PM-1414 Connor Hall & Greenhouse Roof Replacement
This Notice of Project (NOP) issued by West Texas A&M University (WTAMU) through SSC Services for Education Facilities Services solicits roof replacement services for Package B, encompassing Connor Hall (Building #0521) and the Greenhouse (Building #0618) located in Canyon, Texas. The project, designated PM-1414, requires comprehensive roof replacement work including removal of existing roof systems, installation of insulation and cover boards, application of roofing membranes, and installation or repair of associated metal flashings, coping, and accessories. Deliverables specify architectural composition shingles for Connor Hall and polycarbonate panels for the Greenhouses, with all work performed in accordance with NRCA, SMACNA, and ANSI/SPRI standards. A mandatory pre-proposal meeting was scheduled for February 12, 2026, at 10:00 AM at WTAMU Physical Plant Conference Room, 2401 Russell Long Blvd., Canyon, TX 79016. Proposals were due by February 26, 2026, at 2:00 PM, to be submitted to SSC Service Solutions at the same physical address. The project start and finish dates were listed as TBD at the time of the Notice of Project posting. CS Advantage was ultimately awarded the contract with an approved bid of $695,000.00 and a 90-day construction timeline.
Technical requirements include fluid-applied, two-layer reflective acrylic coating systems over granulated modified bitumen with specific material specifications (1.5 gallons per square coverage rate, 66 percent solids by weight, 284 psi tensile strength) and application temperature restrictions between 42 and 110 degrees Fahrenheit. Contractor qualifications require approval as an applicator by the primary coating manufacturer, a minimum of twenty years of roof coatings production experience for the manufacturer, National Roofing Contractor's Association membership, submission of completed project references and financial information, and provision of a five-year contractor warranty and ten-year manufacturer's material warranty. A Historically Underutilized Business (HUB) Subcontracting Plan is required, with monthly HUB Progress Assessment Reports mandated with each pay application. Evaluation criteria include total bid cost (51% weight), construction time (10%), technical proposal (24%), litigation and claims history (5%), safety and risk assessment (5%), and quality control (5%). Initial proposals ranged from approximately $142,834.00 to $695,000.00, with significant variance among bidders. Technical questions should be directed to Architect/Engineer Greg Carroll of Armko Industries, Inc., and HUB-related inquiries should be submitted to Bryon McCafferty at WTAMU.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SSC Services for Education Facilities Services Revised 07/2018
NOTICE OF PROJECT (NOP) - Regions POSTED ON BEHALF OF SSC BY West Texas A&M University
Attention: Bryon McCafferty, bmccafferty@wtamu.edu Date of Request: 2/5/2026
PROJECT INFORMATION
Project Number: PM-1414 Project Name: Pkg B- Connor Hall & Greenhouse Roof Replacement Project Location: Canyon, TX, Connor Hall #0521; Greenhouse #0618 Project Start Date: TBD Project Finish Date: TBD Project Description: Roof Replacement
DOCUMENT ACQUSITION INFORMATION
Choose an item. and information are available electronically at (web link):https://app.e-builder.net/public/publicLanding.aspx?QS=d65c699a63ed4571a46f3ef1f2ea14b4
SUBMISSION INFORMATION
Submissions are due by Date: 2/26/2026 Time: 2:00 PM
Mail or Hand-deliver to: SSC Service Solutions WTAMU Physical Plant 2401 Russell Long Blvd.
Canyon, TX, 79016
HISTORICALLY UNDERUTILIZED BUSINESS (HUB)
HUB Subcontracting Plan Required: Yes ☒ No ☐ If yes, monthly HUB Progress Assessment Reports (PARs) are required with each pay application.
Contact Bryon McCafferty, bmccafferty@wtamu.edu, (806)651-2111 with all HUB-related questions.
QUERY INFORMATION
Pre-proposal Meeting Location (if applicable): WTAMU Physical Plant Conference Room, 2401 Russell Long Blvd. Canyon, TX 79016 Date: 2/12/2026 Time: 10:00 AM Inquiries regarding the submission process/requirements should be directed to SSC Project Manager: Stephanie Young Email: stephanie.young@sscserv.com Phone: (806)-672-1839
If applicable, inquiries regarding the technical aspects of the Construction Documents shall be directed to:
A/E Contact: Greg Carroll A/E Firm: Armko Industries, Inc.
Email: GCarroll@armko.com Phone: (806)-789-3267