Plans-KA2601 Plans.pdf
PDF 13 MB Posted
- Solicitation number
- B27000570
- Issued by
- Kauai County, Hawaii
About this file
This is a set of architectural plans prepared by the Hawaii Department of Land and Natural Resources, Division of Boating and Ocean Recreation, for the repair of the marginal wharf at Kikiaola Small Boat Harbor in Kekaha, Kauai. The project addresses damage sustained from Hurricane Lowell and encompasses three sheets of detailed drawings: a title sheet with location maps, a demolition and best management practices (BMP) plan, and a site plan with repair details. The scope of work requires contractors to furnish all materials, labor, equipment, and incidental services necessary to complete the wharf repairs according to the project specifications and plans.
The project involves the complete removal of the marginal wharf's wooden superstructure, including fenders, cleats, hardware, and mounting brackets, followed by preparation of existing steel pipe piles to accommodate new mounting hardware. Replacement materials must meet specified standards, including marine-grade lumber with Chemonite ACZA pressure treatment, cast aluminum cleats (Schoellhorn-Albrecht Number S1224-15 or approved equivalent), and 316 stainless steel for all angles, brackets, hardware, and fasteners. Additional work includes repairing and patching the concrete ramp to provide smooth transitions, implementing full-depth turbidity curtain controls around the project site, and proper disposal of all construction waste at the appropriate county landfill or disposal facility. Contractor staging and storage areas must be coordinated with the Kauai District Manager and surrounded with filter socks to prevent roadway or parking area obstruction.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF HAWAII
DIVISION OF BOATING AND OCEAN RECREATION
SHEET NO. 1 OF 3 SHEETS
DEPARTMENT OF LAND AND NATURAL RESOURCES
KEKAHA, KAUAI, HAWAII
APPROVED: DATE:
MEGHAN L. STATTS
ADMINISTRATOR
DIVISION OF BOATING AND OCEAN RECREATION
DEPARTMENT OF LAND AND NATURAL RESOURCES
KIKIAOLA SMALL BOAT HARBOR
HURRICANE LOWELL MARGINAL WHARF REPAIR
DRAWING NO.
T-1
JOB NO. KA26-01
LOCATION MAP
(NOT TO SCALE)
VICINITY MAP
(NOT TO SCALE)
DRAWING INDEX
DRAWING
NO.
SHEET
NO. DESCRIPTION
T-1 1 TITLE SHEET
C-1 2 DEMOLITION AND BMP PLAN
C-2 3 SITE PLAN AND REPAIR DETAILS
TMK (4) 1-2-006:017
KIKIAOLA
HARBOR
BOAT RAMP
PROJECT SITE
MARGINAL WHARF
10/14/26
AutoCAD SHX Text N
AutoCAD SHX Text Kauai
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
HANAMAULU
AutoCAD SHX Text
KAPAA
AutoCAD SHX Text
LIHUE
AutoCAD SHX Text
HANAPEPE
AutoCAD SHX Text
KAUMAKANI
AutoCAD SHX Text
WAIMEA
AutoCAD SHX Text
PACIFIC MISSILE
AutoCAD SHX Text
KEKAHA
AutoCAD SHX Text
KALAHEO
AutoCAD SHX Text
ANAHOLA
AutoCAD SHX Text
KILAUEA
AutoCAD SHX Text
HAENA
AutoCAD SHX Text N.A.S.A.
AutoCAD SHX Text S.T.D.N.
AutoCAD SHX Text
STATION
AutoCAD SHX Text
RANGE FACILITY
AutoCAD SHX Text
BARKING SANDS
Finn McCall Text Box
JOB NO. KA26-01
KIKIAOLA SMALL BOAT HARBOR
HURRICANE LOWELL MARGINAL WHARF REPAIR
KEKAHA, KAUAI, HAWAII
DEMOLITION AND BMP PLAN
Finn McCall Text Box
JOB NO. KA26-01 SHEET 2 OF 3 SHEETS
Finn McCall Callout ALLOWABLE CONTRACTOR STAGING AND STORAGE AREAS. COORDINATE LOCATION WITH KAUAI DISTRICT MANAGER. DO NOT BLOCK ANY ROADWAYS OR PARKING AREAS. SURROUND STAGING/STORAGE AREAS WITH FILTER SOCKS.
Finn McCall Line
Finn McCall Callout PREPARE CONC. RAMP AS NEEDED TO PROVIDE SMOOTH RIDING TRANSITION TO MARGINAL WHARF
Finn McCall Polygonal Line
Finn McCall Callout REMOVE AND DISPOSE OF MARGINAL WHARF WOODEN SUPERSTRUCTURE INCL., FENDERS, CLEATS, HARDWARE, AND MOUNTING BRACKETS
Finn McCall Callout PREPARE STEEL PIPE PILES TO ACCOMMODATE NEW MOUNTING BRACKETS FOR DECK, FENDERS, ETC.
Finn McCall Text Box
DEMOLITION AND BMP PLAN
(NOT TO SCALE)
Finn McCall Polygonal Line
Finn McCall Callout
PROVIDE FULL-DEPTH DOT TYPE 2 TURBIDITY CURTAIN AROUND PROJECT SITE
Finn McCall Text Box
NOTES:
1. ALL CONSTRUCTION WASTE SHALL BE HAULED AND PROPERLY DISPOSED AT THE NEAREST COUNTY LANFILL OR OTHER APPROPRIATE DISPOSAL FACILITY.
2. SEE SCOPE OF WORK AND SPECIFICATIONS FOR MORE DETAILS.
Finn McCall Line
Finn McCall Line
Finn McCall Line
Finn McCall Line
Line
Text Box
JOB NO. KA26-01
KIKIAOLA SMALL BOAT HARBOR
HURRICANE LOWELL MARGINAL WHARF REPAIR
KEKAHA, KAUAI, HAWAII
SITE PLAN AND REPAIR DETAILS
Finn McCall Text Box
JOB NO. KA26-01 SHEET 3 OF 3 SHEETS
Finn McCall Line
Finn McCall Line
Finn McCall Text Box
DO NOT PROVIDE TIRES
Finn McCall Callout PREPARE STEEL PIPE PILES TO ACCOMMODATE NEW MOUNTING BRACKETS FOR DECK, FENDERS, ETC.
Finn McCall Text Box
SITE PLAN AND REPAIR DETAILS
(NOT TO SCALE)
Finn McCall Callout NEW CLEATS SHALL BE CAST ALUMINUM, SCHOELLHORN-ALBRECHT NUMBER S1224-15 OR APPROVED EQUAL, SEE SCOPE OF WORK AND SPECIFICATIONS FOR DETIALS
Finn McCall Callout ALL STEEL ANGLES, BRACKETS, HARDWARE, LAG SCREWS, ETC. SHALL BE 316 STAINLESS STEEL, SEE SCOPE OF WORK AND SPECIFICATIONS FOR DETAILS
Finn McCall Rectangle
Finn McCall Callout NEW LUMBER SHALL BE MARINE-GRADE WITH CHEMONITE ACZA PRESSURE TREATMENT OR APPROVED EQUAL
Finn McCall Line
Finn McCall Line
Finn McCall Text Box
DO NOT PROVIDE TIRES
Finn McCall Line
Finn McCall Line
Finn McCall Line
Finn McCall Line
Finn McCall Line
Finn McCall Line
Finn McCall Callout REPAIR/PATCH CONC. RAMP AS NECESSARY TO PROVIDE SMOOTH RIDING TRANSITION TO MARGINAL WHARF
Finn McCall Line
Finn McCall Line
Finn McCall Callout ALL STEEL ANGLES, BRACKETS, HARDWARE, LAG SCREWS, ETC. SHALL BE 316 STAINLESS STEEL, SEE SCOPE OF WORK AND SPECIFICATIONS FOR DETAILS
| Kikiaola SBH Marg Wharf Repair_T-1 title sheet (signed) |
| Sheets and Views |
| Model |
| Kikiaola SBH Hurricane Lowell Marginal Wharf Repair_Demo & BMP Plan |
| Kikiaola SBH Hurricane Lowell Marginal Wharf Repair_Site Plan & Repair Dtls |
File details come from the government source that posted it. Updated .