Plans_H7147_I-40_KCTI_Cost_Est_Stage_IV.pdf

PDF 99 KB Posted

Attached to
Request for Qualifications for the Master Development of Kingman Crossing Traffic Interchange, Arterial Roadway Improvements and Adjacent City-Owned Land
Solicitation number
2026-RFQ-019
Issued by
Mohave County, Arizona

About this file

This is a Stage IV (95% design) cost estimate prepared by AECOM for the Arizona Department of Transportation (ADOT) for the I-40 Kingman Crossing Traffic Interchange (KCTI) project in Mohave County, Arizona. The project encompasses 1.39 miles of Interstate 40 improvements from Kingman to Ash Fork, including roadway construction, two bridge structures (eastbound and westbound overpasses), five box culverts, drainage infrastructure, traffic signal systems, lighting, pavement markings, erosion control, and associated site work. Major construction items include 313,225 cubic yards of roadway excavation, 17,614 square yards of Portland cement concrete pavement, 23,971 tons of asphaltic concrete (3/4" mix), installation of various storm drain pipes ranging from 12" to 60" diameter, 1,752 linear feet of metal handrail, temporary concrete barriers, and comprehensive electrical and traffic control systems.

The combined bid-item construction cost totals $35,393,420.71, with additional non-bid items of $109,313.00, bringing the project total to $40,821,746.81 after including construction engineering costs (9% at $3,185,407.86), consultant services for project delivery services (1% at $353,934.21), construction contingencies (5% at $1,769,671.04), and communication costs ($10,000.00). Unit prices are established for each work item, with roadway subtotal at $28,576,157.71 and structure subtotals ranging from $43,670.00 for the smallest box culvert to $2,910,400.00 for the eastbound overpass. The estimate was prepared on February 10, 2023, and represents the advanced design phase for this major infrastructure interchange project at the Kingman Crossing Boulevard and I-40 intersection.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

9/29/23

TRACS NUMBER LOCATION TERMINI ITEM

040 MO 54 H7147 01C KINGMAN CROSSING TI - KINGMAN KINGMAN - ASH FORK HWY (I-40)

FEDERAL NUMBER

040-B(AUE)

COUNTY CONTRACT # GROSS LENGTH NET LENGTH PREPARED BY

MOHAVE NA 1.39 Miles 1.39 Miles AECOM

ARIZONA DEPARTMENT OF TRANSPORTATION

STAGE IV (95%)

INTERMODAL TRANSPORTATION DIVISION

CONTRACTS AND SPECIFICATION SERVICES

COMBINED ESTIMATE

TRACS NO. 040 MO 54 H7147 01C COMBINED ESTIMATE - STAGE IV (95%)

I-40 KINGMAN CROSSING TI

2/10/23

Item No. Item Description Unit Quantity Unit Price Amount

2010011 CLEARING AND GRUBBING ACRE 36 $1,500.00 $53,518.60

2020009 REMOVAL OF STRUCTURAL CONCRETE CU.YD. 138 $55.00 $7,590.00

2020029 REMOVAL OF ASPHALTIC CONCRETE PAVEMENT SQ.YD. 30,737 $12.00 $368,846.67

2020041 REMOVAL OF PIPE L.FT. 803 $55.00 $44,165.00

2020052 REMOVE (COMMUNICATIONS LINE AND CONDUIT) L.FT. 4,030 $10.00 $40,300.00

2020085 REMOVE BITUMINOUS PAVEMENT (MILLING) (3") SQ.YD. 3,601 $6.00 $21,607.33

2020102 REMOVE AND SALVAGE FENCE L.FT. 8,240 $13.00 $107,120.00

2020156 REMOVE (END SECTION) EACH 6 $600.00 $3,600.00

2020158 REMOVE (SIGN ASSEMBLY, POST AND FOUNDATION) EACH 1 $1,100.00 $1,100.00

2030301 ROADWAY EXCAVATION CU.YD. 313,225 $12.00 $3,758,700.00

2030401 DRAINAGE EXCAVATION CU.YD. 41,591 $12.00 $499,092.00

2030811 DYKE (TYPE A) (C-03.10) L.FT. 62 $22.00 $1,364.00

2090005 FURNISH WATER M.GAL. 60,000 $14.00 $840,000.00

3030022 AGGREGATE BASE, CLASS 2 CU.YD. 20,569 $75.00 $1,542,675.00

4010009 PORTLAND CEMENT CONCRETE PAVEMENT (9") SQ.YD. 17,614 $80.00 $1,409,128.89

4040111 BITUMINOUS TACK COAT TON 43 $825.00 $35,722.50

4040112 BITUMINOUS TACK COAT (ASPHALT CEMENT) TON 36 $825.00 $29,700.00

4040116 APPLY BITUMINOUS TACK COAT HOUR 146 $130.00 $18,980.00

4040125 FOG COAT TON 1 $1,100.00 $1,100.00

4040165 BLOTTER MATERIAL SQ.YD. 7,452 $130.00 $968,760.00

4040230 ASPHALT BINDER (PG 70-22 PM) TON 1,317 $800.00 $1,053,360.00

4090006 ASPHALTIC CONCRETE (MISCELLANEOUS STRUCTURAL) (SPECIAL MIX) TON 2,363 $190.00 $448,970.00

4140040 ASPHALTIC CONCRETE FRICTION COURSE (ASPHALT-RUBBER) TON 1,267 $90.00 $113,997.44

4140042 ASPHALT RUBBER MATERIAL (FOR AR-ACFC) TON 114 $950.00 $108,297.57

4140044 MINERAL ADMIXTURE (FOR AR-ACFC) TON 11 $165.00 $1,815.00

4160004 ASPHALTIC CONCRETE (3/4" MIX) (END PRODUCT) (SPECIAL MIX) TON 23,971 $75.00 $1,797,825.00

4160031 MINERAL ADMIXTURE TON 248 $150.00 $37,200.00

5010004 PIPE, CORRUGATED METAL, 12" L.FT. 228 $145.00 $33,060.00

5012515 STORM DRAIN PIPE, 15" L.FT. 503 $150.00 $75,450.00

5012518 STORM DRAIN PIPE, 18" L.FT. 660 $165.00 $108,900.00

H7147_I-40_KCTI_Cost Est_Stage IV.xlsx AECOM Page 2 of 14

2/10/23

Item No. Item Description Unit Quantity Unit Price Amount

5012524 STORM DRAIN PIPE, 24" L.FT. 626 $220.00 $137,720.00

5012530 STORM DRAIN PIPE, 30" L.FT. 125 $245.00 $30,625.00

5012536 STORM DRAIN PIPE 36" L.FT. 492 $265.00 $130,380.00

5012560 STORM DRAIN PIPE, 60" L.FT. 1,423 $350.00 $498,050.00

5012924 PIPE CULVERT, 24" L.FT. 148 $170.00 $25,160.00

5012942 PIPE CULVERT, 42" L.FT. 120 $290.00 $34,800.00

5012954 PIPE CULVERT, 54" L.FT. 27 $330.00 $8,910.00

5014524 FLARED END SECTION, 24" (C-13.20 OR C-13.25) EACH 3 $1,800.00 $5,400.00

5014542 FLARED END SECTION, 42" (C-13.20 OR C-13.25) EACH 2 $240.00 $480.00

5030337 CATCH BASIN,TYPE B, (MAG DET. 531) EACH 1 $2,400.00 $2,400.00

5030348 CATCH BASIN, TYPE D, ONE 10' WING (MAG DET. 533-1) EACH 10 $6,000.00 $60,000.00

5030601 CATCH BASIN (DETAIL DM - BEEHIVE INLET EACH 2 $5,500.00 $11,000.00

5030604 CONCRETE CATCH BASIN (C-15.90) EACH 1 $7,700.00 $7,700.00

5030605 CONCRETE CATCH BASIN (C-15.80) EACH 8 $6,600.00 $52,800.00

5030606 CONCRETE CATCH BASIN (C-15.92) EACH 2 $7,700.00 $15,400.00

5030607 CONCRETE CATCH BASIN (DETAIL DO - BLEEDOFF-STRUCTURE) EACH 3 $6,700.00 $20,100.00

5050001 MANHOLE (C-18.10) (NO. 1) (FOR PIPES 6" TO 36") EACH 2 $11,000.00 $22,000.00

5050065 MANHOLE (MAG DET. 520 & 522) EACH 3 $11,000.00 $33,000.00

5050066 MANHOLE (MAG DET. 521 & 522) EACH 7 $13,000.00 $91,000.00

6016088 HEADWALL (24IN STRAIGHT HDWL)(SD 6.30-2) EACH 1 $4,400.00 $4,400.00

6016089 HEADWALL (36IN DROP INLET HDWL)(C-15.75) EACH 1 $6,600.00 $6,600.00

6016090 HEADWALL (54IN INLET/OUTLET)(SKEW 30 DEG)(SD 6.30-4) EACH 2 $9,000.00 $18,000.00

6016091 HEADWALL (24IN DROP INLET HDWL)(C-15.75) EACH 1 $5,500.00 $5,500.00

6016111 CUT-OFF-WALL L.FT. 253 $150.00 $37,950.00

6060133 CANTILEVER SIGN STRUCTURE (SD9.10, TYPE 3C) EACH 4 $66,000.00 $264,000.00

6060256 FOUNDATION FOR CANTILEVER SIGN STRUCTURE (SD9.10, TYPE 3C) EACH 4 $22,000.00 $88,000.00

6070002 BREAKAWAY SIGN POST S4X7.7 L.FT. 48 $55.00 $2,640.00

6070004 BREAKAWAY SIGN POST W6X12 L.FT. 113 $80.00 $9,040.00

6070006 BREAKAWAY SIGN POST W8X18 L.FT. 334 $80.00 $26,720.00

6070022 FOUNDATION FOR BREAKAWAY SIGN POST S4X7.7 EACH 4 $1,050.00 $4,200.00

H7147_I-40_KCTI_Cost Est_Stage IV.xlsx AECOM Page 3 of 14

2/10/23

Item No. Item Description Unit Quantity Unit Price Amount

6070024 FOUNDATION FOR BREAKAWAY SIGN POST W6X12 EACH 7 $1,400.00 $9,800.00

6070026 FOUNDATION FOR BREAKAWAY SIGN POST W8X18 EACH 17 $1,800.00 $30,600.00

6070038 SLIP BASE EACH 39 $300.00 $11,700.00

6070054 SIGN POST (PERFORATED) (2 S) L.FT. 88 $24.00 $2,112.00

6070055 SIGN POST (PERFORATED) (2 1/2 S) L.FT. 36 $22.00 $792.00

6070057 SIGN POST (PERFORATED) (2 1/2 T) L.FT. 388 $33.00 $12,804.00

6070060 FOUNDATION FOR SIGN POST (CONCRETE) EACH 67 $380.00 $25,460.00

6080005 REGULATORY, WARNING, OR MARKER SIGN PANEL SQ.FT. 366 $45.00 $16,470.00

6080018 EXTRUDED ALUMINUM SIGN PANEL SQ.FT. 1,549 $45.00 $69,705.00

6080025 FLAT SHEET ALUMINUM SIGN PANEL SQ.FT. 60 $50.00 $3,000.00

6080110 REMOVE AND REINSTALL SIGN EACH 14 $1,300.00 $18,200.00

6110201 METAL HANDRAIL L.FT. 1,752 $110.00 $192,720.00

7015010 TEMPORARY CONCRETE BARRIER (INSTALLATION AND REMOVAL) L.FT. 5,525 $13.00 $71,825.00

7015020 TEMPORARY IMPACT ATTENUATORS (INSTALLATION AND REMOVAL) EACH 3 $1,100.00 $3,300.00

7015052 OBLITERATE PAVEMENT MARKING (STRIPE) L.FT. 31,895 $1.00 $31,895.00

7016020 TEMPORARY CONCRETE BARRIER (IN USE) L.FT.-DAY 519,658 $0.07 $36,376.06

7016021 TEMPORARY IMPACT ATTENUATORS (IN USE) EACH-DAY 270 $50.00 $13,500.00

7016030 BARRICADE (TYPE 1, TYPE 2, VERT.PANEL, TUBULAR MARKER) EACH-DAY 99,069 $0.35 $34,674.15

7016031 BARRICADE (TYPE 3, HIGH LEVEL FLAG TREE) EACH-DAY 6,588 $0.50 $3,294.00

7016033 PORTABLE SIGN STAND (SPRING TYPE) EACH-DAY 1,154 $1.00 $1,154.00

7016035 WARNING LIGHT (TYPE A) EACH-DAY 12,791 $0.35 $4,476.85

7016037 WARNING LIGHT (TYPE C) EACH-DAY 99,069 $0.35 $34,674.15

7016039 EMBEDDED SIGN POST EACH-DAY 26,352 $0.30 $7,905.60

7016052 TEMPORARY SIGN (10 S.F. OR MORE) EACH-DAY 14,711 $0.75 $11,033.25

7016061 FLASHING ARROW PANEL EACH-DAY 184 $25.00 $4,600.00

7016067 CHANGEABLE MESSAGE BOARD (CONTRACTOR FURNISHED) EACH-DAY 2,252 $50.00 $112,600.00

7016079 FLAGGING SERVICES (UNIFORMED OFFICER) HOUR 1,537 $67.00 $102,979.00

7020001 IMPACT ATTENUATION DEVICE (ENERGY ABSORBING TERMINAL) EACH 1 $40,000.00 $40,000.00

7030038 FOUNDATION FOR MILEPOST MARKER EACH 2 $400.00 $800.00

7030095 MILEPOST MARKER (S-10) EACH 2 $500.00 $1,000.00

H7147_I-40_KCTI_Cost Est_Stage IV.xlsx AECOM Page 4 of 14

2/10/23

Item No. Item Description Unit Quantity Unit Price Amount

7040005 PAVEMENT MARKING (WHITE EXTRUDED THERMOPLASTIC) (0.090") L.FT. 52,646 $1.00 $52,646.00

7040006 PAVEMENT MARKING (YELLOW EXTRUDED THERMOPLASTIC) (0.090") L.FT. 9,362 $1.00 $9,362.00

7042031 PRIMER-SEALER FOR PCCP THERMOPLASTIC STRIPING L.FT. 11,617 $1.00 $11,617.00

7042051 REMOVAL OF CURING COMPOUND FOR STRIPING L.FT. 11,617 $1.00 $11,617.00

7050036 PAVEMENT MARKING, PREFORMED, TYPE II LEGEND EACH 6 $900.00 $5,400.00

7050060 PAVEMENT MARKING, PREFORMED, LEGEND, TYPE IV EACH 17 $1,000.00 $17,000.00

7050063 PAVEMENT MARKING, PREFORMED, SINGLE ARROW, TYPE IV EACH 49 $750.00 $36,750.00

7080201 WATERBORNE-TYPE I PAVEMENT MARKING (PAINTED) (WHITE) L.FT. 69,999 $0.35 $24,499.65

7080202 WATERBORNE-TYPE I PAVEMENT MARKING (PAINTED) (YELLOW) L.FT. 24,481 $0.35 $8,568.35

7080205 WATERBORNE-TYPE I PAVEMENT MARKING (PAINTED SYMBOL) (DOUBLE ARROW) EACH 6 $165.00 $990.00

7080206 WATERBORNE-TYPE I PAVEMENT MARKING (PAINTED SYMBOL) (ARROW) EACH 49 $100.00 $4,900.00

7080208 WATERBORNE-TYPE I PAVEMENT MARKING (PAINTED LEGEND) (ONLY) EACH 17 $100.00 $1,700.00

7080301 PAINT BULL NOSE EACH 5 $165.00 $825.00

7080401 WATERBORNE-TYPE II PAVEMENT MARKING (PAINTED) (WHITE) L.FT. 14,642 $0.45 $6,588.90

7080402 WATERBORNE-TYPE II PAVEMENT MARKING (PAINTED) (YELLOW) L.FT. 13,500 $0.45 $6,075.00

7310010 POLE (TYPE A) EACH 5 $500.00 $2,500.00

7310070 POLE (TYPE G) (STANDARD BASE) EACH 12 $5,000.00 $60,000.00

7310072 POLE (TYPE G) (SLIP AWAY BASE)(BREAKAWAY BASE) EACH 19 $5,500.00 $104,500.00

7310130 POLE (TYPE Q) EACH 2 $3,500.00 $7,000.00

7310190 POLE (TYPE W PER ADOT DET. 4-17) EACH 4 $16,500.00 $66,000.00

7310200 POLE FOUNDATION (TYPE A) EACH 5 $1,300.00 $6,500.00

7310260 POLE FOUNDATION (TYPE G) (STANDARD BASE) EACH 12 $1,700.00 $20,400.00

7310262 POLE FOUNDATION (TYPE G) (SLIP AWAY BASE) (BREAKAWAY BASE) EACH 19 $1,700.00 $32,300.00

7310310 POLE FOUNDATION (TYPE Q) EACH 2 $4,000.00 $8,000.00

7310372 POLE FOUNDATION (TYPE W PER ADOT DETAIL. 4-17) EACH 4 $5,500.00 $22,000.00

7310551 MAST ARM (20 FT.) (TAPERED) EACH 37 $1,500.00 $55,500.00

7310590 MAST ARM (40 FT.) (TAPERED) EACH 2 $4,000.00 $8,000.00

7310635 MAST ARM (60 FT.) (TAPERED) EACH 2 $12,000.00 $24,000.00

7310640 MAST ARM (65 FT.) (TAPERED) EACH 2 $15,000.00 $30,000.00

7320050 ELECTRICAL CONDUIT (2") (PVC) L.FT. 12,970 $25.00 $324,250.00

H7147_I-40_KCTI_Cost Est_Stage IV.xlsx AECOM Page 5 of 14

2/10/23

Item No. Item Description Unit Quantity Unit Price Amount

7320060 ELECTRICAL CONDUIT (2 1/2") (PVC) L.FT. 810 $30.00 $24,300.00

7320070 ELECTRICAL CONDUIT (3") (PVC) L.FT. 1,690 $40.00 $67,600.00

7320274 ELECTRICAL CONDUIT (2-3") (DIRECTIONAL DRILL) L.FT. 610 $65.00 $39,650.00

7320293 ELECTRICAL CONDUIT (2") (PVC) (DIRECTIONAL DRILL) L.FT. 1,070 $65.00 $69,550.00

7320410 PULL BOX (NO. 5) EACH 34 $800.00 $27,200.00

7320420 PULL BOX (NO. 7) EACH 9 $1,000.00 $9,000.00

7320421 PULL BOX (NO. 7) (WITH EXTENSION) EACH 3 $1,100.00 $3,300.00

7320650 CONDUCTORS L.SUM 2 $17,000.00 $34,000.00

7330060 TRAFFIC SIGNAL FACE (TYPE F) EACH 19 $825.00 $15,675.00

7330135 TRAFFIC SIGNAL FACE (TYPE R) EACH 8 $825.00 $6,600.00

7330212 PEDESTRIAN SIGNAL (COMPLETE COUNTDOWN) EACH 16 $825.00 $13,200.00

7330310 TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE II) EACH 17 $250.00 $4,250.00

7330330 TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE IV) EACH 1 $550.00 $550.00

7330340 TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE V) EACH 9 $550.00 $4,950.00

7330350 TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE VI) EACH 2 $650.00 $1,300.00

7330360 TRAFFIC SIGNAL MOUNTING ASSEMBLY (TYPE VII) EACH 6 $770.00 $4,620.00

7330510 SIGN (STREET NAME) EACH 2 $825.00 $1,650.00

7340120 METER PEDESTAL CABINET EACH 1 $5,500.00 $5,500.00

7340251 CONTROLLER (ECONOLOITE SMART CONTROLLER W/BBS) EACH 1 $28,000.00 $28,000.00

7340304 CONTROL CABINET FOUNDATION (ELEVATED BASE) EACH 1 $1,500.00 $1,500.00

7340306 METER PEDESTAL FOUNDATION EACH 1 $1,700.00 $1,700.00

7350060 PEDESTRIAN PUSH BUTTON EACH 14 $1,300.00 $18,200.00

7360104 LUMINAIRE (LED) EACH 37 $900.00 $33,300.00

7360160 POWER SUPPLY (BATTERY BACKUP) EACH 1 $9,000.00 $9,000.00

7360235 LOAD CENTER CABINET (TYPE II) (240/480 VOLT, METERED) EACH 2 $11,000.00 $22,000.00

7360240 LOAD CENTER CABINET FOUNDATION EACH 2 $1,600.00 $3,200.00

7370705 CCTV FIELD EQUIPMENT EACH 2 $12,000.00 $24,000.00

8030104 DECOMPOSED GRANITE (3/4") SQ.YD. 9,905 $10.00 $99,047.78

8030106 DECOMPOSED GRANITE (1 1/4") SQ.YD. 6,939 $10.00 $69,387.78

8050003 SEEDING (CLASS II) ACRE 53 $5,500.00 $291,500.00

H7147_I-40_KCTI_Cost Est_Stage IV.xlsx AECOM Page 6 of 14

2/10/23

Item No. Item Description Unit Quantity Unit Price Amount

8080187 AIR/VACUUM RELEASE VALVE (COK STD DTL 388) EACH 5 $1,200.00 $6,000.00

8080224 GATE VALVE (12") EACH 3 $5,500.00 $16,500.00

8080243 FLUSH LINE ASSEMBLY (COK STD DTL 390) EACH 3 $4,000.00 $12,000.00

8080398 PIPE (PVC) (12") (SDR 18) (CLASS 150) L.FT. 2,084 $220.00 $458,480.00

8080651 FIRE HYDRANT EACH 6 $6,000.00 $36,000.00

8090086 SEWER PIPE (8") (PVC) L.FT. 2,106 $180.00 $379,080.00

8090501 SEWER STUBOUT AND PLUG EACH 3 $2,500.00 $7,500.00

8091114 MANHOLE, SANITARY SEWER (COK DET. 420-1) (48") EACH 6 $14,000.00 $84,000.00

8101005 EROSION CONTROL (CHECK DAM) (ROCK) CU.YD. 336 $100.00 $33,600.00

8101014 EROSION CONTROL (SEDIMENT WATTLE 20") L.FT. 17,922 $7.00 $125,454.00

8101016 EROSION CONTROL (ROCK MULCH) CU.YD. 139 $110.00 $15,290.00

8101017 EROSION CONTROL (GRAVEL BAG) EACH 320 $20.00 $6,400.00

8101018 EROSION CONTROL (STABILIZED CONSTRUCTION ENTRANCE/EXIT GRAVEL PAD) SQ.YD. 1,768 $30.00 $53,040.00

8101021 EROSION CONTROL (WATTLES) (9") L.FT. 1,985 $3.00 $5,955.00

8101035 EROSION CONTROL (SEDIMENT LOGS) (20") L.FT. 480 $7.00 $3,360.00

9010001 MOBILIZATION L.SUM 1 $3,540,000.00 $3,540,000.00

9020004 CHAIN LINK FENCE, TYPE 1 (72") L.FT. 400 $35.00 $14,000.00

9020111 CHAIN LINK FENCE GATE, TYPE 1 (72") (OVER 6' TO 13' WIDE) EACH 5 $4,000.00 $20,000.00

9020201 CONSTRUCT CHAIN LINK FENCE FROM SALVAGE L.FT. 8,240 $20.00 $164,800.00

9040001 CHAIN LINK CABLE BARRIER L.FT. 126 $350.00 $44,100.00

9050005 GUARD RAIL, W-BEAM, SINGLE FACE (MASH) L.FT. 2,113 $50.00 $105,625.00

9050024 GUARD RAIL TERMINAL (TANGENT TYPE) EACH 9 $5,000.00 $45,000.00

9050036 GUARD RAIL, ANCHOR ASSEMBLY EACH 6 $2,800.00 $16,800.00

9050419 GUARD RAIL TRANSITION (THRIE-BEAM GUARD RAIL TRANSITION SYSTEM) EACH 7 $6,500.00 $45,500.00

9080084 CONCRETE CURB AND GUTTER (C-05.10)(TYPE E) L.FT. 165 $28.00 $4,620.00

9080101 CONCRETE CURB AND GUTTER, TYPE A (MAG DET. 220-1) L.FT. 4,223 $28.00 $118,244.00

9080107 CONCRETE SINGLE CURB (MAG DET. 222) L.FT. 3,675 $22.00 $80,850.00

9080241 CONCRETE SIDEWALK (MAG DET. 230) SQ.FT. 27,121 $7.00 $189,847.00

9080296 CONCRETE SIDEWALK RAMP (C-05.30) (TYPE B) EACH 6 $3,300.00 $19,800.00

9080298 CONCRETE SIDEWALK RAMP (C-05.30) (TYPE C) EACH 9 $3,300.00 $29,700.00

H7147_I-40_KCTI_Cost Est_Stage IV.xlsx AECOM Page 7 of 14

2/10/23

Item No. Item Description Unit Quantity Unit Price Amount

9080300 CONCRETE SIDEWALK RAMP (C-05.30) (TYPE F) EACH 2 $3,300.00 $6,600.00

9090035 RESET FRAME & COVER FOR VALVE BOX, TYPE B/A (MAG DET ) EACH 1 $700.00 $700.00

9100008 CONCRETE BARRIER (C-10.52 WITH 2.5' GUTTER) L.FT. 281 $170.00 $47,770.00

9100009 CONCRETE BARRIER (C-10.50 32" TYPE F) L.FT. 1,141 $135.00 $154,035.00

9120004 SHOTCRETE (4") SQ.YD. 561 $130.00 $72,930.00

9120006 SHOTCRETE (6") SQ.YD. 1,303 $140.00 $182,420.00

9130051 RIPRAP (DUMPED) (D50 = 6-INCH) CU.YD. 3,330 $160.00 $532,800.00

9130052 RIPRAP (DUMPED) (D50 = 9-INCH) CU.YD. 10 $180.00 $1,800.00

9130053 RIPRAP (DUMPED) (D50 = 12-INCH) CU.YD. 189 $200.00 $37,800.00

9140178 RETAINING WALL (REINFORCED CONCRETE CANTILEVER) SQ.FT. 18,055 $110.00 $1,986,050.00

9141801 PIPE PLUG (C-13.76) L.SUM 1 $5,500.00 $5,500.00

9160001 EMBANKMENT CURB L.FT. 57 $45.00 $2,565.00

9170011 EMBANKMENT DOWNDRAINS (C-4.20) L.FT. 212 $100.00 $21,200.00

9170031 INLET (C-4.20) (SINGLE) EACH 2 $4,500.00 $9,000.00

9170045 OUTLET (C-04.50)(DOWNDRAIN ENERGY DISSIPATOR) EACH 1 $2,200.00 $2,200.00

9210011 MEDIAN PAVING SQ.YD. 647 $90.00 $58,250.00

9240010 FORCE ACCOUNT WORK (PROVIDE ELECTRICAL SERVICES) L.SUM 1 $10,000.00 $10,000.00

9240017 FORCE ACCOUNT WORK (SUPPLEMENTAL EROSION CONTROL) L.SUM 1 $10,000.00 $10,000.00

9240050 MISCELLANEOUS WORK (RADAR DETECTION SYSTEMS) L.SUM 1 $90,000.00 $90,000.00

9240115 MISCELLANEOUS WORK (CAT 5E CABLE FOR CCTV) L.FT. 850 $1.00 $850.00

9240119 MISCELLANEOUS WORK (PIPE CULVERT PLUG) (DETAIL DE1) EACH 2 $5,500.00 $11,000.00

9240120 MISCELLANEOUS WORK (6'x3' CONCRETE BOX CULVERT PLUG) (DETAIL DE2) EACH 1 $15,000.00 $15,000.00

9240121 MISCELLANEOUS WORK (10'x8' CONCRETE BOX CULVERT PLUG) (DETAIL DE2) EACH 1 $25,000.00 $25,000.00

9240122 MISCELLANEOUS WORK (6'x5' CONCRETE BOX CULVERT PLUG) (DETAIL DE2) EACH 1 $20,000.00 $20,000.00

9240126 MISCELLANEOUS WORK (OPTICOM PRE-EMPTION SYSTEM L.SUM 1 $20,000.00 $20,000.00

9240127 MISCELLANEOUS WORK (STORM DRAIN PLUG, STD C-13.76) EACH 1 $5,000.00 $5,000.00

9240133 MISCELLANEOUS WORK (CONTRA COSTA ENERGY DISSIPATOR - DETAIL DL) EACH 1 $5,500.00 $5,500.00

9240139 MISCELLANEOUS WORK (CONCRETE LINED SPILLWAYS) SQ.YD. 2,599 $145.00 $376,855.00

9240170 CONTRACTOR QUALITY CONTROL L.SUM 1 $710,000.00 $710,000.00

9240181 MISCELLANEOUS WORK (CONTROL OF NOXIOUS PLANTS) (MANUAL/MECHNICAL METHODS) SQ.YD. 85,000 $0.80 $68,000.00

H7147_I-40_KCTI_Cost Est_Stage IV.xlsx AECOM Page 8 of 14

2/10/23

Item No. Item Description Unit Quantity Unit Price Amount

9240182 MISCELLANEOUS WORK (CONTROL OF NOXIOUS PLANTS) (HERBICIDE) SQ.YD. 12,000 $0.50 $6,000.00

9240210 SAWCUT GROOVE FOR STRIPING (DIAMOND BLADE) L.FT. 39,998 $0.90 $35,998.20

9250001 CONSTRUCTION SURVEYING AND LAYOUT L.SUM 1 $350,000.00 $350,000.00

9280037 GROUND-IN RUMBLE STRIP (12 INCH) L.FT. 30,400 $0.50 $15,200.00

$28,576,157.71ROADWAY SUBTOTAL:

H7147_I-40_KCTI_Cost Est_Stage IV.xlsx AECOM Page 9 of 14

2/10/23

Item No. Item Description Unit Quantity Unit Price Amount

KINGMAN CROSSING BLVD TI OVERPASS (EB)

2030501 A STRUCTURAL EXCAVATION CU.YD. 1,610 $30.00 $48,300.00

2030506 A STRUCTURE BACKFILL CU.YD. 970 $50.00 $48,500.00

6010003 A STRUCTURAL CONCRETE (CLASS S) (F'C = 3,500) CU.YD. 608 $1,200.00 $729,600.00

6010005 A STRUCTURAL CONCRETE (CLASS S) (F'C = 4,500) CU.YD. 245 $1,800.00 $441,000.00

6011150 A SINGLE SLOPE BRIDGE CONCRETE BARRIER AND TRANSITION (38") L.FT. 495 $200.00 $99,000.00

6011347 A DECK JOINT ASSEMBLY (3X3 COMPRESSION SEAL) L.FT. 90 $400.00 $36,000.00

6011371 A APPROACH SLAB (SD 2.01) SQ.FT. 1,345 $50.00 $67,250.00

6014851 A PRECAST, PRESTRESSED CONCRETE BRIDGE MEMBER (UBT-42 GIRDER) L.FT. 707 $400.00 $282,800.00

6015101 A RESTRAINERS, VERTICAL EARTHQUAKE (FIXED) EACH 8 $450.00 $3,600.00

6015102 A RESTRAINERS, VERTICAL EARTHQUAKE (EXPANSION) EACH 8 $650.00 $5,200.00

6050002 A REINFORCING STEEL LB. 150,100 $2.00 $300,200.00

6100025 A PAINT STRUCTURE (BRIDGES & RETAINING WALLS) L.SUM 1 $285,000.00 $285,000.00

9140121 A RETAINING WALL (REINFORCED CONCRETE) SQ.FT. 1,861 $150.00 $279,150.00

9240129 A MISCELLANEOUS WORK (SLOPE PAVING)(SD 2.04) SQ.YD. 712 $400.00 $284,800.00

9999903 A LUMP SUM STRUCTURE (TOTAL OF PRECEEDING STRUCTURE ITEMS) L.SUM 1 ---- $2,910,400.00

$2,910,400.00STRUCTURE SUBTOTAL:

H7147_I-40_KCTI_Cost Est_Stage IV.xlsx AECOM Page 10 of 14

2/10/23

Item No. Item Description Unit Quantity Unit Price Amount

KINGMAN CROSSING BLVD TI OVERPASS (WB)

2030501 B STRUCTURAL EXCAVATION CU.YD. 1,580 $30.00 $47,400.00

2030506 B STRUCTURE BACKFILL CU.YD. 950 $50.00 $47,500.00

6010003 B STRUCTURAL CONCRETE (CLASS S) (F'C = 3,500) CU.YD. 594 $1,200.00 $712,800.00

6010005 B STRUCTURAL CONCRETE (CLASS S) (F'C = 4,500) CU.YD. 245 $1,800.00 $441,000.00

6011150 B SINGLE SLOPE BRIDGE CONCRETE BARRIER AND TRANSITION (38") L.FT. 495 $200.00 $99,000.00

6011347 B DECK JOINT ASSEMBLY (3X3 COMPRESSION SEAL) L.FT. 90 $400.00 $36,000.00

6011371 B APPROACH SLAB (SD 2.01) SQ.FT. 1,345 $50.00 $67,250.00

6014851 B PRECAST, PRESTRESSED CONCRETE BRIDGE MEMBER (UBT-42 GIRDER) L.FT. 707 $400.00 $282,800.00

6015101 B RESTRAINERS, VERTICAL EARTHQUAKE (FIXED) EACH 8 $450.00 $3,600.00

6015102 B RESTRAINERS, VERTICAL EARTHQUAKE (EXPANSION) EACH 8 $650.00 $5,200.00

6050002 B REINFORCING STEEL LB. 149,100 $2.00 $298,200.00

6100025 B PAINT STRUCTURE (BRIDGES & RETAINING WALLS) L.SUM 1 $285,000.00 $285,000.00

9140121 B RETAINING WALL (REINFORCED CONCRETE) SQ.FT. 1,770 $150.00 $265,500.00

9240129 B MISCELLANEOUS WORK (SLOPE PAVING)(SD 2.04) SQ.YD. 712 $400.00 $284,800.00

9999903 B LUMP SUM STRUCTURE (TOTAL OF PRECEEDING STRUCTURE ITEMS) L.SUM 1 ---- $2,876,050.00

$2,876,050.00STRUCTURE SUBTOTAL:

H7147_I-40_KCTI_Cost Est_Stage IV.xlsx AECOM Page 11 of 14

2/10/23

Item No. Item Description Unit Quantity Unit Price Amount

2-8'X4' BOX CULVERT BE-B

2020009 C REMOVAL OF STRUCTURAL CONCRETE CU.YD. 31 $1,000.00 $31,000.00

2030501 C STRUCTURAL EXCAVATION CU.YD. 87 $90.00 $7,830.00

2030506 C STRUCTURE BACKFILL CU.YD. 38 $200.00 $7,600.00

6010002 C STRUCTURAL CONCRETE (CLASS S) (F'C = 3,000) CU.YD. 78 $1,000.00 $78,000.00

6050002 C REINFORCING STEEL LB. 11,077 $2.00 $22,154.00

6050101 C PLACE DOWELS EACH 24 $35.00 $840.00

6110201 C METAL HANDRAIL L.FT. 93 $100.00 $9,300.00

9999903 C LUMP SUM STRUCTURE (TOTAL OF PRECEEDING STRUCTURE ITEMS) L.SUM 1 ---- $156,724.00

$156,724.00

6'X3' BOX CULVERT BE-D

2020009 D REMOVAL OF STRUCTURAL CONCRETE CU.YD. 31 $1,000.00 $31,000.00

2030501 D STRUCTURAL EXCAVATION CU.YD. 41 $90.00 $3,690.00

2030506 D STRUCTURE BACKFILL CU.YD. 77 $200.00 $15,400.00

6010002 D STRUCTURAL CONCRETE (CLASS S) (F'C = 3,000) CU.YD. 64 $1,000.00 $64,000.00

6050002 D REINFORCING STEEL LB. 7,528 $2.00 $15,056.00

6050101 D PLACE DOWELS EACH 5 $35.00 $175.00

6110201 C METAL HANDRAIL L.FT. 29 $100.00 $2,900.00

9999903 D LUMP SUM STRUCTURE (TOTAL OF PRECEEDING STRUCTURE ITEMS) L.SUM 1 ---- $132,221.00

$132,221.00

2-8'X4' BOX CULVERT BE-H

2020009 E REMOVAL OF STRUCTURAL CONCRETE CU.YD. 31 $1,000.00 $31,000.00

2030501 E STRUCTURAL EXCAVATION CU.YD. 142 $70.00 $9,940.00

2030506 E STRUCTURE BACKFILL CU.YD. 223 $200.00 $44,600.00

6010002 E STRUCTURAL CONCRETE (CLASS S) (F'C = 3,000) CU.YD. 345 $1,000.00 $345,000.00

6050002 E REINFORCING STEEL LB. 54,665 $2.00 $109,330.00

6050101 E PLACE DOWELS EACH 24 $35.00 $840.00

6110201 C METAL HANDRAIL L.FT. 100 $100.00 $10,000.00

9999903 E LUMP SUM STRUCTURE (TOTAL OF PRECEEDING STRUCTURE ITEMS) L.SUM 1 ---- $550,710.00

STRUCTURE

SUBTOTAL: $550,710.00

STRUCTURE SUBTOTAL:

STRUCTURE SUBTOTAL:

H7147_I-40_KCTI_Cost Est_Stage IV.xlsx AECOM Page 12 of 14

2/10/23

Item No. Item Description Unit Quantity Unit Price Amount

6'X5' BOX CULVERT BE-J

2020009 F REMOVAL OF STRUCTURAL CONCRETE CU.YD. 30 $1,000.00 $30,000.00

2030501 F STRUCTURAL EXCAVATION CU.YD. 40 $90.00 $3,600.00

2030506 F STRUCTURE BACKFILL CU.YD. 88 $200.00 $17,600.00

6010002 F STRUCTURAL CONCRETE (CLASS S) (F'C = 3,000) CU.YD. 78 $1,000.00 $78,000.00

6050002 F REINFORCING STEEL LB. 8,969 $2.00 $17,938.00

6050101 F PLACE DOWELS EACH 10 $35.00 $350.00

9999903 F LUMP SUM STRUCTURE (TOTAL OF PRECEEDING STRUCTURE ITEMS) L.SUM 1 ---- $147,488.00

$147,488.00

6'X3' BOX CULVERT BE-M

2020009 G REMOVAL OF STRUCTURAL CONCRETE CU.YD. 15 $1,000.00 $15,000.00

2030501 G STRUCTURAL EXCAVATION CU.YD. 30 $90.00 $2,700.00

2030506 G STRUCTURE BACKFILL CU.YD. 23 $200.00 $4,600.00

6010002 G STRUCTURAL CONCRETE (CLASS S) (F'C = 3,000) CU.YD. 30 $1,000.00 $30,000.00

6050002 G REINFORCING STEEL LB. 3,010 $2.00 $6,020.00

6050101 G PLACE DOWELS EACH 10 $35.00 $350.00

9999903 G LUMP SUM STRUCTURE (TOTAL OF PRECEEDING STRUCTURE ITEMS) L.SUM 1 ---- $43,670.00

$43,670.00

STRUCTURE SUBTOTAL:

STRUCTURE SUBTOTAL:

H7147_I-40_KCTI_Cost Est_Stage IV.xlsx AECOM Page 13 of 14

2/10/23

Item No. Item Description Unit Quantity Unit Price Amount

SUMMARY

ROADWAY $28,576,157.71

KINGMAN CROSSING BLVD TI OVERPASS (EB) $2,910,400.00

KINGMAN CROSSING BLVD TI OVERPASS (WB) $2,876,050.00

2-8'X4' BOX CULVERT BE-B $156,724.00

6'X3' BOX CULVERT BE-D $132,221.00

2-8'X4' BOX CULVERT BE-H $550,710.00

6'X5' BOX CULVERT BE-J $147,488.00

6'X3' BOX CULVERT BE-M $43,670.00

$35,393,420.71

CONSTRUCTION ENGINEERING COST 9% $3,185,407.86

CONSULTANT SERVICES (PDS) COST 1% $353,934.21

CONSTRUCTION CONTINGENCIES (5%) COST 5% $1,769,671.04

COMMUNICATION COST $10,000.00

$5,319,013.11

AC (3/4" MIX) MATERIAL QUALITY TON 23,971 $3.00 $71,913.00

AR-ACFC SMOOTHNESS LANE-MILE 3.4 $11,000.00 $37,400.00

$109,313.00

$40,821,746.81PROJECT TOTAL:

Non-Bid Items

NON-BID SUBTOTAL:

PROJECT TOTAL BID ITEMS:

PROJECT WIDE:

H7147_I-40_KCTI_Cost Est_Stage IV.xlsx AECOM Page 14 of 14

File details come from the government source that posted it. Updated .