This file contains project plans and design documents for the City of Kingman, Arizona related to the Kingman Crossing Traffic Interchange (KCTI) and associated arterial roadway improvements. The document outlines the master development of a traffic interchange at the intersection of Interstate 40 and the Kingman Crossing Boulevard alignment, including the design and construction of Kingman Crossing Boulevard and development of approximately 128 acres of adjacent City-owned property on the south side of I-40. The City is seeking Statements of Qualifications from qualified master developers with documented experience in large-scale infrastructure projects of similar size and scope. Responses were due by 5:00 pm Arizona time on Thursday, November 19, 2026, with a question submission deadline of 5:00 pm Arizona time on Friday, November 6, 2026. All submissions must be made through the City's OpenGov procurement portal at https://procurement.opengov.com/portal/cityofkingman.
The project encompasses retail, commercial, and complementary uses on the developable land adjacent to the interchange and roadway improvements. The City reserves the right to reject any response that does not comply with prescribed solicitation procedures and requirements, as well as the right to reject any response when cancellation is deemed in the best interest of the City. Prospective respondents were required to register for a free OpenGov account to submit qualifications. The procurement documents and detailed instructions are available through the City of Kingman's procurement portal, with subscription options available for notifications of future solicitations.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I-40 Kingman Crossing Traffic Interchange
Pavement Design Summary
Kingman Healthcare, Inc
AECOM Project number: 60667904
Project number: 040 MO 54 H7147 01C
Federal Aid No. 040-B(AUE)
September 28, 2023
FINAL
I-40 Kingman Crossing Traffic Interchange Kingman, Arizona ADOT TRACS No. 040 MO 54 H714701C;
040‐B(AUE)
FINAL Project number: 60667904
Prepared for: Kingman Healthcare, Inc
AECOM
i
Quality information
Prepared by Checked by Verified by Approved by
Elizabeth Young P.E., Ph.D.
Senior Staff Geotechnical Engineer
Stoney Mather, P.E.
Senior Geotechnical Engineer
Jeff Heyman, P.E.
Senior Engineer
Dale Wiggins, P.E.
Senior Transportation Engineer
Revision History
Revision Revision date Details Authorized Name Position
Final Draft 4/11/23 Revised for Final
Final Draft 9/07/23 Revised Pavement Sections
Final 9/28/23 Issued Report
Distribution List
# Hard Copies PDF Required Association / Company Name
09/28/2023
ADOT TRACS No. 040 MO 54 H714701C;
ii
Prepared for:
Kingman Healthcare, Inc
3269 Stockton Hill Road
Prepared by:
Elizabeth Young P.E., Ph.D.
Senior Staff Geotechnical Engineer
T: +1-602-389-8212
M: 334.740.7866
E: elizabeth.g.young@aecom.com
Prepared by:
Stoney Mather P.E.
Senior Geotechnical Engineer
M: +1.385.266.6288
T: +1-801-904-4000
E: Stoney.Mather@aecom.com
7720 North 16th Street
Phoenix, AZ 85020 aecom.com
Copyright © 2023 by AECOM
All rights reserved. No part of this copyrighted work may be reproduced, distributed, or transmitted in any form or by any means without the prior written permission of AECOM.
mailto:elizabeth.g.young@aecom.com
ADOT TRACS No. 040 MO 54 H714701C;
iii
Table of Contents
1. Introduction
2. Roadway Description
2.1 Project Location
2.2 Geometric and Cross-Sectional Elements
2.3 Other Characteristics
2.3.1 Design Traffic
3. Project Scope
3.1 Purpose of the Project
3.2 Scope of Work
4. Pavement History and Visual Observations
4.1 Existing Pavement Section
4.2 Existing Pavement Condition
4.3 Other Conditions
5. Test Data
5.1 Pavement Management System Information
5.2 Geotechnical Data
5.2.1 Subsurface Conditions
5.2.2 Laboratory Test Data–Subgrade Soils
5.3 Pavement Cores
6. Design Calculations and Discussion
6.1 New Pavement Design
6.1.1 Design ESALs
6.1.2 Subgrade Parameters
6.1.3 Flexible Pavement Structural Number
6.1.4 Rigid Pavement Section
7. Recommendations
8. Limitations
9. References
Figures
Figure 1. Field Exploration Site
Figure 2. Pavement Structural Sections
Figure 3-4. I-40 Typical Sections
Figure 5. Ramp A & B Typical Sections
Figure 6. Ramp C & D Typical Sections
Figure 7. I-40 & Ramps Infield Grading Typical Sections
Figure 8-9. Kingman Crossing Blvd Typical Sections
Figure 10. Detour Typical Sections
ADOT TRACS No. 040 MO 54 H714701C;
iv
Tables
Table 1. Roadway Geometries Table 2. Design Traffic Summary Table 3. I-40 Pavement History Table 4. Pavement Distress Ratings Table 5. Pavement Management System for I-40 Asphalt Concrete Pavement Table 6. Summary of Subsurface Materials Encountered Within Borings Table 7. Project Roadway Design ESAL Summary Table 8. R-values and Mr for Pavement Areas Table 9. Design Structural Number and Additional Parameters Table 10. Recommended Flexible Pavement Section Table 11. Additional Rigid Pavement Parameters Table 12. Roadway Pavement Design Thickness
Acronyms and Abbreviations
AADT Average Annual Daily Traffic
AB aggregate base
AC asphalt concrete
ACFC asphaltic concrete friction course
ADOT Arizona Department of Transportation
AR asphalt rubber
B-## bridge boring bgs below ground surface
CL lean clay
EB eastbound
EP edge of pavement
ESAL Equivalent Single Axle Load
GWSI Groundwater Site Inventory
HPMS Highway Performance Monitoring System
I-40 Interstate 40
IRI International Roughness Index
KCTI Kingman Crossing Traffic Interchange mi mile(s)
ADOT TRACS No. 040 MO 54 H714701C;
v
ML sandy silt
MP milepost mph miles per hour
Mr resilient modulus
NAVD88 North American Vertical Datum of 1988
PCCP Portland cement concrete pavement pci pound(s) per cubic inch
PMS Pavement Management System psi pound(s) per square inch
R-## roadway boring
R-value resistance value
Rc Correlated R-value
ROW right of way
RW-## retaining wall boring
Rmean mean resistance value
Rt Laboratory Tested R-value
SC clayey sand
SM silty sand
USCS United States Classification System
WB westbound
ADOT TRACS No. 040 MO 54 H714701C;
1. Introduction
AECOM has prepared this Pavement Design Summary to provide recommendations for rigid and flexible pavement in accordance with the Arizona Department of Transportation (ADOT) Pavement Design
Manual (ADOT 2017) for the proposed Kingman Crossing Traffic Interchange (KCTI) in Kingman, AZ. The conclusions and recommendations in this summary are based on the Kingman Area Transportation Study
(Kimley-Horn 2023) and the results of the geotechnical investigation and laboratory testing presented in the I-40 Kingman Crossing Traffic Interchange Geotechnical Data and Design Report (AECOM 2023a).
The pavement design procedures and guidelines used for the project are based on the ADOT Pavement
Design Manual (ADOT 2017). A summary of the relevant materials design information for the project can be found in the I-40 Kingman Crossing Traffic Interchange Materials Design Report (AECOM 2023b).
2. Roadway Description
2.1 Project Location
The project site is near the east side of the City of Kingman, AZ; the sites include ADOT right of way
(ROW) along Interstate 40 (I-40) from milepost (MP) 54.30 (Station 2844+00) to MP 55.90
(Station 2920+00) and City of Kingman ROW along Kingman Crossing Boulevard, Santa Rosa Drive, and
Prospector Street.
2.2 Geometric and Cross-Sectional Elements
Kingman Crossing Boulevard is planned to extend from the existing intersection with Santa Rosa Drive to just south of a planned interchange with I-40; Kingman Crossing Boulevard will extend below the existing
I-40 at the planned interchange. Planned improvements along Prospector Street include two lanes in each direction from Santa Rosa Drive to the north for approximately 550 feet. However, only two of the four lanes along Prospector Street will be constructed during this project. Kingman Crossing Boulevard and Santa Rosa Drive will be improved to accommodate two left-turn lanes and a right-turn lane. Santa
Rosa Drive is also planned to include two left-turn lanes at the new intersection. Improvements to extend
Santa Rosa Drive from Kingman Crossing Boulevard to Prospector Street are planned, with two lanes in each direction. Detailed descriptions of the roadway geometry for each of the roadways listed are summarized in Table 1. The specific layout information for the intersection of Santa Rosa Drive and
Prospector Street was unavailable at the time of this investigation.
Table 1. Roadway Geometries
Maximum Grades
Total Roadway
Width (feet)
Total Number of Through
Lanes
Maximum Width of
Each Lane (feet)
Cross Slope
I-40 mainline 3 38 4 12 1.5
Ramp A 1.5 28 2 12 2
Ramp B 1.1 22 2 12 2
Ramp C 5 28 2 12 2
Ramp D 3.7 28 2 12 2
Kingman Crossing Blvd. 3.2 115 4 12 2
Santa Rosa Dr. 2.1 N/A 4 12 2
Prospector St. 2.0 N/A 4 12 2
ADOT TRACS No. 040 MO 54 H714701C;
2.3 Other Characteristics
The average ground surface elevation in the project area is 3550 feet (North American Vertical Datum of
1988 [NAVD88]).
The posted and design speed limits within the project limits vary by roadway. The I-40 design speed limit is 75 miles per hour (mph), and the posted speed limit is 75 mph. The I-40 entrance access ramps design speed limit is 65 mph, and the posted speed limit will be 50 mph. The I-40 exit ramps design speed is
70 mph, and the posted speed limit will be 50 mph. The Kingman Crossing Boulevard design speed limit is 45 mph, and the posted speed limit will be 45 mph. The Santa Rosa Drive design speed limit is 45 mph, and the posted speed limit will be 45 mph. The Prospector Street design speed limit is 45 mph, and the posted speed limit will be 45 mph. The I-40 detours design speed limit is 55 mph, and the posted speed limit will be 55 mph.
2.3.1 Design Traffic
The estimated traffic projection data that the AECOM project manager provided are based on the
Kingman Area Transportation Study (Kimley-Horn 2023). The 2045 Average Annual Daily Traffic (AADT), truck percentages, and related design data are summarized in Table 2.
Table 2. Design Traffic Summary
Roadway Location/Description 2045
AADT
Trucks (Percent)
D Factor (Percent)
Lane Factor
(Percent)
Growth (Percent)
I-40 mainline Interstate travel lanes 58,900 20 50 90 1.28
I-40 ramps Eastbound (EB) & westbound (WB) on- and off-ramps
11,800 3 50 100 1.28
Kingman Crossing Blvd. From I-40 extending north & south 25,400 3 50 90 1.28
Santa Rosa Dr. Travel lanes north of I-40 12,900 3 50 90 1.28
Prospector St. Travel lanes north of I-40 4,800 3 50 90 1.28
3. Project Scope
3.1 Purpose of the Project
The KCTI project will create a new traffic interchange on I-40 approximately 1.5 miles east of Andy Devine
Avenue. The new interchange is intended to provide improved access to the Kingman Regional Medical
Center Hualapai Mountain Campus, residential areas, and areas of future commercial growth in the eastern portion of Kingman near the intersection.
3.2 Scope of Work
The project consists of seven areas where improvements will include new paved roadways:
• I-40 mainline, flexible pavement
• I-40 detour lanes, flexible pavement
• I-40 access ramps, flexible pavement
• Kingman Crossing Boulevard, flexible pavement
• Kingman Crossing Boulevard, rigid pavement
• Santa Rosa Drive, flexible pavement
ADOT TRACS No. 040 MO 54 H714701C;
• Prospector Street flexible pavement
Prospector Street has been designed for two travel lanes in each direction. However, only two of the four design lanes of Prospector Street will be constructed during this project. The remaining two lanes will be constructed at a future date. The pavement design for Prospector Street is based on traffic data that consider two lanes in each direction.
The recommendations for pavement sections and relevant material for I-40, the access ramps for the interchange, Kingman Crossing Boulevard, Santa Rosa Drive, and Prospector Street are provided herein and in the Materials Design Report (AECOM 2023b). The geotechnical recommendations for subgrade soil, slope stability, corrosion potential, bridge foundations, and retaining walls are provided in the I-40
Kingman Crossing Traffic Interchange Geotechnical Data and Design Report (AECOM 2023a).
4. Pavement History and Visual Observations
4.1 Existing Pavement Section
A summary of the pavement history of I-40 within the project limits (MP 54.30 to MP 55.90) is provided in
Table 3. The pavement history is based on a review of record drawings by AECOM. Pavement history information for Santa Rosa Drive was unavailable at the time this study was performed. Kingman
Crossing Boulevard and Prospector Street are currently unpaved within the project limits.
Table 3. I-40 Pavement History
Year Roadway Location
Mill (inches)
AB
(inches)
Select Material (inches)
AC
(Misc. Str.)
(Special) (inches)
AR-
ACFC
(inches)
ACFC
(inches)
Total Thickness (inches)
1970 Travel lanes — 4.00 15.00 3.50 — 0.50 23.00
1984 WB travel lanes — — — 2.00 — 0.50 2.50
1984 EB travel lanes — — — 2.25 — 0.50 2.75
1998 Travel lanes 5.00 — — 3.00 — 0.50 8.50
1998 Shoulder — — — 3.00 — 0.50 3.50
2010 Travel lanes 6.00 — — 5.50 0.50 — 12.00
2010 Shoulder 3.50 — — 3.00 0.50 — 7.00
— = not applicable
AB = aggregate base
AC = asphalt concrete
ACFC = asphaltic concrete friction course
AR = asphalt rubber
Str. = structure(s)
4.2 Existing Pavement Condition
The pavement distress ratings for I-40 were obtained from the Pavement Management System (PMS)
Database, which is maintained by the ADOT Pavement Management Group. Table 4 summarizes I-40 pavement conditions within the project limits.
ADOT TRACS No. 040 MO 54 H714701C;
Table 4. Pavement Distress Ratings
Direction From
MP
From
MP
Offset
To
MP
To MP Offset
Date IRI Rating
Rutting Rating
Cracking Rating
Faulting Rating
Overall Rating
East 54 0.2 54 0.3 4/16/21 good fair good null fair
East 54 0.3 54 0.4 4/16/21 good fair good null fair
East 54 0.4 54 0.5 4/16/21 good fair good null fair
East 54 0.5 54 0.6 4/16/21 good fair good null fair
East 54 0.6 54 0.7 4/16/21 good fair good null fair
East 54 0.7 54 0.8 4/16/21 good fair good null fair
East 54 0.8 54 0.9 4/16/21 good fair good null fair
East 54 0.9 55 0.0 4/16/21 good fair good null fair
East 55 0.0 55 0.1 4/16/21 good fair good null fair
East 55 0.1 55 0.2 4/16/21 good fair good null fair
East 55 0.2 55 0.3 4/16/21 good fair good null fair
East 55 0.3 55 0.4 4/16/21 good fair good null fair
East 55 0.4 55 0.5 4/16/21 good fair good null fair
East 55 0.5 55 0.6 4/16/21 good fair good null fair
East 55 0.6 55 0.7 4/16/21 good fair good null fair
East 55 0.7 55 0.8 4/16/21 good fair good null fair
East 55 0.8 55 0.9 4/16/21 good fair good null fair
West 54 0.2 54 0.3 4/16/21 good good good null good
West 54 0.3 54 0.4 4/16/21 good good good null good
West 54 0.4 54 0.5 4/16/21 good good good null good
West 54 0.5 54 0.6 4/16/21 good good good null good
West 54 0.6 54 0.7 4/16/21 good fair good null fair
West 54 0.7 54 0.8 4/16/21 good fair good null fair
West 54 0.8 54 0.9 4/16/21 good good good null good
West 54 0.9 55 0.0 4/16/21 good good fair null fair
West 55 0.0 55 0.1 4/16/21 good fair fair null fair
West 55 0.1 55 0.2 4/16/21 good fair fair null fair
West 55 0.2 55 0.3 4/16/21 good fair good null fair
West 55 0.3 55 0.4 4/16/21 good fair good null fair
West 55 0.4 55 0.5 4/16/21 good fair good null fair
West 55 0.5 55 0.6 4/16/21 good fair good null fair
West 55 0.6 55 0.7 4/16/21 good fair good null fair
ADOT TRACS No. 040 MO 54 H714701C;
MP
From
MP
Offset
To
MP
To MP Offset
Date IRI Rating
Rutting Rating
Cracking Rating
Faulting Rating
Overall Rating
West 55 0.7 55 0.8 4/16/21 good fair good null fair
West 55 0.8 55 0.9 4/16/21 good fair good null fair
IRI= International Roughness Index
4.3 Other Conditions
The existing I-40 roadway is a rural principle arterial divided interstate with two lanes in each direction.
The interstate is constructed on approximately 15 inches of select fill material (AECOM 2023a) with drainage culverts and a grassy median. Currently, Kingman Crossing Boulevard and Prospector Street are unpaved roads. Approximately 750 feet of Santa Rosa Drive east of the intersection of Kingman
Crossing Boulevard and Santa Rosa Drive is currently paved with asphalt concrete. There is a traffic signal at the intersection of Kingman Crossing Boulevard and Santa Rosa Drive.
Within the project limits, the area north and south of I-40 is undeveloped and generally flat and is covered with sparse brush, cacti, and other desert vegetation; relatively small ephemeral washes of various lengths provide relief in the landscape. Similarly, the land east and west of Prospector Street is currently undeveloped. The Kingman Regional Medical Center Hualapai Mountain Campus is to the north of Santa
Rosa Drive.
5. Test Data
5.1 Pavement Management System Information
The main pavement distress indicators for I-40 and KCTI within the project limits include the measured distresses indicated in Table 5. These results were obtained from the PMS Database. The data in Table 5 are from the 2021 PMS.
Table 5. Pavement Management System for I-40 Asphalt Concrete Pavement
Direction From
MP
From MP Offset
To
MP
To MP offset
Date Avg IRI Rutting HPMS Cracking
East 54 0.2 54 0.3 4/16/21 41.1 0.3 1
East 54 0.3 54 0.4 4/16/21 32.6 0.3 1
East 54 0.4 54 0.5 4/16/21 32.0 0.3 0
East 54 0.5 54 0.6 4/16/21 30.2 0.3 0
East 54 0.6 54 0.7 4/16/21 35.1 0.3 0
East 54 0.7 54 0.8 4/16/21 36.2 0.3 0
East 54 0.8 54 0.9 4/16/21 35.2 0.3 0
East 54 0.9 55 0.0 4/16/21 33.9 0.2 0
East 55 0.0 55 0.1 4/16/21 31.3 0.3 0
East 55 0.1 55 0.2 4/16/21 31.6 0.3 2
East 55 0.2 55 0.3 4/16/21 30.4 0.3 0
East 55 0.3 55 0.4 4/16/21 46.2 0.3 0
ADOT TRACS No. 040 MO 54 H714701C;
MP
From MP Offset
To
MP
To MP offset
Date Avg IRI Rutting HPMS Cracking
East 55 0.4 55 0.5 4/16/21 41.0 0.3 0
East 55 0.5 55 0.6 4/16/21 33.1 0.3 0
East 55 0.6 55 0.7 4/16/21 28.1 0.2 0
East 55 0.7 55 0.8 4/16/21 26.1 0.3 0
East 55 0.8 55 0.9 4/16/21 29.3 0.2 0
West 54 0.2 54 0.3 4/16/21 51.5 0.2 0
West 54 0.3 54 0.4 4/16/21 31.3 0.2 0
West 54 0.4 54 0.5 4/16/21 26.8 0.2 0
West 54 0.5 54 0.6 4/16/21 28.4 0.2 0
West 54 0.6 54 0.7 4/16/21 25.9 0.2 0
West 54 0.7 54 0.8 4/16/21 25.7 0.2 0
West 54 0.8 54 0.9 4/16/21 34.0 0.2 0
West 54 0.9 55 0.0 4/16/21 35.1 0.2 7
West 55 0.0 55 0.1 4/16/21 52.4 0.2 18
West 55 0.1 55 0.2 4/16/21 45.8 0.2 16
West 55 0.2 55 0.3 4/16/21 43.5 0.2 2
West 55 0.3 55 0.4 4/16/21 38.2 0.3 1
West 55 0.4 55 0.5 4/16/21 37.3 0.2 0
West 55 0.5 55 0.6 4/16/21 39.6 0.3 1
West 55 0.6 55 0.7 4/16/21 26.9 0.2 0
West 55 0.7 55 0.8 4/16/21 22.6 0.2 0
West 55 0.8 55 0.9 4/16/21 27.2 0.2 0
HPMS = Highway Performance Monitoring System
5.2 Geotechnical Data
AECOM contracted Resilient Drilling Services LLC to perform borings at 21 locations along the shoulders of I-40, 6 locations near the planned EB and WB I-40 bridge structures, 14 locations along planned ramp and retaining walls, and 5 locations along Santa Rosa Drive and Prospector Street. Drilling was performed from September 12 to September 23, 2022. Boreholes were drilled to depths that ranged from
6.5 to 100.5 feet below ground surface (bgs), which correspond to elevations that range from approximately 3507.6 to 3618.5 feet above sea level.
5.2.1 Subsurface Conditions
A generalized description of the geotechnical profile, based on visual and laboratory classification of soils sampled during the subsurface investigation is provided in Table 6. Soil layers found in one area may or may not exist in the other areas. For information regarding the soils encountered at a specific location, refer to the logs provided in Appendix A of the I-40 Kingman Crossing Traffic Interchange Geotechnical
Data and Design Report (AECOM 2023a).
ADOT TRACS No. 040 MO 54 H714701C;
Table 6. Summary of Subsurface Materials Encountered Within Borings
Area
Designation
Boring ID Approximate
Elevation
(ft NAVD88) /
Termination
Depth [ft])
Typical Material & USCS
Encountered
Notes
West of
Kingman
Crossing Blvd
R-01, R-02, R-03, R-04, R-15, R-16, R-17, RW-01,
RW-02
3535–3503 /
0–20
• Upper 5–10 ft silty sand (SM) or clayey sand (SC) soils over sandy lean clay (CL) layer
• Occasional sand lenses embedded in CL layer
• Relative density/consistency:
Medium dense to very dense / medium stiff to hard
Kingman
Crossing Blvd and Access
Ramps
RW-03, RW-04,
RW-05, RW-06,
RW-07, RW-08,
RW-09, RW-10,
RW-11, RW-12,
R-05, R-06, R-
07, B-1, B-2, B-3, B-4, B-5, B-6
3552–3444 /
0–99
• Predominately SC or SM soils with pockets of CL or sandy silt (ML) throughout
• Fine grain pockets range in thickness from approx.
5–15 ft
• Gravel layer in B-3 at elevation 3516 to 3501
• Relative density/consistency: Very loose to very dense / very soft to hard
• Encountered potentially hydro-collapsible soils
East of
Kingman
Crossing Blvd
R-08, R-09, R-10, R-11, R-12, R-13, R-14, R-18, R-19, R-20, R-21, RW-13,
RW-14
3618–3514 /
0–35
• Predominately SC or SM soils with pockets of CL throughout
• Fine grain pockets range in thickness from approx.
5–15 ft
• Gravel layer in R-13 at elevation 3531 to 3521
• Relative density/consistency: Loose to very dense / very soft to hard
Santa Rosa/
Prospector
R-22, R-23, R-24, R-25, R-26
3553–3509 /
0–15
• Upper 5–15 ft SM or SC soils over CL or ML
• Occasional sand lenses embedded in CL/ML layer
• Relative density/consistency: Loose to very dense / medium stiff to hard
B-## = bridge boring
R-## = roadway boring
RW-## retaining wall boring
USCS = United States Classification System
Auger refusal was encountered in boring B-3, and weathered rock fragments were observed in boring B-6 at 45 feet and in boring R-23 at 5 feet. However, competent rock was not encountered during the subsurface investigation.
Groundwater was not encountered in the subsurface explorations. The Arizona Groundwater Site
Inventory (GWSI) includes well data indicating groundwater at elevations (NAVD88) ranging from 3582 feet (403 ft bgs) to 2698.17 feet (602 ft bgs) (ADWR 2022) somewhat near the project site.
It is anticipated the engineering characteristics of the on-site soils would not preclude the construction and performance of the proposed roadway and associated traffic interchange.
ADOT TRACS No. 040 MO 54 H714701C;
5.2.2 Laboratory Test Data–Subgrade Soils
In accordance with the ADOT Geotechnical Project Development Manual (ADOT 2022), resistance value
(R-value) testing was performed on bulk samples collected from zero to 5 feet bgs at intervals of less than
½ mile for the total length under construction. Laboratory results indicated the presence of hydro-collapsible soil layers onsite.
The complete laboratory results can be found in Appendix B, Laboratory Testing, of the I-40 Kingman
Crossing Traffic Interchange Geotechnical Data and Design Report (AECOM 2023a).
5.3 Pavement Cores
Core samples of the existing pavement were not collected as part of the geotechnical investigation.
6. Design Calculations and Discussion
6.1 New Pavement Design
The pavement design procedures and guidelines for the project are based on the ADOT Pavement
Design Manual (ADOT 2017) and the 1993 AASHTO Guide for Design of Pavement Structures
(AASHTO 1993).
6.1.1 Design ESALs
Estimated traffic projection data were used to estimate the Equivalent Single Axle Loads (ESALs) for each of the pavement sections under consideration.
With the exception of the temporary detour pavement section, the pavement analyses were performed for a 20-year design period using the roadway-specific design ESALs summarized in Table 7.
Table 7. Project Roadway Design ESAL Summary
Roadway Location/Description 2045
AADT
Single Units
(Percent)
Combo Units
(Percent)
Design ESAL for Flexible
Pavement
Design ESAL for
Rigid Pavement
I-40 mainline Interstate travel lanes 58,900 11 89 47,026,048 -
I-40 ramps EB & WB on- and off-ramps 11,800 90 10 665,382 -
Kingman Crossing Blvd.
From I-40 extending north & south
25,400 90 10 1,422,118 1,614,285
Santa Rosa Dr. Travel lanes north of I-40 12,900 90 10 721,963 -
Prospector St. Travel lanes north of I-40 4,800 90 10 267,741 -
6.1.2 Subgrade Parameters
Specific mean resistance value (Rmean) and R-values for the I-40 mainline pavement, I-40 access ramps, Kingman Crossing Boulevard, Santa Rosa Drive, and Prospector Street were evaluated using data for soils sampled within about ½-mile of the area being considered. These values are summarized in Table 8.
A seasonal variation factor of 1.7 was estimated for Kingman, AZ, from Table 2−4 in the ADOT Pavement
Design Manual (ADOT 2017).
ADOT TRACS No. 040 MO 54 H714701C;
Table 8. R-values and Mr for Pavement Areas
Roadway Rt avg (psi)
Rc avg (psi) σt (psi) σc (psi)
Rmean (psi)
Mr (psi)
I-40 mainline 50.6 42.6 18.4 15.1 43.7 19,680
I-40 access west ramps 28 39.3 0 20.6 28 12,110
I-40 access east ramps 50.6 49.7 18.4 8.9 49.8 22,980
Kingman Crossing Blvd. 46 41.4 20.7 12.7 41.8 18,680
Santa Rosa Dr. 46 40.7 20.7 12.4 41.1 18,340
Prospector St. 50.6 49.6 18.4 9.1 49.7 22,960
Mr = resilient modulus
Rc = correlated R-value σc = standard deviation of correlated R-values
Rt = laboratory tested R-value σt = standard deviation of tested R-values
Rc was calculated based on the procedures described in the ADOT Pavement Design Manual
(ADOT 2017). Based on the information in Table 8 and the procedures in the ADOT Pavement Design
Manual (ADOT 2017), AECOM recommends a project-wide control R-value of 35.0 psi. Because laboratory test results for samples collected within the upper 3 feet of final subgrade show that some of the in-situ soils have tested and correlated R-values of less than 35.0 psi and should be considered unsuitable for use within 3 feet of final subgrade elevation.
6.1.3 Flexible Pavement Structural Number
The additional parameters required to calculate the design structural number and the calculated design structural number are presented in Table 9 for the flexible pavement sections within the project limits.
Table 10 summarizes the recommended flexible pavement sections, the layer coefficients, and the resulting structural number. For each pavement section, the structural number provided exceeds the design structural number. Figure 2 shows the typical sections.
Table 9. Design Structural Number and Additional Parameters
Roadway Level of Reliability
Standard Deviation
Initial Serviceability
Terminal Serviceability
Average R-Value
Design R- Value
SVF Design Structural Number
I-40 mainline
99 0.45 4.2 3 43.7 35.0 1.7 5.82
I-40 ramps east
99 0.45 4.2 3 49.8 35.0 1.7 2.61
I-40 ramps west
99 0.45 4.2 3 28.0 35.0 1.7 3.45
Kingman Crossing Blvd.
95 0.45 4.2 2.8 41.8 35.0 1.7 2.82
Prospector St.
90 0.45 4.1 2.6 49.7 35.0 1.7 1.81
Santa Rosa Dr.
90 0.45 4.1 2.6 41.1 35.0 1.7 2.35
ADOT TRACS No. 040 MO 54 H714701C;
Table 10. Recommended Flexible Pavement Section
Roadway Asphalt
Concrete
Layer
Coefficient
Base Layer
Coefficient
Asphalt Concrete
Layer Thickness
(in.)
Base Layer
Thickness
(in.)
Provided
Structural
Number
I-40 mainline 0.44 0.14 10.5 12 6.08
I-40 ramps east 0.44 0.14 6 8 3.76
I-40 ramps west 0.44 0.14 6 8 3.76
Kingman Crossing Blvd. 0.44 0.14 4 8 2.88
Prospector St. 0.44 0.14 4 8 2.88
Santa Rosa Dr. 0.44 0.14 4 8 2.88
6.1.4 Rigid Pavement Section
A limited amount of rigid pavement is planned for Kingman Crossing Boulevard near I-40. The additional parameters required to calculate the design structural number and the calculated design structural number for the rigid pavement section under consideration are presented in Table 11. For the rigid pavement section, the structural number provided by the recommended section exceeds the needed design structural number.
Table 11. Additional Rigid Pavement Parameters
Design Parameter Kingman Crossing Blvd. near I-40
Level of reliability 95
Standard deviation 0.25
Initial serviceability 4.2
Terminal serviceability 2.8
Load transfer coefficient 3.9
Concrete elastic modulus (psi) 4,000,000
Concrete modulus of rupture (psi) 670
Drainage coefficient 0.92
Loss of Support 0.75
Effective modulus of subgrade reaction (pounds per cubic inch [pci])
Corrected modulus (pci) 366
Recommended Portland cement concrete pavement thickness (inches)
ADOT TRACS No. 040 MO 54 H714701C;
7. Recommendations
Based on the information provided by the AECOM Project Manager, the ADOT Pavement Design Manual
(ADOT 2017), and the AASHTO Guide for Design of Pavement Structures (AASHTO 1993), the complete pavement recommendations for the KCTI project are as presented in Table 12. Pavement rehabilitation that consists of pavement milling has been included into the pavement design thickness for the I-40
Detour Existing Surface.
Table 12. Roadway Pavement Design Thickness
Roadway*
(Station Range)
Total
Section
Thickness
Mill Tack
Coat
AR-
ACFC
AC-EP;
Special
(3/4″)
AC;
Special
(Misc.
Str.)
AB; Class-
PCCP
(inches) (inches) (inches) (inches) (inches) (inches) (inches)
I-40 Mainline (Sta.
2876+00 to 2876+35.82;
Sta. 2878+11.91 to
2878+55.00)
22.5 --- yes** 0.5 10 --- 12 ---
I-40 Mainline Existing
Surface (Sta. 2844+00 to 2856+99.59; Sta.
2906+85.56 to
2919+99.77)
0.5 0.5 yes** 0.5 --- --- --- ---
I-40 Shoulders (Sta.
2876+00 to 2876+35.82;
Sta. 2878+11.91 to
2878+55.00)
22.0 --- yes --- 10 --- 12 ---
I-40 Shoulders Existing
Surface (Sta. 2844+00 to 2856+99.59; Sta.
2906+85.56 to
2919+99.77)
0.5 --- yes** 0.5 --- --- --- ---
I-40 Ramps (Ramp A
Sta. 14+21.81 to
29+15.33; Ramp B Sta.
19+75.35 to 33+80.67;
Ramp C Sta. 13+44.79 to 32+12.39; Ramp D
11+38.65 to 31+22.37)
14.5 --- yes** 0.5 6 --- 8 ---
Ramp C (Sta. 11+26.81 to 13+44.79) and
Kingman Crossing Blvd
(Sta. 47+96.78 to
60+96.39)
15 --- no --- --- --- 6 9
Kingman Crossing Blvd
(Sta. 43+80.67 to
12 --- yes --- 4 --- 8 ---
ADOT TRACS No. 040 MO 54 H714701C;
Roadway*
(Station Range)
Total
Section
Thickness
Mill Tack
Coat
AR-
ACFC
AC-EP;
Special
(3/4″)
AC;
Special
(Misc.
Str.)
AB; Class-
PCCP
46+80.58; Sta.
56+49.12 to 60+96.39)
I-40 Detours 12 --- yes --- --- 6 6 ---
I-40 Detours Existing
Surface
3 3 yes --- --- 3 --- ---
I-40 Detours Emergency
Vehicle Access
3 --- no --- --- 3 --- ---
Santa Rosa Drive (Sta.
41+89.16 to 56+17.22)
12 --- --- --- 4 --- 8 ---
Prospector Drive 12 --- --- --- 4 --- 8 ---
NOTES:
* See the project roadway plan sheets for exact locations and stations.
**Tack coat will consist of PG oil between the AR-ACFC and upper AC level AR-ACFC = Asphaltic Concrete Friction Course (Asphalt Rubber).
AC-EP = Asphaltic Concrete – End Product (3/4) (Special Mix).
AC = Asphaltic Concrete.
AB = Aggregate Base.
PCCP = Portland Cement Concrete Pavement.
8. Limitations
AECOM conclusions, opinions, and recommendations are based on the completed subsurface investigation, visual observations, and the review of plans prepared by others. It is possible that conditions could vary beyond the data evaluated. AECOM makes no guarantee or warranty, express or implied, regarding the services, communication (oral or written), report, opinion, or instrument of service provided. This report may be used only by the client and its representatives, and only for the purposes stated, within a reasonable time from its issuance. Land use, site conditions (both on-site and off-site), or other factors may change over time, and additional work may be required with the passage of time. Any party other than the client who wishes to use this report shall notify AECOM of such intended use. Based on the intended use of the report, AECOM may require that additional work be performed and that an updated report be issued. Non-compliance with any of these requirements by the client or anyone else will release AECOM from any liability resulting from the use of this report by any unauthorized party.
ADOT TRACS No. 040 MO 54 H714701C;
9. References
AASHTO (American Association of State Highway and Transportation Officials). 1993. AASHTO Guide for
Design of Pavement Structures, 1993. Washington, DC: AASHTO.
ADOT (Arizona Department of Transportation). 2017. Pavement Design Manual. Available at:
https://apps.azdot.gov/files/materials-manuals/Preliminary-Engineering-
Design/PavementDesignManual.pdf. Accessed January 2023.
ADOT (Arizona Department of Transportation). 2022. Geotechnical Project Development Manual.
Available at: https://azdot.gov/sites/default/files/media/2022/09/ADOT-GPDM-2022.pdf. Accessed
January 2023.
ADWR (Arizona Department of Water Resources). 2022. Arizona Groundwater Site Inventory (GWSI).
Available at: https://azwatermaps.azwater.gov/gwsi. Accessed November 2022.
AECOM. 2023a. I-40 Kingman Crossing Traffic Interchange Geotechnical Data and Design Report.
Prepared for Kingman Healthcare, Inc. February.
AECOM. 2023b. I-40 Kingman Crossing Traffic Interchange Materials Design Report. Prepared for
Kingman Healthcare, Inc. February.
Kimley-Horn. 2023. Kingman Area Transportation Study. Prepared for City of Kingman.
https://apps.azdot.gov/files/materials-manuals/Preliminary-Engineering-Design/PavementDesignManual.pdf https://apps.azdot.gov/files/materials-manuals/Preliminary-Engineering-Design/PavementDesignManual.pdf https://azdot.gov/sites/default/files/media/2022/09/ADOT-GPDM-2022.pdf https://azwatermaps.azwater.gov/gwsi
West of Kingman Crossing Blvd
Kingman Crossing Blvd and Access Ramps
East of Kingman Crossing Blvd
Santa Rosa Drive/ Prospector Street
Figure 1
PAVEMENT STRUCTURAL SECTIONS
G-02.01
SECTION NO. 4
6" AB (Class 2) Subgrade
Tack Coat
8" AB (Class 2)
SECTION NO. 5
Subgrade
Total Thickness = 22½"
SECTION NO. 1
Total Thickness = 15.0"
(Plain Jointed)
9" PCCP
I-40 Ramps
Kingman Crossing Blvd
Tack Coat
8" AB (Class 2)
Total Thickness = 14½"
SECTION NO. 3
Subgrade
½" AR-ACFC
I-40 Ramps
Tack Coat
12" AB (Class 2)
Subgrade
Tack Coat
6" AB (Class 2)
Total Thickness = 12"
SECTION NO. 6
Subgrade
3" AC (Misc Str) (Special)
½" AR-ACFC
I-40 Mainline
3" AC-EP (¾") (Special)
3½" AC-EP (¾") (Special)
3½" AC-EP (¾") (Special)
3" AC-EP (¾") (Special)
3" AC-EP (¾") (Special)
2" AC-EP (¾") (Special)
Detours
2" AC-EP (¾") (Special)
Total Thickness = 12"
Kingman Crossing Blvd, I-40 TI to Santa Rosa Dr
3" AC ( Misc Str) (Special)
Total Thickness = ½"
SECTION NO. 7
Surface
Exst Pavement
I-40 Mainline
½" AR-ACFC
Total Thickness = 3"
SECTION NO. 8
Surface
Exst Pavement
Detour (I-40 Shoulders)
Tack Coat
Mill 3"
Total Thickness = 9"
SECTION NO. 9
6" AB (Class 2)
Subgrade
Guardrail Installation
3" AC (Misc Str) (Special)
Total Thickness = 3"
SECTION NO. 10
Subgrade
Detour Emergency Vehicle Access Pavement
Tack Coat (Asphalt Cement)
Tack Coat (Asphalt Cement)
3" AC (Misc Str) (Special)
3" AC (Misc Str) (Special)
Tack Coat (Asphalt Cement)
Fog Coat
Section Not Used
SECTION NO. 2
040 MO 054
STATE
F.H.W.A.
REGION
ARIZ.
PROJECT NO.
SHEET
NO.
TOTAL
SHEETS
ARIZONA DEPARTMENT OF TRANSPORTATION
DESIGN
DRAWN ROADWAY DESIGN SERVICES
CHECKED
NAME
TRACS NO. OF
LOCATIONROUTE
DATE
9/27/2023 by: HyeW4:05:21 PM@ pw://aecom-na-pw.bentley.com:AECOM_USA_Arizona/Documents/60667904-I-40_Kingman_Crossing_TI/900-CAD GIS/910_CAD/20_SHEETS/Roadway/h7147_ds03.dgn
DWG NO:
H7147 01CTRACS NO.
www.aecom.com
AECOM TECHNICAL SERVICES, Inc.
TRANSPORTATION
T 602.371.1100
Phoenix, Arizona 85020
7720 N. 16th St., Suite 100
INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION
R E
V
IS
IO
N
S
U
R V
E Y
N O
F
IN
IS
H E
D P
L A
N
L O
C A
T
IO
N
D A
T E
R
E V
IS
IO
N
R V
E Y
N O
F
IN
IS
H E
D P
L A
N
C A
T
IO
T E
RECORD DRAWING
08/23
I-40 KINGMAN CROSSING TI - KINGMAN
D WIGGINS
M CARRILLO
M CARRILLO
08/23
08/23 Review
NOT FOR
CONSTRUCTION
OR RECORDING
Review
NOT FOR
CONSTRUCTION
OR RECORDING
PRELIMINARY
STAGE IV
040-B(AUE)
040-B(AUE)
Figure 2
TYPICAL SECTIONS
I-40
G-03.01
040 MO 054
STATE
F.H.W.A.
REGION
ARIZ.
PROJECT NO.
SHEET
NO.
TOTAL
SHEETS
ARIZONA DEPARTMENT OF TRANSPORTATION
DESIGN
DRAWN ROADWAY DESIGN SERVICES
CHECKED
NAME
TRACS NO. OF
LOCATIONROUTE
DATE
12/21/2022 aecompw15ics02$5:09:38 PM@
\\aecompw15ics01\iCS_pdf_work_dir\73325\3179_20\h7147_ty01.dgn www.aecom.com
AECOM TECHNICAL SERVICES, Inc.
TRANSPORTATION
T 602.371.1100
Phoenix, Arizona 85020
7720 N. 16th St., Suite 100
INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION
R E
V
IS
IO
N
R V
E Y
F
IN
IS
H E
D
P
L A
N
C A
T
IO
T E
R E
V
IS
IO
N
R V
F
IN
IS
H E
D
P
L A
N
C A
T
IO
T E
RECORD DRAWING
01/23
I-40 KINGMAN CROSSING TI - KINGMAN
D WIGGINS
M CARRILLO
M CARRILLO
01/23
01/23 Review
NOT FOR
CONSTRUCTION
OR RECORDING
STAGE III
60%
040-B(AUE)
040-B(AUE)
4'
22' 16'
12' 12'
2'
20' Min
Exst
54'
6:1 6:1
TYPICAL SECTION - WB I-40
2'
20' Min
Exst
12'
54'
6:1 6:1
TYPICAL SECTION - EB I-40
38' Exst Roadway
12'10'
12'
Varies 0' to 12', Sta 2844+00.00 to Sta 2847+00.00
Sta 2906+85.56 to Sta 2919+99.77
Sta 2844+00.00 to Sta 2856+99.59
6:1 6:1
0.015$
0.015$
38' Exst Roadway
22'16'
4' 12' 12' 10'
12'
* 10', Sta 2851+55.79 to Sta 2852+01.09
Varies 12' to 0', Sta 2845+00.00 to Sta 2848+00.00
Sta 2903+84.63 to Sta 2919+99.77
Sta 2845+00.00 to Sta 2852+01.09
6"
Pvmt Str Sct No. 1 Pvmt Str Sct No. 1
Shldr Shldr
2'
12'
20' Min
54'
Ramp
\ Cst \
10'
6:1
Exst I-40Exst WB I-40 Med Cst \
Varies
TYPICAL SECTION - WB I-40
2'
12'
20' Min
54'
Ramp
\Cst \
10'
6:1
Exst EB I-40
Varies
TYPICAL SECTION - EB I-40
38' Exst Roadway
22'
12' 12'
16'
4'
38' Exst Roadway
16'
4' 12' 12'
22'
0.015$ 0.015$Exst Exst
* 10', Sta 2852+01.09 to Sta 2862+45.89
Varies 14' to 10', See Roadway Plans
Sta 2897+07.42 to Sta 2903+84.63
Varies, See Roadway Plans
Sta 2856+99.59 to Sta 2862+40.74
6:1
6:1
6:1
6:1
2'
Varies
Gore
Ramp
Varies
Pvmt Str Sct No. 3
2'
Varies
Gore
Ramp
Varies
Pvmt Str Sct No. 3
Sta 2897+35.00 to Sta 2899+31.41
Sta 2861+19.01 to Sta 2862+40.74
Paved Gore
Sta 2897+07.42 to Sta 2898+40.37
Sta 2862+00.89 to Sta 2864+01.63
Paved Gore
Pvmt Str Sct No. 7Pvmt Str Sct No. 7
Pvmt Str Sct No. 2
Exst ACFC Exst ACFC
Pvmt Str Sct No. 7
Pvmt Str Sct No. 2
Pvmt Str Sct No. 1 Pvmt Str Sct No. 7Pvmt Str Sct No. 7
Pvmt Str Sct No. 2
Exst ACFC
Pvmt Str Sct No. 1
Pvmt Str Sct No. 7
Pvmt Str Sct No. 2 Pvmt Str Sct No. 7
Exst ACFC
Pvmt Str Sct No. 7
TYPICAL SECTION - WB I-40 TYPICAL SECTION - EB I-40
X
Sta X
X
Sta X
Pvmt Str Sct No. 7
Pvmt Str Sct No. 2
Pvmt Str Sct No. 7
Exst ACFC
38' Exst Roadway
Cst \
Exst WB I-40 Exst I-40
Med Cst \ 54' 54'
Cst \
Exst EB I-40
38' Exst Roadway
22'16'22' 16'
4' 12' 12'12' 12' 4'
Exst Exst
Pvmt Str Sct No. 7
Pvmt Str Sct No. 2 Pvmt Str Sct No. 7
Exst ACFC
10' 10'
Exst WB I-40
Cst \
Exst I-40
Med Cst \
Exst EB I-40
Cst \
Figure 3
I-40
G-03.02
040 MO 054
STATE
F.H.W.A.
REGION
ARIZ.
PROJECT NO.
SHEET
NO.
TOTAL
SHEETS
ARIZONA DEPARTMENT OF TRANSPORTATION
DESIGN
DRAWN ROADWAY DESIGN SERVICES
CHECKED
NAME
TRACS NO. OF
LOCATIONROUTE
DATE
12/21/2022 aecompw15ics01$5:09:48 PM@
\\aecompw15ics01\iCS_pdf_work_dir\73325\3179_21\h7147_ty02.dgn www.aecom.com
AECOM TECHNICAL SERVICES, Inc.
TRANSPORTATION
T 602.371.1100
Phoenix, Arizona 85020
7720 N. 16th St., Suite 100
INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION
R E
V
IS
IO
N
R V
F
IN
IS
H E
D
P
L A
N
C A
T
IO
T E
R E
V
IS
IO
N
R V
F
IN
IS
H E
D
P
L A
N
C A
T
IO
T E
RECORD DRAWING
01/23
I-40 KINGMAN CROSSING TI - KINGMAN
D WIGGINS
M CARRILLO
M CARRILLO
01/23
01/23 Review
NOT FOR
CONSTRUCTION
OR RECORDING
STAGE III
60%
040-B(AUE)
040-B(AUE)
22' 16'
12' 12'
Exst
6:1
54' Cst \
Exst I-40Exst WB I-40
Med Cst \
TYPICAL SECTION - WB I-40 AND EB I-40
54' Cst \
Exst EB I-40
22' 16'
38' Exst Roadway
10'
Pvmt Str Sct No. 1
38' Exst Roadway
22'16'
Pvmt Str Sct No. 1
12' 12' 6'
0.015$ 0.015$
6" (Typ) 6" (Typ)
22'16'
12'12'
Exst
Shldr Shldr
Shldr Shldr
12' 12'
Sta 2878+11.91 to Sta 2878+55.00
Sta 2876+00.00 to Sta 2876+35.82
2'
11'
Shldr
2'
TYPICAL SECTION - WB I-40, WIDENING FOR GUARDRAIL TYPICAL SECTION - EB I-40, WIDENING FOR GUARDRAIL
11'
2'
Shldr
2'
11'
2'
6:1
2'
Shldr Shldr
2'
6:1
11'
2'
See Dwg No. G-03.05 For Ramp Infield Grading Slopes See Dwg No. G-03.05 For Ramp Infield Grading Slopes
Var ies
E x s t
E P
2'
Sawcut
10:1
11'
No. 9 (Typ)
Pvmt Str Sct
2'
2'-8"
Std C-10.01
Guardrail Installation
2'
11'
2'
N e w
P
Std C-10.03
W-Beam Guardrail MGS, 10'
No. 9 (Typ)
Pvmt Str Sct
4'
6:1
No. 9 (Typ)
Pvmt Str Sct
10'4'
Detail 'AA' (Typ)
Wedge See Shoulder
Detail 'AA' (Typ)
WedgeSee Shoulder
Std C-10.30 to Conc Barrier, Guardrail Transition
DETAIL 'AA'
WEDGESHOULDER
4' 10'
Detail 'BB' (Typ)
WedgeSee Shoulder
Detail 'BB' (Typ)
See Shoulder Wedge
10' Shldr
10' Shldr
2'-8"
Detail 'BB' (Typ)
WedgeSee Shoulder
Detail 'AA' (Typ)
Wedge See Shoulder
54' Cst \
Exst I-40Exst WB I-40
Med Cst \ 54'
Cst \
Exst EB I-40
38' Exst Roadway 38' Exst Roadway
Var ies
10:1
Std C-10.01
Guardrail Installation No. 9 (Typ)
Pvmt Str Sct
DETAIL 'BB'
WEDGESHOULDER
See Dwg No. G-03.05 For Ramp Infield Grading Slopes
Sta 2878+55.00 to Sta 2881+43.41
Sta 2875+05.17 to Sta 2876+00.00
Sta 2878+55.00 to Sta 2882+03.41
Sta 2874+80.17 to Sta 2876+00.00
Sta 2878+55.00 to Sta 2879+67.56
Sta 2872+44.32 to Sta 2876+00.00
Sta 2878+55.00 to Sta 2879+42.56
Sta 2873+04.32 to Sta 2876+00.00
No. 2Pvmt Str Sct No. 2Pvmt Str Sct
Figure 4
RAMP A & B
G-03.03
040 MO 054
STATE
F.H.W.A.
REGION
ARIZ.
PROJECT NO.
SHEET
NO.
TOTAL
SHEETS
ARIZONA DEPARTMENT OF TRANSPORTATION
DESIGN
DRAWN ROADWAY DESIGN SERVICES
CHECKED
NAME
TRACS NO. OF
LOCATIONROUTE
DATE
12/21/2022 aecompw15ics02$5:10:05 PM@
\\aecompw15ics01\iCS_pdf_work_dir\73325\3179_22\h7147_ty03.dgn www.aecom.com
AECOM TECHNICAL SERVICES, Inc.
TRANSPORTATION
T 602.371.1100
Phoenix, Arizona 85020
7720 N. 16th St., Suite 100
INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION
R E
V
IS
IO
N
R V
F
IN
IS
H E
D
P
L A
N
C A
T
IO
T E
R E
V
IS
IO
N
R V
F
IN
IS
H E
D
P
L A
N
C A
T
IO
T E
RECORD DRAWING
01/23
I-40 KINGMAN CROSSING TI - KINGMAN
D WIGGINS
M CARRILLO
M CARRILLO
01/23
01/23 Review
NOT FOR
CONSTRUCTION
OR RECORDING
STAGE III
60%
040-B(AUE)
040-B(AUE)
0.020$
12' 12'
36.9' to 56.9'
14'
6:1
2' 2'
Profile Grade
14'
28'
Ramp A
TYPICAL SECTION - RAMP A
6:1
20' Min
22'
12'
0.020$ 6:16:1
Profile Grade
Ramp B
TYPICAL SECTION - RAMP B
3:1
12'12'
20' Min26'14'
40'
12'
0.020$
Grade
Profile 2' 2'
6:16:1
Ramp B
TYPICAL SECTION - RAMP B
3:1
6:1
6:1
6:1
No. 3
Pvmt Str Sct No. 3
Pvmt Str Sct
No. 3
Pvmt Str Sct
2'
8'
Sta 14+21.81 to Sta 29+15.33
6:1 6:1
6:1 6:1
Varies 8' to 26', Sta 25+67.69 to Sta 31+67.65
Sta 19+75.35 to Sta 31+67.65
6:1 6:1
Cross Slope Varies. See Dwg No. C-03.07
Cross Slope Varies. See Dwg No. C-03.08
Sta 31+67.65 to Sta 33+80.67
20'
20'
20'
Between I-40 And Ramps
See Dwg No. G-03.05 For Slope Details
Between I-40 And Ramps
See Dwg No. G-03.07 For Slope Details
Between I-40 And Ramps
See Dwg No. G-03.05 For Slope Details
Sta 27+50.00 to 29+15.33, Pvmt Str Sct No. 4.
Sta 31+67.65 to 33+80.67, Pvmt Str Sct No. 4.
0'-12' Varies
16'-28' Varies
12'4'
Sta 27+95.00 to Sta 28+15.41
Fence On Top of Wall
New 4' Chain Link
3:1
32" Type 'F' (PCCP Pvmt) w/ 2.5' Gutter
Concrete Half Barrier
ADOT Std C-10.52
32" Type 'F' (AC Pvmt)
Concrete Half Barrier
ADOT Std C-10.50
Line
Telephone
Relocated
R/W Control Access
New
Esmt Util New
13'
Esmt 10'
24.9'-25.6'
Retaining Wall
ADOT Std SD 7.01
3:1
0'-13' Varies
Sta 22+90.33 to Sta 27+75.00
66.5' to 68.9'
Link Fence
Control Chain
New 6' Access
R/W Control Access
New
Esmt 10'
Esmt Util New
Varies
Link Fence
Control Chain
New 6' Access
Line
Telephone
Relocated
2'
20'
10:1
12'
No. 10
Pvmt Str Sct
Sta XX+XX.XX to Sta XX+XX.XX
3.7:1
See Detour plans for locations and details.
Temporary Emergecy Vehicle Access Pvmt*
Slope
Emb
Temp
Grade
Final Finished
Figure 5
RAMP C & D
G-03.04
040 MO 054
STATE
F.H.W.A.
REGION
ARIZ.
PROJECT NO.
SHEET
NO.
TOTAL
SHEETS
ARIZONA DEPARTMENT OF TRANSPORTATION
DESIGN
DRAWN ROADWAY DESIGN SERVICES
CHECKED
NAME
TRACS NO. OF
LOCATIONROUTE
DATE
12/21/2022 aecompw15ics02$5:09:36 PM@
\\aecompw15ics01\iCS_pdf_work_dir\73325\3179_23\h7147_ty04.dgn www.aecom.com
AECOM TECHNICAL SERVICES, Inc.
TRANSPORTATION
T 602.371.1100
Phoenix, Arizona 85020
7720 N. 16th St., Suite 100
INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION
R E
V
IS
IO
N
R V
F
IN
IS
H E
D
P
L A
N
C A
T
IO
T E
R E
V
IS
IO
N
R V
F
IN
IS
H E
D
P
L A
N
C A
T
IO
T E
RECORD DRAWING
01/23
I-40 KINGMAN CROSSING TI - KINGMAN
D WIGGINS
M CARRILLO
M CARRILLO
01/23
01/23 Review
NOT FOR
CONSTRUCTION
OR RECORDING
STAGE III
60%
040-B(AUE)
040-B(AUE)
12' 12'
28' 14'
12'
0.020$
Grade
Profile 2'
6:1
Ramp C
TYPICAL SECTION - RAMP C
20' Min 12'
0.020$ 6:1 6:1
Profile Grade
Ramp C
3:1
TYPICAL SECTION - RAMP C
10'
0.020$
12'12'
20' Min14'
6:1 6:1
2'2'
Profile Grade
14'
28'
Ramp D
3:1
TYPICAL SECTION - RAMP D
6:1
6:1
No. 3
Pvmt Str Sct
No. 3
Pvmt Str Sct
No. 4
Pvmt Str Sct
6'
Sta 11+38.65 to Sta 31+22.37
6:1
6:1
6:1 6:1
6:1
42'
28'
20'
20'
20'
Sta 11+38.65 to 12+50.00, Pvmt Str Sct No. 4.
Cross Slope Varies. See Dwg No. C-03.10
Between I-40 And Ramps
See Dwg No. G-03.05 For Slope Details
Between I-40 And Ramps
See Dwg No. G-03.05 For Slope Details
Between I-40 And Ramps
See Dwg No. G-03.05 For Slope Details
Sta 11+26.81 to Sta 13+44.79
Varies 24' to 10', Sta 13+44.79 to Sta 19+44.96
Varies 42' to 28', Sta 13+44.79 to Sta 20+00.00
Sta 13+44.79 to Sta 32+12.39Varies
Sta 13+44.79 to Sta 18+50.00
Varies 2' to 6', Sta 19+00.00 to 20+00.00
2', Sta 13+44.79 to Sta 19+00.00
3:1
20'
6:1
Sta 11+61.50 to Sta 25+11.50
See Drainage Plans
Detention Basins
Chain Link Fence
New 6' Access Control
3:1 Line
Telephone
Relocated
32" Type 'F'
Concrete Half Barrier
ADOT Std C-10.50
Varies 42' to 22'
R/W Control Access
New
Esmt 10'
Esmt Util New
3:1
4'
10.74'
20'
10:1
12'
No. 10
Pvmt Str Sct
Sta XX+XX.XX to Sta XX+XX.XX*
8.74'12'
R/W Control Access
New
Line
Telephone
Relocated
On Top of Wall
New 4'Chain Link Fence
Varies 42' to 22'
32" Type 'F'
Concrete Half Barrier w/ 2.5' Gutter
ADOT Std C-10.52
12' 8.74'
10.74'
1'
Esmt Util New
Chain Link Fence
New 6' Access Control
Esmt 10'
Esmt Util New
Esmt Util New
1'
On Top of Wall
Link Fence
New 4'Chain
3.7:1
See Detour plans for locations and details.
Temporary Emergecy Vehicle Access Pvmt*
Grade
Finished
Final
Slope
Emb
Temp
Figure 6
INFIELD GRADING
I-40 & RAMPS
G-03.05
040 MO 054
STATE
F.H.W.A.
REGION
ARIZ.
PROJECT NO.
SHEET
NO.
TOTAL
SHEETS
ARIZONA DEPARTMENT OF TRANSPORTATION
DESIGN
DRAWN ROADWAY DESIGN SERVICES
CHECKED
NAME
TRACS NO. OF
LOCATIONROUTE
DATE
12/21/2022 aecompw15ics02$5:10:41 PM@
\\aecompw15ics01\iCS_pdf_work_dir\73325\3179_24\h7147_ty05.dgn www.aecom.com
AECOM TECHNICAL SERVICES, Inc.
TRANSPORTATION
T 602.371.1100
Phoenix, Arizona 85020
7720 N. 16th St., Suite 100
INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION
R E
V
IS
IO
N
R V
F
IN
IS
H E
D
P
L A
N
C A
T
IO
T E
R E
V
IS
IO
N
R V
F
IN
IS
H E
D
P
L A
N
C A
T
IO
T E
RECORD DRAWING
01/23
I-40 KINGMAN CROSSING TI - KINGMAN
D WIGGINS
M CARRILLO
M CARRILLO
01/23
01/23 Review
NOT FOR
CONSTRUCTION
OR RECORDING
STAGE III
60%
040-B(AUE)
040-B(AUE)
Cst \
Exst I-40
E x s t
E P
6:16:1
3:1
VariesVaries 20' Varies
I-40 & RAMPS
TYPICAL SLOPES
Ramp Cst
6:16:1
3:1
VariesVaries
Ramp Cst
22'
I-40 & RAMPS
TYPICAL SLOPES
6:1
Varies Varies
E x s t
E P
Ramp D Sta 11+20.00 to 21+35.00
Ramp C Sta 11+20.00 to 20+60.00
Ramp B Sta 26+00.00 to 34+03.65
Ramp A Sta 19+10.00 to 29+15.33
* WB Shown, EB Similar
Cst \
Exst I-40
WB
Var ies
8:1 Min, 3:
1 M ax
Ramp D Sta 21+35.00 to 31+22.37
Ramp C Sta 20+60.00 to 30+15.65
Ramp B Sta 21+76.06 to 26+00.00
Ramp A Sta 15+26.98 to 19+10.00
33'
11'
H in g e
P o in t
Figure 7
KINGMAN CROSSING BLVD
G-03.06
040 MO 054
STATE
F.H.W.A.
REGION
ARIZ.
PROJECT NO.
SHEET
NO.
TOTAL
SHEETS
ARIZONA DEPARTMENT OF TRANSPORTATION
DESIGN
DRAWN ROADWAY DESIGN SERVICES
CHECKED
NAME
TRACS NO. OF
LOCATIONROUTE
DATE
12/21/2022 aecompw15ics02$5:09:37 PM@
\\aecompw15ics01\iCS_pdf_work_dir\73325\3179_25\h7147_ty06.dgn www.aecom.com
AECOM TECHNICAL SERVICES, Inc.
TRANSPORTATION
T 602.371.1100
Phoenix, Arizona 85020
7720 N. 16th St., Suite 100
INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION
R E
V
IS
IO
N
R V
F
IN
IS
H E
D
P
L A
N
C A
T
IO
T E
R E
V
IS
IO
N
R V
F
IN
IS
H E
D
P
L A
N
C A
T
IO
T E
RECORD DRAWING
01/23
I-40 KINGMAN CROSSING TI - KINGMAN
D WIGGINS
M CARRILLO
M CARRILLO
01/23
01/23 Review
NOT FOR
CONSTRUCTION
OR RECORDING
STAGE III
60%
040-B(AUE)
040-B(AUE)
Profile Grade
12'12' 11' 6.5'12' 12'11'6.5'8'2'
TYPICAL SECTION
H=6" (Typ)
MAG Dtl 220, Type A
New Conc Curb & Gutter
0.020$ 0.020$
2'8'12'
115' Roadway
57.5'
8'
0.015$0.015$
H=6" (Typ)
MAG Dtl 222, Type A
New Conc Single Curb
Sta 47+96.78 to Sta 51+98.35
2:
12'
57.5'
Cst
Kingman Crossing Blvd
MAG Dtl 230
Sidewalk (Typ)
New 8' Conc
Lane Lt Turn
Lane Lt Turn
Lane Lt Turn
Lane Lt Turn
Profile Grade
2:1
Profile Grade
11' 6.5'12'11'6.5'8'2'
TYPICAL SECTION
H=6" (Typ)
MAG Dtl 220, Type A
New Conc Curb & Gutter
0.020$ 0.020$
2'8'
115' Roadway
57.5'
28'
0.015$0.015$
H=6" (Typ)
MAG Dtl 222, Type A
New Conc Single Curb
Sta 43+80.67 to Sta 46+80.58
3:1
12'
57.5'
Cst
Kingman Crossing Blvd
MAG Dtl 230
Sidewalk (Typ)
New 8' ConcProfile Grade
28'
4' 12' 12'
Lane Lt Turn
Lane Lt Turn
28'
Profile Grade Profile Grade
Intersection With Ramps B & D NB Lt Turn Lane at
4.5' 14'
Lane Rt Turn
Intersection With Ramp D NB Rt Turn Lane at
3:1
Pvmt Str Sct No. 5
Pvmt Str Sct No. 4
Figure 8
KINGMAN CROSSING BLVD
G-03.07
040 MO 054
STATE
F.H.W.A.
REGION
ARIZ.
PROJECT NO.
SHEET
NO.
TOTAL
SHEETS
ARIZONA DEPARTMENT OF TRANSPORTATION
DESIGN
DRAWN ROADWAY DESIGN SERVICES
CHECKED
NAME
TRACS NO. OF
LOCATIONROUTE
DATE
12/21/2022 aecompw15ics03$5:11:54 PM@
\\aecompw15ics01\iCS_pdf_work_dir\73325\3179_26\h7147_ty07.dgn www.aecom.com
AECOM TECHNICAL SERVICES, Inc.
TRANSPORTATION
T 602.371.1100
Phoenix, Arizona 85020
7720 N. 16th St., Suite 100
INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION
R E
V
IS
IO
N
R V
F
IN
IS
H E
D
P
L A
N
C A
T
IO
T E
R E
V
IS
IO
N
R V
F
IN
IS
H E
D
P
L A
N
C A
T
IO
T E
RECORD DRAWING
01/23
I-40 KINGMAN CROSSING TI - KINGMAN
D WIGGINS
M CARRILLO
M CARRILLO
01/23
01/23 Review
NOT FOR
CONSTRUCTION
OR RECORDING
STAGE III
60%
040-B(AUE)
040-B(AUE)
Profile Grade
11' 6.5'12'11'6.5'8'
2'
TYPICAL SECTION
H=6" (Typ)
MAG Dtl 220, Type A
New Conc Curb & Gutter
0.020$ 0.020$
Varies
Varies
Varies
0.015$
H=6" (Typ)
MAG Dtl 222, Type A
New Conc Single Curb
Sta 53+23.41 to Sta 60+96.39
12'
Varies
MAG Dtl 230
Sidewalk (Typ)
New 8' ConcProfile Grade
Varies
4'12'12'
Lane Lt Turn
Lane Lt Turn
28'
Profile Grade Profile Grade
Intersection With Ramps A & C SB Lt Turn Lane at
4.5' 14'
Lane Rt Turn
Santa Rosa Dr NB Rt Turn Lane at
Cst
Kingman Crossing Blvd
28'-15' 28'-15'
12' 12'
Lane Lt Turn
Lane Lt Turn
Varies
Profile Grade Profile Grade
Santa Rosa Dr NB Lt Turn Lane at
Varies
4.5'14'
Lane Rt Turn
Ramp A and Driveway SB Rt Turn Lane at
0.015$
8'2'
3:1
See Wall Plans
New Retaining Wall (Typ)
Pvmt Str Sct No. 4
8'
2'
0.015$
0.015$
8' 2'
3:1
Sta 56+39.08 to Sta 60+96.39 Sta 56+32.17 to Sta 60+96.39
Sta 56+49.12 to 60+96.39, Pvmt Str Sct No. 5.
Figure 9
DETOUR
G-03.08
040 MO 054
STATE
F.H.W.A.
REGION
ARIZ.
PROJECT NO.
SHEET
NO.
TOTAL
SHEETS
ARIZONA DEPARTMENT OF TRANSPORTATION
DESIGN
DRAWN ROADWAY DESIGN SERVICES
CHECKED
NAME
TRACS NO. OF
LOCATIONROUTE
DATE
12/21/2022 aecompw15ics03$5:11:53 PM@
\\aecompw15ics01\iCS_pdf_work_dir\73325\3179_47\h7147_ty08.dgn www.aecom.com
AECOM TECHNICAL SERVICES, Inc.
TRANSPORTATION
T 602.371.1100
Phoenix, Arizona 85020
7720 N. 16th St., Suite 100
INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION
R E
V
IS
IO
N
R V
F
IN
IS
H E
D
P
L A
N
C A
T
IO
T E
R E
V
IS
IO
N
R V
F
IN
IS
H E
D
P
L A
N
C A
T
IO
T E
RECORD DRAWING
01/23
I-40 KINGMAN CROSSING TI - KINGMAN
D WIGGINS
M CARRILLO
M CARRILLO
01/23
01/23 Review
NOT FOR
CONSTRUCTION
OR RECORDING
STAGE III
60%
040-B(AUE)
040-B(AUE)
Construction
Profile Grade
RAMP DETOUR TYPICAL SECTION
No. 6 (Typ)
Pvmt Str Sct
6:1
14' 14'
EB Ramp Detour
Sta XX+XX.XX to Sta XX+XX.XX
15'
Varies
Cross Slope Varies. See Dwg No. C-XX.XX
1.5:1 (Typ)
15'
10:1
12'
No. 10
Pvmt Str Sct
Exst
Cst \
Exst EB I-40
DETOUR TYPICAL SECTION - EB I-40
38' Exst Roadway
22'16'
12' 12'
Sta XX+XX.XX to Sta XX+XX.XX
10'
10:1
No. 10 (Typ)
Pvmt Str Sct
12'
14'
4'
16'
12'
Exst
DETOUR TYPICAL SECTION
Exst
Cst \
Exst EB I-40
16'
4' 12'
Sta XX+XX.XX to Sta XX+XX.XXSta XX+XX.XX to Sta XX+XX.XX
Cst \
Exst WB I-40
12'14'Varies
Varies
12' 14' Varies
Varies
DETOUR TYPICAL SECTION
Cst \
Exst EB I-40
Cst \
Exst WB I-40
6'14'
Varies
Sta XX+XX.XX to Sta XX+XX.XX
14'12'
No. 6 (Typ)
Pvmt Str Sct
No. 6 (Typ)
Pvmt Str Sct
No. 6 (Typ)
Pvmt Str Sct
No. 8 (Typ)
Pvmt Str Sct
No. 8 (Typ)
Pvmt Str Sct
Cst \ Detour
EB or WB
Cst \ Detour
EB
Cst \ Detour
EB or WB
Cst \ Detour
WB
10:1 10:1
2' 2'
No. 10 (Typ)
Pvmt Str Sct
2'
10:1
No. 10 (Typ)
Pvmt Str Sct
No. 6 (Typ)
Pvmt Str Sct
No. 10 (Typ)
Pvmt Str Sct
2' 12' 12' 2'2'2'
28'
2'
3'
3:1 Max (Typ)
Sawcut
0.02$
Profile Grade
3:1 Max (Typ)
Profile Grade Profile Grade
Exst Pavement
To Remain
WB*
* Mirror for EB Detour
3:1 Max (Typ)
Exst Pavement
To Remain
Profile Grade
SHOULDER WEDGE DETAIL
After Detour Pavement Removal
Exst Detour AC Pavement
Remove
3' 10' Shoulder
6:1
No. 6
Pvmt Str Sct
Figure 10
ADOT TRACS No. 040 MO 54 H714701C;
aecom.com
| Figures |
| h7147_ty01 |
| References |
| h7147_KCTI_typ.dgn, Default |
| h7147_KCTI_bdr.dgn, Default |
| h7147_ty02 |
| References |
| h7147_KCTI_typ.dgn, Default |
| h7147_KCTI_bdr.dgn, Default |
| h7147_ty03 |
| References |
| h7147_KCTI_typ.dgn, Default |
| h7147_KCTI_bdr.dgn, Default |
| h7147_ty04 |
| References |
| h7147_KCTI_typ.dgn, Default |
| h7147_KCTI_bdr.dgn, Default |
| h7147_ty05 |
| References |
| h7147_KCTI_typ.dgn, Default |
| h7147_KCTI_bdr.dgn, Default |
| h7147_ty06 |
| References |
| h7147_KCTI_typ.dgn, Default |
| h7147_KCTI_bdr.dgn, Default |
| h7147_ty07 |
| References |
| h7147_KCTI_typ.dgn, Default |
| h7147_KCTI_bdr.dgn, Default |
| h7147_ty08 |
| References |
| h7147_KCTI_typ.dgn, Default |
| h7147_KCTI_bdr.dgn, Default |
Field Exploration Site
| Roadway |
| h7147_ds03 |