This file contains technical drawings for HVAC deficiency corrections at the VA Wisconsin-Iowa Healthcare System (VANWIHCS) facility in Omaha, Nebraska, under project number PN 636-25-301. The drawings are presented as Part 3 of a multi-part set and comprise 22 pages of architectural and mechanical specifications detailing the scope of HVAC system modifications, including equipment locations, ductwork routing, piping configurations, and control system installations. The drawings establish the technical requirements and spatial parameters that contractors must follow to address identified HVAC deficiencies within the specified facility.
The drawings serve as the technical foundation for the solicitation 36C326326B0031 issued by the Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 23. These technical documents are essential reference materials for prospective contractors preparing proposals, as they define the precise work scope, existing conditions, and performance specifications necessary to complete the HVAC system corrections. Contractors responding to this opportunity must review these drawings in conjunction with other contract documents, including the Statement of Work or Performance Work Statement, to understand the complete project requirements and develop accurate cost and schedule proposals.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12 13 14 1517.A 17.B 17.C 17.D
17.2
17.1
N
M
L
17.3
K
MOTORIZED
DAMPER
60x54 SA
108x54 SA
60x24 SA UP
(TYP. 4)
60x40 SA
CAPPED FOR
FUTURE
x5
S
A
17-M401
17-M401
108x40 SA
CAPPED FOR
FUTURE
CONTROL
PANELS
17-M401
FF-3
20X10
SDSD
SA-3
SF-3
H-AHU3-1 H-AHU3-2
PF3-2
20X10
PF3-1
20X10
17-M403
CC-3CC3-1W
HC3-1W HC-3
VFD3-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234
Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520
NE COA NUMBER: CA-1620
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
NE COA NUMBER: CA-0721
on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
A
B
C
D
E
F
12/24/2025A u to d e s k D o c s /1
-2
-3
A E
C o rr e c t H
V A
C D e fi c ie n c ie s /6
-3
.B
.M E
P .R
.r v t
/2 /2
:4
:1
A
M
17-MH102
BUILDING 17 - MEZZANINE LEVEL -
DUCTWORK
Correct HVAC Deficiencies
4101 Woolworth Ave, Omaha, NE 68105
636-25-301
12/24/2025 JMM NAP
KEY NOTES:
1. 70X108 SA PLENUM TO PROVIDE INITIAL TEMPORARY AIR TO EXISTING AHU-1 RISERS. REMOVAL OF EXISTING
AND TIE-IN OF TEMPORARY AND INITIATION OF TEMPORARY AIRFLOW MUST OCCUR WITHIN A FOUR HOUR
WINDOW.
2. FAN ARRAY CANNOT EXCEED 135 PSF OVER THE FOOTPRINT OF THE ARRAY.
3. NEW VARIABLE SPEED DRIVES. TWO DRIVES (ONE REDUNDANT).
4. EXTENDED OUTSIDE AIR INTAKE ABOVE UNIT. PROVIDE 8’X3’ OPENING INTO TOP OF UNIT WITH MOTORIZED
DAMPER.
5. 60”X40” DUCT TO BACKFEED AHU-1 DOWNSTREAM DUCTWORK UNDER AHU-1 ADDITIVE BID ITEM IWORK.
CAP DUCT FOR FUTURE CONNECTION UNDER BASE CASE.
6. EXISTING LOUVERS TO BE REMOVED TO FACILITATE REMOVAL OF EXISTING COMPONENTS AND ENTRY OF
NEW COMPONENTS. OPENING TO BE PHYSICALLY SECURED AT ALL TIMES. PERIOD PROTECT EXISTING LOUVERS FROM DAMAGE. REPLACE LOUVERS AS SOON AS FEASIBLE AFTER NEW EQUIPMENT IS SECURED
IN THE BUILDING.
7. CONSTRUCT PLENUM SPACE BELOW PREHEAT COIL WITH FIN TUBE HEATING AND DRAIN TO ALLOW FOR
MELTING OF BUILT UP SNOW IN OUTSIDE AIR INTAKE PLENUM.
8. INCREASE EXISTING OPENIN SIZE TO 84"X84". CONNECT NEW DUCTWORK TO NEW OPENING AND BLANK OFF NEW DUCTWORK INSIDE AHU-3 DISCHARGE UNDER TEMPORARY AIR WORK AND REMOVE AFTER AHU-3 UPGRADES ARE MADE AND UNIT IS TO BE PUT INTO OPERATION. BLANK OFF CONSTRUCTION TO ALLOW QUICK REPLACEMENT SHOULD ISSUES ARISE WHEN BRINGING AHU-3 ON LINE FOR SERVICE. AHU-3 TO OPERATE UNDER STABLE OPERATION FOR A MINIMUM OF 7 DAYS BEFORE TEMPORARY AIR SERVICE TO
AHU-3 IS DECOMMISSIONED.
9. PROVIDE 18 INCH BY 18 INCH DOUBLE PANE UV RESISTANT WINDOW IN 24 INCH BY 84 INCH ACCESS DOOR.
PROVIDE CUT OUT SWITCH ON DOOR INTERLOCKED WITH UV LIGHT CONTROLS TO TURN OFF UV LIGHTS
WHEN ACCESS DOOR IS OPENED.
10. PROVIDE 16 GAUGE BLANK OFF PLATES AT UNIT ELEMENTS AS INDICATED TO ISOLATE UPSTREAM AND DOWNSTREAM SECTIONS. SEAL ALL MATING SECTIONS TO SMACNA SEAL CLASS A. WHERE INDICATED
PROVIDE 24 INCH BY 84 INCH ACCESS DOORS IN BLANK OFFS.
11. PROVIDE 4 INCH 16 GAUGE DOUBLE WALL INSULATED BLANK OFF AT COOLING COILS TO ISOLATE UPSTREAM
AND DOWNSTREAM SECTIONS. SEAL ALL MATING SECTIONS TO SMACNA SEAL CLASS A.
12. PROVIDE NEW DIFFERENTIAL PRESSURE SENSOR IN 54 INCH DUCT RISER AT LEVEL 3. REFER TO NEW AHU-3
SEQUENCE FOR INFORMATION ON TESTING DUCT PRESSURE TO ESTABLISH INITIAL SETPOINT.
1/4" = 1'-0"1
BUILDING 17 - MEZZANINE LEVEL - DUCTWORK
N
1. NEW HOUSEKEEPING PAD LOCATIONS ARE BASED ON BASIS OF DESIGN EQUIPMENT SELECTIONS.
COORDINATE FINAL LOCATION OF NEW HOUSEKEEPING PADS WITH CONTRACTORS PURCHASED
EQUIPMENT, EQUIPMENT SUPPORTS AND FINAL LAYOUT PER COORDINATION DRAWINGS.
2. COOLING COIL INSTALLATION: FIELD VERIFY EXISTING CONDITIONS. CASING HEIGHT TO BE COORDINATED WITH EXISTING CONDITIONS, COIL BASE SUPPORT DETAIL 9/17-M505 AND SUPPLEMENTAL COIL SUPPORTS.
3. PROVIDE SUPPORTS OF ALL UNIT COMPONENTS AS NEEDED FOR STRUCTURAL STABILITY. COORDINATE
COIL AND FILTER SUPPORT REQUIREMENTS WITH THE COIL AND FILTER MANUFACTURERS.
SHEET NOTES:
Mark Revisions: Date:
17.1
N
M
L
17.3
K
17-M402
17-M402
144x40 SA
60x40 SA
52ø SA
70x108 SA
PLENUM
144x40 SA
38ø SA
EXTENDED
INTAKE PLENUM
H-AHU1-1 H-AHU1-2
SF-1
SA-1
FF-1
20X10
17-M404
HC1-1W HC-1
SDSD
CDCD
10PF1-2
20X10
PF1-1
20X10
CC1-2ECC1-4W
VFD1-1
VFD1-2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234
Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520
NE COA NUMBER: CA-1620
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
NE COA NUMBER: CA-0721
on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
A
B
C
D
E
F
12/24/2025A u to d e s k D o c s /1
-2
-3
A E
C o rr e c t H
V A
C D e fi c ie n c ie s /6
-3
.B
.M E
P .R
.r v t
/2 /2
:4
:1
A
M
17-MH102-A
BUILDING 17 - MEZZANINE LEVEL -
DUCTWORK - ADDITIVE BID ITEM I
Correct HVAC Deficiencies
4101 Woolworth Ave, Omaha, NE 68105
636-25-301
12/24/2025 JMM NAP
KEY NOTES:
1. 70X108 SA PLENUM TO PROVIDE INITIAL TEMPORARY AIR TO EXISTING AHU-1 RISERS. REMOVAL OF EXISTING
AND TIE-IN OF TEMPORARY AND INITIATION OF TEMPORARY AIRFLOW MUST OCCUR WITHIN A FOUR HOUR
WINDOW.
2. FAN ARRAY CANNOT EXCEED 135 PSF OVER THE FOOTPRINT OF THE ARRAY.
3. NEW VARIABLE SPEED DRIVES FOR AHU-1. FOUR DRIVES (ONE REDUNDANT).
4. PROVIDE EXTENDED INTAKE PLENUM ABOVE EXISTING AHU-1. PROVIDE NEW 8’X3’ OPENING INTO TOP OF
UNIT WITH MOTORIZED DAMPER. REMOVE LOUVER BLANKOFF PLATE AND CONNECT NEW PLENUM TO LOUVER CONSTRUCTED OF 4 INCH DOUBLE WALL INSULATED PANELS. SEAL ALL SEAMS TO SMACNA SEAL
CLASS A. REFER TO ELEVATION FOR ADDITIONAL INFORMATION.
5. 60”X40” DUCT TO BACKFEED AHU-1 DOWNSTREAM DUCTWORK UNDER AHU-1 UPGRADE WORK AND AHU-1
ALTERNATE WORK. CAP DUCT FOR FUTURE CONNECTION UNDER BASE CASE.
6. EXISTING LOUVERS TO BE REMOVED TO FACILITATE REMOVAL OF EXISTING COMPONENTS AND ENTRY OF NEW COMPONENTS. OPENING TO BE PHYSICALLY SECURED AT ALL TIMES PERIOD PROTECT EXISTING LOUVERS FROM DAMAGE. REPLACE LOUVERS AS SOON AS FEASIBLE AFTER NEW EQUIPMENT IS SECURED
IN THE BUILDING.
7. PROVIDE 18 INCH BY 18 INCH DOUBLE PANE UV RESISTANT WINDOW IN 24 INCH BY 84 INCH ACCESS DOOR.
PROVIDE CUT OUT SWITCH ON DOOR INTERLOCKED WITH UV LIGHT CONTROLS TO TURN OFF UV LIGHTS
WHEN ACCESS DOOR IS OPENED.
8. PROVIDE 16 GAUGE BLANK OFF PLATES AT UNIT ELEMENTS AS INDICATED TO ISOLATE UPSTREAM AND DOWNSTREAM SECTIONS. SEAL ALL MATING SECTIONS TO SMACNA SEAL CLASS A. WHERE INDICATED
PROVIDE 24 INCH BY 84 INCH ACCESS DOORS IN BLANK OFFS.
9. PROVIDE 4 INCH 16 GAUGE DOUBLE WALL INSULATED BLANK OFF AT COOLING COILS TO ISOLATE UPSTREAM
AND DOWNSTREAM SECTIONS. SEAL ALL MATING SECTIONS TO SMACNA SEAL CLASS A.
10. PROVIDE NEW DIFFERENTIAL PRESSURE SENSOR IN 36 INCH DUCT RISER AT LEVEL 3. REFER TO NEW AHU-1
SEQUENCE FOR INFORMATION ON TESTING DUCT PRESSURE TO ESTABLISH INITIAL SETPOINT.
1/4" = 1'-0"1
BUILDING 17 - MEZZANINE LEVEL - DUCTWORK - ADDITIVE BID ITEM I
N
1. NEW HOUSEKEEPING PAD LOCATIONS ARE BASED ON BASIS OF DESIGN EQUIPMENT SELECTIONS.
COORDINATE FINAL LOCATION OF NEW HOUSEKEEPING PADS WITH CONTRACTORS PURCHASED
EQUIPMENT, EQUIPMENT SUPPORTS AND FINAL LAYOUT PER COORDINATION DRAWINGS.
2. COOLING COIL INSTALLATION: FIELD VERIFY EXISTING CONDITIONS. CASING HEIGHT TO BE COORDINATED WITH EXISTING CONDITIONS, COIL BASE SUPPORT DETAIL 9/17-M505 AND SUPPLEMENTAL COIL SUPPORTS.
3. PROVIDE SUPPORTS OF ALL UNIT COMPONENTS AS NEEDED FOR STRUCTURAL STABILITY. COORDINATE
COIL AND FILTER SUPPORT REQUIREMENTS WITH THE COIL AND FILTER MANUFACTURERS.
SHEET NOTES:
12 13 14 15 16 1717.A 17.B 17.C 17.D
17.1
N
M
L
17.3
K
120x48 SA
72x108 SA
SDSD
SDSD
96x96 SA 96x96 SATFF-1
TFF-2
TH-1 TH-2
TF-2TF-1
TCC-1
TCC-2
96x96 OA96x96 OA
THC-1 THC-2
TPF-1
192x96 OA
4 4
EXISTING HOUSEKEEPING PAD
EXISTING HOUSEKEEPING PAD
17-M505
17-M505
17-M505
90x40 SA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234
1, 17
Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520
NE COA NUMBER: CA-1620
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
NE COA NUMBER: CA-0721
on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
A
B
C
D
E
F
12/24/2025A u to d e s k D o c s /1
-2
-3
A E
C o rr e c t H
V A
C D e fi c ie n c ie s /6
-3
.B
.M E
P .R
.r v t
/2 /2
:4
:1
A
M
1-MH103
BUILDINGS 01 AND 17 - THIRD LEVEL
AND ROOF - DUCTWORK
Correct HVAC Deficiencies
4101 Woolworth Ave, Omaha, NE 68105
636-25-301
12/24/2025 JMM NAP
N
1. THIS PLAN SHOWS VARIOUS COMPONENTS FOR A FIELD ASSEMBLED TEMPORARY AIR SYSTEM TO PROVIDE CONDITIONED AIR FOR BACK FEED OF AIR HANDLING UNITS AHU-1 AND AHU-3 DURING THEIR UPGRADES. THE BASIS OF DESIGN PERFORMANCE OF THE COMPONENTS IS INDICATED ON THE PROJECT SCHEDULE SHEETS. ALTERNATE EQUIPMENT, SUCH AS RENTAL EQUIPMENT OR SINGLE LARGER CAPACITY COILS OR ALTERNATE ARRANGEMENTS SUCH AS A FAN ARRAY, THAT MEET THE MINIMUM DESIGN REQUIREMENTS MAY BE SUBMITTED FOR CONSIDERATION AND APPROVAL BY THE VA COR AND THE ENGINEER OF RECORD; INLINE ARRANGEMENT OF COMPONENTS MAY NOT BE ALTERED (FOR EXAMPLE, IT IS NOT ACCEPTABLE TO LOCATE THE PREHEAT COIL DOWNSTREAM O THE FAN OR THE FINAL FILTERS UPSTREAM OF THE FAN.). IT WOULD ALSO BE ACCEPTABLE TO CREATE ONE LARGE CAPACITY UNIT OR THREE SMALLER CAPACITY UNITS AS LONG AS THE DELIVERED PERFORMANCE MEETS OR EXCEEDS THE
SCHEDULED PERFORMANCE.
2. COOLING COIL INSTALLATION: FIELD VERIFY EXISTING CONDITIONS. CASING HEIGHT TO BE COORDINATED WITH EXISTING CONDITIONS, COIL BASE SUPPORT DETAIL 9/17-M505 AND SUPPLEMENTAL COIL SUPPORTS.
3. PROVIDE SUPPORTS OF ALL UNIT COMPONENTS AS NEEDED FOR STRUCTURAL STABILITY. COORDINATE
COIL AND FILTER SUPPORT REQUIREMENTS WITH THE COIL AND FILTER MANUFACTURERS.
4. IF A SINGLE LARGER UNIT IS USED THE HUMIDIFIER(S) FACE VELOCITY MUST BE A MINIMUM OF 300 FPM AT
A UNIT OPERATION OF 30,000 CFM (AHU-1 APPROXIMATE TEMPORARY OPERATIONAL CFM).
5. IT IS ALLOWED FOR THE CONCRETE SLAB TO BE USED AS THE FLOOR OF THE TEMPORARY UNIT;
HOWEVER, THE FLOOR MAY NOT BE USED FOR THE ACCUMULATION OF CONDENSATE. CONDENSATE DRAIN PANS FOR THE COOLING COIL MUST BE PROVIDE AS PER DETAIL 5/17-M501 AND DISCHARGE PIPING
ROUTED TO THE NEAREST FLOOR DRAIN.
KEY NOTES:
1. PROVIDE 6' X 7' TAP OFF DISCHARGE PLENUM. THE BOTTOM OF THE 120" X 48" SUPPLY DUCT TO BE 5'-8"
ABOVE FINISHED FLOOR.
2. COOLING COIL INSTALLATION: FIELD VERIFY EXISTING CONDITIONS. CASING HEIGHT TO BE COORDINATED
WITH EXISTING CONDITIONS, COIL BASE SUPPORT DETAIL 9/17-M505 AND SUPPLEMENTAL COIL SUPPORTS.
3. REMOVE LOUVER TO ALLOW FOR INSTALLATION OF TEMPORARY UNIT COMPONENTS. PROTECT FROM
DAMAGE AND REINSTALL AFTER REMOVAL OF TEMPORARY UNIT COMPONENTS.
4. FEED TEMPORARY UNIT COMPONENTS FROM EXISTING CHILLED WATER, HOT WATER, AND STEAM
CONNECTIONS.
5. DUCTWORK FROM THE OA LOUVER TO THE FINAL FILTER SHALL BE 10" PRESSURE CLASS.
6. DUCTWORK DOWNSTREAM OF THE SMOKE DAMPERS SHALL BE 6" PRESSURE CLASS.
7. INSTALL AND SUPPORT DUCTWORK PER ASCE 7.
8. PRIOR TO DUCT PENETRATION, CONTRACTOR SHALL ENSURE PROPER HAZARDOUS MATERIAL ABATEMENT.
9. PROVIDE 16 GAUGE BLANK OFF PANEL AT FAN DISCHARGE
10. SHEET METAL PANEL SEPARATING TEMPORARY UNIT 1 FROM TEMPORARY UNIT 2 TO BE DOUBLE WALL
INSULATED.
11. PROVIDE 3' WEATHER HOOD EXTENSION. PROVIDE 1/2" SCREEN AT BUILDING OPENING.
12. REMOVE LOUVER TO ALLOW FOR INSTALLATION OF TEMPORARY DUCTWORK. PROTECT LOUVER FROM
DAMAGE AND REINSTALL AFTER REMOVAL OF TEMPORARY DUCTWORK. PROVIDE WEATHER TIGHT SEAL
AROUND REMAINING OPENING WITH R-20 INSULATION.
SHEET NOTES:
1/4" = 1'-0"1
BUILDINGS 01 AND 17 - THIRD LEVEL AND ROOF - DUCTWORK
17.1
N
M
L
17.3
K
MECHANICAL HVAC
4" GHWS
4" GHWR UP
4" GHWS UP
4" G
H W
R
4" G
H W
R
HX-3
HX-1
P-10
P-8
4" GHWR
OFFICE A/C OPERATORS
A101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234
Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520
NE COA NUMBER: CA-1620
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
NE COA NUMBER: CA-0721
on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
A
B
C
D
E
F
12/24/2025A u to d e s k D o c s /1
-2
-3
A E
C o rr e c t H
V A
C D e fi c ie n c ie s /6
-3
.B
.M E
P .R
.r v t
/2 /2
:4
:1
A
M
17-MP101-A
BUILDING 17 - BASEMENT LEVEL -
HYDRONIC PIPING - ADDITIVE BID ITEM I
Correct HVAC Deficiencies
4101 Woolworth Ave, Omaha, NE 68105
636-25-301
12/24/2025 JMM NAP
N
KEY NOTES:
1. REPLACE 3" GHWS AND GHWR WITH 4" PIPE BACK TO HEAT EXCHANGERS.
2. EXISTING PUMP TO REMAIN.
1/4" = 1'-0"1
BUILDING 17 - BASEMENT LEVEL - HYDRONIC PIPING - ADDITIVE BID ITEM I
17.1
N
M
L
17.3
K
4" LPS
4" GHWS
4" GHWR
H-AHU3-1
SF-3
SA-3
17-M403
H-AHU3-2
3 3
3" LPS
PF3-2
20X10
PF3-1
20X10
FF-3
20X10
1" LPC
CC-3
HC-3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234
Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520
NE COA NUMBER: CA-1620
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
NE COA NUMBER: CA-0721
on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
A
B
C
D
E
F
12/24/2025A u to d e s k D o c s /1
-2
-3
A E
C o rr e c t H
V A
C D e fi c ie n c ie s /6
-3
.B
.M E
P .R
.r v t
/2 /2
:4
:1
A
M
17-MP102
BUILDING 17 - MEZZANINE LEVEL -
HYDRONIC PIPING
Correct HVAC Deficiencies
4101 Woolworth Ave, Omaha, NE 68105
636-25-301
12/24/2025 JMM NAP
N
KEY NOTES:
1. ROUTE NEW CHILLED WATER PIPING OVER THE TOP OF NEW SOUND ATTENUATORS AND FAN ARRAYS TO
CONNECT TO NEW CHILLED WATER COIL LOCATIONS. PROVIDE NEW FLOOR DRAIN TO SERVE COOLING
COILS.
2. TOTAL OF EIGHT CHILLED WATER COILS.
3. PROVIDE UV LIGHT ARRAY MOUNTED A MINIMUM OF 12 INCHES DOWNSTREAM OF COOLING COIL.
4. 1” STEAM CONDENSATE DOWN TO BASEMENT LEVEL. CONNECT TO EXISTING STEAM CONDENSATE MAIN.
1/4" = 1'-0"1
BUILDING 17 - MEZZANINE LEVEL - HYDRONIC PIPING
17.1
N
M
L
17.3
K
SA-1
SF-1
H-AHU1-1 H-AHU1-2
4" LPS
17-M404
4" GHWR DN
4" GHWS DN
4" GHWR
4" GHWS
3 3
PF1-1
PF1-2
CC1-4W CC1-2E
FF-1
20X10
1" LPC
CC-1
CC-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234
Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520
NE COA NUMBER: CA-1620
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
NE COA NUMBER: CA-0721
on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
A
B
C
D
E
F
12/24/2025A u to d e s k D o c s /1
-2
-3
A E
C o rr e c t H
V A
C D e fi c ie n c ie s /6
-3
.B
.M E
P .R
.r v t
/2 /2
:4
:1
A
M
17-MP102-A
BUILDING 17 - MEZZANINE LEVEL -
HYDRONIC PIPING - ADDITIVE BID ITEM I
Correct HVAC Deficiencies
4101 Woolworth Ave, Omaha, NE 68105
636-25-301
12/24/2025 JMM NAP
N
KEY NOTES:
1. ROUTE NEW CHILLED WATER PIPING OVER THE TOP OF NEW SOUND ATTENUATORS AND FAN ARRAYS TO
CONNECT TO NEW CHILLED WATER COIL LOCATIONS. PROVIDE NEW FLOOR DRAIN TO SERVE COOLING
COILS.
2. TOTAL OF EIGHT CHILLED WATER COILS, SIX EXISTING CHILLED WATER COILS TO BE REUSED. REFER TO
SHEET 17-MD102 FOR ADDITIONAL INFORMATION.
3. PROVIDE UV LIGHT ARRAY MOUNTED A MINIMUM OF 12 INCHES DOWNSTREAM OF COOLING COIL.
4. 1” STEAM CONDENSATE DOWN TO BASEMENT LEVEL. CONNECT TO EXISTING STEAM CONDENSATE MAIN.
1/4" = 1'-0"1
BUILDING 17 - MEZZANINE LEVEL - HYDRONIC PIPING - ADDITIVE BID ITEM I
12 13 14 15 16 1717.A 17.B 17.C 17.D
17.1
N
M
L
17.3
K
1" LPC
3" LPS
TH-1 TH-2
TF-1 TF-2
TCC-1 TCC-2
THC-2THC-1
8" CWR
8" CWS
6" HWS
6" HWR
EXISTING HOUSEKEEPING PAD
EXISTING HOUSEKEEPING PAD
1 1/2" LPS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234
Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520
NE COA NUMBER: CA-1620
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
NE COA NUMBER: CA-0721
on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
A
B
C
D
E
F
12/24/2025A u to d e s k D o c s /1
-2
-3
A E
C o rr e c t H
V A
C D e fi c ie n c ie s /6
-3
.B
.M E
P .R
.r v t
/2 /2
:4
:1
A
M
1-MP103
BUILDING 01 - THIRD LEVEL -
HYDRONIC PIPING
Correct HVAC Deficiencies
4101 Woolworth Ave, Omaha, NE 68105
636-25-301
12/24/2025 JMM NAP
N
1/4" = 1'-0"1
BUILDING 01 - THIRD LEVEL - HYDRONIC PIPING
MEZZANINE LEVEL
241' - 4"
L 17.3 K
17-M401
AHU-2AHU-2
40x60 SA x2
S
A x2
S
A
144x40 SA
PLENUM 2
BUILDING 17 ROOF
259' - 4"
MEZZANINE LEVEL
241' - 4"
L17.3
84x84 SA
54x84 SA
BUILDING 17 ROOF
259' - 4"
SDSD
FF-3
MEZZANINE LEVEL
241' - 4"
12 13 1417.B 17.C
17-M401 x1
O
A 40x144 SA x1
S
A
40x108 SA
54x108
54x60 SA
CDCD
x6
S
A x6
S
A
38ø SA
60x40 SA
AHU-2AHU-2
40ø SA
15' - 0"
8' - 8"
17-M401
54x60 SA
38ø SA
17-M403
17-M404
BUILDING 17 ROOF
259' - 4"
CONTROL PANELS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234
Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520
NE COA NUMBER: CA-1620
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
NE COA NUMBER: CA-0721
on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
A
B
C
D
E
F
12/24/2025A u to d e s k D o c s /1
-2
-3
A E
C o rr e c t H
V A
C D e fi c ie n c ie s /6
-3
.B
.M E
P .R
.r v t
/2 /2
:4
:2
A
M
17-M401
BUILDING 17 - MECHANICAL
SECTIONS
Correct HVAC Deficiencies
4101 Woolworth Ave, Omaha, NE 68105
636-25-301
12/24/2025 JMM NAP
KEY NOTES:
1. 48 X 108 TO BE CAPPED UNDER INITIAL TEMPORARY BACKFEED OF AHU-1 DOWNSTREAM DUCTWORK; REFER
TO 17-MH102 WORK FOR REFERENCE.
2. CAPPED UNDER BASE BID.
1/2" = 1'-0"2
SECTION AT AHU-2
1/2" = 1'-0"3
SECTION AT AHU-3
1/2" = 1'-0"1
SECTION AT AHU-2
12 13 1417.B 17.C
17-M402
40x144 SA x1
S
A x1
S
A
54x108
CDCD
x1
O
A
(TYP. 4)
54x60 SA
38ø SA
60x40 SA
PLENUM
17-M401
17-M403
17-M404
BUILDING 17 ROOF
259' - 4"
CONTROL PANELS
AHU-2
MEZZANINE LEVEL
241' - 4"
L 17.3 K
17-M402
52ø SA
40x60 SA
40x60 SA60x24 SA
60x24 SA
144x40 SA
AHU-2AHU-2
108x70 SA
PLENUM
4' - 8"
PLENUM
PLENUM
38ø SA
BUILDING 17 ROOF
259' - 4"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234
Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520
NE COA NUMBER: CA-1620
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
NE COA NUMBER: CA-0721
on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
A
B
C
D
E
F
12/24/2025A u to d e s k D o c s /1
-2
-3
A E
C o rr e c t H
V A
C D e fi c ie n c ie s /6
-3
.B
.M E
P .R
.r v t
/2 /2
:4
:2
A
M
17-M402
BUILDING 17 - MECHANICAL
SECTIONS - ADDITIVE BID ITEM I
Correct HVAC Deficiencies
4101 Woolworth Ave, Omaha, NE 68105
636-25-301
12/24/2025 JMM NAP
KEY NOTES:
1. COORDINATE REMOVAL OF EXISTING DUCTWORK WITH INSTALLATION OF TEMPORARY DUCT AS INDICATED.
TOP 40 X 60 TAP PROVIDED AND ACTIVE UNDER INITIAL TIE-IN. BOTTOM 40X60 TAP TO BE CAPPED UNDER
INTIAL INSTALLATION OF 108X70 SA PLENUM.
2. CONNECT BOTTOM 40 X 60 DUCT INTO NEW 120 X 48 AHU-1 SUPPLY AIR PLENUM AS PART OF TIE-IN OF AHU-1 UPGRADE. REMOVAL OF EXISTING AND TIE-IN OF TEMPORARY AND INITIATION OF TEMPORARY AIRFLOW MUST OCCUR WITHIN A FOUR HOUR WINDOW. FINAL TIE-IN OF UPGRADED AHU-1 WORK AND SHUT DOWN OF
TEMPORARY AIR HANDLING UNIT TO OCCUR WITHIN A FOUR HOUR WINDOW.
1/2" = 1'-0"1
SECTION AT AHU-2 - ADDITIVE BID ITEM I
1/2" = 1'-0"2
SECTION AT AHU-2 - ADDITIVE BID ITEM I
17.2 17.1NM
SECOND LEVEL
247' - 1 1/4"
17-M402
17-M401
PF3-1PF3-2
H-AHU3-1
SF-3SA-3FF-3
SDSD
6" CWS
6" CWR 4" LPS
4" GHWS
4" GHWR
BUILDING 17 ROOF
259' - 4"
2" CD
CC-1
HC-1
24" MIN.36" MIN.
36" MIN.48" MIN.
30" MIN.
30" MIN.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234
Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520
NE COA NUMBER: CA-1620
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
NE COA NUMBER: CA-0721
on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
A
B
C
D
E
F
12/24/2025A u to d e s k D o c s /1
-2
-3
A E
C o rr e c t H
V A
C D e fi c ie n c ie s /6
-3
.B
.M E
P .R
.r v t
/2 /2
:4
:2
A
M
17-M403
BUILDING 17 - MECHANICAL
SECTIONS - AHU-3
Correct HVAC Deficiencies
4101 Woolworth Ave, Omaha, NE 68105
636-25-301
12/24/2025 JMM NAP
1/2" = 1'-0"1
AHU-3 SECTION
KEY NOTES:
1. PROVIDE 16 GAUGE BLANK OFF PLATE, SEAL ALL MATING SECTIONS TO SMACNA SEAL CLASS A.
2. 4 INCH 16 GAUGE DOUBLE WALL INSULATED BLANK OFF.
MN17.1 17.217.217.1 N M
SECOND LEVEL
247' - 1 1/4"
17-M402
PF1-1
H-AHU1-2
SF-1 SA-1
FF-1
SDSD
4" LPS
4" GHWR
4" GHWS
PF1-2
BUILDING 17 ROOF
259' - 4"
8' X 3' MOTORIZED DAMPER
16 GAUGE BLANK OFF PLATE
4" DOUBLE WALL INSULATED PLENUM
1" LPC
30" MIN.48" MIN.36" MIN.
30" MIN.
30" MIN.
HC-1
CC-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234
Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520
NE COA NUMBER: CA-1620
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
NE COA NUMBER: CA-0721
on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
A
B
C
D
E
F
12/24/2025A u to d e s k D o c s /1
-2
-3
A E
C o rr e c t H
V A
C D e fi c ie n c ie s /6
-3
.B
.M E
P .R
.r v t
/2 /2
:4
:2
A
M
17-M404
BUILDING 17 - MECHANICAL
SECTIONS - ADDITIVE BID ITEM I
Correct HVAC Deficiencies
4101 Woolworth Ave, Omaha, NE 68105
636-25-301
12/24/2025 JMM NAP
1/2" = 1'-0"1
AHU-1 SECTION - ADDITIVE BID ITEM I
KEY NOTES:
1. HEATING COIL SHALL HAVE A MINIMUM CLEARANCE OF 30" FROM THE LOWER LEVEL PLENUM. HC-1
COMPOSED OF 6 COIL SECTIONS REFER TO 17-MP102A FOR ADDITIONAL INFORMATION.
2. PROVIDE 16 GAUGE BLANK OFF PLATE, SEAL ALL MATING SECTIONS TO SMACNA SEAL CLASS A.
3. CC-1 COMPOSED OF 8 COIL SECTIONS 17-MP102A FOR ADDITIONAL INFORMATION.
4. 4 INCH 16 GAUGE DOUBLE WALL INSULATED BLANK OFF.
POINTS LIST GENERAL NOTE:
ALL POINTS LISTS ARE PROVIDED TO CLARIFY INTENT AND ASSIST THE CONTRACTOR
IN UNDERSTANDING CONTROLS BIDDING REQUIREMENTS. NOT ALL POINTS REQUIRED
FOR THE PROJECT ARE COVERED BY THE POINTS LISTS. THE SPECIFICATIONS,
SEQUENCES OF OPERATIONS AND ANY SCHEMATICS PROVIDED ARE TO BE USED IN
CONJUNCTION WITH THE POINTS LIST FOR THE BASIS OF THE CONTRACTORS BID. ANY
DISCREPANCIES BETWEEN THE POINTS LISTS AND THE OTHER CONTROLS
DOCUMENTS NOTED DEFAULT TO THE MORE STRINGENT REQUIREMENT.
GENERAL NOTES
1. SERVICE DISCONNECT PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR SHALL BE LOCATED WITHIN 6 FEET OF
CONTROLLER.
2. CONTROLLER SHALL HAVE A MINIMUM SERVICE CLEARANCE OF 36 INCHES.
3. WIRE ALL SENSORS AND CONTROL DEVICES BACK TO CONTROLLER.
4. COORDINATE ALL CASING AND DUCT PENETRATIONS WITH FURNISHING CONTRACTOR. ENSURE ALL PENETRATIONS ARE
PROPERLY SEALED.
SEQUENCE OF OPERATION
DESCRIPTION:
THE AIR HANDLING UNIT IS A VARIABLE VOLUME UNIT THAT NORMALLY OPERATES AT CONSTANT VOLUME. OVER TIME THE CONSTANT VOLUME SETPOINT WILL BE AMENDED AS PATIENT FLOORS ARE SERVED BY NEW UNITS LOCATED IN THE NEW AHU TOWER. UNIT CONSISTS OF SUPPLY FANS WITH VFDS, OUTDOOR AIR DAMPER, PRE-FILTER BANK, HOT GLYCOL HEATING COIL, CHILLED WATER COOLING COIL, UV LIGHTS, STEAM HUMIDIFIER, FINAL FILTER
BANK AND UNIT ISOLATION SMOKE DAMPER.
SUPPLY FAN CONTROL:
START/STOP: THE DDC SYSTEM SHALL START THE SUPPLY FANS VIA THE VFDs WITH A TIME DELAY TO ALLOW ALL FIRE/SMOKE AND SMOKE DAMPERS IN THE AIR HANDLING SYSTEM TO OPEN PRIOR TO SUPPLY FAN OPERATION. THE
SUPPLY FANS SHALL RUN CONTINUOUSLY.
VFD RESET: IN CASE OF VFD FAULT DETECTION, THE DDC SYSTEM SHALL WAIT 30 SECONDS (ADJUSTABLE) AND THEN CALL THE VFD TO START. IF THE VFD DOES NOT START, THE DDC SYSTEM SHALL CALL A SECOND TIME. IF THE
VFD STILL HAS NOT STARTED, AN ALARM SHALL BE SENT TO THE OPERATOR INTERFACE.
CURRENT STATUS SWITCH: INSTALL A CURRENT STATUS SWITCH FOR EACH INDIVIDUAL SUPPLY FAN AND REPORT STATUS TO BMS. IF THE CURRENT STATUS SWITCH DOES NOT PROVE OPERATION OF A GIVEN FAN IN VFD OR BYPASS MODE, SEND AN ALARM TO THE OPERATOR INTERFACE. IF THE CURRENT STATUS SWITCH FOR ALL FANS DOES NOT PROVE OPERATION, THE UNIT SHALL SHUT DOWN AND SEND AN ALARM TO THE OPERATOR INTERFACE.
SPEED CONTROL: PURPOSE OF THE SUPPLY FAN CONTROL IS TO MAINTAIN A MINIMUM STATIC PRESSURE IN THE SUPPLY DUCT WORK, THE DDC SYSTEM SHALL CONTROL THE SUPPLY FAN VFD IN UNISON FROM THE SUPPLY DUCT DIFFERENTIAL PRESSURE TRANSMITTER SIGNALS ASSOCIATED WITH AIR HANDLER 3 UPGRADE. INITIAL SET POINT SHALL BE SET BY THE TEST AND BALANCE CONTRACTOR MEASURING THE DUCT STATIC PRESSURE IN THE DUCT AT THE LOCATION OF THE NEW SENSOR. THE NEW SENSOR SHALL BE USED AS THE CONTROL POINT FOR THE TEMPORARY UNIT WHEN BACKFEEDING THIS UNIT AND AS THE FINAL SENSOR FOR THIS UNIT. THIS SETPOINT SHALL BE ADJUSTABLE WITH FINAL SETPOINT OPTIMIZED BY THE BALANCING CONTRACTOR WHEN THE UPDATED UNIT IS BROUGHT ONLINE.
HIGH PRESSURE LIMIT: DIFFERENTIAL PRESSURE SWITCH SHALL BE A MANUAL RESET TYPE AND WIRED IN SERIES WITH THE START/STOP CONTROL OF THE SUPPLY FAN. THE DDC SYSTEM SHALL MONITOR THE STATUS OF THE
DIFFERENTIAL PRESSURE SWITCH. INITIAL SETPOINT SHALL BE +8.0" W.C. (ADJUSTABLE).
HIGH SUCTION PRESSURE LIMIT: DIFFERENTIAL PRESSURE SWITCH SHALL BE A MANUAL RESET TYPE AND WIRED IN SERIES WITH THE START/STOP CONTROL OF THE SUPPLY FAN. THE DDC SYSTEM SHALL MONITOR THE STATUS OF THE DIFFERENTIAL PRESSURE SWITCH. INITIAL SETPOINT SHALL BE -8.0" W.C. (ADJUSTABLE).
DISCHARGE AIR CONTROL: DISCHARGE AIR TEMPERATURE SETPOINT SHALL BE 55ºF (ADJUSTABLE). ALL SETPOINTS SHALL BE ADJUSTABLE AT THE OPERATOR INTERFACE.
WHENEVER THE DISCHARGE AIR TEMPERATURE IS ABOVE THE SETPOINT, THE FOLLOWING SHALL OCCUR IN SEQUENCE:
1. THE HEATING COIL CONTROL VALVE(S) SHALL MODULATE CLOSED.
2. THE DDC SYSTEM SHALL MODULATE THE CHILLED WATER CONTROL VALVE(S) OPEN.
3. IF THE DISCHARGE AIR TEMPERATURE IS MORE THAN 10ºF (ADJUSTABLE) ABOVE THE SETPOINT, SEND AN ALARM TO THE OPERATOR INTERFACE.
WHENEVER THE DISCHARGE AIR TEMPERATURE IS BELOW THE SETPOINT, THE FOLLOWING SHALL OCCUR IN SEQUENCE:
1. THE CHILLED WATER CONTROL VALVE(S) SHALL MODULATE CLOSED.
2. THE HEATING COIL CONTROL VALVE SHALL MODULATE OPEN TO MAINTAIN SETPOINT.
3. IF THE DISCHARGE AIR TEMPERATURE IS MORE THAN 10ºF (ADJUSTABLE) BELOW THE SETPOINT, SEND AN ALARM TO THE OPERATOR INTERFACE.
COOLING AND HEATING COILS HEAT RECOVERY MODE:
IN UNIT HEATING MODE THE AIR HANDLING UNIT PREHEAT COIL AND COOLING COIL WORK IN CONCERT TO RECOVERY COOLING ENERGY FROM THE OUTSIDE AIR STREAM AS A MEANS OF HEAT RECOVERY FOR THE BUILDINGS COOLING SYSTEM. THE INTENT IS FOR THE COILS TO WORK IN CONCERT TO PROVIDE CHILLED WATER RETURN AS LOW AS 50 DEGF (ADJUSTABLE) CHILLED WATER RETURN TEMPERATURE FROM THE AIR HANDLING UNIT COOLING
COIL. SEQUENCE AS FOLLOWS:
PREHEAT COIL DISCHARGE AIR TEMPERATURE (DAT) INITIAL SETPOINT SHALL BE 42 DEGF (ADJUSTABLE). IN HEATING MODE THE CHILLED WATER (DAT) COIL SHALL MODULATE TO MAINTAIN UNIT DISCHARGE AIR TEMPERATURE SETPOINT. MONITOR COIL CHILLED WATER COIL RETURN TEMPERATURE. IF CHILLED WATER RETURN TEMPERATURE IS GREATER THAN 55 DEGF (ADJUSTABLE), DECREASE PREHEAT COIL DISCHARGE AIR SETPOINT BY ONE DEGF. IF AFTER THIRTY MINUTES THE CHILLED WATER RETURN TEMPERATURE REMAINS GREATER THAN 55 DEGF DECREASE PREHEAT COIL BY ANOTHER DEGF. PREHEAT RESET TEMPERATURE TO NOT GO BELOW 38 DEGF (ADJUSTABLE).
IF CHILLED WATER COIL RETURN TEMPERATURE DROPS BELOW 50 DEGF INCREASE PREHEAT COIL DISCHARGE AIR TEMPERATURE BY 1 DEGF. IF AFTER 30 MINUTES THE CHILLED WATER COIL RETURN TEMPERATURE REMAINS BELOW 50 DEGF INCREASE PREHEAT COIL DISCHARGE AIR TEMPERATURE ANOTHER 1 DEGF. MAXIMUM PREHEAT COIL DAT SETPOINT SHALL BE 46 DEGF (ADJUSTABLE).
HUMIDIFIER CONTROL: USE EXISTING HUMIDITY SENSORS IN THE AREAS SERVED BY AHU-3 TO INITIATE AND CONTROL THE HUMIDIFIER. IF THE AVERAGE HUMIDITY OF THE EXISTING SENSORS SERVING THE AHU-3 AREA IS LESS THAN 30% (ADJUSTABLE) INITIATE HUMIDIFICATION TO CONTROL AVERAGE HUMIDITY TO 30% (ADJUSTABLE). The DDC SYSTEM SHALL OVERRIDE THE SIGNAL TO THE HUMIDIFIER CONTROL VALVE TO LIMIT THE SUPPLY AIR RELATIVE HUMIDITY TO A MAXIMUM OF 70% (ADJUSTABLE). IF THE SUPPLY OR RELATIVE HUMIDITY EXCEEDS 75% (ADJUSTABLE) AN ALARM SHALL BE SENT TO THE OPERATOR INTERFACE. WHENEVER THE OUTDOOR AIR BULB REFERENCE TEMPERATURE IS ABOVE 40 DEGREESF (ADJUSTABLE) THE DDC SYSTEM SHALL CLOSE THE HUMIDIFIER CONTROL VALVE AND DISABLE ANY ALARMS.
VENTILATION AIR CONTROL:
AIRFLOW STATION: AIR INLET PROBES ON SUPPLY FANS SHALL BE USED TO MONITOR SYSTEM AIRFLOW. PROVIDE COMBINED AIRFLOW VALUE TO DDC FROM ALL FAN MONITORS.
UV LIGHTS: THE UV LIGHTS SHALL BE ENABLED WHENEVER THE AIR HANDLING UNIT IS ENABLED AND RUN CONTINUOUSLY. MONITOR RUN-HOURS AND PROVIDE MAINTENANCE ALARMS AT INTERVALS RECOMMENDED BY THE MANUFACTURER. UV LIGHTS SHALL BE HARDWIRED TO THE AIR HANDLING UNIT DOOR SWITCH. IN THE EVENT THE DOOR OPENS, THE LIGHTS SHALL BE DISABLED.
UNIT SHUTDOWN:
THE SUPPLY FANS SHALL STOP.
THE OUTSIDE AIR DAMPER SHALL CLOSE.
THE CHILLED WATER CONTROL VALVE(S) SHALL CLOSE.
THE HUMIDIFIER CONTROL VALVE SHALL CLOSE.
THE HEATING COIL CONTROL VALVE(S) SHALL CLOSE. FREEZESTAT SHALL OVERRIDE HEATING CONTROL VALVE(S) AS REQUIRED.
ALL FIRE/SMOKE AND SMOKE DAMPERS ASSOCIATED WITH THE AIR HANDLING SYSTEM SHALL CLOSE.
FILTER MONITORING:
FOR EACH FILTER BANK WITH RATING OF MERV 8 AND BELOW, PROVIDE AN ALARM TO THE OPERATOR INTERFACE WHEN THE DIFFERENTIAL STATIC PRESSURE EXCEEDS 0.6" W.C. (ADJUSTABLE).
FOR EACH FILTER BANK WITH RATING OF MERV 9 TO MERV 16, PROVIDE AN ALARM TO THE OPERATOR INTERFACE WHEN THE DIFFERENTIAL STATIC PRESSURE EXCEEDS 1.0" W.C. (ADJUSTABLE).
FOR EACH FILTER BANK WITH RATING OF MERV 17 AND ABOVE, PROVIDE AN ALARM TO THE OPERATOR INTERFACE WHEN THE DIFFERENTIAL STATIC PRESSURE EXCEEDS 2.0" W.C. (ADJUSTABLE).
ALARM MONITORING:
FREEZE PROTECTION: INSTALL AN ELECTRIC FREEZESTAT DOWNSTREAM OF THE HEATING COIL PER MANUFACTURER'S RECOMMENDATION. PROVIDE A STAGED FREEZE PROTECTION APPROACH AS INDICATED BELOW.
1. IF THE HEATING COIL DISCHARGE AIR TEMPERATURE DROPS BELOW 40°F (ADJUSTABLE) FOR 5 MINUTES, OVERRIDE THE OUTSIDE AIR DAMPER TO MAINTAIN THE MINIMUM OUTSIDE AIRFLOW AND MODULATE THE HEATING
COIL CONTROL VALVE TO MAINTAIN A HEATING COIL DISCHARGE AIR TEMPERATURE OF AT LEAST 55ºF (ADJUSTABLE). DISABLE THIS FUNCTION WHEN THE HEATING COIL DISCHARGE AIR TEMPERATURE RISES ABOVE 45ºF
(ADJUSTABLE) FOR 5 MINUTES.
2. IF THE HEATING COIL DISCHARGE AIR TEMPERATURE DROPS BELOW 38 DEGF ADJUSTABLE FOR 5 MINUTES, SEND AN ALARM TO THE BUILDING MANAGEMENT SYSTEM. IF DISCHARGE AIR TEMPERATURE DROPS BELOW 36 DEGF SHUT THE AIR HANDLING UNIT DOWN, CLOSE THE OUTSIDE AIR DAMPER AND SEND AN ALARM TO THE BUILDING MANAGEMENT SYSTEM.
3. IF THE FREEZESTAT SENSES A TEMPERATURE AT OR BELOW 32ºF (ADJUSTABLE), SHUT DOWN THE SUPPLY FANS, CLOSE THE OUTDOOR AIR DAMPER, OPEN THE COOLING COIL CONTROL VALVE TO 100%. MODULATE THE HEATING COIL CONTROL VALVE TO MAINTAIN A HEATING COIL DISCHARGE AIR TEMPERATURE OF 80ºF (ADJUSTABLE). THE FREEZESTAT SHALL SHUT DOWN THE UNIT INDEPENDENTLY OF THE DDC SYSTEM VIA RELAYS. A SECOND SET OF CONTACTS SHALL NOTIFY THE DDC SYSTEM THAT SHALL SEND AN ALARM TO THE OPERATOR INTERFACE (MANUAL RESET TYPE).
FIRE ALARM INTERFACE: WHEN SMOKE DETECTORS AT THE OUTSIDE AIR INLET AND UNIT DISCHARGE ARE INITIATED, THE UNIT SHALL SHUT DOWN AND THE ISOLATION SMOKE DAMPERS AT THE INLET AND OUTLET OF THE AIR HANDLING UNIT SHALL CLOSE. THE FIRE ALARM SYSTEM SHALL NOTIFY THE OPERATOR INTERFACE WHENEVER AN ALARM CONDITION IS EXPERIENCED AT THE UNIT OR IN AREAS SERVED BY THE UNIT.
WITH THE EXCEPTION OF HARDWIRED SAFETIES (FREEZESTAT, ISOLATION SMOKE DAMPERS, HIGH SUCTION AND HIGH DISCHARGE PRESSURES) ALL AIR HANDLING UNIT AND GLYCOL HEATING HOT WATER SETPOINTS TO BE ADJUSTABLE THROUGH THE GRAPHIC INTERFACE. ADJUSTMENT INCLUDES BUT IS NOT LIMITED TO: VARIABLE SPEED DRIVES; HEATING, COOLING AND HUMIDIFIER CONTROL VALVES; HEATING HOT WATER PUMP SPEED, PREHEAT COIL DISCHARGE AIR TEMPERATURE SETPOINT, CHILLED WATER COIL DISCHARGE AIR TEMPERATURE SETPOINT.
OUTDOOR AIR
VFD
VFDS
M
P
T
F T RH
T
P P RH T M
S P
P
30 32 33
34 38
39 40 41 42
31 37
RH T
T
T
P
REMARKS:
1. E = ELECTRIC P = PNEUMATIC BO = BY OTHERS S = REFERENCED POINT FROM HARDWIRE ELSEWHERE ON DDC NETWORK
2. A = ANALOG B = BINARY
3. I = INPUT O = OUTPUT
4. G = GENERAL C = CRITICAL H = HIGH LIMIT L = LOW LIMIT F = FAILURE
5. T = TRENDING EH = EVENT HISTORY AR = ARCHIVE TT = TOTALIZATION GP = GRAPHICAL POINT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMP
321 4 5 6 7 8 9 10
ARCHITECT/ENGINEER OF RECORD
InfraStructure, LLC 6910 Pacific Street, Suite 310 Omaha, NE 68106 Phone: (402) 554-0234
Specialized Engineering Solutions 10360 Ellison Circle Omaha, NE 68134 Phone: (402) 991-5520
NE COA NUMBER: CA-1620
Alesia Architecture P.C.
3705 North 200th Street Elkhorn, Nebraska 68022 Phone: (402) 291-6941
NE COA NUMBER: CA-0721
on e ei gh th in ch o ne f oo t th re e in ch es o ne f oo t
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
A
B
C
D
E
F
12/24/2025A u to d e s k D o c s /1
-2
-3
A E
C o rr e c t H
V A
C D e fi c ie n c ie s /6
-3
.B
.M E
P .R
.r v t
/2 /2
:4
:2
A
M
17-M501
BUILDING 17 - MECHANICAL
CONTROLS - AHU-3
Correct HVAC Deficiencies
4101 Woolworth Ave, Omaha, NE 68105
636-25-301
12/24/2025 JMM NAP
NO SCALE1
AHU-3 CONTROL SEQUENCE
DIRECT DIGITAL CONTROL POINTS LIST - AHU #3
POINT
ID POINT DESCRIPTION SOURCE (1) TYPE (2) I/O (3)
SETPOINT
ADJUSTMENT ALARMS (4)
APPLICATIONS
(5) UNITS
6 SUPPLY FAN VFD STATUS E B I NO G, F EH, AR -
7 SUPPLY FAN VFD START/STOP E B O NO - - -
8 SUPPLY FAN VFD SPEED CONTROL E A O YES - T, AR, GP % SPEED
9 SUPPLY FAN CURRENT STATUS SWITCH E B I NO G, F EH, AR ON / OFF
20 OUTDOOR AIR ISOLATION DAMPER POSITION E B I NO - EH, AR, GP OPEN / CLOSED
21 OUTDOOR AIR ISOLATION DAMPER ACTUATOR E B I NO - EH, AR, GP OPEN / CLOSED
22 SUPPLY FAN SUCTION STATIC PRESSURE SWITCH E B I YES C, H EH, AR, GP INCHES W.C.
25 HEATING WATER COIL CONTROL VALVE E A O NO - - -
26 HEATING WATER TEMPERATURE - RETURN E A I NO - T, AR, GP DEGREES F
27 PRE-FILTER MERV 8 DIFFERENTIAL PRESSURE E A I YES G, H T, EH, AR, GP INCHES W.C.
28 HEATING WATER TEMPERATURE - SUPPLY E A I NO - T, AR, GP DEGREES F
29 PRE-FILTER MERV 11 DIFFERENTIAL PRESSURE E A I YES G, H T, EH, AR, GP INCHES W.C.
30 FREEZESTAT ALARM E B I NO F EH, AR, GP NORMAL / ALARM
31 <varies> E A <varies> NO - <varies> <varies>
32 HEATING COIL DISCHARGE AIR TEMPERATURE E A I NO G, H, L T, AR, GP DEGREES F
33 HUMIDITY HIGH LIMIT ALARM E B I NO F EH, AR, GP -
34 CHILLED WATER TEMPERATURE - RETURN E A I NO - T, AR, GP DEGREES F
35 CHILLED WATER CONTROL VALVE E A O NO - - -
36 CHILLED WATER TEMPERATURE - SUPPLY E A I NO - T, AR, GP DEGREES F
37 UV LIGHT RUN HOURS E A I NO G EH, GP RUN HOURS
38 SUPPLY FAN AIRFLOW VOLUME E A I NO - T, AR, GP CFM
39 SUPPLY FAN DISCHARGE STATIC PRESSURE SWITCH E B I YES C, H EH, AR, GP INCHES W.C.
40 FINAL FILTER DIFFERENTIAL PRESSURE E A I YES G, H T, EH, AR, GP INCHES W.C.
41 SUPPLY AIR HUMIDITY E A I NO - T, AR, GP % RELATIVE HUMIDITY
42 SUPPLY AIR TEMPERATURE E A I NO - T, AR, GP DEGREES F
43 SUPPLY AIR TEMPERATURE SETPOINT E A O YES - T, AR, GP DEGREES F
45 AHU SUPPLY AIR ISOLATION DAMPER POSITION E B I NO - EH, AR, GP OPEN / CLOSED
46 SUPPLY DUCT STATIC PRESSURE E A I YES - T, AR, GP INCHES W.C.
47 OUTDOOR AIR REFERENCE TEMPERATURE S A I NO - T, AR, GP DEGREES F
48 OUTDOOR AIR REFERENCE HUMIDITY S A I NO - T, AR, GP % RELATIVE HUMIDITY
51 FIRE ALARM STATUS S B I NO C, F EH, AR NORMAL / ALARM
OUTDOOR AIR
VFD
VFDS
M
P
T
F T RH
T
P P RH T M
S P
P
30 32 33
34 38
39 40 41 42
31 37
T
T
P
GENERAL NOTES
1. SERVICE DISCONNECT PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR SHALL BE LOCATED WITHIN 6 FEET OF
CONTROLLER.
2. CONTROLLER SHALL HAVE A MINIMUM SERVICE CLEARANCE OF 36 INCHES.
3. WIRE ALL SENSORS AND CONTROL DEVICES BACK TO CONTROLLER.
4. COORDINATE ALL CASING AND DUCT PENETRATIONS WITH FURNISHING CONTRACTOR. ENSURE ALL PENETRATIONS ARE
PROPERLY SEALED.
SEQUENCE OF OPERATION
DESCRIPTION:
THE AIR HANDLING UNIT IS A VARIABLE VOLUME UNIT THAT NORMALLY OPERATES AT CONSTANT VOLUME. OVER TIME THE CONSTANT VOLUME SETPOINT WILL BE AMENDED AS PATIENT FLOORS ARE SERVED BY NEW UNITS LOCATED IN THE NEW AHU TOWER. UNIT CONSISTS OF SUPPLY FANS WITH VFDS, OUTDOOR AIR DAMPER, PRE-FILTER BANK, HOT GLYCOL HEATING COIL, CHILLED WATER COOLING COIL, UV LIGHTS, STEAM HUMIDIFIER, FINAL FILTER
BANK AND UNIT ISOLATION SMOKE DAMPER.
SUPPLY FAN CONTROL:
START/STOP: THE DDC SYSTEM SHALL START THE SUPPLY FANS VIA THE VFDs WITH A TIME DELAY TO ALLOW ALL FIRE/SMOKE AND SMOKE DAMPERS IN THE AIR HANDLING SYSTEM TO OPEN PRIOR TO SUPPLY FAN OPERATION. THE
SUPPLY FANS SHALL RUN CONTINUOUSLY.
VFD RESET: IN CASE OF VFD FAULT DETECTION, THE DDC SYSTEM SHALL WAIT 30 SECONDS (ADJUSTABLE) AND THEN CALL THE VFD TO START. IF THE VFD DOES NOT START, THE DDC SYSTEM SHALL CALL A SECOND TIME. IF THE
VFD STILL HAS NOT STARTED, AN ALARM SHALL BE SENT TO THE OPERATOR INTERFACE.
CURRENT STATUS SWITCH: INSTALL A CURRENT STATUS SWITCH FOR EACH INDIVIDUAL SUPPLY FAN AND REPORT STATUS TO BMS. IF THE CURRENT STATUS SWITCH DOES NOT PROVE OPERATION OF A GIVEN FAN IN VFD OR BYPASS MODE, SEND AN ALARM TO THE OPERATOR INTERFACE. IF THE CURRENT STATUS SWITCH FOR ALL FANS DOES NOT PROVE OPERATION, THE UNIT SHALL SHUT DOWN AND SEND AN ALARM TO THE OPERATOR INTERFACE.
SPEED CONTROL: PURPOSE OF THE SUPPLY FAN CONTROL IS TO MAINTAIN A MINIMUM STATIC PRESSURE IN THE SUPPLY DUCT WORK, THE DDC SYSTEM SHALL CONTROL THE SUPPLY FAN VFD IN UNISON FROM THE SUPPLY DUCT DIFFERENTIAL PRESSURE TRANSMITTER SIGNALS ASSOCIATED WITH AIR HANDLER 1 UPGRADE. INITIAL SET POINT SHALL BE SET BY THE TEST AND BALANCE CONTRACTOR MEASURING THE DUCT STATIC PRESSURE IN THE DUCT AT THE LOCATION OF THE NEW SENSOR. THE NEW SENSOR SHALL BE USED AS THE CONTROL POINT FOR THE TEMPORARY UNIT WHEN BACKFEEDING THIS UNIT AND AS THE FINAL SENSOR FOR THIS UNIT. THIS SETPOINT SHALL BE ADJUSTABLE WITH FINAL SETPOINT OPTIMIZED BY THE BALANCING CONTRACTOR WHEN THE UPDATED UNIT IS BROUGHT ONLINE.
HIGH PRESSURE LIMIT: DIFFERENTIAL PRESSURE SWITCH SHALL BE A MANUAL RESET TYPE AND WIRED IN SERIES WITH THE START/STOP CONTROL OF THE SUPPLY FAN. THE DDC SYSTEM SHALL MONITOR THE STATUS OF THE
DIFFERENTIAL PRESSURE SWITCH. INITIAL SETPOINT SHALL BE +8.0" W.C. (ADJUSTABLE).
HIGH SUCTION PRESSURE LIMIT: DIFFERENTIAL PRESSURE SWITCH SHALL BE A MANUAL RESET TYPE AND WIRED IN SERIES WITH THE START/STOP CONTROL OF THE SUPPLY FAN. THE DDC SYSTEM SHALL MONITOR THE STATUS OF THE DIFFERENTIAL PRESSURE SWITCH. INITIAL SETPOINT SHALL BE -8.0" W.C. (ADJUSTABLE).
DISCHARGE AIR CONTROL: DISCHARGE AIR TEMPERATURE SETPOINT SHALL BE 55ºF (ADJUSTABLE). ALL SETPOINTS SHALL BE ADJUSTABLE AT THE OPERATOR INTERFACE.
WHENEVER THE DISCHARGE AIR TEMPERATURE IS ABOVE THE SETPOINT, THE FOLLOWING SHALL OCCUR IN SEQUENCE:
1. THE HEATING COIL CONTROL VALVE(S) SHALL MODULATE CLOSED.
2. THE DDC SYSTEM SHALL MODULATE THE CHILLED WATER CONTROL VALVE(S) OPEN.
3. IF THE DISCHARGE AIR TEMPERATURE IS MORE THAN 10ºF (ADJUSTABLE) ABOVE THE SETPOINT, SEND AN ALARM TO THE OPERATOR INTERFACE.
WHENEVER THE DISCHARGE AIR TEMPERATURE IS BELOW THE SETPOINT, THE FOLLOWING SHALL OCCUR IN SEQUENCE:
1. THE CHILLED WATER CONTROL VALVE(S) SHALL MODULATE CLOSED.
2. THE HEATING COIL CONTROL VALVE SHALL MODULATE OPEN TO MAINTAIN SETPOINT.
3. IF THE DISCHARGE AIR TEMPERATURE IS MORE THAN 10ºF (ADJUSTABLE) BELOW THE SETPOINT, SEND AN ALARM TO THE OPERATOR INTERFACE.
COOLING AND HEATING COILS HEAT RECOVERY MODE:
IN UNIT HEATING MODE THE AIR HANDLING UNIT PREHEAT COIL AND COOLING COIL WORK IN CONCERT TO RECOVERY COOLING ENERGY FROM THE OUTSIDE AIR STREAM AS A MEANS OF HEAT RECOVERY FOR THE BUILDINGS COOLING SYSTEM. THE INTENT IS FOR THE COILS TO WORK IN CONCERT TO PROVIDE CHILLED WATER RETURN AS LOW AS 50 DEGF (ADJUSTABLE) CHILLED WATER RETURN TEMPERATURE FROM THE AIR HANDLING UNIT COOLING
COIL. SEQUENCE AS FOLLOWS:
PREHEAT COIL DISCHARGE AIR TEMPERATURE (DAT) INITIAL SETPOINT SHALL BE 42 DEGF (ADJUSTABLE). IN HEATING MODE THE CHILLED WATER (DAT) COIL SHALL MODULATE TO MAINTAIN UNIT DISCHARGE AIR TEMPERATURE SETPOINT. MONITOR COIL CHILLED WATER COIL RETURN TEMPERATURE. IF CHILLED WATER RETURN TEMPERATURE IS GREATER THAN 55 DEGF (ADJUSTABLE), DECREASE PREHEAT COIL DISCHARGE AIR SETPOINT BY ONE DEGF. IF AFTER THIRTY MINUTES THE CHILLED WATER RETURN TEMPERATURE REMAINS GREATER THAN 55 DEGF DECREASE PREHEAT COIL BY ANOTHER DEGF. PREHEAT RESET TEMPERATURE TO NOT GO BELOW 38 DEGF (ADJUSTABLE).
IF CHILLED WATER COIL RETURN TEMPERATURE DROPS BELOW 50 DEGF INCREASE PREHEAT COIL DISCHARGE AIR TEMPERATURE BY 1 DEGF. IF AFTER 30 MINUTES THE CHILLED WATER COIL RETURN TEMPERATURE REMAINS BELOW 50 DEGF INCREASE PREHEAT COIL DISCHARGE AIR TEMPERATURE ANOTHER 1 DEGF. MAXIMUM PREHEAT COIL DAT SETPOINT SHALL BE 46 DEGF (ADJUSTABLE).
HUMIDIFIER CONTROL: USE EXISTING HUMIDITY SENSORS IN THE AREAS SERVED BY AHU-1 TO INITIATE AND CONTROL THE HUMIDIFIER. IF THE AVERAGE HUMIDITY OF THE EXISTING SENSORS SERVING THE AHU-1 AREA IS LESS THAN 30% (ADJUSTABLE) INITIATE HUMIDIFICATION TO CONTROL AVERAGE HUMIDITY TO 30% (ADJUSTABLE). The DDC SYSTEM SHALL OVERRIDE THE SIGNAL TO THE HUMIDIFIER CONTROL VALVE TO LIMIT THE SUPPLY AIR RELATIVE HUMIDITY TO A MAXIMUM OF 70% (ADJUSTABLE). IF THE SUPPLY OR RELATIVE HUMIDITY EXCEEDS 75% (ADJUSTABLE) AN ALARM SHALL BE SENT TO THE OPERATOR INTERFACE. WHENEVER THE OUTDOOR AIR BULB REFERENCE TEMPERATURE IS ABOVE 40 DEGREESF (ADJUSTABLE) THE DDC SYSTEM SHALL CLOSE THE HUMIDIFIER CONTROL VALVE AND DISABLE ANY ALARMS.
VENTILATION AIR CONTROL:
AIRFLOW STATION: AIR INLET PROBES ON SUPPLY FANS SHALL BE USED TO MONITOR SYSTEM AIRFLOW. PROVIDE COMBINED AIRFLOW VALUE TO DDC FROM ALL FAN MONITORS.
UV LIGHTS: THE UV LIGHTS SHALL BE ENABLED WHENEVER THE AIR HANDLING UNIT IS ENABLED AND RUN CONTINUOUSLY. MONITOR RUN-HOURS AND PROVIDE MAINTENANCE ALARMS AT INTERVALS RECOMMENDED BY THE MANUFACTURER. UV LIGHTS SHALL BE HARDWIRED TO THE AIR HANDLING UNIT DOOR SWITCH. IN THE EVENT THE DOOR OPENS, THE LIGHTS SHALL BE DISABLED.
UNIT SHUTDOWN:
THE SUPPLY FANS SHALL STOP.
THE OUTSIDE AIR DAMPER SHALL CLOSE.
THE CHILLED WATER CONTROL VALVE(S) SHALL CLOSE.
THE HUMIDIFIER CONTROL VALVE SHALL CLOSE.
THE HEATING COIL CONTROL VALVE(S) SHALL CLOSE. FREEZESTAT SHALL OVERRIDE HEATING CONTROL VALVE(S) AS REQUIRED.
ALL FIRE/SMOKE AND SMOKE DAMPERS ASSOCIATED WITH THE AIR HANDLING SYSTEM SHALL CLOSE.
FILTER MONITORING:
FOR EACH FILTER BANK WITH RATING OF MERV 8 AND BELOW, PROVIDE AN ALARM TO THE OPERATOR INTERFACE WHEN THE DIFFERENTIAL STATIC PRESSURE EXCEEDS 0.6" W.C. (ADJUSTABLE).
FOR EACH FILTER BANK WITH RATING OF MERV 9 TO MERV 16, PROVIDE AN ALARM TO THE OPERATOR INTERFACE WHEN THE DIFFERENTIAL STATIC PRESSURE EXCEEDS 1.0" W.C. (ADJUSTABLE).
FOR EACH FILTER BANK WITH RATING OF MERV 17 AND ABOVE, PROVIDE AN ALARM TO THE OPERATOR INTERFACE WHEN THE DIFFERENTIAL STATIC PRESSURE EXCEEDS 2.0" W.C. (ADJUSTABLE).
ALARM MONITORING:
FREEZE PROTECTION: INSTALL AN ELECTRIC FREEZESTAT DOWNSTREAM OF THE HEATING COIL PER MANUFACTURER'S RECOMMENDATION. PROVIDE A STAGED FREEZE PROTECTION APPROACH AS INDICATED BELOW.
1. IF THE HEATING COIL DISCHARGE AIR TEMPERATURE DROPS BELOW 40°F (ADJUSTABLE) FOR 5 MINUTES, OVERRIDE THE OUTSIDE AIR DAMPER TO MAINTAIN THE MINIMUM OUTSIDE AIRFLOW AND MODULATE THE HEATING
COIL CONTROL VALVE TO MAINTAIN A HEATING COIL DISCHARGE AIR TEMPERATURE OF AT LEAST 55ºF (ADJUSTABLE). DISABLE THIS FUNCTION WHEN THE HEATING COIL DISCHARGE AIR TEMPERATURE RISES ABOVE 45ºF
(ADJUSTABLE) FOR 5 MINUTES.
2. IF THE HEATING COIL DISCHARGE AIR TEMPERATURE DROPS BELOW 38 DEGF ADJUSTABLE FOR 5 MINUTES, SEND AN ALARM TO THE BUILDING MANAGEMENT SYSTEM. IF DISCHARGE AIR TEMPERATURE DROPS BELOW 36 DEGF SHUT THE AIR HANDLING UNIT DOWN, CLOSE THE OUTSIDE AIR DAMPER AND SEND AN ALARM TO THE BUILDING MANAGEMENT SYSTEM.
3. IF THE FREEZESTAT SENSES A TEMPERATURE AT OR BELOW 32ºF (ADJUSTABLE), SHUT DOWN THE SUPPLY FANS, CLOSE THE OUTDOOR AIR DAMPER, OPEN THE COOLING COIL CONTROL VALVE TO 100%. MODULATE THE HEATING COIL CONTROL VALVE TO MAINTAIN A HEATING COIL DISCHARGE AIR TEMPERATURE OF 80ºF (ADJUSTABLE). THE FREEZESTAT SHALL SHUT DOWN THE UNIT INDEPENDENTLY OF THE DDC SYSTEM VIA RELAYS. A SECOND SET OF CONTACTS SHALL NOTIFY THE DDC SYSTEM THAT SHALL SEND AN ALARM TO THE OPERATOR INTERFACE (MANUAL RESET TYPE).
FIRE ALARM INTERFACE: WHEN SMOKE DETECTORS AT THE OUTSIDE AIR INLET AND UNIT DISCHARGE ARE INITIATED, THE UNIT SHALL SHUT DOWN AND THE ISOLATION SMOKE DAMPERS AT THE INLET AND OUTLET OF THE AIR HANDLING UNIT SHALL CLOSE. THE FIRE ALARM SYSTEM SHALL NOTIFY THE OPERATOR INTERFACE WHENEVER AN ALARM CONDITION IS EXPERIENCED AT THE UNIT OR IN AREAS SERVED BY THE UNIT.
WITH THE EXCEPTION OF HARDWIRED SAFETIES (FREEZESTAT, ISOLATION SMOKE DAMPERS, HIGH SUCTION AND HIGH DISCHARGE PRESSURES) ALL AIR HANDLING UNIT AND GLYCOL HEATING HOT WATER SETPOINTS TO BE ADJUSTABLE THROUGH THE GRAPHIC…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .