About this file

This is an Earthwork Summary report prepared by the City of Kingman, Arizona for the Stage IV submittal of the Kingman Crossing Boulevard Traffic Interchange project (H7147). The document presents detailed excavation and embankment quantities organized across five project phases. Total excavation quantities amount to 378,466 cubic yards, with roadway excavation comprising 313,225 cubic yards, drainage excavation at 41,591 cubic yards, pipe excavation at 9,814 cubic yards, structural excavation (bridges, walls, and box culverts) at 10,712 cubic yards, and riprap excavation at 3,124 cubic yards. Corresponding total embankment quantities are 72,493 cubic yards, plus an additional 8,699 cubic yards accounting for a 12 percent shrink factor, resulting in total embankment with shrink of 81,192 cubic yards. The project includes waste quantities of 297,274 cubic yards distributed across phases. Work is segmented into five phases, with Phase 1 and Phase 3 representing smaller scale activities, while Phases 2 and 4 contain the largest quantities associated with the northbound and southbound I-40 interchange improvements, respectively. Phase 5 contains no quantities. The report includes detailed breakdowns for pipe culvert installation (50 pipe references totaling 9,814 cubic yards excavation and 2,204 cubic yards backfill), box culvert work (9 structures with 340 cubic yards structural excavation and 449 cubic yards backfill), bridge structures (two overpass structures with 3,190 cubic yards structural excavation and 1,920 cubic yards backfill), and wall structures with 7,182 cubic yards structural excavation and 2,402 cubic yards backfill.

The project encompasses major infrastructure improvements including the construction of a traffic interchange at Interstate Highway 40 and Kingman Crossing Boulevard, completion of Kingman Crossing Boulevard design and construction, and development of approximately 128 adjacent city-owned acres. Ground compaction work totals 2,312 cubic yards across all phases. The City of Kingman issued a Request for Qualifications (2026-RFQ-019) seeking qualified master developers with documented experience on similar large-scale infrastructure projects. Responses were due by 5:00 pm Arizona time on Thursday, November 19, 2026, with questions to be submitted by 5:00 pm Arizona time on Friday, November 6, 2026 through the OpenGov procurement portal at https://procurement.opengov.com/portal/cityofkingman. The project involves retail, commercial, and complementary uses on city-owned property south of I-40 at the Kingman Crossing Boulevard intersection. Responses must be submitted through the OpenGov procurement portal, and the City reserves the right to reject any non-compliant response or any response when cancellation serves the city's interests.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

September 2023

STAGE IV SUBMITTAL

PREPARED BY

EARTHWORK SUMMARY

KINGMAN CROSSING TI

040 MO 54 H7147 01 D

EARTHWORK SUMMARY

KINGMAN CROSSING BLVD TI

040 MO 54 H7147 01C

SHEET

Cover 1

Table of Contents 2

Earthwork Quantities & Calculation Summary 3

Roadway Excavation & Embankment 4

Excavation (Over Ex & Replace) 5

Drainage Excavation & Embankment 6-7

Pipe Culvert Quantities 8

Box Culvert Quantities 9

Bridge Excavation & Backfill 10

Wall Excavation & Backfill 11

Excavation For Riprap 12

Ground Compaction 13

Back up Calculations

Roadway End Areas Excavation & Embankment 14-33

Drainage Quantities 34-

TABLE OF CONTENTS

040 MO 54 H7147 01C

(CY) (CY) (CY) (CY) (CY) (CY)

Roadway Excavation 2,139 144,963 1,522 164,601 0 313,225

Drainage Excavation (Berms & Channels) 41,591 0 0 0 0 41,591

Pipe Excavation 9,814 0 0 0 0 9,814

Structural Excavation (Box Culverts) 340 0 0 0 0 340

Structural Excavation (Bridges) 0 1,580 0 1,610 0 3,190

Structural Excavation (Walls) 0 7,182 0 0 0 7,182

Excavation For Riprap 3,124 0 0 0 0 3,124

Total Excavation 57,008 153,725 1,522 166,211 0 378,466

Embankment 5,055 23,567 3,231 10,829 0 42,682

Box Culvert Adjustment 0 0 0 0 0 0

Ground Compaction 390 1,072 298 552 0 2,312

Drainage Embankment (Berms & Channels) 4,746 0 0 0 0 4,746

Structure Backfill (Bridges) 0 950 0 970 0 1,920

Structure Backfill (Box Culverts) 449 0 0 0 0 449

Structure Backfill (Walls) 0 2,402 0 0 0 2,402

Pipe Backfill 2,204 0 0 0 0 2,204

Trench Backfill 15,779 0 0 0 0 15,779

Total Embankment 28,622 27,991 3,529 12,351 0 72,493

Shrink (+12%) 3,435 3,359 423 1,482 0 8,699

Total Embankment with Shrink Applied 32,057 31,350 3,952 13,833 0 81,192

Waste 24,952 122,375 (2,430) 152,378 0 297,274

Phase-2

EARTHWORK QUANTITIES & CALCULATION SUMMARY

TotalPhase-3 Description

Phase-1 Phase-4 Phase-5

040 MO 54 H7147 01C

Side Roadway Begin Sta End Sta Roadway

Excavation Embankment

Median 2 Lane Crossover 2,139 5,055

Subtotal 2,139 5,055

Phase I Total 2,139 5,055

North I40WB West End 2844+00 2861+20 1,411 1816 North Ramp A 14+20 29+60 24,109 3298 North KC Blvd North 50+00 60+95 61,304 2 North Ramp C 10+60 32+10 56,547 15073 North I40WB East End 2899+30 2920+00 1,592 3378

Subtotal 144,963 23567

Phase 2 Total 144,963 23,567

Median West 2-Lane Cross Over 857 1,037 Median East 2-Lane Cross Over 665 1,435 Ramp Ramp Detour 0 759

Subtotal 1,522 3,231

Phase 3 Total 1,522 3,231

South I40EB West End 2845+00 2862+00 2,233 625 South Ramp B 19+80 34+40 37,338 506 South KC Blvd South 43+81 50+00 51,712 0 South Ramp D 10+60 31+50 71,480 8,511 South I40EB East End 2898+60 2920+00 1,838 1,187

Subtotal 164,601 10,829

Phase 4 Total 164,601 10,829

Subtotal 0 0

Phase 5 Total 0 0

Grand Total 313,225 42,682

PHASE 3

Roadway Excavation & Embankment

PHASE 1

PHASE 2

PHASE 4

PHASE 5

040 MO 54 H7147 01C

Side Roadway Begin Sta End Sta Excavation Embankment

Subtotal 0 0

Phase I Total 0 0

Subtotal 0 0

Phase 2 Total 0 0

Subtotal 0 0

Phase 3 Total 0 0

Subtotal 0 0

Phase 4 Total 0 0

Subtotal 0 0

Phase 5 Total 0 0

TOTAL 0 0

PHASE 2

PHASE 3

PHASE 4

PHASE 5

Excavation (Over Ex & Replace)

PHASE 1

040 MO 54 H7147 01C

Side Roadway Begin Sta End Sta Excavation Embankment

South Channel C Interim 3,749 Channel E1 328 2 Basin C & Channel C 2,438 146 Basin F & Channel F 10,505 1 Basin H & Channel H(n&e) 24,571 4511

Subtotal 41,591 4,660

Phase I Total 41,591 4,660

Subtotal 0 0

Phase 2 Total 0 0

Subtotal 0 0

Phase 3 Total 0 0

Subtotal 0 0

Phase 4 Total 0 0

Subtotal 0 0

Phase 5 Total 0 0

PHASE 2

Drainage Excavation & Embankment (Channels)

PHASE 1

PHASE 3

PHASE 4

PHASE 5

040 MO 54 H7147 01C

Side Location/Pipe Ref # Begin Sta End Sta Excavation Embankment

RT BE-J 2901+46 2901+46 26

Culvert B Outlet West 30 Culvert B Outlet East 30

Subtotal 0 86

Phase I Total 0 86

Subtotal 0 0

Phase 2 Total 0 0

Subtotal 0 0

Phase 3 Total 0 0

Subtotal 0 0

Phase 4 Total 0 0

Subtotal 0 0

Phase 5 Total 0 0

PHASE 4

PHASE 5

Drainage Excavation & Embankment (Berms)

PHASE 1

PHASE 2

PHASE 3

040 MO 54 H7147 01C

Pipe Ref Pipe Excavation Shrink (Yes/No) Pipe Backfill Pipe Trench Backfill Total Phase 1 Phase 2 Phase 3 Phase 4 Phase 5

CE-C 5 6 0

CE-C 27 21 0

CE-I 9 29 0

CE-I 19 17 0

CE-K 8 13 0

CE-K 6 7 0

CE-L 8 6 0

CE-L 4 3 0

1 239 43 1,016

2 149 22 707

3 535 117 517

4 748 198 455

5 725 190 456

6 684 153 634

7 960 191 1,080

8 2,951 534 3,717

1L 41 12 133

2R 79 14 379

3R2 17 4 38

3L 61 12 277

3R 163 32 352

3R1 204 44 390

4L3 201 43 585

4L2 47 12 79

4L1 160 31 419

4L 224 42 501

4R 100 22 278

4L4 31 15 30

4R1 54 16 91

5R 70 14 221

5R1 35 14 221

6L3 39 18 51

6L2 116 35 187

6L1 80 22 89

6L 136 33 211

6R 76 15 164

6R1 67 15 164

6R2 76 21 149

6R3 1 0 5

6L4 2 1 3

7L 66 14 278

7R 72 14 278

8L 67 14 291

9L 69 12 332

9R 79 12 410

P30 9 7 0

P31 26 13 0

P32 18 8 12

P33 38 15 8

P50 215 61 574

Totals 9,814 0 0 0 0 0 0 2,204 15,779

PIPE EXCAVATION SUMMARY

Shrink (15%)

040 MO 54 H7147 01C

Ref No. Phase Size Length Actual Width Actual Height Culvert Volume Structural Excavation

Structure Backfill

Culvert Adjustment

(ft) (ft) (ft) (ft) (CY) (CY) (CY) (CY) BE-B (LT) 1 (2) 8'x4' 36 21 BE-B (RT) 1 (2) 8'x4' 51 17

BE-D (LT) 1 6'x3' 41 77

BE-H (LT) 1 (2) 8'x4' 68 130 BE-H (RT) 1 (2) 8'x4' 74 93

BE-J (LT) 1 6'x5' 22 55 BE-J (RT) 1 6'x5' 18 33

BE-M (LT) 1 6'x3' 11 9 BE-M (RT) 1 6'x3' 19 14

Phase 1 340 449 0 Phase 2 0 0 0 Phase 3 0 0 0 Phase 4 Phase 5

Grand Total 340 449 0

BOX CULVERT ADJUSTMENTS

040 MO 54 H7147 01C

Structure Length (ft) Width (ft) Height (ft) Volume (CY)

Per Abut Total Volume

(CY)

PHASE 2

Kingman Crossing Blvd TI Overpass (WB)

Abut. Structural Excavation 706 1,420 Abut. Structure Backfill 427 860 Pier Structural Excavation 156 160 Pier Structure Backfill 88 90

Subtotals Structural Excavation 1,580 Structure Backfill 950

PHASE 4

Kingman Crossing Blvd TI Overpass (EB)

Structural Excavation 722 1,450 Structure Backfill 438 880 Pier Structural Excavation 156 160 Pier Structure Backfill 88 90

Subtotals Structural Excavation 1,610 Structure Backfill 970

Totals Structural Excavation 3,190 Structure Backfill 1,920

Structure Excavation Backfill Phase 2 0 0 Phase 4 0 0

Totals 0 0

Bridge Structure Excavation & Backfill

Drilled Shaft Excavation

040 MO 54 H7147 01C

Structure Length (ft) Width (ft) Height (ft) Volume (CY)

Per Wall Total Volume

(CY)

PHASE 2

Wall 1

Structural Excavation 2,212 2,212 Structure Backfill 726 726

Wall 2

Structural Excavation 4,970 4,970 Structure Backfill 1,676 1,676

Totals Structural Excavation 7,182 Structure Backfill 2,402

Wall Structure Excavation & Backfill

040 MO 54 H7147 01C

Item No. Description Phase 1 Phase 2 Phase 3 Phase 4 Phase 4 TOTAL

CE-C Culvert outlet apron, Dtl DA 4

BE-D Culvert outlet apron, Dtl DA 21

CE-I Culvert outlet apron, Dtl DA 10

CE-K Culvert outlet apron, Dtl DA 22

CE-L Culvert outlet apron, Dtl DA 5

BE-M Culvert outlet apron, Dtl DA 24

DB_C Main Spillway 32

DB_F Inlet Spillway 71

Main Spillway 132

DB_H Inlet Spillway 22

Ramp D DETAIL DK

11+76 TYPE 1 FLAT APRON 19

12+61

Ramp B

20+63 TYPE 2 V-DITCH 173

22+47

22+47 TYPE 2 V-DITCH 613

28+96

28+96 TYPE 2 V-DITCH 159

30+62

Ramp B

21+47 TYPE 3 SLOPE BANK & LEVEL APRON 84

22+25

Ramp D

13+08 TYPE 3 SLOPE BANK & LEVEL APRON 83

14+28

26+80 TYPE 3 SLOPE BANK & LEVEL APRON 42

27+22

27+22 TYPE 3 SLOPE BANK & LEVEL APRON 96

28+45

28+45 TYPE 3 SLOPE BANK & LEVEL APRON 92

29+62

29+62 TYPE 3 SLOPE BANK & LEVEL APRON 23

29+95

29+95 TYPE 3 SLOPE BANK & LEVEL APRON 55

30+37

26+60 TYPE 3 SLOPE BANK & LEVEL APRON 19

26+64

26+64 TYPE 3 SLOPE BANK & LEVEL APRON 72

27+51

28+44 TYPE 3 SLOPE BANK & LEVEL APRON 88

29+62

29+62 TYPE 3 SLOPE BANK & LEVEL APRON 66

30+41

30+41 TYPE 3 SLOPE BANK & LEVEL APRON 87

30+46

30+48 TYPE 3 SLOPE BANK & LEVEL APRON 54

30+62

30+62 TYPE 3 SLOPE BANK & LEVEL APRON 74

30+66

34+91 TYPE 3 SLOPE BANK & LEVEL APRON 10

34+84

Ramp D

12+59 TYPE 4 TRAPEZOIDAL CHANNEL 361

17+80

17+80 TYPE 4 TRAPEZOIDAL CHANNEL 492

24+91

24+91 TYPE 4 TRAPEZOIDAL CHANNEL 19

25+11

Total 3,124 0 0 0 0 0

EXCAVATION FOR RIP RAP

Volume (CY)

040 MO 54 H7147 01C

Side Roadway Begin Sta End Sta Area (SY) Volume (CY)

WB Detour 14,610 390

Subtotal 14,610 390

Phase I Total 14,610 390

Ramp A 14,305 381 Ramp C 25,900 691

Subtotal 40,205 1,072

Phase 2 Total 40,205 1,072

EB Detour 11,175 298

Subtotal 11,175 298

Phase 3 Total 11,175 298

Ramp B 2,003 53 Ramp D 18,696 499

Subtotal 20,699 552

Phase 4 Total 20,699 552

Subtotal 0 0

Phase 5 Total 0 0

PHASE 5

Ground Compaction (0.15')

PHASE 1

PHASE 2

PHASE 3

PHASE 4

H7147_Stage IV_EW_Rpt
H7147_Stage IV_EW_Rpt 1
H7147_EW_Summary_StageIV 2

File details come from the government source that posted it. Updated .