMINARY DESIGN PHASE CALCULATIONS. EQUIPMENT SCCR SHALL BE MINIMUM

120% OF THE AVAILABLE SCC. RATING SHALL BE ADJUSTED IF REQUIRED BASED ON FINAL SCC CALCULATION. EQUIPMENT INDICATED WITH 5 KA MAY BE PROVIDED WITH 5 KA SCCR. REVIEW SCCR WITH

ELECTRICAL CONTRACTOR PRIOR TO ORDERING EQUIPMENT.

REMARKS:

1. PROVIDE AUTOMATIC AIR VENT, BLOWDOWN DRAIN VALVE WITH HOSE CONNECTION AND MAKE UP WATER CONNECTION.

2. COORDINATE INSTALLATION WITH OTHER EQUIPMENT. ENSURE PROPER CLEARANCE IS PROVIDED FOR MAINTENANCE AND PROPER OPERATION.

3. PROVIDE REMOVABLE END COVER FOR ACCESS TO SEPARATION CHAMBER.

4. VESSEL SHALL BE ASME CERTIFIED.

REMARKS:

1. PROVIDE ASME RATED VESSEL.

2. PROVIDE WITH 2" OF FIBERGLASS INSULATION.

REMARKS:

1. PROVIDE WITH ASME RATED VESSEL, REPLACEABLE BLADDER, AND SIGHT GLASS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234

Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520

NE COA NUMBER: CA-1620

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

NE COA NUMBER: CA-0721

on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

A

B

C

D

E

F

12/24/2025A u to d e s k D o c s /1

-2

-3

A E

C o rr e c t H

V A

C D e fi c ie n c ie s /6

-3

.B

.M E

P .R

.r v t

/2 /2

:3

:4

A

M

6-MP601

BUILDING 06 - MECHANICAL

SCHEDULES - ADDITIVE BID ITEM II

Correct HVAC Deficiencies

4101 Woolworth Ave, Omaha, NE 68105

636-25-301

12/24/2025 JMM NAP

HUMIDIFIER SCHEDULE

MARK

STEAM TO STEAM STEAM GENERATOR HUMIDIFIER MANIFOLD

REMARKS

CAPACITY

[LB / HR]

STEAM

[PSIG]

ELECTRIC ELECTRICAL DATA

CFM

STEAM

CAPACITY

[LB / HR]

STEAM

PRESSURE

[PSIG]

NUMBER OF

MANIFOLDS

DUCT

SIZE

ABSORPTION

DISTANCE MAX

[IN] MANUFACTURER MODELKW

CONTROLLER /

STARTER BY DISCONNECT BY

DISCONNECT

TYPE VOLTAGE PHASE MANUFACTURER MODEL

H-6-1 36 ATMOSPHER

IC

12 MANUFACTURER MANUFACTURER NON-FUSED 208 V 3 DRI-STEEM RX-36-1 5000 36 ATMOSPHERIC 1 53 x 27.25 7 DRI-STEEM LX-50 (1)(2)(3)(4)(5)(6)(7)(8)

PUMP SCHEDULE

MARK

FLOW

[GPM]

TOTAL

HEAD

[FT]

SHUT-OFF

HEAD

[FT]

MIN EFFICIENCY

TYPE OF

FLUID RPM

SUCTION /

DISCHARGE

SIZE

[IN]

ELECTRICAL DATA

MANUFACTURER MODEL REMARKSHP VOLTAGE PHASE DISCONNECT BY

SCCR

(REMARK 8)

P-6-1 35 50 50.9 45.8 WATER 1800 1.5 / 1.5 1.5 208 V 3 ELECTRICAL 5 BELL + GOSSETT E-80,1.5X1.5C

7C

P-6-2 35 50 50.9 45.8 WATER 1800 1.5 / 1.5 1.5 208 V 3 ELECTRICAL 5 BELL + GOSSETT E-80,1.5X1.5C 7C

ELECTRICAL BOILER SCHEDULE

MARK

MEDIA

[STEAM OR HOT

WATER] MINIMUM STEPS

HOT WATER BOILER DATA ELECTRICAL DATA

MANUFACTURER MODEL REMARKS

OUTPUT

[MBH]

EWT / LWT

[°F]

FLUID %

GLYCOL

CONNECTIONS

KW VOLTAGE PHASE DISCONNECT BY

HEATING

WATER IN

[IN]

HEATING

WATER OUT

[IN]

B-6-1 WATER 5 256 180 / 150 0 2" 2" 75 208 V 3 MANUFACTURER LATTNER SPACE SAVER (1)(2)(3)(4)(5)

HYDRONIC COIL SCHEDULE

MARK SERVES

FLUID

TYPE

AIRFLOW

[CFM]

MIN

ROWS

MAX FINS

PER INCH

MAX SIZE

(LxWxH)

[IN]

MAX

VELOCITY

[FPM]

MAX AIR

P.D.

[IN W.C.]

ENTERING

DB / WB

[°F]

LEAVING DB /

WB

[°F]

TOTAL

CAPACITY

[MBH]

SENS.

CAPACITY

[MBH]

FLUID DATA

MANUFACTURER MODEL REMARKS

FLOW

[GPM]

EWT / LWT

[°F]

MAX P.D.

[FT]

HC-1 AHU-1 HOT WATER 5000 2 8 48 X 3 X 15 1000 0.53 60 / - 89 159 159 20 160 / 144 5 DAIKIN 5WH0802B (1)

HVAC PIPING INSULATION SCHEDULE

PIPING SYSTEM FLUID

TEMP.

RANGE DEG.

F.

THICKNESS IN INCHES FOR PIPE SIZES THROUGH SIZE LISTED

TYPE

JACKET TYPE

(2)

NCIIS PLATE

NUMBER (1) REMARKS<1 1 - 1.25 1.5 - 3 4 - 6 >/= 8

HPS AND MPS (STEAM PRESSURES UP TO 120 PSIG INCLUDING

CONDENSATE)

251 - 350 3 4 4.5 4.5 4.5 MF ASJ-SSL 1-100

LPS (STEAM PRESSURES UP TO 15 PSIG INCLUDING CONDENSATE

AND BOILER FEEDWATER.)

0 - 250 2.5 2.5 2.5 3 3 MF ASJ-SSL 1-100

INDOOR STEAM VENT AND BOILER BLOWDOWN 140 - 200 1.5 1.5 2 2 2 MF ASJ-SSL 1-100

INDOOR HOT WATER 141 - 200 1.5 1.5 2 2 2 MF ASJ-SSL 1-100 (3)

INDOOR CONDENSATE AND EQUIPMENT DRAINS BELOW 60 0.5 0.5 0.5 0.5 0.5 MF, E ASJ-SSL 1-100, 1-200 (4)

DIRECT DIGITAL CONTROL POINTS LIST - HEATING WATER LOOP

CONTROL - ELECTRIC BOILERS

POINT

ID POINT DESCRIPTION

SOURCE

(1)

TYP

E (2)

I/O

(3) UNITS

1 AHU CONTROL VALVE E A O % OPEN

2 HEATING WATER SUPPLY TEMPERATURE E A I DEGREES F

3 HEATING WATER TEMPERATURE E A I DEGREES F

4 HEATING WATER FLOW METER E A I GPM

5 DIFFERENTIAL PRESSURE SENSOR E A I PSI

6 OUTDOOR AIR REFERENCE TEMPERATURE S A I DEGREES F

7 BOILER START/STOP E D O -

8 BOILER STATUS E D I ON / OFF

9 HEATING WATER SUPPLY TEMPERATURE E A I DEGREES F

10 LEAD PUMP VFD STATUS E B I -

11 LEAD PUMP VFD START/STOP E B O -

12 LEAD PUMP VFD SPEED CONTROL E A O % SPEED

13 LEAD PUMP CURRENT STATUS SWITCH E B I ON/OFF

14 LAG PUMP VFD STATUS E B I -

15 LAG PUMP VFD START/STOP E B O -

16 LAG PUMP VFD SPEED CONTROL E A O -

17 LAG PUMP CURRENT STATUS SWITCH E B I OPEN/CLOSE

18 NORTH PERIMETER HEAT CONTROL VALUE E B O -

19 WEST PERIMETER HEAT CONTROL VALUE E B O OPEN/CLOSE

VARIABLE FREQUENCY DRIVE SCHEDULE

MARK SERVES

QUANTITY OF

DRIVES

ENCLOSURE

(REMARK 5)

ELECTRICAL DATA

MANUFACTURER MODEL REMARKSHP VOLTAGE PHASE SCCR

VFD-P-6-2 P-6-2 1 NEMA 1 3 208 V 3 5 YASKAWA HV600 (1)(2)(3)(4)

VFD-P-6-1 P-6-1 1 NEMA 1 3 208 V 3 5 YASKAWA HV600 (1)(2)(3)(4)

COMBINATION AIR AND DIRT SEPARATOR SCHEDULE

MARK SERVES CONFIGURATION

MAX OPERATING

WEIGHT

[LBS]

FLOW

[GPM]

PIPE CONNECTION

SIZE

PRESSURE

DROP

[FT W.G.] MANUFACTURER MODEL REMARKS

AS-6-1 HEATING HORIZONTAL 6 35 2" 1.00 CALEFFI DISCAL 551

SERIES

(1)(2)(3)(4)

VESSEL SCHEDULE

MARK SERVES CONFIGURATION

VOLUME

[GAL]

MAX SIZE

(DxH/L)

[IN]

PIPE

CONNECTION

SIZE GPM MANUFACTURER MODEL REMARKS

BT-6-1 HEATING VERTICAL 75 24 2" 35 TACO BTH (1)(2)

EXPANSION TANK SCHEDULE

MARK SERVES CONFIGURATION

MAX OPERATING

FULL WEIGHT

[LBS]

MAX SIZE

(ØxH)

[IN]

PIPE

CONNECTION

SIZE

ACCEPTANCE

VOLUME

[GAL] MANUFACTURER MODEL REMARKS

ET-6-1 HEATING VERTICAL 250 16 3/4" 20.2 WESSELS NTA 40 (1)

ELECTRICAL ABBREVIATIONS

ABBREVIATION DESCRIPTION

REFER TO OTHER SCHEDULES AND NOTES FOR ADDITIONAL ABBREVIATIONS.

MOUNTING HEIGHT TO CENTERLINE (ABOVE FINISHED FLOOR)

AMPERE

AMPERE FRAME

ABOVE FINISHED FLOOR

ALUMINUM

AMPERE TRIP

CONDUIT

CIRCUIT BREAKER

CORRELATED COLOR TEMPERATURE

COPPER

DATA (WHEN APPLIED TO COMMUNICATIONS OUTLET)

DEMO (WHEN APPLIED TO EXISTING/DEMO ITEMS)

EXISTING

ELECTRICALLY OPERATED

ENERGY REDUCING MAINTENANCE SWITCH

FUSE

FULL LOAD AMPS

GROUND FAULT CIRCUIT INTERRUPTER

GROUND FAULT ALARM

GROUND FAULT PROTECTION

HORSEPOWER

KILOAMPERE INTERRUPTING CAPACITY

KILOVOLT AMPERE

KILOWATT

MAXIMUM

MINIMUM CIRCUIT AMPS

MAIN CIRCUIT BREAKER

MINIMUM

MAIN LUGS ONLY

MANUALLY OPERATED

NORMALLY CLOSED

NON-FUSED

NOT IN CONTRACT

NORMALLY OPEN

POLES

PARTIAL

RELOCATE

SHORT CIRCUIT CURRENT RATING

SURGE PROTECTIVE DEVICE

SHUNT TRIP

TYPICAL

UNLESS NOTED OTHERWISE

VOICE

WIRE

WEATHER RESISTANT

TRANSFORMER

ZONE SELECTIVE INTERLOCKING

A

AF

AFF

AL

AT

C

CB

CCT

CU

D

D

E

EO

ERMS

F

FLA

G, GFCI

GFA

GFP

HP

KAIC

KVA

KW

MAX

MCA

MCB

MIN

MLO

MO

NC

NF

NIC

NO

P

PART

R

SCCR

SPD

ST

TYP

UNO

V

W

WR

XFMR

ZSI

A. BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 75' SHALL UTILIZE #10 AWG CONDUCTORS.

RECEPTACLE BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 150' SHALL UTILIZE #8 AWG

CONDUCTORS.

B. FOR ALL CONDUIT AND OTHER ITEMS PENETRATING A FIRE RATED WALL, PROVIDE UL LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM THAT IS SPECIFIC TO THE WALL CONSTRUCTION ASSEMBLY AND COMPLIANT WITH ASTM E814. INSTALL SYSTEM IN STRICT COMPLIANCE WITH THE FIRE STOPPING MANUFACTURER’S U.L. APPROVED DETAIL. WHERE EXISTING WALLS ARE BEING UPGRADED TO FIRE RATED WALLS OR THE FIRE RATING IS BEING MODIFIED, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM FOR ALL NEW AND EXISTING PENETRATIONS. REFER TO THE ARCHITECTURAL LIFE

SAFETY PLANS FOR LOCATIONS OF FIRE RATED WALLS.

C. NEW TEMPORARY ROOF MOUNTED DUCTWORK SHALL BE BONDED TO NEW BUILDING 17 ROOF LIGHTNING PROTECTION SYSTEM. PROVIDE TEMPORARY AIR TERMINALS ON TOP OF DUCTWORK PER MANUFACTURER RECOMMENDATIONS AND BOND TO NEW SYSTEM PER NFPA 780 AND UL 96A REQUIREMENTS. PROVIDE UL INSPECTION AND/OR LPI SYSTEM CERTIFICATE. REFER TO SHEET 17-EPV204 AND SPECIFICATION SECTION 26 41 00.

D. ANY ITEMS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR, AT NO ADDITIONAL

COST TO THE OWNER.

E. NEW WIRING DEVICES AND ASSOCIATED COVERPLATES SHALL MATCH EXISTING FINISH OF SIMILAR

INSTALLED DEVICES. REFER TO SPECIFICATIONS FOR FURTHER INFORMATION.

F. THE SELECTED EQUIPMENT AIC RATINGS ARE BASED ON THE IMPEDANCES FOR CONDUCTORS AND TRANSFORMERS USED IN THE CALCULATIONS. IF DIFFERENT EQUIPMENT OR DIFFERENT CONFIGURATIONS

ARE SELECTED FOR INSTALLATION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING

ADEQUATELY RATED EQUIPMENT THAT MEETS APPLICABLE SELECTIVE COORDINATION GOALS AND

PROVIDES SIMILAR INCIDENT ENERGY RISK OF ARC FLASH HAZARDS.

G. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO INDEPENDENTLY SUPPORT ALL EXISTING TO REMAIN

CABLING.

H. ELECTRICAL WORK REQUIRED FOR THIS PROJECT WILL REQUIRE MULTIPLE SHUT DOWNS TO ACCESSS BREAKERS WITHIN AN EXISTING SWITCHBOARD. PROJECT COORDINATOR SHALL SCHEDULE SHUT DOWNS WITH VA COR A MINUMUM OF 30 DAYS PRIOR TO SHUT DOWN AND PLAN FOR THIS WORK TO OCCUR OVER A WEEKEND. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION AND PROCEDURES FOR SHUT DOWN

REQUIREMENTS.

I. PRIOR TO DEMOLITION, CONTRACTOR SHALL PERFORM LIDAR LASER SCANNING OF BUILDING 17 MECHANICAL AND ELECTRICAL AREAS TO CAPTURE LOCATIONS OF EXISTING CONDUIT AND EQUIPMENT.

AFTER COMPLETION OF WORK, CONTRACTOR SHALL PERFORM ANOTHER SCAN TO CAPTURE LOCATION OF NEW CONDUIT AND EQUIPMENT. REFER TO DIVISION 01 AND 26 FRONT END SPECIFICATIONS FOR

ADDITIONAL INFORMATION FOR THE EXTENT OF THIS WORK.

J. INSTALL GREEN INSULATED GROUND WIRE WITH LIGHTING, RECEPTACLE AND EQUIPMENT BRANCH

CIRCUITS.

K. INSTALL INDIVIDUAL (DEDICATED) NEUTRAL CONDUCTORS FOR EACH 120V PHASE CONDUCTOR SERVED

FROM A SINGLE POLE CIRCUIT BREAKER.

(GENERAL NOTES SHALL APPLY TO ALL SHEETS)

ELECTRICAL GENERAL NOTES:

LEGEND: (LOW VOLTAGE COORDINATION LEGEND)

CF: CONTRACTOR FURNISHED

CI: CONTRACTOR INSTALLED

GENERAL NOTES: (LOW VOLTAGE COORDINATION LEGEND)

A. REFER TO SYMBOL LEGENDS AND SPECIFICATIONS FOR SPECIFIC REQUIREMENTS.

B. COORDINATE ROUGH-IN REQUIREMENTS WITH FINAL EQUIPMENT SELECTION FOR ALL SYSTEMS.

C. CONDUITS SHALL ROUTE CONCEALED INSIDE WALL TO ABOVE NEAREST ACCESSIBLE CEILING SPACE, UNLESS

OTHERWISE INDICATED.

D. WHERE CABLING IS CONTRACTOR FURNISHED AND CONTRACTOR INSTALLED, TERMINATE AND TEST ALL CABLING PER

SPECIFICATION.

A. THE INTENT OF THE DEMOLITION DRAWINGS IS TO DEFINE THE SCOPE OF ELECTRICAL DEMOLITION WORK. EXISTING ELECTRICAL SYSTEMS (DEVICES, FIXTURES, EQUIPMENT, WIRING, AND RACEWAYS INCLUDING DATA/COMMUNICATION SYSTEMS). EXISTING ELECTRICAL SYSTEMS SERVING ADJACENT AREAS SHALL REMAIN UNLESS OTHERWISE INDICATED. RE-SUPPORT EXISTING CONDUITS AND CABLES THAT MUST

REMAIN. REFER TO FLOOR PLANS FOR INDICATION OF DEMOLITION TYPE FOR EACH AREA:

a. SELECTIVE DEMOLITIONS AREAS:

• PROVIDE DEMOLITION FOR ITEMS AS SHOWN. EXISTING ELECTRICAL SYSTEMS WITHIN LIMITS OF

DEMOLITION SHALL REMAIN UNLESS OTHERWISE INDICATED.

B. ITEMS INDICATED WITH A SUBSCRIPT 'E' SHALL BE EXISTING TO REMAIN (E-EXISTING). ITEMS INDICATED WITH A SUBSCRIPT 'D' OR SHOWN DASHED SHALL BE REMOVED (D-DEMOLITION). ITEMS INDICATED WITH A SUBSCRIPT 'R' SHALL BE REMOVED, STORED, AND REINSTALLED PER NEW WORK (R-RELOCATION).

C. THESE DRAWINGS DO NOT IDENTIFY EACH INDIVIDUAL ITEM TO BE REMOVED. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ITEMS WHICH MUST BE REMOVED TO FACILITATE NEW CONSTRUCTION IN

AREAS NOT ACCESSIBLE. SEE ARCHITECTURAL PLANS FOR EXACT LIMITS OF DEMOLITION AND

CONSTRUCTION.

D. THE OWNER SHALL HAVE FIRST SALVAGE RIGHTS TO ALL ITEMS REMOVED. IF OWNER REFUSES SALVAGE, CONTRACTOR IS RESPONSIBLE FOR DISPOSAL.

E. SYSTEMS SERVING ADJACENT AREAS AND ITEMS THAT REMAIN SHALL BE MAINTAINED AT ALL TIMES. MODIFY SYSTEMS AS REQUIRED THROUGHOUT CONSTRUCTION TO MAINTAIN CONTINUITY OF SERVICE. DO NOT INTERRUPT SERVICE WITHOUT OWNER'S PRIOR WRITTEN APPROVAL. ELECTRICAL WORK REQUIRED FOR THIS

PROJECT WILL REQUIRE MULTIPLE SHUT DOWNS TO ACCESSS BREAKERS WITHIN AN EXISTING

SWITCHBOARD. PROJECT COORDINATOR SHALL SCHEDULE SHUT DOWNS WITH VA COR A MINUMUM OF 30

DAYS PRIOR TO SHUT DOWN AND PLAN FOR THIS WORK TO OCCUR OVER A WEEKEND. REFER TO

SPECIFICATIONS FOR ADDITIONAL INFORMATION AND PROCEDURES FOR SHUT DOWN REQUIREMENTS. LIMIT DURATION OF INTERRUPTION ONLY TO THE TIME NECESSARY FOR DISCONNECTION AND IMMEDIATE RECONNECTION. INTERRUPTION TO SERVICE DEEMED BY OWNER AS ESSENTIAL MAY REQUIRE PREMIUM TIME AND SHALL BE INCLUDED WITH THE BID. EXTREME CARE SHALL BE TAKEN BY THE CONTRACTOR TO IDENTIFY EXISTING SYSTEM COMPONENTS ASSOCIATED WITH THESE SERVICES. APPROPRIATE METHODS OF MARKING THESE SHALL OCCUR TO ELIMINATE THE POSSIBILITY OF ACCIDENTAL INTERRUPTION. FOR CONDUIT AND CABLING THAT CAN REMAIN, PROVIDE SUPPORT AS REQUIRED. RELOCATE EXISTING JUNCTION BOXES

THAT BECOME INACCESSIBLE DUE TO NEW WORK.

F. COORDINATE DEMOLITION WITH THE WORK OF OTHER TRADES. PROVIDE TEMPORARY POWER AND LIGHTING

AS REQUIRED TO ALLOW THE WORK OF OTHER TRADES TO PROCEED.

G. PROTECT EXISTING ELECTRICAL EQUIPMENT THAT REMAINS. IF DAMAGED OR DISTURBED IN THE COURSE OF THE WORK, REMOVE DAMAGED PORTIONS AND INSTALL NEW PRODUCTS OF EQUAL CAPACITY, QUALITY, AND

FUNCTIONALITY.

H. PATCH AND REPAIR OPENINGS IN EXISTING WALLS AND FLOORS RESULTANT FROM SPECIFIED ELECTRICAL DEMOLITION. PATCH SHALL MATCH EXISTING CONSTRUCTION, FIRE RATING, AND FINISH. SEE

ARCHITECTURAL SPECIFICATIONS FOR MEANS AND METHODS.

I. THIS PROJECT WILL BE PHASED. CONSTRUCTION CONTRACT WILL DICTATE SCHEDULE AND TIMELINES. SEE DRAWINGS AND PROJECT MANUAL FOR ADDITIONAL DETAILS. SYSTEM SERVICES TO AREAS NOT IN THE

CURRENT PHASE OF CONSTRUCTION SHALL BE MAINTAINED AT ALL TIMES.

J. NEW CONSTRUCTION DOCUMENTS REFLECT WORK FOR REPLACING THE INTERNAL COMPONENTS OF AHU-1 AND AHU-3. AHU-3 REFLECTS BASE BID WORK. AHU-1 WORK TO BE PRICED AS "ADDITIVE BID ITEM I" AS DEPICTED IN THE DOCUMENTS. BUILDING 6 BOILER REPLACEMENT WORK SHALL BE CONSIDERED ADDITIVE

BID ITEM II.

(ELECTRICAL DEMOLITION NOTES APPLY TO ALL ELECTRICAL DEMOLITION PLANS AND

ALL ELECTRICAL DEMOLITION WORK)

ELECTRICAL DEMOLITION GENERAL NOTES:

A. ELECTRICAL DEVICE MOUNTING HEIGHTS ARE NOT INDICATED ON ELECTRICAL FLOOR PLANS FOR ALL DEVICES. CONTRACTOR SHALL COORDINATE EXACT DEVICE LOCATIONS AND MOUNTING HEIGHTS WITH SPECIFICATIONS, SYMBOL LEGENDS, AND TYPICAL ELECTRICAL DEVICE MOUNTING HEIGHTS DETAIL.

WHERE DEVICE MOUNTING HEIGHTS ARE NOT INDICATED PER SYMBOL LEGENDS, OR DETAILS, MOUNT

DEVICES AT HEIGHT INDICATED IN ELECTRICAL PROJECT SPECIFICATIONS.

B. REFER TO DETAILS, SCHEDULES, AND SYMBOL LEGENDS FOR ADDITIONAL REQUIREMENTS.

C. PLANS REFLECT WORK FOR REPLACING THE INTERNAL COMPONENTS OF AHU-1 AND AHU-3. AHU-3

REFLECTS THE BASE CASE. WORK RELATED TO AHU-1 TO BE PRICED AS "ADDITIVE BID ITEM I".

(POWER GENERAL NOTES SHALL APPLY TO ALL SHEETS)

POWER GENERAL NOTES:

(LIGHTING CONTROL GENERAL NOTES SHALL APPLY TO ALL SHEETS)

A. LIGHTING CONTROL DEVICES ARE INDICATED WITHOUT CONNECTION TO FIXTURE(S) BEING CONTROLLED.

WITHIN EACH AREA, CONNECT CONTROL DEVICE TO SERVE LIGHT FIXTURE(S) LOCATED WITHIN SAME AREA.

WHERE LIGHT FIXTURES ARE INDICATED WITH A SUBSCRIPT LETTER IDENTIFYING INDIVIDUAL LIGHTING

CONTROL ZONES, CONTROL DEVICE SERVING AREA WITH MATCHING SUBSCRIPT SHALL CONTROL

CORRESPONDING LIGHT FIXTURES.

B. LIGHTING CONTROL DEVICE MOUNTING HEIGHTS ARE NOT INDICATED ON LIGHTING CONTROL FLOOR PLANS FOR ALL DEVICES. CONTRACTOR SHALL COORDINATE EXACT DEVICE LOCATIONS AND MOUNTING HEIGHTS WITH SYMBOL LEGENDS, AND TYPICAL ELECTRICAL DEVICE MOUNTING HEIGHTS DETAIL. WHERE DEVICE MOUNTING HEIGHTS ARE NOT INDICATED PER SYMBOL LEGENDS, OR DETAILS, MOUNT DEVICES AT HEIGHT

INDICATED IN ELECTRICAL PROJECT SPECIFICATIONS.

C. REFER TO DETAILS, SCHEDULES, AND SYMBOL LEGENDS FOR ADDITIONAL REQUIREMENTS.

LIGHTING CONTROL PLAN GENERAL NOTES:

EXISTING / BACKGROUND

NEW

DEMOLITION

LINEWEIGHT LEGEND

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234

6 & 17

Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520

NE COA NUMBER: CA-1620

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

NE COA NUMBER: CA-0721

on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

A

B

C

D

E

F

12/24/2025

A u to d e s k D o c s /1

-2

-3

A E

C o rr e c t H

V A

C D e fi c ie n c ie s /6

-3

.B

.M E

P .R

.r v t

/1

/2

:1

:3

P

M

EK001

ELECTRICAL SYMBOLS AND

ABBREVIATIONS

Correct HVAC Deficiencies

4101 Woolworth Ave, Omaha, NE 68105

636-25-301

12/24/2025 CTB NTH

ELECTRICAL FIXTURE

SYMBOLS

PLAN SYMBOL NAME

LIGHTNING PROTECTION - AIR

TERMINAL

LIGHTNING PROTECTION -

DOWNLEAD

LIGHTNING PROTECTION -

GROUND ROD

RECEPTACLE - DUPLEX - CONV

RECEPTACLE - DUPLEX - CONV -

GFCI

RECEPTACLE - DUPLEX -

EMERGENCY (RED) - CONV -

GFCI

ELECTRICAL FIXTURE SYMBOL LEGEND

PLAN SYMBOL NAME DESCRIPTION

GROUND BAR PROVIDE LENGTH AS REQUIRED TO ACCOMMODATE TERMINATIONS, MINIMUM 20" IN LENGTH FOR ELECTRICAL GROUND BARS AND MINIMUM 10" IN LENGTH FOR TELECOMMUNICATIONS GROUND BARS. REFER TO

SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

FIRE ALARM SYMBOLS

PLAN SYMBOL NAME

DETECTOR - SYSTEM HEAT -

CEILING

HORN AND STROBE

COMBINATION - WALL

MANUAL PULL STATION

FIRE ALARM SYMBOL LEGEND

PLAN SYMBOL NAME DESCRIPTION

SMOKE DAMPER OR FIRE/SMOKE

DAMPER

CIRCUIT SMOKE AND FIRE/SMOKE DAMPERS PROVIDED BY MECHANICAL CONTRACTOR TO 20A 120V BRANCH CIRCUITS IN ASSOCIATED EMERGENCY BRANCH PANEL (INSTALL CIRCUIT BREAKER LOCK ON BRANCH BREAKERS).

EACH BRANCH CIRCUIT SHALL SERVE A MAXIMUM OF 20 DAMPERS. PROVIDE INDIVIDUAL CIRCUITS FOR EACH AIR HANDLING UNIT ZONE. REFER TO MECHANICAL PLANS FOR ASSOCIATED ZONES. CONTROL EACH DAMPER INDIVIDUALLY WITH ADDRESSABLE CONTROL MODULES FROM FIRE ALARM SYSTEM. LABEL EACH RELAY WITH THE NAME OF THE AIR HANDLING UNIT SERVING THE SMOKE ZONE AND WITH THE WORDS "SMOKE DAMPER CONTROL".

CONTROL DAMPER BY ACTIVATION OF ANY SMOKE DETECTOR WITHIN AIR HANDLING UNIT ZONE. PROVIDE REMOTE STATUS INDICATOR AND TEST STATION FOR DETECTOR AND COORDINATE MOUNTING LOCATION WITH OWNER.

REFER TO ELECTRICAL FLOOR PLANS FOR DAMPER LOCATIONS.

LIGHTING DEVICE SYMBOLS

PLAN SYMBOL NAME

LIGHT SWITCH

ELECTRICAL MISC SYMBOLS

PLAN SYMBOL NAME

BRANCH CIRCUIT CONCEALED IN

CEILING OR WALL

BRANCH CIRCUIT CONCEALED IN

FLOOR OR BELOW GRADE

CLEARANCE SPACE

CONDUIT BREAK

CONDUIT DOWN

CONDUIT STUB-OUT

CONDUIT UP

HOMERUN TO PANEL

G = GFCI CIRCUIT

(PART) = PARTIAL CIRCUIT

LOW VOLTAGE COORDINATION LEGEND

SYSTEMS

ROUGH-INS &

PATHWAYS

CABLING &

TERMINATIONS

DEVICES &

EQUIPMENT REMARKS

FIRE ALARM CF / CI CF / CI CF / CI -

LIGHTING CONTROLS CF / CI CF / CI CF / CI -

ELECTRICAL EQUIPMENT

SYMBOLS

PLAN SYMBOL NAME

AUTOMATIC TRANSFER SWITCH

DISTRIBUTION PANEL

ENCLOSED DISCONNECT

SWITCH - NON-FUSED

LOW VOLTAGE PANEL -

SURFACE

PANELBOARD - SURFACE

SWITCHBOARD

TRANSFORMER - DRY TYPE

ELECTRICAL EQUIPMENT SYMBOL LEGEND

PLAN SYMBOL NAME DESCRIPTION

DIRECT DIGITAL CONTROL

SYSTEM CONTROL PANEL

CIRCUIT CONTROL PANEL TO 20A 120V BRANCH CIRCUIT IN LOCAL NORMAL BRANCH PANEL OF THE ASSOCIATED CONSTRUCTION PHASE. REFER TO FLOOR PLANS FOR BRANCH CIRCUIT DESIGNATIONS. COORDINATE CONNECTION REQUIREMENTS WITH FINAL EQUIPMENT SELECTION AND PROVIDED NEMA 5-20 RECEPTACLE OR HARD-WIRED CONNECTION TO CABINET AS REQUIRED. PROVIDE ONE (1) NETWORK DATA CABLE FROM ASSOCIATED COMMUNICATIONS DISTRIBUTION

ROOM.

DIRECT DIGITAL CONTROL

SYSTEM CONTROL PANEL

CIRCUIT CONTROL PANEL TO 20A 120V BRANCH CIRCUIT IN LOCAL NORMAL BRANCH PANEL OF THE ASSOCIATED CONSTRUCTION PHASE. REFER TO FLOOR PLANS FOR BRANCH CIRCUIT DESIGNATIONS. COORDINATE CONNECTION REQUIREMENTS WITH FINAL EQUIPMENT SELECTION AND PROVIDED NEMA 5-20 RECEPTACLE OR HARD-WIRED CONNECTION TO CABINET AS REQUIRED. PROVIDE ONE (1) NETWORK DATA CABLE FROM ASSOCIATED COMMUNICATIONS DISTRIBUTION

ROOM.

DIRECT DIGITAL CONTROL

SYSTEM CONTROL PANEL

CIRCUIT CONTROL PANEL TO 20A 120V BRANCH CIRCUIT IN LOCAL NORMAL BRANCH PANEL OF THE ASSOCIATED CONSTRUCTION PHASE. REFER TO FLOOR PLANS FOR BRANCH CIRCUIT DESIGNATIONS. COORDINATE CONNECTION REQUIREMENTS WITH FINAL EQUIPMENT SELECTION AND PROVIDED NEMA 5-20 RECEPTACLE OR HARD-WIRED CONNECTION TO CABINET AS REQUIRED. PROVIDE ONE (1) NETWORK DATA CABLE FROM ASSOCIATED COMMUNICATIONS DISTRIBUTION

ROOM.

ONE LINE SYMBOL

PLAN SYMBOL NAME

AUTOMATIC TRANSFER SWITCH

CONTINUATION

DIGITAL METER

DISCONNECT SWITCH

ENCLOSED CIRCUIT BREAKER

GROUND BAR

GROUNDING ELECTRODE

MOTOR

PANEL BOARD

STARTER

SURGE PROTECTIVE DEVICE

SWITCHBOARD/SWITCHGEAR

TRANSFORMER

LIGHTING FIXTURE

SYMBOLS

PLAN SYMBOL NAME

LENSED STRIP - PENDANT

12 13 14 1517.A 17.B 17.C 17.D

17.2

17.1

N

M

L

17.3

K

ATS-14

E

T-E17C2 E

E17C2 E

E

XFMR

E

XFMR

E

ATS-12

E

E

E17C1 E

ATS-13

E

E

MDP-17

E

METER

E

N17C1 E

N17C2 E

LIMITS OF SELECTIVE ELECTRICAL DEMOLITION

E

AHU-1

ADDITIVE BID ITEM I

AHU -3

BASE BID

AHU-2

E

LIMITS OF SELECTIVE ELECTRICAL DEMOLITION 1

D

D

D

D

LIMITS OF SELECTIVE ELECTRICAL DEMOLITION

E

2 2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234

Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520

NE COA NUMBER: CA-1620

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

NE COA NUMBER: CA-0721

on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

A

B

C

D

E

F

12/24/2025

A u to d e s k D o c s /1

-2

-3

A E

C o rr e c t H

V A

C D e fi c ie n c ie s /6

-3

.B

.M E

P .R

.r v t

/2 /2

:4

:3

A

M

17-ED102

BUILDING 17 - MEZZANINE LEVEL -

ELECTRICAL - DEMOLITION

Correct HVAC Deficiencies

4101 Woolworth Ave, Omaha, NE 68105

636-25-301

12/24/2025 CTB NTH

KEY NOTES:

1. DEMOLISH ALL EXISTING SUPPLY FAN MOTOR FEEDERS AND CONDUIT WITHIN AHU BACK TO VFD. DEMOLISH

GENERAL RECEPTACLES AND LIGHTING FIXTURES WITHIN AHU. MAINTAIN CIRCUITING AND CONDUIT OUTSIDE OF AHU FOR FUTURE USE TO SUPPLY NEW RECEPTACLES AND LIGHTING FIXTURES DURING RENOVATION. EXISTING CIRCUITS ORIGINATE FROM PANEL E17C2. REFER TO SHEET 17-EP102 FOR

INFORMATION ON NEW DEVICES.

2. EXISTING VFD'S SERVING AHU'S TO BE DEMOLISHED AS UNIT IS BEING RENOVATED. REMOVE ALL EXISTING CONDUIT AND WIRE TO UNIT IN ADDITION TO CONTROLS WIRING TO FANS WITHIN AHU. REMOVE EXISTING CONDUIT AND FEEDERS BACK TO MAIN DISTRIBUTION PANEL 'MDP-17'. REFER TO ONE-LINES ON SHEET 17-

EP601 AND 17-EP602 FOR ADDITIONAL INFORMATION ON THIS WORK.

3. REMOVAL OF EQUIPMENT CONNECTIONS AND NEW CONNECTIONS WILL REQUIRE A SHUT DOWN OF SERVICE TO SWITCHBOARD MDP-17. REFER TO ONE-LINE DRAWING FOR SPECIFIC BREAKERS TO BE ADJUSTED AND REQUIRED CONNECTION MODIFICATIONS. EXISTING BREAKERS WILL REMAIN IN PLACE. COORDINATE ANY REQUIRED SERVICE SHUT DOWNS WITH THE VA COR A MINIMUM OF 30 DAYS PRIOR TO SHUT DOWN. REFER

TO SPECIFICATIONS FOR ADDITIONAL INFORMATION AND PROCEDURES FOR SHUT DOWNS.

1/4" = 1'-0"1

BUILDING 17 - MEZZANINE LEVEL - ELECTRICAL - DEMOLITION

N

F

F

F

F

16 17 1817.D

17.2

17.1

N

M

L

17.3

K

L3 E

E

E

E

E

E

E E

E E

E E

E

E

E

E

E

E

EE

E

E

E

E

E

E

EEE

E

EEE

E E

E

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234

Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520

NE COA NUMBER: CA-1620

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

NE COA NUMBER: CA-0721

on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

A

B

C

D

E

F

12/24/2025

A u to d e s k D o c s /1

-2

-3

A E

C o rr e c t H

V A

C D e fi c ie n c ie s /6

-3

.B

.M E

P .R

.r v t

/2 /2

:4

:3

A

M

1-ED103

BUILDING 01 - THIRD LEVEL -

ELECTRICAL - EXISTING CONDITIONS

Correct HVAC Deficiencies

4101 Woolworth Ave, Omaha, NE 68105

636-25-301

12/24/2025 CTB NTH

KEY NOTES:

1. EXISTING CONDITIONS PROVIDED BASED ON CONSTRUCTION DOCUMENTS AND NOT FIELD VERIFICATION.

DURING NEW CONSTRUCTION, VERIFY EXISTING CONDITIONS DO NOT INTERFERE WITH NEW WORK

REQUIRED FOR TEMPORARY AIR HANDLING UNIT WORK.

1/4" = 1'-0"1

BUILDING 01 - THIRD LEVEL - ELECTRICAL - EXISTING CONDITIONS

N

EXISTING HOUSE KEEPING PAD

EXISTING HOUSE KEEPING PAD

12 13 14 1517.A 17.B 17.C 17.D

17.1

N

M

L

17.3

K

E17C2 E

E

T-E17C2 E

N17C2 E

N17C1 E

ATS-14

E

ATS-12

E

XFMR

E

XFMR

E

E17C1 E

ATS-13

E

E

E

METER

E

MDP-17

E

E

K1 K1 K1 K1

K1K1K1K1

K1 K1

K1K1

K1 K1 K1 K1

K1 K1

K1K1

SDSD

UV-AHU1-2

UV-AHU1-1

UV-AHU3-2

UV-AHU3-1

SDSD

E17C2-27

E17C2-29

VFD1-2

VFD1-1

VFD3-1

K1 K1

K1 K1 K1

K1 K1

AHU-3 -

BASE BID

AHU-1 -

ADDITIVE BID ITEM I

E

E17C2-13

4 4

4 4

E17C2-9

E17C2-11

HVAC CONTROL

PANEL "DDC"

HVAC CONTROL

PANEL "DDC"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234

Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520

NE COA NUMBER: CA-1620

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

NE COA NUMBER: CA-0721

on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

A

B

C

D

E

F

12/24/2025

A u to d e s k D o c s /1

-2

-3

A E

C o rr e c t H

V A

C D e fi c ie n c ie s /6

-3

.B

.M E

P .R

.r v t

/2 /2

:4

:4

A

M

17-EP102

BUILDING 17 - MEZZANINE LEVEL -

ELECTRICAL PLAN

Correct HVAC Deficiencies

4101 Woolworth Ave, Omaha, NE 68105

636-25-301

12/24/2025 CTB NTH

KEY NOTES:

1. UTILIZE EXISTING BRANCH CIRCUITING AND CONDUIT FROM DEMOLISHED RECEPTACLES AND LIGHTING

FIXTURES TO SUPPLY NEW RECEPTACLES AND LIGHTING FIXTURES. CIRCUITS ARE REFERENCED FROM OLD DRAWINGS DUE TO LIMITED LABELING IN THE AREA. CONFIRM EXACT CIRCUITING DURING DEMOLITION BUT

SOURCE IS FROM PANEL E17C2. UPDATE AS-BUILTS AS REQUIRED.

2. POWER CONNECTION FOR UV LIGHTING ARRAYS. REFER TO EQUIPMENT SCHEDULE FOR CIRCUITING.

PROVIDE ALL CONNECTIONS TO AHU AS REQUIRED PER MANUFACTURER AND MECHANICAL CONTRACTOR INSTRUCTION. REFER TO EQUIPMENT CONNECTION SCHEDULE FOR FURTHER DETAILS. AHU UV LIGHTING MANUFACTURER WILL SUPPLY TOGGLE SWITCH AND DOOR CONTACT FOR INSTALLATION BY ELECTRICAL CONTRACTOR. COORDINATE MOUNTING AND WIRING OF DEVICES WITH AHU MANUFACTURER PRIOR TO ROUGH-IN. UV LIGHTING ARRAYS TO BE INSTALLED 12 INCHES DOWNSTREAM OF COOLING COILS.

3. ROUTE CONDUIT FOR TEMPORARY AHU'S UP INTO LEVEL 2 CEILING OF BUILDING 01 AHU TOWER AND THEN UP TO THIRD LEVEL. REFER TO SHEET 01-EPV203 FOR CONTINUATION OF TEMPORARY CONDUIT ROUTE.

CONDUIT SHALL COME STRAIGHT OUT OF THE TOP OF SWITCHBOARD MDP-17, ROUTE UP WALL, AND ELBOW

INTO NEW CORE HOLES IN WALL TO ENTER 2ND LEVEL OF ADJACENT AHU TOWER.

4. PROVIDE A TOGGLE SWITCH FOR EACH INDIVIDUAL SECTION OF LIGHTING WITHIN UNIT. TOGGLE SWITCH

SHALL BE SURFACE MOUNTED TO EXTERIOR OF UNIT.

5. WORK NOTED FOR AHU-3 SHALL BE INCLUDED IN THE BASE BID INSTALLATION. WORK AT AHU-1 SHALL BE

INCLUDED IN THE ADDITIVE BID ITEM ISCOPE.

6. HVAC CONTROLS PANEL TO BE PROVIDED BY CONTROLS CONTRACTOR FOR AHU'S. COORDINATE LOW

VOLTAGE CONNECTIONS TO FIRE ALARM SYSTEM.

1/4" = 1'-0"1

BUILDING 17 - MEZZANINE LEVEL - ELECTRICAL PLAN

16 17 1817.D

17.1

N

M

L

17.3

K

TF-1 TF-2

HVAC CONTROL

PANEL "DDC"

L3 E

L3-11

VFD-TEMP-1

VFD-TEMP-2

SDSD SDSD

TIGHT TO STRUCTURE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234

Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520

NE COA NUMBER: CA-1620

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

NE COA NUMBER: CA-0721

on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

A

B

C

D

E

F

12/24/2025

A u to d e s k D o c s /1

-2

-3

A E

C o rr e c t H

V A

C D e fi c ie n c ie s /6

-3

.B

.M E

P .R

.r v t

/2 /2

:4

:4

A

M

1-EP103

BUILDING 01 - THIRD LEVEL -

ELECTRICAL PLAN

Correct HVAC Deficiencies

4101 Woolworth Ave, Omaha, NE 68105

636-25-301

12/24/2025 CTB NTH

KEY NOTES:

1. ROUTE CONDUIT TIGHT TO STRUCTURE FOR TEMPORARY AIR HANDLING UNITS (AHUS) DOWN TO SECOND

LEVEL CEILING OF BUILDING 01 AHU TOWER AND THEN CORE INTO MEZZANINE LEVEL OF BUILDING 17 ABOVE SWITCHBOARD MDP-17. REFER TO SHEET 17-EP203 FOR CONTINUATION OF AHU CONNECTION CONDUIT

ROUTE.

2. HVAC CONTROLS PANEL TO BE PROVIDED BY CONTROLS CONTRACTOR FOR TEMPORARY AHU'S.

COORDINATE LOW VOLTAGE CONNECTIONS TO FIRE ALARM SYSTEM.

1/4" = 1'-0"1

BUILDING 01 - THIRD LEVEL - ELECTRICAL PLAN

A A A A D

A

A

A

AA A AA A

A

A

A A A

A

A

12 13 14 1517.A 17.B 17.C 17.D

17.2

17.1

N

M

L

17.3

K

(TYP)1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234

Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520

NE COA NUMBER: CA-1620

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

NE COA NUMBER: CA-0721

on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

A

B

C

D

E

F

12/24/2025

A u to d e s k D o c s /1

-2

-3

A E

C o rr e c t H

V A

C D e fi c ie n c ie s /6

-3

.B

.M E

P .R

.r v t

/2 /2

:4

:4

A

M

17-EP104

BUILDING 17 - ROOF LEVEL -

LIGHTNING PROTECTION PLAN

Correct HVAC Deficiencies

4101 Woolworth Ave, Omaha, NE 68105

636-25-301

12/24/2025 CTB NTH

1/4" = 1'-0"1

BUILDING 17 - ROOF LEVEL - LIGHTNING PROTECTION PLAN

KEY NOTES:

1. PROVIDE LIGHTNING PROTECTION ON BUILDING 17 ROOF. PROVIDE ALL NECESSARY COMPONENTS AND

EQUIPMENT REQUIRED FOR A COMPLETE LIGHTNING PROTECTION SYSTEM OF BUILDING 17 ROOF AND TEMPORARY DUCTWORK. PROVIDE AIR TERMINALS AT MAXIMUM 20'-0" ON CENTER SURROUNDING AREA.

2. EXTEND BUILDING 17 ROOF LIGHTING PROTECTION TO ADJACENT BUILDING 1 AHU TOWER LEVEL 3 ROOF SYSTEM. LEVEL 3 ROOF SYSTEM ON AHU TOWER ROUTES DOWN THE WALL TO A GROUND RING THAT SURROUNDS THE BUILDING. COORDINATE FINAL TIE IN POINT AT BUILDING CONNECTION WITH EXISTING INSTALLATION. ROOF LEVEL OF BUILDING 17 IS ROUGHLY 1'-0" LOWER THAN BUILDING 1 AHU TOWER LEVEL 3

ROOF AREA.

9.52MM (3/8") MIN

GALVANIZED THREADED

ROD, TYP

LOCKING SQUARE

WASHER & LOCKNUT

INTEGRAL

GALVANIZED LIPPED

STEEL MOUNTING

CHANNEL

WASHER & LOCKNUT

REFER TO PLANS

FOR QUANTITY &

SIZE OF CONDUITS

CONDUIT CLAMP

SIZE AS REQUIRED

INTEGRAL

GALVANIZED LIPPED

STEEL MOUNTING

CHANNEL

9.52MM (3/8") MIN

GALVANIZED THREADED

ROD, TYP

LOCKING SQUARE

WASHER & LOCKNUT

INTEGRAL

GALVANIZED LIPPED

STEEL MOUNTING

CHANNEL

LENGTH AS REQUIRED

NOTES:

1. COORDINATE DEVICE MOUNTING HEIGHTS WITH ARCHITECT AND ARCHITECTURAL DETAILS.

MOUNTING HEIGHTS INDICATED ABOVE ARE TO BE UTILIZED FOR DEVICES NOT DETAILED BY

ARCHITECT.

2. ELEVATIONS SHOWN ARE FROM FINISHED FLOOR OR SURFACE TO CENTER LINE OF DEVICE.

(EXCEPT WHERE INDICATED OTHERWISE)

3. WHERE DEVICES SHOWN ON PLAN ARE NOTED WITH AN EQUIPMENT TAG, COORDINATE EXACT

LOCATION AND ELEVATION TO DIRECTLY SERVE EQUIPMENT.

4. WHERE DEVICES SERVE MOVEABLE EQUIPMENT, MOUNT DEVICES BEHIND EQUIPMENT. DEVICES

SERVING FIXED EQUIPMENT SHALL BE LOCATED ADJACENT TO EQUIPMENT OR BEHIND

EQUIPMENT WHERE ACCESS FOR DISCONNECTION CAN BE MAINTAINED.

5. IF DEVICES ARE SHOWN TO EXCEED 44" AFF AT COUNTERS AND WORK SURFACES, NOTIFY

ARCHITECT REGARDING ADA REQUIREMENTS PRIOR TO INSTALLATION.

12" MAX

LOCATE DEVICES

ADJACENT TO OR

DIRECTLY BELOW

EQUIPMENT AS

COORDINATED

WITH OWNER

WALL MOUNTED EQUIPMENT

(COORDINATE WITH

MOUNTING ELEVATION OF

EQUIPMENT)

46"

LIGHT SWITCH

CONVENIENCE DEVICES

ON OPEN WALL SPACE

18"

AIR TERMINAL

MAIN CONDUCTOR

CLIP CABLE SUPPORT

SEALING WASHER

2' -0

(M

IN

MAIN CONDUCTOR

PARAPET WALL

CLIP CABLE SUPPORT

CABLE CONNECTOR

AIR TERMINAL

ROOF

2' -0

M

IN

DOWN CONDUCTOR

GROUND ROD

GROUND ROD CLAMP

GRADE

0" M

IN

1'

0"

M

IN

2' - 0"

MIN.

NO SCALE2

TYPICAL ELECTRICAL DEVICE MOUNTING HEIGHTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234

Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520

NE COA NUMBER: CA-1620

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

NE COA NUMBER: CA-0721

on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

A

B

C

D

E

F

12/24/2025

A u to d e s k D o c s /1

-2

-3

A E

C o rr e c t H

V A

C D e fi c ie n c ie s /6

-3

.B

.M E

P .R

.r v t

/2 /2

:4

:4

A

M

17-EP501

ELECTRICAL DETAILS Correct HVAC Deficiencies

4101 Woolworth Ave, Omaha, NE 68105

636-25-301

12/24/2025 CTB NTH

NO SCALE1

CONDUIT TRAPEZE MOUNTING DETAIL

1/8" = 1'-0"3

LIGHTNING PROTECTION - AIR TERMINAL

1/8" = 1'-0"4

LIGHTNING PROTECTION - AIR TERMINAL PARAPET MOUNTING

1/8" = 1'-0"5

LIGHTNING PROTECTION - GROUNDING AT GRADE

600/3AF

600/3AT

GPF

ZSI

2000/3

GFP

ZSI

EE

EE

EXISTING PORTABLE

GENERATOR

CONNECTION

ATS-14

2000A, 4-POLES

BYPASS-ISOLATION

24.3 KAIC

1500 KVA

13800-480Y/277V

EE

MDP-17

2000A, 480Y/277V

25.7 KAIC

225/3AF

175/3AT

GPF

ZSI

160/3AF

90/3AT

GPF

ZSI

160/3AF

125/3AT

GPF

ZSI

160/3AF

150/3AT

GPF

ZSI

160/3AF

100/3AT

GPF

ZSI

160/3AF

100/3AT

GPF

ZSI

160/3AF

125/3AT

GPF

ZSI

225/3AF

175/3AT

GPF

ZSI

160/3AF

125/3AT

GPF

ZSI

160/3AF

125/3AT

GPF

ZSI

160/3AF

160/3AT

GPF

ZSI

160/3AF

150/3AT

GPF

ZSI

600/3AF

400/3AT

GPF

ZSI

160/3AF

150/3AT

GPF

ZSI

160/3AF

160/3AT

GPF

ZSI

400/3AF

315/3AT

GPF

ZSI

400/3AF

400/3AT

GPF

ZSI

400/3AF

400/3AT

GPF

ZSI

400/3AF

400/3AT

GPF

ZSI

DD

WEST

AHU-3

SF-3

DD

AHU-3

SF-3

EE

SF-2

EE

CENTER

EAST

CT-1

EE

EAST

CT-1

EE

CENTER

WEST

CT-1

EE

WEST

CT-1

EXISTING

COOLING

TOWER

EXISTING

PANEL

P-17B

EXISTING

XFMR

P-17A

EE

CW PUMP

P-22

DD

EAST (A)

AHU-1

SF-1

DD

EAST (B)

AHU-1

SF-1

EE

ATS-12

EQUIPMENT

BRANCH

XFMR

112.5 KVA

EE

FROM EXISTING

GENERATOR

EXISTING

ELEVATORS

#7 & #8

EE

CW PUMP

P-2

EE

CW PUMP

P-1

ATS-13

EQUIPMENT

BRANCH

EE

CW PUMP

P-5

EE

CW PUMP

P-4

DD

CW PUMP

P-3

EE

600/3 600/3 600/3

EE DD

EE

175/3

FROM EXISTING

GENERATOR

EE

XFMR

112.5 KVA

E17C1 400A, 480Y/277V

24.2 KAIC

N17C1 600A, 480Y/277V

22.3 KAIC

EE EE400/3

EE

EAST

CH-2

EE

WEST

CH-1

25/3 70/3 70/3

EE

30/3

T-E17C2

15 KVA

EE

EE

E17C2 208/120V

40/3 40/3 40/3 40/3 30/350/3 70/3 15/3 15/320/315/340/315/330/330/330/320/320/3 20/3 20/3 20/330/3 20/3

600/3

EE

HCW PUMP

P-19

EE

HCW PUMP

P-18

EE

HCW PUMP

P-17

EE

HCW PUMP

P-16

EE

HCW PUMP

P-15

EE

HCW PUMP

P-14

EE

GLYCOL

P-13

EE

GLYCOL

P-12

EE

GLYCOL

P-11

EE

GLYCOL

P-10

EE

GLYCOL

P-9

EE

GLYCOL

P-8

EE

CW PUMP

P-7

EE

CW PUMP

P-6

EE

EF

E-15

30/3

EE

EE

EF

EF-7

EE

EF

EF-6

EE

EF

EF-5

EE

EF

EF-4

EE

EF

EF-3

EE

PLANT

EXHAUST

EE

EE

SUPPLY

SF-4

EE

EE

COND.

CP-1

30/3

EE

1 1

3 3 4 4

SPACE

250/3AF

250/3AT

GPF

ZSI

EXISTING

PANEL

HNBE3

225/3AF

175/3AT

GPF

ZSI

EXISTING MEDIUM

VOLTAGE SWITCH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

ARCHITECT/ENGINEER OF RECORD

InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234

Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520

NE COA NUMBER: CA-1620

Alesia Architecture P.C.

3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941

NE COA NUMBER: CA-0721

on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t

6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t

6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t

A

B

C

D

E

F

12/24/2025

A u to d e s k D o c s /1

-2

-3

A E

C o rr e c t H

V A

C D e fi c ie n c ie s /6

-3

.B

.M E

P .R

.r v t

/1

/2

:0

:4

P

M

17-EP601

BUILDING 17 - ONE-LINE DIAGRAM -

DEMOLITION

Correct HVAC Deficiencies

4101 Woolworth Ave, Omaha, NE 68105

636-25-301

12/24/2025 CTB NTH

NO SCALE1

BUILDING 17 - ONE-LINE DIAGRAM - DEMOLITION

KEY NOTES:

1. PLANS REFLECT WORK FOR REPLACING THE INTERNAL COMPONENTS OF AHU-1 AND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .