This is a construction plan document prepared by Gosling Czubak Engineering Sciences for the Michigan Department of Corrections, specifically detailing electrical disconnect work at the Pugsley Correctional Facility Lagoon Closure project located in Fife Lake Township, Grand Traverse County, Michigan. The project involves the disconnection and removal of electrical components associated with a wastewater treatment plant (WWTP), including the main distribution panel (MDP), WWTP control panel (CP), circuit breakers, conductors, and seven indoor conduits that supply power to WWTP loads. The contractor is required to field-verify existing conditions before bidding, as the details provided are based on 2000 construction as-built drawings and are for reference only. The work requires disconnection of all 480-volt conductors and the removal of control and monitoring cables to ensure downstream devices are de-energized. Panel locations require verification in the field, with potential locations identified in the maintenance building.
The plan emphasizes that the contractor must confirm which conduits are actually feeding WWTP loads and monitoring/control systems, and cut and cap only those conduits at grade inside the building. Upon completion of items regarding the MDP and WWTP CP disconnection, there should be no energized conductors remaining in the conduits. The document was drawn by Elizabeth Princing and checked by WCB, with an issue date of August 6, 2018, and saved as of August 7, 2018. No specific pricing, contract term, or bid submission details are included in this technical plan sheet.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Plans Pg 5.pdf | ||
| Addendum 1 (Plans 1 of 2).pdf | ||
| Addendum 1 (Plans 2 of 2).pdf | ||
| Plans Pg 3.pdf | ||
| Plans Pg 2.pdf | ||
| CAJ-1037 DOC LEIN Request REV 04-2018.pdf | ||
| Plans Pg 8.pdf | ||
| Plans Pg 4.pdf | ||
| Specs.pdf | ||
| Plans Pg 1.pdf | ||
| Addendum 1.pdf | ||
| Plans Pg 7.pdf | ||
| Advertisement.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Location:
P
C
A D
D D a t a
C
D
P
S i t e d w g
T a b
E
L E
C T
R I C
A L
D
I S
C O
N N
E C
T
S a v e d b y w c b o t t
M l o t t e d b y
E l i z a b e t h r i n c i n g
A
M e n g i n e e r i n g s c i e n c e s , i n c .
Project Number:
Checked By:
Drawn By:
Date Surveyed:
Scale:
Date Issued:
Designed By:
Original sheet size is 22x34
D a t e
N o
B y R e v i s i o n
1280 Business Park Dr.
Traverse City, Michigan
231-946-9191 phone info@goslingczubak.com www.goslingczubak.com
CIVIL ENGINEERING
SURVEYING
ENVIRONMENTAL SERVICES
GEOTECHNICAL
CONSTRUCTION SERVICES
DRILLING
LANDSCAPE ARCHITECTURE
2018660001.01
P U
G S
L E
Y
C
O R
R E
C T
I O
N A
L
F
A C
I L
I T
Y
L
A G
O O
N
C
L O
S U
R E
E L
E C
T R
I C
L
I S
C O
N N
E C
T
M I C
H I G
N
E P
A R
T M
E N
T
O
F
C
O R
R E
C T
I O
N S
Sheet:
SECTION 20
T 25N, R 09W
FIFE LAKE TOWNSHIP
GRAND TRAVERSE COUNTY
MICHIGAN
AS NOTED
WCB
ERP
GLW
N/A
08/06/2018
AutoCAD SHX Text DETAILS ON THIS SHEET ARE FROM THE 2000 CONSTRUCTION "AS-BUILT" DRAWINGS AND ARE INTENDED FOR REFERENCE ONLY. CONTRACTOR TO FIELD VERIFY PRIOR TO BIDDING.
AutoCAD SHX Text
PANEL TO BE REMOVED. CONDUIT TO BE CUT AND CAPPED AT GRADE INSIDE OF BUILDING.
AutoCAD SHX Text PANEL LOCATIONS NEED TO BE VERIFIED. MAY BE LOCATED ON WEST WALL IN MAINTENANCE BUILDING.
AutoCAD SHX Text
1. EXISTING MAIN DISTRIBUTION PANEL (MDP). THE RED "BOX" INDICATES EXISTING MAIN DISTRIBUTION PANEL (MDP). THE RED "BOX" INDICATES CIRCUIT BREAKERS THAT WILL BE REQUIRED TO HAVE CONDUCTORS DISCONNECTED AND REMOVED IN ITS ENTIRETY. ONCE THE CONDUCTORS ARE DISCONNECTED AND REMOVED, ALL DOWNSTREAM DEVICES SHOULD NO LONGER BE ENERGIZED WITH 480 V.
AutoCAD SHX Text
2. EXISTING MDP AND WWTP CONTROL PANEL (CP). THE RED "BOX" AROUND THE WWTP CP EXISTING MDP AND WWTP CONTROL PANEL (CP). THE RED "BOX" AROUND THE WWTP CP SIGNIFIES THAT THIS BOX ALONG WITH ALL OF ITS CONDUIT AND CONDUCTORS SHOULD BE DISCONNECTED AND REMOVED IN ITS ENTIRETY. ONCE THE CONDUCTORS ARE DISCONNECTED AND REMOVED ALL DOWNSTREAM DEVICES SHOULD NO LONGER BE ENERGIZED WITH 480 V, AND THE CONTROL/ MONITORING CABLES WOULD ALSO BE DE-ENERGIZED.
AutoCAD SHX Text
3. SEVEN INDOOR CONDUITS TO WWTP. THE SEVEN CONDUITS SEVEN INDOOR CONDUITS TO WWTP. THE SEVEN CONDUITS LEAVING THE MDP AND THE WWTP CP AND FEEDING ALL OF THE WWTP LOADS. THE CONTRACTOR SHOULD CONFIRM THIS AND ONLY CUT AND CAP THE CONDUITS THAT ARE ACTUALLY FEEDING THE WWTP LOADS AND THOSE THAT ARE USED FOR THE MONITORING/CONTROL. IF ITEMS #1 AND #2 WERE COMPLETED PRIOR TO THIS, THERE SHOULD BE NO ENERGIZED CONDUCTORS IN THESE CONDUITS.
File details come from the government source that posted it. Updated .