This document set comprises the Construction Documents for the "Correct HVAC Deficiencies" federal contract project at 4101 Woolworth Ave, Omaha, NE 68105 (Project 636-25-301), issued by the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management. The documents include architectural, mechanical, and electrical construction drawings, schedules, and specifications for HVAC system upgrades and corrections across multiple buildings.
The mechanical scope includes replacement of internal components for Air Handling Units (AHU-1 and AHU-3), with AHU-3 as the base bid and AHU-1 priced as Additive Bid Item I. Building 6 boiler replacement work is priced as Additive Bid Item II. The mechanical work encompasses new electric boiler installation (75 KW output, 256 MBH, Lattner Space Saver model B-6-1), two redundant heating water pumps (P-6-1 and P-6-2, 35 GPM each) with Variable Frequency Drives, humidifier system (H-6-1, 36 lb/hr capacity), expansion tank (ET-6-1, 75 gallons), combination air and dirt separator (AS-6-1), and associated piping, insulation, and controls. The electrical scope includes provision of power connections to new HVAC equipment, Variable Frequency Drives for pump and fan motors, fire alarm integration with smoke dampers, UV lighting arrays for AHU units, and construction of temporary air handling systems during renovation. The project requires coordination among mechanical, electrical, and controls contractors, with multiple service shutdowns to existing switchboard MDP-17 requiring minimum 30-day advance notice to VA COR. Construction documents reflect fully sprinklered systems and compliance with Building 17 lightning protection requirements extending to adjacent Building 1 AHU tower facilities.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BOILER WATER HEATER WATER SOFTENER
CONDENSATE PUMP
HEAT EXCHANGER
TO DRAIN
DRAINDOWN
1" BF
1" BF
3/4" NPCW
2" VENT
1 1/4" LPR
1 1/4" LPR
1"
1"
3/4"
2" LPS
1" LPS
1 1/4" LPR
1" LPR
1/2" DHWC
1 1/2"
3/4"
1 1/2"
1 1/2"
2" SHW
2" DHW
1/2"
3/4" DCW
3/4" DHW
3/4" DCW
2" DCW
1 1/2"
1 1/2"
1 1/4"
EAST
WALL
EAST
WALL
EAST
WALL
WEST
WALL
EAST
WALL
TO FIRST
LEVEL
SOUTH
WALL
SOUTH
WALL
NORTH
WALL
IN-LINE HOT
WATER PUMP
HOT WATER
CIRCULATION PUMP
WEST
WALL
3 1/2"
1"
EXPANSION
TANK
3/4"
1. WATER HEATER TO BE RELOCATED. REFER TO DEMOLITION AND NEW PLANS.
2. CAP LINE FOR CONNECTION TO NEW WORK.
KEY NOTES:
SOUTH
WALL
S
WATER HEATER WATER SOFTENER
1/2" DHWC
1 1/2"
3/4"
1 1/2"
1 1/2"
2" SHW
2" DHW
1/2"
3/4" DCW
3/4" DHW
3/4" DCW
2" DCW
EAST
WALL
EAST
WALL
1 1/4" HWR
THROUGH
WEST WALL
EAST
WALL
TO FIRST
LEVEL
1 1/2" HWS
THROUGH
SOUTH WALL
1 1/4" HWR
THROUGH
NORTH WALL
HOT WATER
CIRCULATION PUMP
ET-6-1
B-6-1
HWS
HWR
P-6-2
P-6-1
1 1/4" HWS
TO AHU
1 1/4" HWR
FROM AHU2"
2"
CHEMICAL POT
FEEDER
AS-6-1
3. WATER HEATER TO BE RELOCATED. REFER TO DEMOLITION AND NEW PLANS.
KEY NOTES:
ET-6-1
BT-6-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234
Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520
NE COA NUMBER: CA-1620
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
NE COA NUMBER: CA-0721
on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
A
B
C
D
E
F
12/24/2025A u to d e s k D o c s /1
-2
-3
A E
C o rr e c t H
V A
C D e fi c ie n c ie s /6
-3
.B
.M E
P .R
.r v t
/2 /2
:3
:4
A
M
6-MP503
BUILDING 06 - HEATING HOT WATER
SCHEMATICS - ADDITIVE BID ITEM II
Correct HVAC Deficiencies
4101 Woolworth Ave, Omaha, NE 68105
636-25-301
12/24/2025 JMM ETD
NO SCALE1
EXISTING HEATING HOT WATER SCHEMATIC
NO SCALE2
NEW HEATING HOT WATER SCHEMATIC
Mark Revisions: Date:
REMARKS:
1. PROVIDE IN ACCORDANCE WITH ALL MANUFACTURER INSTALLATION INSTRUCTIONS FOR THE LOCATION AND APPLICATION SHOWN ON THE PLANS.
2. PROVIDE FIELD INSTALLED UNISTRUT OR FACTORY PROVIDED SUPPORT LEGS.
3. PROVIDE STAINLESS STEEL PIPE BETWEEN STEAM GENERATOR AND HUMIDIFIER MANIFOLD. INSTALL A WATER TIGHT SEAL TRAP AT DISCHARGE FROM HUMIDIFIER.
4. INSTALL MANIFOLD IN AIR HANDLING UNIT. VERIFY DIMENSIONS. SEAL AROUND MANIFOLD AIRTIGHT.
5. PROVIDE A DRAIN LINE COOLER FOR STEAM GENERATOR AND HUMIDIFIER MANIFOLD. DRISTEAM “DRAIN KOOLER” OR EQUIVALENT.
6. “SCCR” - VALUE INDICATED IS AVAILABLE SHORT CIRCUIT CURRENT (SCC) IN KILOAMPS AT THE EQUIPMENT BASED ON PRELIMINARY DESIGN PHASE CALCULATIONS. EQUIPMENT SCCR SHALL BE MINIMUM 120% OF THE AVAILABLE SCC. RATING SHALL BE
ADJUSTED OK IF REQUIRED BASED ON FINAL SCC CALCULATION. EQUIPMENT INDICATED WITH FIVE KA MAY BE PROVIDED WITH 5KA SCCR. REVIEW SCCR WITH ELECTRICAL CONTRACTOR PRIOR TO ORDERING EQUIPMENT.
7. PROVIDE FACTORY INSULATION AND DISPERSION TUBE AND HEADER.
REMARKS:
1. PERFORMANCE BASED ON FLUID AND CONDITIONS INDICATED IN THIS SCHEDULE.
2. PROVIDE WITH THE FOLLOWING ACCESSORIES: DISCONNECT, CHECK VALVE, VENTURI FLOW MEASURING DEVICE, FLEXIBLE CONNECTORS, UNIONS, AND TEMPERATURE AND PRESSURE GAUGES ON EACH CONNECTION.
3. PROVIDE BACNET INTERFACE.
4. "SCCR" - VALUE INDICATED IS AVAILABLE SHORT CIRCUIT CURRENT (SCC) IN KILOAMPS AT THE EQUIPMENT BASED ON PRELIMINARY DESIGN PHASE CALCULATIONS. EQUIPMENT SCCR SHALL BE MINIMUM 120% OF THE AVAILABLE SCC. RATING SHALL BE ADJUSTED IF
REQUIRED BASED ON FINAL SCC CALCULATION. EQUIPMENT INDICATED WITH 5 KA MAY BE PROVIDED WITH 5 KA SCCR. REVIEW SCCR WITH ELECTRICAL CONTRACTOR PRIOR TO ORDERING EQUIPMENT.
REMARKS:
1. BOILER PERFORMANCE BASED ON FLUID AND CONDITIONS INDICATED IN THIS SCHEDULE.
2. MOUNT AND ANCHOR BOILER TO EXISTING HOUSEKEEPING PAD.
3. PROVIDE BOILER PUMP (P-6-3).
4. BOILER AND FUEL SYSTEM SHALL BE CSD-1 AND FM COMPLIANT. PROVIDE ALL ACCESSORIES AND CONTROLS REQUIRED.
5. "SCCR" - VALUE INDICATED IS AVAILABLE SHORT CIRCUIT CURRENT (SCC) IN KILOAMPS AT THE EQUIPMENT BASED ON PRELIMINARY DESIGN PHASE CALCULATIONS. EQUIPMENT SCCR SHALL BE MINIMUM 120% OF THE AVAILABLE SCC. RATING SHALL BE ADJUSTED IF REQUIRED
BASED ON FINAL SCC CALCULATION. EQUIPMENT INDICATED WITH 5 KA MAY BE PROVIDED WITH 5 KA SCCR. REVIEW SCCR WITH ELECTRICAL CONTRACTOR PRIOR TO ORDERING EQUIPMENT.
REMARKS:
1. CONTRACTOR TO PIPE UNIT AS INDICATED FROM FACTORY, COUNTERFLOW.
ABBREVIATIONS: MF = MINERAL FIBER/FIBERGLASS, E = ELASTOMERIC, CG = CELLULAR GLASS, ASJ = ALL SERVICE JACKET, SSL = SELF SEALING LAP
REMARKS:
1. NCIIS (NATIONAL COMMERCIAL AND INDUSTRIAL INSULATION STANDARD) PLATE NUMBER REFERENCED ARE PROVIDED TO CLARIFY THE SCOPE OF INSTALLATION. INSTALL INSULATION AND ACCESSORY COMPONENTS PER APPLICABLE NCIIS AND
MANUFACTURERS RECOMMENDATIONS.
2. “JACKET TYPE” IS FOR INSULATION ONLY, REFER TO SPECIFICATIONS FOR INSTALLATIONS REQUIRING ADDITIONAL FIELD APPLIED JACKETING SUCH AS METAL OR PVC.
3. HOT WATER SYSTEM TEMPERATURES EXCEEDING 200 DEG F TO BE TREATED FOR APPROPRIATE TEMPERATURE RANGE AS LISTED UNDER LPS OR HPS.
4. INCLUDES AIR CONDITIONING CONDENSATE, P-TRAPS FOR FLOOR DRAINS/SINKS RECEIVING AIR CONDITIONING CONDENSATE OR ICE MAKER DRAIN PIPING, AND SANITARY DRAINAGE PIPING FROM ELECTRIC WATER COOLERS TO MAIN.
5. INSULATION PRODUCT TO BE PLENUM RATED AND FULLY COMPLIANT PER APPLICABLE MECHANICAL AND PLUMBING CODES AS A UL LISTED AND LABELED PIPE INSULATION, UL CATEGORY: INSULATED PLASTIC PIPE ASSEMBLIES (BSMP) FOR
INSTALLATION OVER POLYMER PIPES (I.E. PVC, POLYETHYLENE AND POLYPROPYLENE).
HWS
HWR
HWR
SEQUENCE OF OPERATION
DESCRIPTION: THE HEATING SYSTEM CONSISTS OF ONE ELECTRIC BOILER, TWO SECONDARY PUMPS WITH VFDS AND TWO PERIMETER HEAT CONTROL VALVES THAT SERVE THE BUILDINGS PERIMETER HEATING SYSTEM AS WELL AS THE AIR HANDLING UNIT HEATING COIL.
BOILER CONTROL:
• SENSE HEATING WATER SUPPLY TEMPERATURE IN THE COMMON SUPPLY PIPING BETWEEN THE BOILER AND THE PUMPS. SENSE THE HEATING WATER RETURN TEMPERATURE
IN THE COMMON RETURN PIPING BEFORE THE BOILER. TEMPERATURE SENSORS IN THE COMMON PIPING SHALL BE INDEPENDENT OF THE BOILER SYSTEM CONTROLS.
• WIRE AND INSTALL HEATING WATER SUPPLY AND RETURN TEMPERATURE SENSORS FOR THE BOILER SYSTEM CONTROLS.
• THE DDC SYSTEM SHALL START THE BOILER SYSTEM WHEN THE OUTSIDE AIR TEMPERATURE IS BELOW 70 DEGREES F (ADJUSTABLE) AND THERE IS A CALL FOR HEAT FROM
THE AHU-1 CONTROLLER.
• THE BOILER SYSTEM CONTROLS SHALL BE ENABLED AND MODULATE THE BOILER AS REQUIRED TO MAINTAIN THE HEATING WATER SUPPLY TEMPERATURE SETPOINT. THE DDC
SYSTEM SHALL MONITOR BOILER STATUS AND BOILER RUNTIME.
• PROVIDE INTERLOCK WIRING BETWEEN BOILER AND ASSOCIATED LEAD PUMP SO THE PUMP RUNS CONTINUOUSLY WHEN THE BOILER IS ENABLED. INTERLOCK WIRING SHALL
BE INDEPENDENT OF THE BMS. PROVIDE A CURRENT STATUS SWITCH FOR PUMP TO PROVE OPERATION. IF THE CURRENT STATUS SWITCH DOES NOT PROVE OPERATION, SEND
AN ALARM TO THE OPERATOR INTERFACE.
• THE TEMPERATURE OF THE HEATING WATER SUPPLY SHALL BE CONTROLLED TO MAINTAIN A SETPOINT AS DETERMINED BY THE OUTDOOR AIR DRY BULB TEMPERATURE. THE SETPOINT SHALL CORRESPOND LINEARLY BASED ON THE FOLLOWING CORRESPONDING POINTS (SCHEDULE SETPOINTS SHALL BE ADJUSTABLE):
OAT HWS TEMPERATURE
60°F 120°F 10°F 160°F
HEATING WATER PUMP CONTROL:
• THE DIRECT DIGITAL CONTROL (DDC) SYSTEM SHALL START THE LEAD PUMP VIA THE VFD AND SHALL RUN CONTINUOUSLY WHEN THE BOILER PLANT IS ENABLED. THE LAG
PUMP SHALL REMAIN OFF.
• IN CASE OF VFD FAULT DETECTION, THE DDC SYSTEM SHALL WAIT 30 SECONDS (ADJUSTABLE.) AND THEN CALL THE VFD TO START. IF THE VFD DOES NOT START, THE DDC
SYSTEM SHALL CALL A SECOND TIME. IF THE VFD STILL HAS NOT STARTED, AN ALARM SHALL BE SENT TO THE OPERATOR INTERFACE.
• INSTALL A CURRENT STATUS SWITCH TO PROVE LEAD AND LAG PUMP OPERATION. LOCATE SWITCHES SO THEY SENSE PUMP STATUS WHEN OPERATED BY THE VFD. IF THE
LEAD PUMP CURRENT STATUS SWITCH DOES NOT PROVE OPERATION, AN ALARM SHALL BE SENT TO THE OPERATOR INTERFACE AND THE DDC SYSTEM SHALL START THE LAG PUMP VIA THE VFD. IF THE LAG PUMP CURRENT STATUS SWITCH DOES NOT PROVE OPERATION, A SECOND ALARM SHALL BE SENT TO THE OPERATOR INTERFACE. THE SEQUENCE SHALL BE REPEATED TWICE. IF SYSTEM DOES NOT PROVE OPERATION, THE LAG PUMP SHALL REMAIN ON.
• THE DDC SYSTEM SHALL CONTROL THE OPERATING PUMP VFD FROM THE DIFFERENTIAL PRESSURE. INITIAL SETPOINT SHALL BE 5 PSIG (ADJUSTABLE). FINAL SETPOINT SHALL
BE OPTIMIZED BY THE BALANCING CONTRACTOR.
• THE DDC SYSTEM SHALL ALTERNATE THE LEAD/LAG STATUS OF THE PUMPS ON A WEEKLY (ADJUSTABLE) BASIS.
BUILDING 6 AHU-1 HEATING HOT WATER COIL AND HUMIDIFIER CONTROL
• ADD THE FOLLOWING CONTROL SEQUENCES TO AHU-1 CONTROL:
• ON A CALL FOR HEATING FROM THE EXISTING AHU-1 DDC CONTROLLER, THE HEATING HOT WATER THREE-WAY VALVE SHALL MODULATE OPEN TO MEET SETPOINT.
• PROVIDE A HUMIDITY SENSOR IN THE RETURN DUCT OF AHU-1, WHEN RETURN HUMIDITY DROPS BELOW 25% SEND A SIGNAL TO THE NEW HUMIDIFICATION STEAM GENERATOR CONTROLLER TO INITIATE STEAM GENERATION. THE STEAM GENERATOR WILL MODULATE TO MAINTAIN RETURN RELATIVE HUMIDITY AT 30%. PROVIDE A HUMIDITY SENSOR IN THE DOWNSTREAM DUCTWORK THE DDC SYSTEM SHALL OVERRIDE THE SIGNAL TO THE HUMIDIFIER CONTROL VALVE TO LIMIT THE SUPPLY AIR RELATIVE HUMIDITY TO 70% (ADJUSTABLE). IF THE SUPPLY AIR RELATIVE HUMIDITY EXCEEDS 75% (ADJUSTABLE) THE STEAM GENERATOR SHALL STOP AND AN ALARM SHALL BE SENT TO THE ENERGY COMMAND CENTER. WHENEVER THE OUTDOOR AIR TEMPERATURE IS ABOVE 40 DEGREES F(ADJUSTABLE), THE DDC SYSTEM SHALL SEND A SIGNAL TO THE STEAM
GENERATOR TO BE OFF.
FLOW METER:
• INSTALL FLOW METER AS INDICATED.
• FLOW METER SHALL MONITOR FLOW RATE TO TRACK PEAK MBH CONSUMPTION AND TOTALIZE BUILDING BTU CONSUMPTION.
GENERAL NOTES
1. SERVICE DISCONNECT PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR SHALL BE LOCATED WITHIN 6 FEET OF CONTROLLER.
2. CONTROLLER SHALL HAVE A MINIMUM SERVICE CLEARANCE OF 36 INCHES.
3. WIRE ALL SENSORS AND CONTROL DEVICES BACK TO CONTROLLER.
4. ALL SENSORS SHALL BE INSTALLED IN TEES OR THREAD-O-LETS. PRESSURE/TEMPERATURE (P/T) PLUGS ARE NOT ACCEPTABLE.
5. DIFFERENTIAL PRESSURE SENSOR SHALL BE LOCATED IN THE SUPPLY AND RETURN PIPING APPROXIMATELY 2/3 OF THE RUN AWAY FROM THE BOILERS (VERIFY LOCATION WITH
ENGINEER PRIOR TO INSTALLATION).
BOILER
HWR HWS
HWS
T
T F
DP2
3 4
NORTH PERIMETER HEAT
WEST PERIMETER HEAT
AHU CONTROL VALVE
P-6-2
P-6-1
VFD
VFD
17 14
16 15
19 1
REMARKS:
1. E = ELECTRIC P = PNEUMATIC BO = BY OTHERS S = REFERENCED POINT FROM HARDWIRE ELSEWHERE ON DDC NETWORK
2. A = ANALOG B = BINARY
3. I = INPUT O = OUTPUT
4. G = GENERAL C = CRITICAL H = HIGH LIMIT L = LOW LIMIT F = FAILURE
5. T = TRENDING EH = EVENT HISTORY AR = ARCHIVE TT = TOTALIZATION GP = GRAPHICAL POINT
POINTS LIST GENERAL NOTE:
ALL POINTS LISTS ARE PROVIDED TO CLARIFY INTENT AND ASSIST THE CONTRACTOR
IN UNDERSTANDING CONTROLS BIDDING REQUIREMENTS. NOT ALL POINTS REQUIRED
FOR THE PROJECT ARE COVERED BY THE POINTS LISTS. THE SPECIFICATIONS,
SEQUENCES OF OPERATIONS AND ANY SCHEMATICS PROVIDED ARE TO BE USED IN
CONJUNCTION WITH THE POINTS LIST FOR THE BASIS OF THE CONTRACTORS BID. ANY
DISCREPANCIES BETWEEN THE POINTS LISTS AND THE OTHER CONTROLS
DOCUMENTS NOTED DEFAULT TO THE MORE STRINGENT REQUIREMENT.
REMARKS:
1. PROVIDE WITH INTEGRAL DISCONNECT AND EMI/RFI FILTER.
2. MAINTAIN ALL CLEARANCES PER NFPA 70(NEC) AND MANUFACTURER RECOMMENDATIONS.
3. VERIFY MOTOR HORSEPOWER, AMPERAGE, VOLTAGE, AND PHASE PRIOR TO PURCHASE.
4. "SCCR" - VALUE INDICATED IS AVAILABLE SHORT CIRCUIT CURRENT (SCC) IN KILOAMPS AT THE EQUIPMENT BASED ON PRELIMINARY DESIGN PHASE CALCULATIONS. EQUIPMENT SCCR SHALL BE MINIMUM
120% OF THE AVAILABLE SCC. RATING SHALL BE ADJUSTED IF REQUIRED BASED ON FINAL SCC CALCULATION. EQUIPMENT INDICATED WITH 5 KA MAY BE PROVIDED WITH 5 KA SCCR. REVIEW SCCR WITH
ELECTRICAL CONTRACTOR PRIOR TO ORDERING EQUIPMENT.
REMARKS:
1. PROVIDE AUTOMATIC AIR VENT, BLOWDOWN DRAIN VALVE WITH HOSE CONNECTION AND MAKE UP WATER CONNECTION.
2. COORDINATE INSTALLATION WITH OTHER EQUIPMENT. ENSURE PROPER CLEARANCE IS PROVIDED FOR MAINTENANCE AND PROPER OPERATION.
3. PROVIDE REMOVABLE END COVER FOR ACCESS TO SEPARATION CHAMBER.
4. VESSEL SHALL BE ASME CERTIFIED.
REMARKS:
1. PROVIDE ASME RATED VESSEL.
2. PROVIDE WITH 2" OF FIBERGLASS INSULATION.
REMARKS:
1. PROVIDE WITH ASME RATED VESSEL, REPLACEABLE BLADDER, AND SIGHT GLASS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234
Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520
NE COA NUMBER: CA-1620
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
NE COA NUMBER: CA-0721
on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
A
B
C
D
E
F
12/24/2025A u to d e s k D o c s /1
-2
-3
A E
C o rr e c t H
V A
C D e fi c ie n c ie s /6
-3
.B
.M E
P .R
.r v t
/2 /2
:3
:4
A
M
6-MP601
BUILDING 06 - MECHANICAL
SCHEDULES - ADDITIVE BID ITEM II
Correct HVAC Deficiencies
4101 Woolworth Ave, Omaha, NE 68105
636-25-301
12/24/2025 JMM NAP
HUMIDIFIER SCHEDULE
MARK
STEAM TO STEAM STEAM GENERATOR HUMIDIFIER MANIFOLD
REMARKS
CAPACITY
[LB / HR]
STEAM
[PSIG]
ELECTRIC ELECTRICAL DATA
CFM
STEAM
CAPACITY
[LB / HR]
STEAM
PRESSURE
[PSIG]
NUMBER OF
MANIFOLDS
DUCT
SIZE
ABSORPTION
DISTANCE MAX
[IN] MANUFACTURER MODELKW
CONTROLLER /
STARTER BY DISCONNECT BY
DISCONNECT
TYPE VOLTAGE PHASE MANUFACTURER MODEL
H-6-1 36 ATMOSPHER
IC
12 MANUFACTURER MANUFACTURER NON-FUSED 208 V 3 DRI-STEEM RX-36-1 5000 36 ATMOSPHERIC 1 53 x 27.25 7 DRI-STEEM LX-50 (1)(2)(3)(4)(5)(6)(7)(8)
PUMP SCHEDULE
MARK
FLOW
[GPM]
TOTAL
HEAD
[FT]
SHUT-OFF
HEAD
[FT]
MIN EFFICIENCY
TYPE OF
FLUID RPM
SUCTION /
DISCHARGE
SIZE
[IN]
ELECTRICAL DATA
MANUFACTURER MODEL REMARKSHP VOLTAGE PHASE DISCONNECT BY
SCCR
(REMARK 8)
P-6-1 35 50 50.9 45.8 WATER 1800 1.5 / 1.5 1.5 208 V 3 ELECTRICAL 5 BELL + GOSSETT E-80,1.5X1.5C
7C
P-6-2 35 50 50.9 45.8 WATER 1800 1.5 / 1.5 1.5 208 V 3 ELECTRICAL 5 BELL + GOSSETT E-80,1.5X1.5C 7C
ELECTRICAL BOILER SCHEDULE
MARK
MEDIA
[STEAM OR HOT
WATER] MINIMUM STEPS
HOT WATER BOILER DATA ELECTRICAL DATA
MANUFACTURER MODEL REMARKS
OUTPUT
[MBH]
EWT / LWT
[°F]
FLUID %
GLYCOL
CONNECTIONS
KW VOLTAGE PHASE DISCONNECT BY
HEATING
WATER IN
[IN]
HEATING
WATER OUT
[IN]
B-6-1 WATER 5 256 180 / 150 0 2" 2" 75 208 V 3 MANUFACTURER LATTNER SPACE SAVER (1)(2)(3)(4)(5)
HYDRONIC COIL SCHEDULE
MARK SERVES
FLUID
TYPE
AIRFLOW
[CFM]
MIN
ROWS
MAX FINS
PER INCH
MAX SIZE
(LxWxH)
[IN]
MAX
VELOCITY
[FPM]
MAX AIR
P.D.
[IN W.C.]
ENTERING
DB / WB
[°F]
LEAVING DB /
WB
[°F]
TOTAL
CAPACITY
[MBH]
SENS.
CAPACITY
[MBH]
FLUID DATA
MANUFACTURER MODEL REMARKS
FLOW
[GPM]
EWT / LWT
[°F]
MAX P.D.
[FT]
HC-1 AHU-1 HOT WATER 5000 2 8 48 X 3 X 15 1000 0.53 60 / - 89 159 159 20 160 / 144 5 DAIKIN 5WH0802B (1)
HVAC PIPING INSULATION SCHEDULE
PIPING SYSTEM FLUID
TEMP.
RANGE DEG.
F.
THICKNESS IN INCHES FOR PIPE SIZES THROUGH SIZE LISTED
TYPE
JACKET TYPE
(2)
NCIIS PLATE
NUMBER (1) REMARKS<1 1 - 1.25 1.5 - 3 4 - 6 >/= 8
HPS AND MPS (STEAM PRESSURES UP TO 120 PSIG INCLUDING
CONDENSATE)
251 - 350 3 4 4.5 4.5 4.5 MF ASJ-SSL 1-100
LPS (STEAM PRESSURES UP TO 15 PSIG INCLUDING CONDENSATE
AND BOILER FEEDWATER.)
0 - 250 2.5 2.5 2.5 3 3 MF ASJ-SSL 1-100
INDOOR STEAM VENT AND BOILER BLOWDOWN 140 - 200 1.5 1.5 2 2 2 MF ASJ-SSL 1-100
INDOOR HOT WATER 141 - 200 1.5 1.5 2 2 2 MF ASJ-SSL 1-100 (3)
INDOOR CONDENSATE AND EQUIPMENT DRAINS BELOW 60 0.5 0.5 0.5 0.5 0.5 MF, E ASJ-SSL 1-100, 1-200 (4)
DIRECT DIGITAL CONTROL POINTS LIST - HEATING WATER LOOP
CONTROL - ELECTRIC BOILERS
POINT
ID POINT DESCRIPTION
SOURCE
(1)
TYP
E (2)
I/O
(3) UNITS
1 AHU CONTROL VALVE E A O % OPEN
2 HEATING WATER SUPPLY TEMPERATURE E A I DEGREES F
3 HEATING WATER TEMPERATURE E A I DEGREES F
4 HEATING WATER FLOW METER E A I GPM
5 DIFFERENTIAL PRESSURE SENSOR E A I PSI
6 OUTDOOR AIR REFERENCE TEMPERATURE S A I DEGREES F
7 BOILER START/STOP E D O -
8 BOILER STATUS E D I ON / OFF
9 HEATING WATER SUPPLY TEMPERATURE E A I DEGREES F
10 LEAD PUMP VFD STATUS E B I -
11 LEAD PUMP VFD START/STOP E B O -
12 LEAD PUMP VFD SPEED CONTROL E A O % SPEED
13 LEAD PUMP CURRENT STATUS SWITCH E B I ON/OFF
14 LAG PUMP VFD STATUS E B I -
15 LAG PUMP VFD START/STOP E B O -
16 LAG PUMP VFD SPEED CONTROL E A O -
17 LAG PUMP CURRENT STATUS SWITCH E B I OPEN/CLOSE
18 NORTH PERIMETER HEAT CONTROL VALUE E B O -
19 WEST PERIMETER HEAT CONTROL VALUE E B O OPEN/CLOSE
VARIABLE FREQUENCY DRIVE SCHEDULE
MARK SERVES
QUANTITY OF
DRIVES
ENCLOSURE
(REMARK 5)
ELECTRICAL DATA
MANUFACTURER MODEL REMARKSHP VOLTAGE PHASE SCCR
VFD-P-6-2 P-6-2 1 NEMA 1 3 208 V 3 5 YASKAWA HV600 (1)(2)(3)(4)
VFD-P-6-1 P-6-1 1 NEMA 1 3 208 V 3 5 YASKAWA HV600 (1)(2)(3)(4)
COMBINATION AIR AND DIRT SEPARATOR SCHEDULE
MARK SERVES CONFIGURATION
MAX OPERATING
WEIGHT
[LBS]
FLOW
[GPM]
PIPE CONNECTION
SIZE
PRESSURE
DROP
[FT W.G.] MANUFACTURER MODEL REMARKS
AS-6-1 HEATING HORIZONTAL 6 35 2" 1.00 CALEFFI DISCAL 551
SERIES
(1)(2)(3)(4)
VESSEL SCHEDULE
MARK SERVES CONFIGURATION
VOLUME
[GAL]
MAX SIZE
(DxH/L)
[IN]
PIPE
CONNECTION
SIZE GPM MANUFACTURER MODEL REMARKS
BT-6-1 HEATING VERTICAL 75 24 2" 35 TACO BTH (1)(2)
EXPANSION TANK SCHEDULE
MARK SERVES CONFIGURATION
MAX OPERATING
FULL WEIGHT
[LBS]
MAX SIZE
(ØxH)
[IN]
PIPE
CONNECTION
SIZE
ACCEPTANCE
VOLUME
[GAL] MANUFACTURER MODEL REMARKS
ET-6-1 HEATING VERTICAL 250 16 3/4" 20.2 WESSELS NTA 40 (1)
ELECTRICAL ABBREVIATIONS
ABBREVIATION DESCRIPTION
REFER TO OTHER SCHEDULES AND NOTES FOR ADDITIONAL ABBREVIATIONS.
MOUNTING HEIGHT TO CENTERLINE (ABOVE FINISHED FLOOR)
AMPERE
AMPERE FRAME
ABOVE FINISHED FLOOR
ALUMINUM
AMPERE TRIP
CONDUIT
CIRCUIT BREAKER
CORRELATED COLOR TEMPERATURE
COPPER
DATA (WHEN APPLIED TO COMMUNICATIONS OUTLET)
DEMO (WHEN APPLIED TO EXISTING/DEMO ITEMS)
EXISTING
ELECTRICALLY OPERATED
ENERGY REDUCING MAINTENANCE SWITCH
FUSE
FULL LOAD AMPS
GROUND FAULT CIRCUIT INTERRUPTER
GROUND FAULT ALARM
GROUND FAULT PROTECTION
HORSEPOWER
KILOAMPERE INTERRUPTING CAPACITY
KILOVOLT AMPERE
KILOWATT
MAXIMUM
MINIMUM CIRCUIT AMPS
MAIN CIRCUIT BREAKER
MINIMUM
MAIN LUGS ONLY
MANUALLY OPERATED
NORMALLY CLOSED
NON-FUSED
NOT IN CONTRACT
NORMALLY OPEN
POLES
PARTIAL
RELOCATE
SHORT CIRCUIT CURRENT RATING
SURGE PROTECTIVE DEVICE
SHUNT TRIP
TYPICAL
UNLESS NOTED OTHERWISE
VOICE
WIRE
WEATHER RESISTANT
TRANSFORMER
ZONE SELECTIVE INTERLOCKING
A
AF
AFF
AL
AT
C
CB
CCT
CU
D
D
E
EO
ERMS
F
FLA
G, GFCI
GFA
GFP
HP
KAIC
KVA
KW
MAX
MCA
MCB
MIN
MLO
MO
NC
NF
NIC
NO
P
PART
R
SCCR
SPD
ST
TYP
UNO
V
W
WR
XFMR
ZSI
A. BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 75' SHALL UTILIZE #10 AWG CONDUCTORS.
RECEPTACLE BRANCH CIRCUITS WITH A TOTAL LENGTH LONGER THAN 150' SHALL UTILIZE #8 AWG
CONDUCTORS.
B. FOR ALL CONDUIT AND OTHER ITEMS PENETRATING A FIRE RATED WALL, PROVIDE UL LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM THAT IS SPECIFIC TO THE WALL CONSTRUCTION ASSEMBLY AND COMPLIANT WITH ASTM E814. INSTALL SYSTEM IN STRICT COMPLIANCE WITH THE FIRE STOPPING MANUFACTURER’S U.L. APPROVED DETAIL. WHERE EXISTING WALLS ARE BEING UPGRADED TO FIRE RATED WALLS OR THE FIRE RATING IS BEING MODIFIED, PROVIDE U.L. LISTED THROUGH PENETRATION FIRE STOPPING SYSTEM FOR ALL NEW AND EXISTING PENETRATIONS. REFER TO THE ARCHITECTURAL LIFE
SAFETY PLANS FOR LOCATIONS OF FIRE RATED WALLS.
C. NEW TEMPORARY ROOF MOUNTED DUCTWORK SHALL BE BONDED TO NEW BUILDING 17 ROOF LIGHTNING PROTECTION SYSTEM. PROVIDE TEMPORARY AIR TERMINALS ON TOP OF DUCTWORK PER MANUFACTURER RECOMMENDATIONS AND BOND TO NEW SYSTEM PER NFPA 780 AND UL 96A REQUIREMENTS. PROVIDE UL INSPECTION AND/OR LPI SYSTEM CERTIFICATE. REFER TO SHEET 17-EPV204 AND SPECIFICATION SECTION 26 41 00.
D. ANY ITEMS DAMAGED BY THE CONTRACTOR SHALL BE REPLACED BY THE CONTRACTOR, AT NO ADDITIONAL
COST TO THE OWNER.
E. NEW WIRING DEVICES AND ASSOCIATED COVERPLATES SHALL MATCH EXISTING FINISH OF SIMILAR
INSTALLED DEVICES. REFER TO SPECIFICATIONS FOR FURTHER INFORMATION.
F. THE SELECTED EQUIPMENT AIC RATINGS ARE BASED ON THE IMPEDANCES FOR CONDUCTORS AND TRANSFORMERS USED IN THE CALCULATIONS. IF DIFFERENT EQUIPMENT OR DIFFERENT CONFIGURATIONS
ARE SELECTED FOR INSTALLATION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING
ADEQUATELY RATED EQUIPMENT THAT MEETS APPLICABLE SELECTIVE COORDINATION GOALS AND
PROVIDES SIMILAR INCIDENT ENERGY RISK OF ARC FLASH HAZARDS.
G. PROVIDE ADDITIONAL SUPPORTS AS REQUIRED TO INDEPENDENTLY SUPPORT ALL EXISTING TO REMAIN
CABLING.
H. ELECTRICAL WORK REQUIRED FOR THIS PROJECT WILL REQUIRE MULTIPLE SHUT DOWNS TO ACCESSS BREAKERS WITHIN AN EXISTING SWITCHBOARD. PROJECT COORDINATOR SHALL SCHEDULE SHUT DOWNS WITH VA COR A MINUMUM OF 30 DAYS PRIOR TO SHUT DOWN AND PLAN FOR THIS WORK TO OCCUR OVER A WEEKEND. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION AND PROCEDURES FOR SHUT DOWN
REQUIREMENTS.
I. PRIOR TO DEMOLITION, CONTRACTOR SHALL PERFORM LIDAR LASER SCANNING OF BUILDING 17 MECHANICAL AND ELECTRICAL AREAS TO CAPTURE LOCATIONS OF EXISTING CONDUIT AND EQUIPMENT.
AFTER COMPLETION OF WORK, CONTRACTOR SHALL PERFORM ANOTHER SCAN TO CAPTURE LOCATION OF NEW CONDUIT AND EQUIPMENT. REFER TO DIVISION 01 AND 26 FRONT END SPECIFICATIONS FOR
ADDITIONAL INFORMATION FOR THE EXTENT OF THIS WORK.
J. INSTALL GREEN INSULATED GROUND WIRE WITH LIGHTING, RECEPTACLE AND EQUIPMENT BRANCH
CIRCUITS.
K. INSTALL INDIVIDUAL (DEDICATED) NEUTRAL CONDUCTORS FOR EACH 120V PHASE CONDUCTOR SERVED
FROM A SINGLE POLE CIRCUIT BREAKER.
(GENERAL NOTES SHALL APPLY TO ALL SHEETS)
ELECTRICAL GENERAL NOTES:
LEGEND: (LOW VOLTAGE COORDINATION LEGEND)
CF: CONTRACTOR FURNISHED
CI: CONTRACTOR INSTALLED
GENERAL NOTES: (LOW VOLTAGE COORDINATION LEGEND)
A. REFER TO SYMBOL LEGENDS AND SPECIFICATIONS FOR SPECIFIC REQUIREMENTS.
B. COORDINATE ROUGH-IN REQUIREMENTS WITH FINAL EQUIPMENT SELECTION FOR ALL SYSTEMS.
C. CONDUITS SHALL ROUTE CONCEALED INSIDE WALL TO ABOVE NEAREST ACCESSIBLE CEILING SPACE, UNLESS
OTHERWISE INDICATED.
D. WHERE CABLING IS CONTRACTOR FURNISHED AND CONTRACTOR INSTALLED, TERMINATE AND TEST ALL CABLING PER
SPECIFICATION.
A. THE INTENT OF THE DEMOLITION DRAWINGS IS TO DEFINE THE SCOPE OF ELECTRICAL DEMOLITION WORK. EXISTING ELECTRICAL SYSTEMS (DEVICES, FIXTURES, EQUIPMENT, WIRING, AND RACEWAYS INCLUDING DATA/COMMUNICATION SYSTEMS). EXISTING ELECTRICAL SYSTEMS SERVING ADJACENT AREAS SHALL REMAIN UNLESS OTHERWISE INDICATED. RE-SUPPORT EXISTING CONDUITS AND CABLES THAT MUST
REMAIN. REFER TO FLOOR PLANS FOR INDICATION OF DEMOLITION TYPE FOR EACH AREA:
a. SELECTIVE DEMOLITIONS AREAS:
• PROVIDE DEMOLITION FOR ITEMS AS SHOWN. EXISTING ELECTRICAL SYSTEMS WITHIN LIMITS OF
DEMOLITION SHALL REMAIN UNLESS OTHERWISE INDICATED.
B. ITEMS INDICATED WITH A SUBSCRIPT 'E' SHALL BE EXISTING TO REMAIN (E-EXISTING). ITEMS INDICATED WITH A SUBSCRIPT 'D' OR SHOWN DASHED SHALL BE REMOVED (D-DEMOLITION). ITEMS INDICATED WITH A SUBSCRIPT 'R' SHALL BE REMOVED, STORED, AND REINSTALLED PER NEW WORK (R-RELOCATION).
C. THESE DRAWINGS DO NOT IDENTIFY EACH INDIVIDUAL ITEM TO BE REMOVED. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING ITEMS WHICH MUST BE REMOVED TO FACILITATE NEW CONSTRUCTION IN
AREAS NOT ACCESSIBLE. SEE ARCHITECTURAL PLANS FOR EXACT LIMITS OF DEMOLITION AND
CONSTRUCTION.
D. THE OWNER SHALL HAVE FIRST SALVAGE RIGHTS TO ALL ITEMS REMOVED. IF OWNER REFUSES SALVAGE, CONTRACTOR IS RESPONSIBLE FOR DISPOSAL.
E. SYSTEMS SERVING ADJACENT AREAS AND ITEMS THAT REMAIN SHALL BE MAINTAINED AT ALL TIMES. MODIFY SYSTEMS AS REQUIRED THROUGHOUT CONSTRUCTION TO MAINTAIN CONTINUITY OF SERVICE. DO NOT INTERRUPT SERVICE WITHOUT OWNER'S PRIOR WRITTEN APPROVAL. ELECTRICAL WORK REQUIRED FOR THIS
PROJECT WILL REQUIRE MULTIPLE SHUT DOWNS TO ACCESSS BREAKERS WITHIN AN EXISTING
SWITCHBOARD. PROJECT COORDINATOR SHALL SCHEDULE SHUT DOWNS WITH VA COR A MINUMUM OF 30
DAYS PRIOR TO SHUT DOWN AND PLAN FOR THIS WORK TO OCCUR OVER A WEEKEND. REFER TO
SPECIFICATIONS FOR ADDITIONAL INFORMATION AND PROCEDURES FOR SHUT DOWN REQUIREMENTS. LIMIT DURATION OF INTERRUPTION ONLY TO THE TIME NECESSARY FOR DISCONNECTION AND IMMEDIATE RECONNECTION. INTERRUPTION TO SERVICE DEEMED BY OWNER AS ESSENTIAL MAY REQUIRE PREMIUM TIME AND SHALL BE INCLUDED WITH THE BID. EXTREME CARE SHALL BE TAKEN BY THE CONTRACTOR TO IDENTIFY EXISTING SYSTEM COMPONENTS ASSOCIATED WITH THESE SERVICES. APPROPRIATE METHODS OF MARKING THESE SHALL OCCUR TO ELIMINATE THE POSSIBILITY OF ACCIDENTAL INTERRUPTION. FOR CONDUIT AND CABLING THAT CAN REMAIN, PROVIDE SUPPORT AS REQUIRED. RELOCATE EXISTING JUNCTION BOXES
THAT BECOME INACCESSIBLE DUE TO NEW WORK.
F. COORDINATE DEMOLITION WITH THE WORK OF OTHER TRADES. PROVIDE TEMPORARY POWER AND LIGHTING
AS REQUIRED TO ALLOW THE WORK OF OTHER TRADES TO PROCEED.
G. PROTECT EXISTING ELECTRICAL EQUIPMENT THAT REMAINS. IF DAMAGED OR DISTURBED IN THE COURSE OF THE WORK, REMOVE DAMAGED PORTIONS AND INSTALL NEW PRODUCTS OF EQUAL CAPACITY, QUALITY, AND
FUNCTIONALITY.
H. PATCH AND REPAIR OPENINGS IN EXISTING WALLS AND FLOORS RESULTANT FROM SPECIFIED ELECTRICAL DEMOLITION. PATCH SHALL MATCH EXISTING CONSTRUCTION, FIRE RATING, AND FINISH. SEE
ARCHITECTURAL SPECIFICATIONS FOR MEANS AND METHODS.
I. THIS PROJECT WILL BE PHASED. CONSTRUCTION CONTRACT WILL DICTATE SCHEDULE AND TIMELINES. SEE DRAWINGS AND PROJECT MANUAL FOR ADDITIONAL DETAILS. SYSTEM SERVICES TO AREAS NOT IN THE
CURRENT PHASE OF CONSTRUCTION SHALL BE MAINTAINED AT ALL TIMES.
J. NEW CONSTRUCTION DOCUMENTS REFLECT WORK FOR REPLACING THE INTERNAL COMPONENTS OF AHU-1 AND AHU-3. AHU-3 REFLECTS BASE BID WORK. AHU-1 WORK TO BE PRICED AS "ADDITIVE BID ITEM I" AS DEPICTED IN THE DOCUMENTS. BUILDING 6 BOILER REPLACEMENT WORK SHALL BE CONSIDERED ADDITIVE
BID ITEM II.
(ELECTRICAL DEMOLITION NOTES APPLY TO ALL ELECTRICAL DEMOLITION PLANS AND
ALL ELECTRICAL DEMOLITION WORK)
ELECTRICAL DEMOLITION GENERAL NOTES:
A. ELECTRICAL DEVICE MOUNTING HEIGHTS ARE NOT INDICATED ON ELECTRICAL FLOOR PLANS FOR ALL DEVICES. CONTRACTOR SHALL COORDINATE EXACT DEVICE LOCATIONS AND MOUNTING HEIGHTS WITH SPECIFICATIONS, SYMBOL LEGENDS, AND TYPICAL ELECTRICAL DEVICE MOUNTING HEIGHTS DETAIL.
WHERE DEVICE MOUNTING HEIGHTS ARE NOT INDICATED PER SYMBOL LEGENDS, OR DETAILS, MOUNT
DEVICES AT HEIGHT INDICATED IN ELECTRICAL PROJECT SPECIFICATIONS.
B. REFER TO DETAILS, SCHEDULES, AND SYMBOL LEGENDS FOR ADDITIONAL REQUIREMENTS.
C. PLANS REFLECT WORK FOR REPLACING THE INTERNAL COMPONENTS OF AHU-1 AND AHU-3. AHU-3
REFLECTS THE BASE CASE. WORK RELATED TO AHU-1 TO BE PRICED AS "ADDITIVE BID ITEM I".
(POWER GENERAL NOTES SHALL APPLY TO ALL SHEETS)
POWER GENERAL NOTES:
(LIGHTING CONTROL GENERAL NOTES SHALL APPLY TO ALL SHEETS)
A. LIGHTING CONTROL DEVICES ARE INDICATED WITHOUT CONNECTION TO FIXTURE(S) BEING CONTROLLED.
WITHIN EACH AREA, CONNECT CONTROL DEVICE TO SERVE LIGHT FIXTURE(S) LOCATED WITHIN SAME AREA.
WHERE LIGHT FIXTURES ARE INDICATED WITH A SUBSCRIPT LETTER IDENTIFYING INDIVIDUAL LIGHTING
CONTROL ZONES, CONTROL DEVICE SERVING AREA WITH MATCHING SUBSCRIPT SHALL CONTROL
CORRESPONDING LIGHT FIXTURES.
B. LIGHTING CONTROL DEVICE MOUNTING HEIGHTS ARE NOT INDICATED ON LIGHTING CONTROL FLOOR PLANS FOR ALL DEVICES. CONTRACTOR SHALL COORDINATE EXACT DEVICE LOCATIONS AND MOUNTING HEIGHTS WITH SYMBOL LEGENDS, AND TYPICAL ELECTRICAL DEVICE MOUNTING HEIGHTS DETAIL. WHERE DEVICE MOUNTING HEIGHTS ARE NOT INDICATED PER SYMBOL LEGENDS, OR DETAILS, MOUNT DEVICES AT HEIGHT
INDICATED IN ELECTRICAL PROJECT SPECIFICATIONS.
C. REFER TO DETAILS, SCHEDULES, AND SYMBOL LEGENDS FOR ADDITIONAL REQUIREMENTS.
LIGHTING CONTROL PLAN GENERAL NOTES:
EXISTING / BACKGROUND
NEW
DEMOLITION
LINEWEIGHT LEGEND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234
6 & 17
Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520
NE COA NUMBER: CA-1620
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
NE COA NUMBER: CA-0721
on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
A
B
C
D
E
F
12/24/2025
A u to d e s k D o c s /1
-2
-3
A E
C o rr e c t H
V A
C D e fi c ie n c ie s /6
-3
.B
.M E
P .R
.r v t
/1
/2
:1
:3
P
M
EK001
ELECTRICAL SYMBOLS AND
ABBREVIATIONS
Correct HVAC Deficiencies
4101 Woolworth Ave, Omaha, NE 68105
636-25-301
12/24/2025 CTB NTH
ELECTRICAL FIXTURE
SYMBOLS
PLAN SYMBOL NAME
LIGHTNING PROTECTION - AIR
TERMINAL
LIGHTNING PROTECTION -
DOWNLEAD
LIGHTNING PROTECTION -
GROUND ROD
RECEPTACLE - DUPLEX - CONV
RECEPTACLE - DUPLEX - CONV -
GFCI
RECEPTACLE - DUPLEX -
EMERGENCY (RED) - CONV -
GFCI
ELECTRICAL FIXTURE SYMBOL LEGEND
PLAN SYMBOL NAME DESCRIPTION
GROUND BAR PROVIDE LENGTH AS REQUIRED TO ACCOMMODATE TERMINATIONS, MINIMUM 20" IN LENGTH FOR ELECTRICAL GROUND BARS AND MINIMUM 10" IN LENGTH FOR TELECOMMUNICATIONS GROUND BARS. REFER TO
SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
FIRE ALARM SYMBOLS
PLAN SYMBOL NAME
DETECTOR - SYSTEM HEAT -
CEILING
HORN AND STROBE
COMBINATION - WALL
MANUAL PULL STATION
FIRE ALARM SYMBOL LEGEND
PLAN SYMBOL NAME DESCRIPTION
SMOKE DAMPER OR FIRE/SMOKE
DAMPER
CIRCUIT SMOKE AND FIRE/SMOKE DAMPERS PROVIDED BY MECHANICAL CONTRACTOR TO 20A 120V BRANCH CIRCUITS IN ASSOCIATED EMERGENCY BRANCH PANEL (INSTALL CIRCUIT BREAKER LOCK ON BRANCH BREAKERS).
EACH BRANCH CIRCUIT SHALL SERVE A MAXIMUM OF 20 DAMPERS. PROVIDE INDIVIDUAL CIRCUITS FOR EACH AIR HANDLING UNIT ZONE. REFER TO MECHANICAL PLANS FOR ASSOCIATED ZONES. CONTROL EACH DAMPER INDIVIDUALLY WITH ADDRESSABLE CONTROL MODULES FROM FIRE ALARM SYSTEM. LABEL EACH RELAY WITH THE NAME OF THE AIR HANDLING UNIT SERVING THE SMOKE ZONE AND WITH THE WORDS "SMOKE DAMPER CONTROL".
CONTROL DAMPER BY ACTIVATION OF ANY SMOKE DETECTOR WITHIN AIR HANDLING UNIT ZONE. PROVIDE REMOTE STATUS INDICATOR AND TEST STATION FOR DETECTOR AND COORDINATE MOUNTING LOCATION WITH OWNER.
REFER TO ELECTRICAL FLOOR PLANS FOR DAMPER LOCATIONS.
LIGHTING DEVICE SYMBOLS
PLAN SYMBOL NAME
LIGHT SWITCH
ELECTRICAL MISC SYMBOLS
PLAN SYMBOL NAME
BRANCH CIRCUIT CONCEALED IN
CEILING OR WALL
BRANCH CIRCUIT CONCEALED IN
FLOOR OR BELOW GRADE
CLEARANCE SPACE
CONDUIT BREAK
CONDUIT DOWN
CONDUIT STUB-OUT
CONDUIT UP
HOMERUN TO PANEL
G = GFCI CIRCUIT
(PART) = PARTIAL CIRCUIT
LOW VOLTAGE COORDINATION LEGEND
SYSTEMS
ROUGH-INS &
PATHWAYS
CABLING &
TERMINATIONS
DEVICES &
EQUIPMENT REMARKS
FIRE ALARM CF / CI CF / CI CF / CI -
LIGHTING CONTROLS CF / CI CF / CI CF / CI -
ELECTRICAL EQUIPMENT
SYMBOLS
PLAN SYMBOL NAME
AUTOMATIC TRANSFER SWITCH
DISTRIBUTION PANEL
ENCLOSED DISCONNECT
SWITCH - NON-FUSED
LOW VOLTAGE PANEL -
SURFACE
PANELBOARD - SURFACE
SWITCHBOARD
TRANSFORMER - DRY TYPE
ELECTRICAL EQUIPMENT SYMBOL LEGEND
PLAN SYMBOL NAME DESCRIPTION
DIRECT DIGITAL CONTROL
SYSTEM CONTROL PANEL
CIRCUIT CONTROL PANEL TO 20A 120V BRANCH CIRCUIT IN LOCAL NORMAL BRANCH PANEL OF THE ASSOCIATED CONSTRUCTION PHASE. REFER TO FLOOR PLANS FOR BRANCH CIRCUIT DESIGNATIONS. COORDINATE CONNECTION REQUIREMENTS WITH FINAL EQUIPMENT SELECTION AND PROVIDED NEMA 5-20 RECEPTACLE OR HARD-WIRED CONNECTION TO CABINET AS REQUIRED. PROVIDE ONE (1) NETWORK DATA CABLE FROM ASSOCIATED COMMUNICATIONS DISTRIBUTION
ROOM.
DIRECT DIGITAL CONTROL
SYSTEM CONTROL PANEL
CIRCUIT CONTROL PANEL TO 20A 120V BRANCH CIRCUIT IN LOCAL NORMAL BRANCH PANEL OF THE ASSOCIATED CONSTRUCTION PHASE. REFER TO FLOOR PLANS FOR BRANCH CIRCUIT DESIGNATIONS. COORDINATE CONNECTION REQUIREMENTS WITH FINAL EQUIPMENT SELECTION AND PROVIDED NEMA 5-20 RECEPTACLE OR HARD-WIRED CONNECTION TO CABINET AS REQUIRED. PROVIDE ONE (1) NETWORK DATA CABLE FROM ASSOCIATED COMMUNICATIONS DISTRIBUTION
ROOM.
DIRECT DIGITAL CONTROL
SYSTEM CONTROL PANEL
CIRCUIT CONTROL PANEL TO 20A 120V BRANCH CIRCUIT IN LOCAL NORMAL BRANCH PANEL OF THE ASSOCIATED CONSTRUCTION PHASE. REFER TO FLOOR PLANS FOR BRANCH CIRCUIT DESIGNATIONS. COORDINATE CONNECTION REQUIREMENTS WITH FINAL EQUIPMENT SELECTION AND PROVIDED NEMA 5-20 RECEPTACLE OR HARD-WIRED CONNECTION TO CABINET AS REQUIRED. PROVIDE ONE (1) NETWORK DATA CABLE FROM ASSOCIATED COMMUNICATIONS DISTRIBUTION
ROOM.
ONE LINE SYMBOL
PLAN SYMBOL NAME
AUTOMATIC TRANSFER SWITCH
CONTINUATION
DIGITAL METER
DISCONNECT SWITCH
ENCLOSED CIRCUIT BREAKER
GROUND BAR
GROUNDING ELECTRODE
MOTOR
PANEL BOARD
STARTER
SURGE PROTECTIVE DEVICE
SWITCHBOARD/SWITCHGEAR
TRANSFORMER
LIGHTING FIXTURE
SYMBOLS
PLAN SYMBOL NAME
LENSED STRIP - PENDANT
12 13 14 1517.A 17.B 17.C 17.D
17.2
17.1
N
M
L
17.3
K
ATS-14
E
T-E17C2 E
E17C2 E
E
XFMR
E
XFMR
E
ATS-12
E
E
E17C1 E
ATS-13
E
E
MDP-17
E
METER
E
N17C1 E
N17C2 E
LIMITS OF SELECTIVE ELECTRICAL DEMOLITION
E
AHU-1
ADDITIVE BID ITEM I
AHU -3
BASE BID
AHU-2
E
LIMITS OF SELECTIVE ELECTRICAL DEMOLITION 1
D
D
D
D
LIMITS OF SELECTIVE ELECTRICAL DEMOLITION
E
2 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234
Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520
NE COA NUMBER: CA-1620
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
NE COA NUMBER: CA-0721
on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
A
B
C
D
E
F
12/24/2025
A u to d e s k D o c s /1
-2
-3
A E
C o rr e c t H
V A
C D e fi c ie n c ie s /6
-3
.B
.M E
P .R
.r v t
/2 /2
:4
:3
A
M
17-ED102
BUILDING 17 - MEZZANINE LEVEL -
ELECTRICAL - DEMOLITION
Correct HVAC Deficiencies
4101 Woolworth Ave, Omaha, NE 68105
636-25-301
12/24/2025 CTB NTH
KEY NOTES:
1. DEMOLISH ALL EXISTING SUPPLY FAN MOTOR FEEDERS AND CONDUIT WITHIN AHU BACK TO VFD. DEMOLISH
GENERAL RECEPTACLES AND LIGHTING FIXTURES WITHIN AHU. MAINTAIN CIRCUITING AND CONDUIT OUTSIDE OF AHU FOR FUTURE USE TO SUPPLY NEW RECEPTACLES AND LIGHTING FIXTURES DURING RENOVATION. EXISTING CIRCUITS ORIGINATE FROM PANEL E17C2. REFER TO SHEET 17-EP102 FOR
INFORMATION ON NEW DEVICES.
2. EXISTING VFD'S SERVING AHU'S TO BE DEMOLISHED AS UNIT IS BEING RENOVATED. REMOVE ALL EXISTING CONDUIT AND WIRE TO UNIT IN ADDITION TO CONTROLS WIRING TO FANS WITHIN AHU. REMOVE EXISTING CONDUIT AND FEEDERS BACK TO MAIN DISTRIBUTION PANEL 'MDP-17'. REFER TO ONE-LINES ON SHEET 17-
EP601 AND 17-EP602 FOR ADDITIONAL INFORMATION ON THIS WORK.
3. REMOVAL OF EQUIPMENT CONNECTIONS AND NEW CONNECTIONS WILL REQUIRE A SHUT DOWN OF SERVICE TO SWITCHBOARD MDP-17. REFER TO ONE-LINE DRAWING FOR SPECIFIC BREAKERS TO BE ADJUSTED AND REQUIRED CONNECTION MODIFICATIONS. EXISTING BREAKERS WILL REMAIN IN PLACE. COORDINATE ANY REQUIRED SERVICE SHUT DOWNS WITH THE VA COR A MINIMUM OF 30 DAYS PRIOR TO SHUT DOWN. REFER
TO SPECIFICATIONS FOR ADDITIONAL INFORMATION AND PROCEDURES FOR SHUT DOWNS.
1/4" = 1'-0"1
BUILDING 17 - MEZZANINE LEVEL - ELECTRICAL - DEMOLITION
N
F
F
F
F
16 17 1817.D
17.2
17.1
N
M
L
17.3
K
L3 E
E
E
E
E
E
E E
E E
E E
E
E
E
E
E
E
EE
E
E
E
E
E
E
EEE
E
EEE
E E
E
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234
Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520
NE COA NUMBER: CA-1620
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
NE COA NUMBER: CA-0721
on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
A
B
C
D
E
F
12/24/2025
A u to d e s k D o c s /1
-2
-3
A E
C o rr e c t H
V A
C D e fi c ie n c ie s /6
-3
.B
.M E
P .R
.r v t
/2 /2
:4
:3
A
M
1-ED103
BUILDING 01 - THIRD LEVEL -
ELECTRICAL - EXISTING CONDITIONS
Correct HVAC Deficiencies
4101 Woolworth Ave, Omaha, NE 68105
636-25-301
12/24/2025 CTB NTH
KEY NOTES:
1. EXISTING CONDITIONS PROVIDED BASED ON CONSTRUCTION DOCUMENTS AND NOT FIELD VERIFICATION.
DURING NEW CONSTRUCTION, VERIFY EXISTING CONDITIONS DO NOT INTERFERE WITH NEW WORK
REQUIRED FOR TEMPORARY AIR HANDLING UNIT WORK.
1/4" = 1'-0"1
BUILDING 01 - THIRD LEVEL - ELECTRICAL - EXISTING CONDITIONS
N
EXISTING HOUSE KEEPING PAD
EXISTING HOUSE KEEPING PAD
12 13 14 1517.A 17.B 17.C 17.D
17.1
N
M
L
17.3
K
E17C2 E
E
T-E17C2 E
N17C2 E
N17C1 E
ATS-14
E
ATS-12
E
XFMR
E
XFMR
E
E17C1 E
ATS-13
E
E
E
METER
E
MDP-17
E
E
K1 K1 K1 K1
K1K1K1K1
K1 K1
K1K1
K1 K1 K1 K1
K1 K1
K1K1
SDSD
UV-AHU1-2
UV-AHU1-1
UV-AHU3-2
UV-AHU3-1
SDSD
E17C2-27
E17C2-29
VFD1-2
VFD1-1
VFD3-1
K1 K1
K1 K1 K1
K1 K1
AHU-3 -
BASE BID
AHU-1 -
ADDITIVE BID ITEM I
E
E17C2-13
4 4
4 4
E17C2-9
E17C2-11
HVAC CONTROL
PANEL "DDC"
HVAC CONTROL
PANEL "DDC"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234
Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520
NE COA NUMBER: CA-1620
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
NE COA NUMBER: CA-0721
on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
A
B
C
D
E
F
12/24/2025
A u to d e s k D o c s /1
-2
-3
A E
C o rr e c t H
V A
C D e fi c ie n c ie s /6
-3
.B
.M E
P .R
.r v t
/2 /2
:4
:4
A
M
17-EP102
BUILDING 17 - MEZZANINE LEVEL -
ELECTRICAL PLAN
Correct HVAC Deficiencies
4101 Woolworth Ave, Omaha, NE 68105
636-25-301
12/24/2025 CTB NTH
KEY NOTES:
1. UTILIZE EXISTING BRANCH CIRCUITING AND CONDUIT FROM DEMOLISHED RECEPTACLES AND LIGHTING
FIXTURES TO SUPPLY NEW RECEPTACLES AND LIGHTING FIXTURES. CIRCUITS ARE REFERENCED FROM OLD DRAWINGS DUE TO LIMITED LABELING IN THE AREA. CONFIRM EXACT CIRCUITING DURING DEMOLITION BUT
SOURCE IS FROM PANEL E17C2. UPDATE AS-BUILTS AS REQUIRED.
2. POWER CONNECTION FOR UV LIGHTING ARRAYS. REFER TO EQUIPMENT SCHEDULE FOR CIRCUITING.
PROVIDE ALL CONNECTIONS TO AHU AS REQUIRED PER MANUFACTURER AND MECHANICAL CONTRACTOR INSTRUCTION. REFER TO EQUIPMENT CONNECTION SCHEDULE FOR FURTHER DETAILS. AHU UV LIGHTING MANUFACTURER WILL SUPPLY TOGGLE SWITCH AND DOOR CONTACT FOR INSTALLATION BY ELECTRICAL CONTRACTOR. COORDINATE MOUNTING AND WIRING OF DEVICES WITH AHU MANUFACTURER PRIOR TO ROUGH-IN. UV LIGHTING ARRAYS TO BE INSTALLED 12 INCHES DOWNSTREAM OF COOLING COILS.
3. ROUTE CONDUIT FOR TEMPORARY AHU'S UP INTO LEVEL 2 CEILING OF BUILDING 01 AHU TOWER AND THEN UP TO THIRD LEVEL. REFER TO SHEET 01-EPV203 FOR CONTINUATION OF TEMPORARY CONDUIT ROUTE.
CONDUIT SHALL COME STRAIGHT OUT OF THE TOP OF SWITCHBOARD MDP-17, ROUTE UP WALL, AND ELBOW
INTO NEW CORE HOLES IN WALL TO ENTER 2ND LEVEL OF ADJACENT AHU TOWER.
4. PROVIDE A TOGGLE SWITCH FOR EACH INDIVIDUAL SECTION OF LIGHTING WITHIN UNIT. TOGGLE SWITCH
SHALL BE SURFACE MOUNTED TO EXTERIOR OF UNIT.
5. WORK NOTED FOR AHU-3 SHALL BE INCLUDED IN THE BASE BID INSTALLATION. WORK AT AHU-1 SHALL BE
INCLUDED IN THE ADDITIVE BID ITEM ISCOPE.
6. HVAC CONTROLS PANEL TO BE PROVIDED BY CONTROLS CONTRACTOR FOR AHU'S. COORDINATE LOW
VOLTAGE CONNECTIONS TO FIRE ALARM SYSTEM.
1/4" = 1'-0"1
BUILDING 17 - MEZZANINE LEVEL - ELECTRICAL PLAN
16 17 1817.D
17.1
N
M
L
17.3
K
TF-1 TF-2
HVAC CONTROL
PANEL "DDC"
L3 E
L3-11
VFD-TEMP-1
VFD-TEMP-2
SDSD SDSD
TIGHT TO STRUCTURE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234
Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520
NE COA NUMBER: CA-1620
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
NE COA NUMBER: CA-0721
on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
A
B
C
D
E
F
12/24/2025
A u to d e s k D o c s /1
-2
-3
A E
C o rr e c t H
V A
C D e fi c ie n c ie s /6
-3
.B
.M E
P .R
.r v t
/2 /2
:4
:4
A
M
1-EP103
BUILDING 01 - THIRD LEVEL -
ELECTRICAL PLAN
Correct HVAC Deficiencies
4101 Woolworth Ave, Omaha, NE 68105
636-25-301
12/24/2025 CTB NTH
KEY NOTES:
1. ROUTE CONDUIT TIGHT TO STRUCTURE FOR TEMPORARY AIR HANDLING UNITS (AHUS) DOWN TO SECOND
LEVEL CEILING OF BUILDING 01 AHU TOWER AND THEN CORE INTO MEZZANINE LEVEL OF BUILDING 17 ABOVE SWITCHBOARD MDP-17. REFER TO SHEET 17-EP203 FOR CONTINUATION OF AHU CONNECTION CONDUIT
ROUTE.
2. HVAC CONTROLS PANEL TO BE PROVIDED BY CONTROLS CONTRACTOR FOR TEMPORARY AHU'S.
COORDINATE LOW VOLTAGE CONNECTIONS TO FIRE ALARM SYSTEM.
1/4" = 1'-0"1
BUILDING 01 - THIRD LEVEL - ELECTRICAL PLAN
A A A A D
A
A
A
AA A AA A
A
A
A A A
A
A
12 13 14 1517.A 17.B 17.C 17.D
17.2
17.1
N
M
L
17.3
K
(TYP)1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234
Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520
NE COA NUMBER: CA-1620
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
NE COA NUMBER: CA-0721
on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
A
B
C
D
E
F
12/24/2025
A u to d e s k D o c s /1
-2
-3
A E
C o rr e c t H
V A
C D e fi c ie n c ie s /6
-3
.B
.M E
P .R
.r v t
/2 /2
:4
:4
A
M
17-EP104
BUILDING 17 - ROOF LEVEL -
LIGHTNING PROTECTION PLAN
Correct HVAC Deficiencies
4101 Woolworth Ave, Omaha, NE 68105
636-25-301
12/24/2025 CTB NTH
1/4" = 1'-0"1
BUILDING 17 - ROOF LEVEL - LIGHTNING PROTECTION PLAN
KEY NOTES:
1. PROVIDE LIGHTNING PROTECTION ON BUILDING 17 ROOF. PROVIDE ALL NECESSARY COMPONENTS AND
EQUIPMENT REQUIRED FOR A COMPLETE LIGHTNING PROTECTION SYSTEM OF BUILDING 17 ROOF AND TEMPORARY DUCTWORK. PROVIDE AIR TERMINALS AT MAXIMUM 20'-0" ON CENTER SURROUNDING AREA.
2. EXTEND BUILDING 17 ROOF LIGHTING PROTECTION TO ADJACENT BUILDING 1 AHU TOWER LEVEL 3 ROOF SYSTEM. LEVEL 3 ROOF SYSTEM ON AHU TOWER ROUTES DOWN THE WALL TO A GROUND RING THAT SURROUNDS THE BUILDING. COORDINATE FINAL TIE IN POINT AT BUILDING CONNECTION WITH EXISTING INSTALLATION. ROOF LEVEL OF BUILDING 17 IS ROUGHLY 1'-0" LOWER THAN BUILDING 1 AHU TOWER LEVEL 3
ROOF AREA.
9.52MM (3/8") MIN
GALVANIZED THREADED
ROD, TYP
LOCKING SQUARE
WASHER & LOCKNUT
INTEGRAL
GALVANIZED LIPPED
STEEL MOUNTING
CHANNEL
WASHER & LOCKNUT
REFER TO PLANS
FOR QUANTITY &
SIZE OF CONDUITS
CONDUIT CLAMP
SIZE AS REQUIRED
INTEGRAL
GALVANIZED LIPPED
STEEL MOUNTING
CHANNEL
9.52MM (3/8") MIN
GALVANIZED THREADED
ROD, TYP
LOCKING SQUARE
WASHER & LOCKNUT
INTEGRAL
GALVANIZED LIPPED
STEEL MOUNTING
CHANNEL
LENGTH AS REQUIRED
NOTES:
1. COORDINATE DEVICE MOUNTING HEIGHTS WITH ARCHITECT AND ARCHITECTURAL DETAILS.
MOUNTING HEIGHTS INDICATED ABOVE ARE TO BE UTILIZED FOR DEVICES NOT DETAILED BY
ARCHITECT.
2. ELEVATIONS SHOWN ARE FROM FINISHED FLOOR OR SURFACE TO CENTER LINE OF DEVICE.
(EXCEPT WHERE INDICATED OTHERWISE)
3. WHERE DEVICES SHOWN ON PLAN ARE NOTED WITH AN EQUIPMENT TAG, COORDINATE EXACT
LOCATION AND ELEVATION TO DIRECTLY SERVE EQUIPMENT.
4. WHERE DEVICES SERVE MOVEABLE EQUIPMENT, MOUNT DEVICES BEHIND EQUIPMENT. DEVICES
SERVING FIXED EQUIPMENT SHALL BE LOCATED ADJACENT TO EQUIPMENT OR BEHIND
EQUIPMENT WHERE ACCESS FOR DISCONNECTION CAN BE MAINTAINED.
5. IF DEVICES ARE SHOWN TO EXCEED 44" AFF AT COUNTERS AND WORK SURFACES, NOTIFY
ARCHITECT REGARDING ADA REQUIREMENTS PRIOR TO INSTALLATION.
12" MAX
LOCATE DEVICES
ADJACENT TO OR
DIRECTLY BELOW
EQUIPMENT AS
COORDINATED
WITH OWNER
WALL MOUNTED EQUIPMENT
(COORDINATE WITH
MOUNTING ELEVATION OF
EQUIPMENT)
46"
LIGHT SWITCH
CONVENIENCE DEVICES
ON OPEN WALL SPACE
18"
AIR TERMINAL
MAIN CONDUCTOR
CLIP CABLE SUPPORT
SEALING WASHER
2' -0
(M
IN
MAIN CONDUCTOR
PARAPET WALL
CLIP CABLE SUPPORT
CABLE CONNECTOR
AIR TERMINAL
ROOF
2' -0
M
IN
DOWN CONDUCTOR
GROUND ROD
GROUND ROD CLAMP
GRADE
0" M
IN
1'
0"
M
IN
2' - 0"
MIN.
NO SCALE2
TYPICAL ELECTRICAL DEVICE MOUNTING HEIGHTS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234
Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520
NE COA NUMBER: CA-1620
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
NE COA NUMBER: CA-0721
on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
A
B
C
D
E
F
12/24/2025
A u to d e s k D o c s /1
-2
-3
A E
C o rr e c t H
V A
C D e fi c ie n c ie s /6
-3
.B
.M E
P .R
.r v t
/2 /2
:4
:4
A
M
17-EP501
ELECTRICAL DETAILS Correct HVAC Deficiencies
4101 Woolworth Ave, Omaha, NE 68105
636-25-301
12/24/2025 CTB NTH
NO SCALE1
CONDUIT TRAPEZE MOUNTING DETAIL
1/8" = 1'-0"3
LIGHTNING PROTECTION - AIR TERMINAL
1/8" = 1'-0"4
LIGHTNING PROTECTION - AIR TERMINAL PARAPET MOUNTING
1/8" = 1'-0"5
LIGHTNING PROTECTION - GROUNDING AT GRADE
600/3AF
600/3AT
GPF
ZSI
2000/3
GFP
ZSI
EE
EE
EXISTING PORTABLE
GENERATOR
CONNECTION
ATS-14
2000A, 4-POLES
BYPASS-ISOLATION
24.3 KAIC
1500 KVA
13800-480Y/277V
EE
MDP-17
2000A, 480Y/277V
25.7 KAIC
225/3AF
175/3AT
GPF
ZSI
160/3AF
90/3AT
GPF
ZSI
160/3AF
125/3AT
GPF
ZSI
160/3AF
150/3AT
GPF
ZSI
160/3AF
100/3AT
GPF
ZSI
160/3AF
100/3AT
GPF
ZSI
160/3AF
125/3AT
GPF
ZSI
225/3AF
175/3AT
GPF
ZSI
160/3AF
125/3AT
GPF
ZSI
160/3AF
125/3AT
GPF
ZSI
160/3AF
160/3AT
GPF
ZSI
160/3AF
150/3AT
GPF
ZSI
600/3AF
400/3AT
GPF
ZSI
160/3AF
150/3AT
GPF
ZSI
160/3AF
160/3AT
GPF
ZSI
400/3AF
315/3AT
GPF
ZSI
400/3AF
400/3AT
GPF
ZSI
400/3AF
400/3AT
GPF
ZSI
400/3AF
400/3AT
GPF
ZSI
DD
WEST
AHU-3
SF-3
DD
AHU-3
SF-3
EE
SF-2
EE
CENTER
EAST
CT-1
EE
EAST
CT-1
EE
CENTER
WEST
CT-1
EE
WEST
CT-1
EXISTING
COOLING
TOWER
EXISTING
PANEL
P-17B
EXISTING
XFMR
P-17A
EE
CW PUMP
P-22
DD
EAST (A)
AHU-1
SF-1
DD
EAST (B)
AHU-1
SF-1
EE
ATS-12
EQUIPMENT
BRANCH
XFMR
112.5 KVA
EE
FROM EXISTING
GENERATOR
EXISTING
ELEVATORS
#7 & #8
EE
CW PUMP
P-2
EE
CW PUMP
P-1
ATS-13
EQUIPMENT
BRANCH
EE
CW PUMP
P-5
EE
CW PUMP
P-4
DD
CW PUMP
P-3
EE
600/3 600/3 600/3
EE DD
EE
175/3
FROM EXISTING
GENERATOR
EE
XFMR
112.5 KVA
E17C1 400A, 480Y/277V
24.2 KAIC
N17C1 600A, 480Y/277V
22.3 KAIC
EE EE400/3
EE
EAST
CH-2
EE
WEST
CH-1
25/3 70/3 70/3
EE
30/3
T-E17C2
15 KVA
EE
EE
E17C2 208/120V
40/3 40/3 40/3 40/3 30/350/3 70/3 15/3 15/320/315/340/315/330/330/330/320/320/3 20/3 20/3 20/330/3 20/3
600/3
EE
HCW PUMP
P-19
EE
HCW PUMP
P-18
EE
HCW PUMP
P-17
EE
HCW PUMP
P-16
EE
HCW PUMP
P-15
EE
HCW PUMP
P-14
EE
GLYCOL
P-13
EE
GLYCOL
P-12
EE
GLYCOL
P-11
EE
GLYCOL
P-10
EE
GLYCOL
P-9
EE
GLYCOL
P-8
EE
CW PUMP
P-7
EE
CW PUMP
P-6
EE
EF
E-15
30/3
EE
EE
EF
EF-7
EE
EF
EF-6
EE
EF
EF-5
EE
EF
EF-4
EE
EF
EF-3
EE
PLANT
EXHAUST
EE
EE
SUPPLY
SF-4
EE
EE
COND.
CP-1
30/3
EE
1 1
3 3 4 4
SPACE
250/3AF
250/3AT
GPF
ZSI
EXISTING
PANEL
HNBE3
225/3AF
175/3AT
GPF
ZSI
EXISTING MEDIUM
VOLTAGE SWITCH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234
Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520
NE COA NUMBER: CA-1620
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
NE COA NUMBER: CA-0721
on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
A
B
C
D
E
F
12/24/2025
A u to d e s k D o c s /1
-2
-3
A E
C o rr e c t H
V A
C D e fi c ie n c ie s /6
-3
.B
.M E
P .R
.r v t
/1
/2
:0
:4
P
M
17-EP601
BUILDING 17 - ONE-LINE DIAGRAM -
DEMOLITION
Correct HVAC Deficiencies
4101 Woolworth Ave, Omaha, NE 68105
636-25-301
12/24/2025 CTB NTH
NO SCALE1
BUILDING 17 - ONE-LINE DIAGRAM - DEMOLITION
KEY NOTES:
1. PLANS REFLECT WORK FOR REPLACING THE INTERNAL COMPONENTS OF AHU-1 AND…