This is an Irrigation Demolition Plan prepared by engineering firm Gosling Czubak for the Michigan Department of Corrections related to the Pugsley Correctional Facility Lagoon Closure project located in Fife Lake Township, Grand Traverse County, Michigan. The project involves the complete removal of an irrigation system that includes seven irrigation fields, main and lateral piping (ranging from 1" to 8" diameter), field control valve chambers, sprinkler heads, monitoring wells, and associated wiring and components. The plan specifies that the owner will pump standing water from lagoon basins through the irrigation system to the lowest possible level before demolition begins, and the irrigation system must be permanently disconnected from pumps and treatment plant power. The contractor is responsible for verifying actual utility locations and quantities of work required prior to bidding, calling "Miss Dig" at least three working days before construction starts, and restoring all disturbed areas through topsoiling, seeding, fertilization, and mulching per specifications.
The plan indicates that the owner will collect final groundwater samples from eleven monitoring wells for testing prior to their abandonment. Upon receipt of acceptable test results, the contractor must properly plug and abandon all monitoring wells in compliance with Michigan Part 127 regulations to prevent future contamination. The contractor is required to protect monitoring wells during demolition and restoration activities. The plan notes that background site information derives from original construction as-built drawings from September 2000, and the contractor bears responsibility for verifying the location of monitoring wells based on permit drawings and making final determinations of quantities and required work prior to submitting a bid.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Plans Pg 5.pdf | ||
| Addendum 1 (Plans 1 of 2).pdf | ||
| Addendum 1 (Plans 2 of 2).pdf | ||
| Plans Pg 3.pdf | ||
| CAJ-1037 DOC LEIN Request REV 04-2018.pdf | ||
| Plans Pg 6.pdf | ||
| Plans Pg 8.pdf | ||
| Plans Pg 4.pdf | ||
| Specs.pdf | ||
| Plans Pg 1.pdf | ||
| Addendum 1.pdf | ||
| Plans Pg 7.pdf | ||
| Advertisement.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0'
1" =
SCALE
120' 240'
120'
Location:
P
C
A D
D D a t a
C
D
P
S i t e d w g
T a b
I R
R I G
A T
I O
N
D
E M
O L
I T
I O
N
P
L A
N
S a v e d b y w c b o t t
M
P l o t t e d b y
E l i z a b e t h
P r i n c i n g
A
M e n g i n e e r i n g s c i e n c e s , i n c .
Project Number:
Checked By:
Drawn By:
Date Surveyed:
Scale:
Date Issued:
Designed By:
Original sheet size is 22x34
D a t e
N o
B y R e v i s i o n
1280 Business Park Dr.
Traverse City, Michigan
231-946-9191 phone info@goslingczubak.com www.goslingczubak.com
CIVIL ENGINEERING
SURVEYING
ENVIRONMENTAL SERVICES
GEOTECHNICAL
CONSTRUCTION SERVICES
DRILLING
LANDSCAPE ARCHITECTURE
2018660001.01
P U
G S
L E
Y
C
O R
R E
C T
I O
N A
L
F
A C
I L
I T
Y
L
A G
O O
N
C
L O
S U
R E
I R
R I G
A T
I O
N
D
E M
O L
I T
I O
N
P
L A
N
M I C
H I G
N
D
E P
A R
T M
E N
T
O
F
C
O R
R E
C T
I O
N S
Sheet:
SECTION 20
T 25N, R 09W
FIFE LAKE TOWNSHIP
GRAND TRAVERSE COUNTY
MICHIGAN
AS NOTED
WCB
ERP
GLW
N/A
08/06/2018
IRRIGATION DEMOLITION PLAN
SCALE : 1" = 120'
NORTH
Know what's below.
before you dig.CallR
IRRIGATION DEMOLITION PLAN NOTES:
IRRIGATION DEMOLITION PLAN LEGEND
AutoCAD SHX Text REMOVE IRRIGATION FIELD CONTROL VALVE CHAMBER COMPLETELY (TYP. OF 7). SEE DETAIL SHEET 5.
AutoCAD SHX Text
8" MAIN
AutoCAD SHX Text
1" LATERAL
AutoCAD SHX Text
6"X4" REDUCER (TYP.)
AutoCAD SHX Text
4" MAIN (TYP.)
AutoCAD SHX Text
8" MAIN (TYP.)
AutoCAD SHX Text
8"X6" REDUCER (TYP.)
AutoCAD SHX Text
6" MAIN (TYP.)
AutoCAD SHX Text
FIELD NO. 1
AutoCAD SHX Text
FIELD NO. 2
AutoCAD SHX Text
FIELD NO. 3
AutoCAD SHX Text
FIELD NO. 4
AutoCAD SHX Text
FIELD NO. 5
AutoCAD SHX Text
FIELD NO. 6
AutoCAD SHX Text
FIELD NO. 7
AutoCAD SHX Text
8" MAIN
AutoCAD SHX Text
MONITORING WELL TO BE PROPERLY ABANDONED. SEE NOTES 3 & 4. (TYP. OF 11)
AutoCAD SHX Text THE LOCATION OF THE EXISTING UTILITIES, AS SHOWN ON THIS PLAN, ARE APPROXIMATE ONLY. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ACTUAL LOCATION AND DEPTH OF ALL EXISTING UTILITIES. THE OWNER AND THE SURVEYOR SHALL NOT BE RESPONSIBLE FOR ANY OMISSION OR VARIATION FROM THE LOCATION SHOWN. THE CONTRACTOR SHALL NOTIFY "MISS DIG" AT 1 (800) 482-7171 OR 811 THREE (3) WORKING DAYS PRIOR TO THE START OF CONSTRUCTION.
AutoCAD SHX Text
1. OWNER WILL PUMP STANDING WATER WITHIN LAGOON BASINS TO THE OWNER WILL PUMP STANDING WATER WITHIN LAGOON BASINS TO THE IRRIGATION SYSTEM AND SPRAY HEADS TO LOWEST POSSIBLE WATER LEVEL WITHOUT DRAWING SOLIDS. CONTRACTOR SHALL MONITOR PROGRESS. IRRIGATION SYSTEM TO BE PERMANENTLY DISCONNECTED FROM PUMPS AND TREATMENT PLANT POWER. 2. CONTRACTOR SHALL COMPLETELY REMOVE ALL IRRIGATION SYSTEM CONTRACTOR SHALL COMPLETELY REMOVE ALL IRRIGATION SYSTEM COMPONENTS, PIPING, MANHOLES, SPRINKLER HEADS AND ANY WIRING. RESTORE ENTIRE IRRIGATION SITE PER SPECIFICATIONS. ALL DISTURBED AREAS TO BE TOPSOILED, SEEDED, FERTILIZED, AND MULCHED PER SPECIFICATIONS. 3. OWNER WILL TAKE FINAL MONITORING WELL WATER SAMPLES AND OWNER WILL TAKE FINAL MONITORING WELL WATER SAMPLES AND SEND TO BE TESTED. CONTRACTOR SHALL PROTECT MONITORING WELLS DURING THE DEMOLITION AND RESTORATION OF FIELDS. 4. UPON RECEIVING AN ACCEPTABLE GROUND WATER TEST RESULTS, THE UPON RECEIVING AN ACCEPTABLE GROUND WATER TEST RESULTS, THE MONITORING WELLS WILL BE PROPERLY PLUGGED AND ABANDONED BY THE CONTRACTOR TO PREVENT ANY FUTURE CONTAMINATION. PLUGGING OF THE WELLS (TOTAL 11 WELLS) WILL MEET REGULATIONS UNDER PART 127.
AutoCAD SHX Text
PROPOSED DEMOLITION LIMITS
AutoCAD SHX Text
PROPOSED SILT FENCE
AutoCAD SHX Text NOTE: BACKGROUND SITE INFORMATION IS FROM ORIGINAL CONSTRUCTION "AS-BUILT" DRAWING FROM SEPTEMBER 2000. IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY AND MAKE DETERMINATION OF QUANTITIES AND REQUIRED WORK PRIOR TO BIDDING. LOCATION OF MONITORING WELLS IS APPROXIMATE BASED ON PERMIT DRAWINGS. CONTRACTOR TO VERIFY PRIOR TO BIDDING.
File details come from the government source that posted it. Updated .