This is an Earthwork Summary report prepared by the City of Kingman, Arizona for the Stage IV submittal of the Kingman Crossing Boulevard Traffic Interchange project (H7147). The document presents detailed excavation and embankment quantities organized across five project phases. Total excavation quantities amount to 378,466 cubic yards, with roadway excavation comprising 313,225 cubic yards, drainage excavation at 41,591 cubic yards, pipe excavation at 9,814 cubic yards, structural excavation (bridges, walls, and box culverts) at 10,712 cubic yards, and riprap excavation at 3,124 cubic yards. Corresponding total embankment quantities are 72,493 cubic yards, plus an additional 8,699 cubic yards accounting for a 12 percent shrink factor, resulting in total embankment with shrink of 81,192 cubic yards. The project includes waste quantities of 297,274 cubic yards distributed across phases. Work is segmented into five phases, with Phase 1 and Phase 3 representing smaller scale activities, while Phases 2 and 4 contain the largest quantities associated with the northbound and southbound I-40 interchange improvements, respectively. Phase 5 contains no quantities. The report includes detailed breakdowns for pipe culvert installation (50 pipe references totaling 9,814 cubic yards excavation and 2,204 cubic yards backfill), box culvert work (9 structures with 340 cubic yards structural excavation and 449 cubic yards backfill), bridge structures (two overpass structures with 3,190 cubic yards structural excavation and 1,920 cubic yards backfill), and wall structures with 7,182 cubic yards structural excavation and 2,402 cubic yards backfill.
The project encompasses major infrastructure improvements including the construction of a traffic interchange at Interstate Highway 40 and Kingman Crossing Boulevard, completion of Kingman Crossing Boulevard design and construction, and development of approximately 128 adjacent city-owned acres. Ground compaction work totals 2,312 cubic yards across all phases. The City of Kingman issued a Request for Qualifications (2026-RFQ-019) seeking qualified master developers with documented experience on similar large-scale infrastructure projects. Responses were due by 5:00 pm Arizona time on Thursday, November 19, 2026, with questions to be submitted by 5:00 pm Arizona time on Friday, November 6, 2026 through the OpenGov procurement portal at https://procurement.opengov.com/portal/cityofkingman. The project involves retail, commercial, and complementary uses on city-owned property south of I-40 at the Kingman Crossing Boulevard intersection. Responses must be submitted through the OpenGov procurement portal, and the City reserves the right to reject any non-compliant response or any response when cancellation serves the city's interests.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
September 2023
STAGE IV SUBMITTAL
PREPARED BY
EARTHWORK SUMMARY
KINGMAN CROSSING TI
040 MO 54 H7147 01 D
EARTHWORK SUMMARY
KINGMAN CROSSING BLVD TI
040 MO 54 H7147 01C
SHEET
Cover 1
Table of Contents 2
Earthwork Quantities & Calculation Summary 3
Roadway Excavation & Embankment 4
Excavation (Over Ex & Replace) 5
Drainage Excavation & Embankment 6-7
Pipe Culvert Quantities 8
Box Culvert Quantities 9
Bridge Excavation & Backfill 10
Wall Excavation & Backfill 11
Excavation For Riprap 12
Ground Compaction 13
Back up Calculations
Roadway End Areas Excavation & Embankment 14-33
Drainage Quantities 34-
TABLE OF CONTENTS
040 MO 54 H7147 01C
(CY) (CY) (CY) (CY) (CY) (CY)
Roadway Excavation 2,139 144,963 1,522 164,601 0 313,225
Drainage Excavation (Berms & Channels) 41,591 0 0 0 0 41,591
Pipe Excavation 9,814 0 0 0 0 9,814
Structural Excavation (Box Culverts) 340 0 0 0 0 340
Structural Excavation (Bridges) 0 1,580 0 1,610 0 3,190
Structural Excavation (Walls) 0 7,182 0 0 0 7,182
Excavation For Riprap 3,124 0 0 0 0 3,124
Total Excavation 57,008 153,725 1,522 166,211 0 378,466
Embankment 5,055 23,567 3,231 10,829 0 42,682
Box Culvert Adjustment 0 0 0 0 0 0
Ground Compaction 390 1,072 298 552 0 2,312
Drainage Embankment (Berms & Channels) 4,746 0 0 0 0 4,746
Structure Backfill (Bridges) 0 950 0 970 0 1,920
Structure Backfill (Box Culverts) 449 0 0 0 0 449
Structure Backfill (Walls) 0 2,402 0 0 0 2,402
Pipe Backfill 2,204 0 0 0 0 2,204
Trench Backfill 15,779 0 0 0 0 15,779
Total Embankment 28,622 27,991 3,529 12,351 0 72,493
Shrink (+12%) 3,435 3,359 423 1,482 0 8,699
Total Embankment with Shrink Applied 32,057 31,350 3,952 13,833 0 81,192
Waste 24,952 122,375 (2,430) 152,378 0 297,274
Phase-2
EARTHWORK QUANTITIES & CALCULATION SUMMARY
TotalPhase-3 Description
Phase-1 Phase-4 Phase-5
040 MO 54 H7147 01C
Side Roadway Begin Sta End Sta Roadway
Excavation Embankment
Median 2 Lane Crossover 2,139 5,055
Subtotal 2,139 5,055
Phase I Total 2,139 5,055
North I40WB West End 2844+00 2861+20 1,411 1816 North Ramp A 14+20 29+60 24,109 3298 North KC Blvd North 50+00 60+95 61,304 2 North Ramp C 10+60 32+10 56,547 15073 North I40WB East End 2899+30 2920+00 1,592 3378
Subtotal 144,963 23567
Phase 2 Total 144,963 23,567
Median West 2-Lane Cross Over 857 1,037 Median East 2-Lane Cross Over 665 1,435 Ramp Ramp Detour 0 759
Subtotal 1,522 3,231
Phase 3 Total 1,522 3,231
South I40EB West End 2845+00 2862+00 2,233 625 South Ramp B 19+80 34+40 37,338 506 South KC Blvd South 43+81 50+00 51,712 0 South Ramp D 10+60 31+50 71,480 8,511 South I40EB East End 2898+60 2920+00 1,838 1,187
Subtotal 164,601 10,829
Phase 4 Total 164,601 10,829
Subtotal 0 0
Phase 5 Total 0 0
Grand Total 313,225 42,682
PHASE 3
Roadway Excavation & Embankment
PHASE 1
PHASE 2
PHASE 4
PHASE 5
040 MO 54 H7147 01C
Side Roadway Begin Sta End Sta Excavation Embankment
Subtotal 0 0
Phase I Total 0 0
Subtotal 0 0
Phase 2 Total 0 0
Subtotal 0 0
Phase 3 Total 0 0
Subtotal 0 0
Phase 4 Total 0 0
Subtotal 0 0
Phase 5 Total 0 0
TOTAL 0 0
PHASE 2
PHASE 3
PHASE 4
PHASE 5
Excavation (Over Ex & Replace)
PHASE 1
040 MO 54 H7147 01C
Side Roadway Begin Sta End Sta Excavation Embankment
South Channel C Interim 3,749 Channel E1 328 2 Basin C & Channel C 2,438 146 Basin F & Channel F 10,505 1 Basin H & Channel H(n&e) 24,571 4511
Subtotal 41,591 4,660
Phase I Total 41,591 4,660
Subtotal 0 0
Phase 2 Total 0 0
Subtotal 0 0
Phase 3 Total 0 0
Subtotal 0 0
Phase 4 Total 0 0
Subtotal 0 0
Phase 5 Total 0 0
PHASE 2
Drainage Excavation & Embankment (Channels)
PHASE 1
PHASE 3
PHASE 4
PHASE 5
040 MO 54 H7147 01C
Side Location/Pipe Ref # Begin Sta End Sta Excavation Embankment
RT BE-J 2901+46 2901+46 26
Culvert B Outlet West 30 Culvert B Outlet East 30
Subtotal 0 86
Phase I Total 0 86
Subtotal 0 0
Phase 2 Total 0 0
Subtotal 0 0
Phase 3 Total 0 0
Subtotal 0 0
Phase 4 Total 0 0
Subtotal 0 0
Phase 5 Total 0 0
PHASE 4
PHASE 5
Drainage Excavation & Embankment (Berms)
PHASE 1
PHASE 2
PHASE 3
040 MO 54 H7147 01C
Pipe Ref Pipe Excavation Shrink (Yes/No) Pipe Backfill Pipe Trench Backfill Total Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
CE-C 5 6 0
CE-C 27 21 0
CE-I 9 29 0
CE-I 19 17 0
CE-K 8 13 0
CE-K 6 7 0
CE-L 8 6 0
CE-L 4 3 0
1 239 43 1,016
2 149 22 707
3 535 117 517
4 748 198 455
5 725 190 456
6 684 153 634
7 960 191 1,080
8 2,951 534 3,717
1L 41 12 133
2R 79 14 379
3R2 17 4 38
3L 61 12 277
3R 163 32 352
3R1 204 44 390
4L3 201 43 585
4L2 47 12 79
4L1 160 31 419
4L 224 42 501
4R 100 22 278
4L4 31 15 30
4R1 54 16 91
5R 70 14 221
5R1 35 14 221
6L3 39 18 51
6L2 116 35 187
6L1 80 22 89
6L 136 33 211
6R 76 15 164
6R1 67 15 164
6R2 76 21 149
6R3 1 0 5
6L4 2 1 3
7L 66 14 278
7R 72 14 278
8L 67 14 291
9L 69 12 332
9R 79 12 410
P30 9 7 0
P31 26 13 0
P32 18 8 12
P33 38 15 8
P50 215 61 574
Totals 9,814 0 0 0 0 0 0 2,204 15,779
PIPE EXCAVATION SUMMARY
Shrink (15%)
040 MO 54 H7147 01C
Ref No. Phase Size Length Actual Width Actual Height Culvert Volume Structural Excavation
Structure Backfill
Culvert Adjustment
(ft) (ft) (ft) (ft) (CY) (CY) (CY) (CY) BE-B (LT) 1 (2) 8'x4' 36 21 BE-B (RT) 1 (2) 8'x4' 51 17
BE-D (LT) 1 6'x3' 41 77
BE-H (LT) 1 (2) 8'x4' 68 130 BE-H (RT) 1 (2) 8'x4' 74 93
BE-J (LT) 1 6'x5' 22 55 BE-J (RT) 1 6'x5' 18 33
BE-M (LT) 1 6'x3' 11 9 BE-M (RT) 1 6'x3' 19 14
Phase 1 340 449 0 Phase 2 0 0 0 Phase 3 0 0 0 Phase 4 Phase 5
Grand Total 340 449 0
BOX CULVERT ADJUSTMENTS
040 MO 54 H7147 01C
Structure Length (ft) Width (ft) Height (ft) Volume (CY)
Per Abut Total Volume
(CY)
PHASE 2
Kingman Crossing Blvd TI Overpass (WB)
Abut. Structural Excavation 706 1,420 Abut. Structure Backfill 427 860 Pier Structural Excavation 156 160 Pier Structure Backfill 88 90
Subtotals Structural Excavation 1,580 Structure Backfill 950
PHASE 4
Kingman Crossing Blvd TI Overpass (EB)
Structural Excavation 722 1,450 Structure Backfill 438 880 Pier Structural Excavation 156 160 Pier Structure Backfill 88 90
Subtotals Structural Excavation 1,610 Structure Backfill 970
Totals Structural Excavation 3,190 Structure Backfill 1,920
Structure Excavation Backfill Phase 2 0 0 Phase 4 0 0
Totals 0 0
Bridge Structure Excavation & Backfill
Drilled Shaft Excavation
040 MO 54 H7147 01C
Structure Length (ft) Width (ft) Height (ft) Volume (CY)
Per Wall Total Volume
(CY)
PHASE 2
Wall 1
Structural Excavation 2,212 2,212 Structure Backfill 726 726
Wall 2
Structural Excavation 4,970 4,970 Structure Backfill 1,676 1,676
Totals Structural Excavation 7,182 Structure Backfill 2,402
Wall Structure Excavation & Backfill
040 MO 54 H7147 01C
Item No. Description Phase 1 Phase 2 Phase 3 Phase 4 Phase 4 TOTAL
CE-C Culvert outlet apron, Dtl DA 4
BE-D Culvert outlet apron, Dtl DA 21
CE-I Culvert outlet apron, Dtl DA 10
CE-K Culvert outlet apron, Dtl DA 22
CE-L Culvert outlet apron, Dtl DA 5
BE-M Culvert outlet apron, Dtl DA 24
DB_C Main Spillway 32
DB_F Inlet Spillway 71
Main Spillway 132
DB_H Inlet Spillway 22
Ramp D DETAIL DK
11+76 TYPE 1 FLAT APRON 19
12+61
Ramp B
20+63 TYPE 2 V-DITCH 173
22+47
22+47 TYPE 2 V-DITCH 613
28+96
28+96 TYPE 2 V-DITCH 159
30+62
Ramp B
21+47 TYPE 3 SLOPE BANK & LEVEL APRON 84
22+25
Ramp D
13+08 TYPE 3 SLOPE BANK & LEVEL APRON 83
14+28
26+80 TYPE 3 SLOPE BANK & LEVEL APRON 42
27+22
27+22 TYPE 3 SLOPE BANK & LEVEL APRON 96
28+45
28+45 TYPE 3 SLOPE BANK & LEVEL APRON 92
29+62
29+62 TYPE 3 SLOPE BANK & LEVEL APRON 23
29+95
29+95 TYPE 3 SLOPE BANK & LEVEL APRON 55
30+37
26+60 TYPE 3 SLOPE BANK & LEVEL APRON 19
26+64
26+64 TYPE 3 SLOPE BANK & LEVEL APRON 72
27+51
28+44 TYPE 3 SLOPE BANK & LEVEL APRON 88
29+62
29+62 TYPE 3 SLOPE BANK & LEVEL APRON 66
30+41
30+41 TYPE 3 SLOPE BANK & LEVEL APRON 87
30+46
30+48 TYPE 3 SLOPE BANK & LEVEL APRON 54
30+62
30+62 TYPE 3 SLOPE BANK & LEVEL APRON 74
30+66
34+91 TYPE 3 SLOPE BANK & LEVEL APRON 10
34+84
Ramp D
12+59 TYPE 4 TRAPEZOIDAL CHANNEL 361
17+80
17+80 TYPE 4 TRAPEZOIDAL CHANNEL 492
24+91
24+91 TYPE 4 TRAPEZOIDAL CHANNEL 19
25+11
Total 3,124 0 0 0 0 0
EXCAVATION FOR RIP RAP
Volume (CY)
040 MO 54 H7147 01C
Side Roadway Begin Sta End Sta Area (SY) Volume (CY)
WB Detour 14,610 390
Subtotal 14,610 390
Phase I Total 14,610 390
Ramp A 14,305 381 Ramp C 25,900 691
Subtotal 40,205 1,072
Phase 2 Total 40,205 1,072
EB Detour 11,175 298
Subtotal 11,175 298
Phase 3 Total 11,175 298
Ramp B 2,003 53 Ramp D 18,696 499
Subtotal 20,699 552
Phase 4 Total 20,699 552
Subtotal 0 0
Phase 5 Total 0 0
PHASE 5
Ground Compaction (0.15')
PHASE 1
PHASE 2
PHASE 3
PHASE 4
| H7147_Stage IV_EW_Rpt |