Plans Pg 3.pdf
PDF 3 MB Posted
- Solicitation number
- RFQ 171 180000000826 2
- Issued by
- Grand Traverse County, Kincheloe CDP, Michigan
About this file
This is a Lagoon Demolition Plan document for the Michigan Department of Corrections' Pugsley Correctional Facility, prepared by engineering firm Gosling Czubak in Traverse City, Michigan. The plan details the demolition and closure of a wastewater treatment lagoon system located in Fife Lake Township, Grand Traverse County, Michigan. The project scope includes removal of biosolids from four lagoons with an assumed combined volume of 0.840 million gallons, removal of liner systems (geosynthetic clay liner and flexible membrane liner) from each lagoon, removal and disposal of inlet/outlet structures, pumping and valve chambers, irrigation piping, and a muffin monster unit (to be salvaged), abandonment of 11 monitoring wells, plugging of numerous pipe sections, and filling and abandonment of manhole structures and chambers in place. The plan indicates that lagoon bottom elevations and monitoring well locations are approximate and require contractor verification prior to bidding.
The plan establishes that contractors are responsible for verifying actual utility locations and quantities of work required prior to submitting bids, and must contact Miss Dig (1-800-482-7171 or 811) at least three working days prior to construction start. Demolition work must follow a specific construction sequence detailed in the specifications document. The plan was drawn by WCB, checked by ERP, designed by GLW, and issued on August 6, 2018, with background site information derived from original construction as-built drawings from September 2000. All removed materials must be properly disposed of in accordance with specifications, and engineer soil sampling from each lagoon is required during liner removal with owner coordination.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Plans Pg 5.pdf | ||
| Addendum 1 (Plans 1 of 2).pdf | ||
| Addendum 1 (Plans 2 of 2).pdf | ||
| Plans Pg 2.pdf | ||
| CAJ-1037 DOC LEIN Request REV 04-2018.pdf | ||
| Plans Pg 6.pdf | ||
| Plans Pg 8.pdf | ||
| Plans Pg 4.pdf | ||
| Specs.pdf | ||
| Plans Pg 1.pdf | ||
| Addendum 1.pdf | ||
| Plans Pg 7.pdf | ||
| Advertisement.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0'
1" =
SCALE
40' 80'
40'
Location:
P
C
A D
D D a t a
C
D
P
S i t e d w g
T a b
L
A G
O O
N
D
E M
O L
I T
I O
N
P
L A
N
S a v e d b y w c b o t t
M
P l o t t e d b y
E l i z a b e t h
P r i n c i n g
A
M e n g i n e e r i n g s c i e n c e s , i n c .
Project Number:
Checked By:
Drawn By:
Date Surveyed:
Scale:
Date Issued:
Designed By:
Original sheet size is 22x34
D a t e
N o
B y R e v i s i o n
1280 Business Park Dr.
Traverse City, Michigan
231-946-9191 phone info@goslingczubak.com www.goslingczubak.com
CIVIL ENGINEERING
SURVEYING
ENVIRONMENTAL SERVICES
GEOTECHNICAL
CONSTRUCTION SERVICES
DRILLING
LANDSCAPE ARCHITECTURE
2018660001.01
P U
G S
L E
Y
C
O R
R E
C T
I O
N A
L
F
A C
I L
I T
Y
L
A G
O O
N
C
L O
S U
R E
L A
G O
O
D
E M
O L
I T
I O
N
P
L A
N
M I C
H I G
D
E P
A R
T M
E N
T
O
F
C
O R
R E
C T
I O
N S
Sheet:
SECTION 20
T 25N, R 09W
FIFE LAKE TOWNSHIP
GRAND TRAVERSE COUNTY
MICHIGAN
AS NOTED
WCB
ERP
GLW
N/A
08/06/2018
LAGOON DEMOLITION PLAN
SCALE : 1" = 40'
N O
R T
H Know what's below.
before you dig.CallR
LAGOON DEMOLITION PLAN NOTES:
AutoCAD SHX Text
FILL & ABANDON MH IN PLACE
AutoCAD SHX Text
FILL & ABANDON MH IN PLACE
AutoCAD SHX Text
FILL & ABANDON MH IN PLACE
AutoCAD SHX Text
FILL & ABANDON IN PLACE
AutoCAD SHX Text
FILL & ABANDON CHAMBER IN PLACE
AutoCAD SHX Text
FILL & ABANDON MH IN PLACE
AutoCAD SHX Text
FILL & ABANDON MH IN PLACE
AutoCAD SHX Text
FILL & ABANDON MH IN PLACE
AutoCAD SHX Text
REMOVE AND DISPOSE CUT TOP AND CAP PUMP STATION AND METER CHAMBER
AutoCAD SHX Text
REMOVE AND DISPOSE OF IRRIGATION PIPING
AutoCAD SHX Text
REMOVE EXISTING BIOSOLIDS, LINERS, AND ABANDON LAGOON IN PLACE
AutoCAD SHX Text
REMOVE AND DISPOSE INLET STRUCTURE
AutoCAD SHX Text
REMOVE EXISTING BIOSOLIDS, LINERS, AND ABANDON LAGOON IN PLACE
AutoCAD SHX Text
REMOVE AND DISPOSE INLET STRUCTURE
AutoCAD SHX Text
REMOVE AND DISPOSE INLET/OUTLET STRUCTURES
AutoCAD SHX Text
REMOVE AND DISPOSE PIPING
AutoCAD SHX Text
REMOVE AND DISPOSE PIPING
AutoCAD SHX Text
OWNER WILL REMOVE FENCE AFTER CLOSURE. CONTRACTOR TO PROTECT.
AutoCAD SHX Text
REMOVE AND DISPOSE CUT TOP AND CAP PUMP STATION AND VALVE CHAMBER
AutoCAD SHX Text
REMOVE EXISTING BIOSOLIDS, LINERS, AND ABANDON LAGOON IN PLACE
AutoCAD SHX Text
REMOVE EXISTING BIOSOLIDS, LINERS, AND ABANDON LAGOON IN PLACE
AutoCAD SHX Text
FILL & ABANDON FLUME IN PLACE
AutoCAD SHX Text
PLUG EACH END
AutoCAD SHX Text
PLUG EACH END
AutoCAD SHX Text
PLUG EACH END
AutoCAD SHX Text
PLUG EACH END
AutoCAD SHX Text
PLUG EACH END
AutoCAD SHX Text
PLUG EACH END
AutoCAD SHX Text
PLUG EACH END
AutoCAD SHX Text
PLUG EACH END
AutoCAD SHX Text
PLUG EACH END
AutoCAD SHX Text
PLUG EACH END
AutoCAD SHX Text
PLUG EACH END
AutoCAD SHX Text
PLUG EACH END
AutoCAD SHX Text
PLUG EACH END
AutoCAD SHX Text
PLUG EACH END
AutoCAD SHX Text
PLUG EACH END
AutoCAD SHX Text
REMOVE & DISPOSE PIPE
AutoCAD SHX Text
MUFFIN MONSTER SHALL BE REMOVED AND SALVAGED PER SPECIFICATIONS.
AutoCAD SHX Text
REMOVE & DISPOSE PIPE
AutoCAD SHX Text
REMOVE & DISPOSE PIPE
AutoCAD SHX Text
REMOVE AND DISPOSE INLET/OUTLET STRUCTURES
AutoCAD SHX Text
MONITORING WELLS TO BE PROPERLY ABANDONED PER SPECIFICATIONS. (TYP. OF 11)
AutoCAD SHX Text THE LOCATION OF THE EXISTING UTILITIES, AS SHOWN ON THIS PLAN, ARE APPROXIMATE ONLY. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ACTUAL LOCATION AND DEPTH OF ALL EXISTING UTILITIES. THE OWNER AND THE SURVEYOR SHALL NOT BE RESPONSIBLE FOR ANY OMISSION OR VARIATION FROM THE LOCATION SHOWN. THE CONTRACTOR SHALL NOTIFY "MISS DIG" AT 1 (800) 482-7171 OR 811 THREE (3) WORKING DAYS PRIOR TO THE START OF CONSTRUCTION.
AutoCAD SHX Text
1. CONDUCT DEMOLITION OF SITE IN ACCORDANCE WITH THE CONDUCT DEMOLITION OF SITE IN ACCORDANCE WITH THE CONSTRUCTION SEQUENCE DESCRIBED IN THE SPECIFICATIONS. 2. REMOVE ALL BIOSOLIDS IN LAGOONS IN ACCORDANCE WITH THE REMOVE ALL BIOSOLIDS IN LAGOONS IN ACCORDANCE WITH THE SPECIFICATIONS. SLUDGE DEPTH AND VOLUME MEASUREMENTS ARE PROVIDED FOR INFORMATION PURPOSES ONLY. LAGOON SLUDGE DEPTH ASSUMED VOLUME SLUDGE DEPTH ASSUMED VOLUME ASSUMED VOLUME SOUTH AERATION 12" 0.036 MG 12" 0.036 MG 0.036 MG NORTH AERATION 5" 0.014 MG 5" 0.014 MG 0.014 MG EAST STORAGE 7" TO 18" 0.420 MG 7" TO 18" 0.420 MG 0.420 MG WEST STORAGE 6" 0.360 MG 6" 0.360 MG 0.360 MG 0.840 MG 3. THE ENTIRE LINER SYSTEM IN EACH LAGOON SHALL BE REMOVED THE ENTIRE LINER SYSTEM IN EACH LAGOON SHALL BE REMOVED AND DISPOSED OF IN ACCORDANCE WITH THE SPECIFICATIONS (ENTIRE LINER SYSTEM INCLUDES GEOSYNTHETIC CLAY LINER AND FLEXIBLE MEMBRANE LINER). WHEN LINER IS REMOVED, COORDINATE WITH OWNER SO THAT ENGINEER CAN TAKE SOIL SAMPLES FROM EACH LAGOON FOR TESTING. 4. FILL PIPING CONNECTED TO SANITARY STRUCTURES WITH FLOWABLE FILL PIPING CONNECTED TO SANITARY STRUCTURES WITH FLOWABLE FILL TO A DISTANCES OF 2' FROM STRUCTURE. EXISTING STRUCTURES TO BE ABANDONED SHALL BE PARTIALLY REMOVED AND FILLED WITH COMPACTED SAND ACCORDING TO THE SPECIFICATIONS. 5. ANY PIPE IN CONFLICT WITH LINER AND DEEMED NECESSARY TO ANY PIPE IN CONFLICT WITH LINER AND DEEMED NECESSARY TO REMOVE SHALL BE CUT IN PLACE AND THE REMAINING OPEN ENDS GROUTED. 6. LAGOON BOTTOM ELEVATIONS ARE BASED ON EXISTING DRAWINGS LAGOON BOTTOM ELEVATIONS ARE BASED ON EXISTING DRAWINGS AND ARE GIVEN FOR INFORMATIONAL PURPOSES ONLY.
AutoCAD SHX Text NOTE: BACKGROUND SITE INFORMATION IS FROM ORIGINAL CONSTRUCTION "AS-BUILT" DRAWING FROM SEPTEMBER 2000. IT IS THE CONTRACTORS RESPONSIBILITY TO VERIFY AND MAKE DETERMINATION OF QUANTITIES AND REQUIRED WORK PRIOR TO BIDDING. LOCATION OF MONITORING WELLS IS APPROXIMATE BASED ON PERMIT DRAWINGS. CONTRACTOR TO VERIFY PRIOR TO BIDDING.