This document is a request for bid for the UT FLAP 2500(1) Taylor Mountain Road project located approximately 6 miles north of Vernal, UT. The project consists of rehabilitating, restoring, and resurfacing approximately 4.95 miles and reconstructing approximately 1.71 miles of road. Major work elements include widening the roadway to a consistent width and making vertical and horizontal alignment changes to correct roadway geometry and improve safety. Construction will generally include cut slopes, embankment, deep patch embankment stabilization, aggregate base course, and paving. Additional improvements include clearing roadside vegetation, stabilizing shoulders, drainage improvements including large and deep pipes and concrete headwalls, pavement markings, and updating signing. Select parking/pullouts and access road intersections will also be rehabilitated or reconstructed. Significant work quantities include 41 acres of clearing and grubbing, 18,000 cubic yards of embankment construction, 19,000 tons of aggregate base, 5 miles of full depth reclamation, and asphalt concrete pavement. The solicitation number for this opportunity is 6982AF21B000017 and is being conducted by the Department of Transportation Federal Highway Administration.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
A2
ABBREVIATIONS DRAINAGE SYMBOLS
GEOLOGIC SYMBOLS
DI
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (Existing, Proposed)
Fence w/ Gate (Existing, Proposed)
Fence (Existing, Proposed)
Material Source
Boring Location (Existing, Proposed)
Riprap Apron (Proposed)
Underdrain (Existing, Proposed)
With Drop Inlet (Existing, Proposed)
With Headwalls (Existing, Proposed)
With End Sections (Existing, Proposed)
Pipe Culvert (Existing, Proposed)
Box Culvert (Existing, Proposed)
Bridge (Existing, Proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (Existing, Proposed)
SPRING
D jt.J int.
incr.
incl.
IDI
hwy.
HW
horiz.
hex.
HES
hdwl.H gdr.
galv.
ga.G ftg.
fin.
FES
Fed.
f.f.F ext.
exp. jt.
exc.
EW
et ux et al
ER
EQ or eq.
EOP
engr(s).
emb.
elev.
El. 94.066 e
EE
dwg(s).
DLC
Dist.
dist.
diaph.
diag.
dia. or D
DI
DHV
decr.D culv.
CTSM
ctrs.
CS
cr.
corr.
cont.
constr. jt.
constr.
conc.
col.
Co.
CMP
clr.
c-c
CBCC
brg.
br.
BP
BM
BK
beg.
b.f.B asph.
appr.
alt.
AH
aggr.
ADT
abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall
Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve
WW
VPI
vph vert.
VV
typ.
TS
transv.
TCE
TBM
tan.
T.
TT
sym.
struc.
str.
stiff.
std.
sta.
ST
st.
spec.
spa.
shldr.
sec.
SC
SADT
SS
rte.
Rt. or RT
RH
ret. wall
Res.
res.
reqd.
reinf.
reconst.
rdwy.
rd.
R/W
R.
RR
quant., QtyQ pvmt.
PT
psi proj.
POT
POS
POC
pl.
PI
perf.
PCC
PCP
OD
o.f.
o.c.O
no. or # neg.
NC
NN
mtn(s).
mon.
min.
max.
matl.
maint.
mag.M
LW
Lt. or LT
LPSM
long.
lat.
lam.
LL
EROSION & SEDIMENT CONTROL SYMBOLS
joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement
Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment diameter curve delta centerline
Ø
Riprap
Rolled Erosion Control Product
Diversion Berm
Check Dam
Bonded Fiber Matrix Mulching
Fiber Roll (Slope Protection)
Temporary Inlet Protection
Silt Fence
Fiber Roll (Ditch and/or Cut Slope)
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts A G e n s h t\ s y m .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
Taylor Mountain Road
UT FLAP 2500(1)
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
Sheet 2 of 2
A3
36 31
36 31
6 1
ˆ
Treeline
Tree
MAPPING SYMBOLS
LANDSCAPING & VEGETATION SYMBOLS PROJECT SPECIFIC SYMBOLS
RIGHT-OF-WAY SYMBOLS
ROADWAY SYMBOLS
SIGN SYMBOLS
UTILITY SYMBOLS
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
Guardwall (Existing, Proposed)
Guardrail (Existing, Proposed)
GUARDRAIL, BARRIER & WALL SYMBOLS
Post Mounted (Existing, Proposed)
Portable (Proposed)
Delineator (Existing, Proposed)
Commercial (Existing, Proposed)
Signs
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone
Sanitary Sewer
Power
Oil
Gas
Fiber Optic
CATV
Underground Utility (Existing, Proposed)
Telephone Pedestal (Existing, Proposed)
Telephone Booth (Existing, Proposed)
Street Light (Existing, Proposed)
Support Pole Anchor (Existing, Proposed)
Support Pole (Existing, Proposed)
Surface (Existing, Proposed)
Underground (Existing, Proposed)
Irrigation Ditch
999.9
Roadway Obliteration
Roadway Centerline (With Station ticks)
Proposed
Existing
Edge of Roadway
Toe of Fill
Transition
Top of Cut
Slope Stake Limits
Clearing/Construction Limits
Survey Control Point
Trail
Spot Elevation
Double Track
Single Track
Railroad
North Arrow
Coordinate Grid Tick
Building (Existing, Proposed)
Section Corner (Found)
Section Corner (Found, Projected)
Section Corner (Found, Projected)
Right-of-Way Line (Proposed)
Right-of-Way Line (Existing)
Property Line
Parcel Number
Monument (As described)
Temporary (Proposed)
Permanent (Proposed)
Permanent (Existing)
Easements
National Wildlife Refuge
National Park
National Forest
Bureau of Land Management
Bureau of Indian Affairs
Section
Section
Section
Township or Range Line
City
County
State
National
Boundaries
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts A G e n s h t\ s y m .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
A4
SURVEY CONTROL
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts A G e n s h t\
C T
L .d
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts A G e n s h t\
S it e
M a p .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
Taylor Mountain Road
UT FLAP 2500(1)
T S R
E
S e c tio n
T S R
E
S e c tio n
T S R
E
S e c tio n
T S R
E
S e c tio n
T S R
E
S e c tio n
T S R
E
S e c tio n
T S R
E
S e c tio n
T S R
E
S e c tio n
T S R
E
S e c tio n
T S R
E
S e c tio n
T S R
E
S e c tio n
T S R
E
S e c tio n
Scale in Feet
0.5 miles 1 mile
SITE MAP
6 miles
To Vernal
0 5
+00
5+
0 1
0 2
0 3
A5
ASHLEY
NATIONAL
FOREST
STATE LANDS
STATE LANDS
STATE LANDS
STATE LANDS
LANDS
STATE
BUREAU OF LAND
MANAGEMENT
BUREAU OF LAND
MANAGEMENT
BUREAU OF LAND
MANAGEMENT
BUREAU OF LAND
MANAGEMENT
P la n t
R o a d
O ld P o w e r
N
Taylor Mountain Road
Begin Rehabilitation
Begin Project
Station 33+50.00
Taylor Mountain Road
Begin Reconstruction
End Rehabilitation
Station 295+00.00 Taylor Mountain Road
End Project
End Reconstruction
Station 385+53.19
See Sheet D2)
(USFS Parking Area
Staging Area
National Forest
To Ashley
Station to Station
LENGTH OF PROJECT
TOTAL (mi)
(ft)
Roadway
NO SCALE
TOTALS (ft)
NOTE:
Dimensions shown are approximate and may be varied by the CO.
Existing superelevated and widened sections are not shown.
2.
1.
Shoulder
Pulverized Width
Traveled way structural section details
See mainline typical section for
Foreslope
DETAIL A
1'
Remarks
6.67
33+50.00 to 295+00.00
EXISTING TYPICAL SECTION
(safety edge) pavement edge
Construct 30°
5.2"
26150.00
35203.19
A6
9053.19
33+50.00 to 295+00 Rehabilitation
Reconstruction for drainage and appearance.
concrete pavement. Shape and compact as necessary
(pay item 30101-0000) after placement of asphalt section. Shoulder up with Aggregate Base
Incorporate pulverized material into the mainline base
Remove all pulverized asphalt material from this section.
REHABILITATION
MAINLINE
TYPICAL SECTIONS
295+00.00 to 385+53.19
Traveled WayTraveled Way
See Detail A
Tack coat (between lifts)
Existing
2% (typ.) 2% (typ.)
base
6" Aggregateand base course method 2 existing pavement
6" Full depth reclamation, 1:41:4 pavement placed in two lifts
3" asphalt concrete
1:4
Average Existing Width is 23' from 16 to 30 ft
Existing width varies
See Detail A on Sheet A7
Variable
Existing Slope Variable Existing Slope
Traveled WayTraveled Way
Match existing Match existing
See Detail A Tack coat (between lifts) pavement placed in two lifts
3" asphalt concrete and base course method 2 existing pavement
6" Full depth reclamation, 144+50 to 181+00
131+50 to 140+00
78+50 to 92+00
66+00 to 72+00
REHABILITATION
TYPICAL SECTION
181+00 to 295+00
140+00 to 144+50
92+00 to 131+50
72+00 to 78+50
33+50 to 66+00
REHABILITATION WITH WIDENING
TYPICAL SECTION
4' Clear Zone 4' Clear Zone
3'
4' Clear Zone 4' Clear Zone
3' varies from 0" to 12" (average depth 4").
Existing aggregate base depth varies from 1.5" to 12" (average depth 4").
Existing asphalt pavement depth
Shdr
1' 11' 11'
Shdr
1'
Construction and Clearing Limits
Construction and Clearing Limits
11'11'
Topsoil and Seeding Limits
5'
Topsoil and Seeding Limits
5' seeding limits Topsoil and
5'
Shldr
1'
5'
Shldr
1' seeding limts Topsoil and in two lifts pavement placed
3" asphalt concrete Leveling 5.
5.
4.
3.
prior to first asphalt lift)
Prime coat (applied prior to first asphalt lift)
Prime coat (applied to top asphalt lift)
Fog seal (applied to top asphalt lift)
Fog seal (applied correct superelevation.
Add aggregate base as shown in the cross-sections to level and
Apply tack coat to the first lift prior to placing the second lift.
Place asphalt concrete pavement in two lifts.
pavement are present and the full depth will need to be pulverized.
Pulverize to a minimum depth of 6". Isolated areas of thicker
Pulverize after placing 6" aggregate base in widened sections.
Pulverize the existing paved width or as directed by the CO.
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts A G e n s h t\
R ty p .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
Hinge point
1:4
2%
Cut slope
(variable) 2%
See plans for locations of curves and superelevations
METHOD OF SUPERELEVATION ON CURVES
NOTE:
Min. superelevation 2% 6% Max. superele vation
Normal crown -2% -2% Normal crown grade
Profile superelevation
Pivot point for pavement)
(top of
Profile grade
(variable)
Fill slope
1.
3.
2.
1:4
DETAIL A
See Detail A
2.
Existing ground
5'
Clearing and construction limits limit
Slope stake 30° asphalt lift)
(applied to top
Fog seal cut slope
Rounded and seeding limits
Topsoil and seeding limits
Topsoil asphalt lifts)
(applied between
Tack coat first asphalt lift)
(applied prior to
Prime coat
Placed in two lifts concrete pavement 3" Asphalt limit stake
Slope
Asphalt concrete pavement sides of roadway)
(Detail applies to both right and left
Shoulder up with aggregate base
Construct 30° pavement edge (safety edge) base
Aggregate from 16 ft to 30 ft
Existing width varies
Average 21 ft
295+00.00 to 385+53.19
EXISTING TYPICAL SECTION
Traveled way
11'
Traveled way
11' ditch Graded
4' shldr
1' shldr
1'
B=5' F=5'
295+00.00 to 385+53.19
TYPICAL SECTION
5.2"
RECONSTRUCTION
MAINLINE
TYPICAL SECTIONS
A7 reduce the B and F dimensions to the actual cut height.
Round all earth slopes and all rippable rock slopes. For cut heights less than B, See the cross sections for cut and fill slope ratios.
slope ratios may be adjusted by the CO to assure adequate drainage and stability.
The gradient and width of roadway ditches and the excavation and embankment
3.
2.
1.
6" Aggregate Base
4.5" to 4" (average depth 4")
Existing aggregate base depth varies from from 0" to 1.5" (average depth 1.5")
Existing asphalt pavement depth varies
3'
4' Clear Zone8' Clear Zone
3'
Subgrade
15'
Subgrade
15'
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts A G e n s h t\
R ty p .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
4" Aggregate base s = 1:4 for type 2 approach s = 1:3 for type 1 approach d = 3' for type 2 approach d = 2' for type 1 approach x = 15' Minimum for type 2 approach x = 0' for type 1 approach
Variable
W
Variable
3' minimum
16'x
20' desired
15' min.
1.3'
W
1.3' d
4' (typ.)
4' (typ.)
APPROACH ROADS
TYPICAL SECTIONS
CLASSTYPE
APPLICATION
SAMPLE
Paved apron
ADT ≥ 200
100 ≤ ADT < 199
25 ≤ ADT < 100
ADT < 25
Minimum 2-Way Use
Logging Truck Use
Farm Equipment
Minimum 1-Way Use
Field Access
A
E
D
C
B
A
D
C
B
A
* Match existing
(ft)
W
WIDTH
MIN.
(ft)
R
RADIUS
MIN.
N/A
4' (typ.)
U s e r k e ll y .t e r r e ll
Sheet 1 of 2
A8 mainline recovery area.
radius to provide a flatter foreslope and increased
Place culverts at the end of the approach road base 2' agg.
6' (typ.)
widths greater than 15 feet.
Apply the normal crown to approach roads with
Variable
V a ria b le
A s
B
A
B
M a in li e
Mainline
±2%
TYPICAL PROFILE
SECTION B-B
Shoulder edge
A
V a ria b le
(1:6 desi rable )1:4 o r flat ter
TYPICAL SYMBOL
M a in li grade (optional)
Typical maximum design
A
A B
B
SECTION A-A
b y t h e C o n tr a c ti n g O ff ic e r
R ig h t-o f-w a y o r a s s ta k d
NOTE:Paved length
(1:6 desirable)
1:4 or flatter base edge
Aggregate thicknesses and foreslopes.
Refer to mainline typical sections for structural section Approach Road
TYPICAL PLAN
TYPES 1 & 2
APPROACH ROAD
TYPICAL PLAN
TYPE 3
APPROACH ROAD
base edge
Aggregate b y t h e C o n tr a c ti n g O ff ic e r
R ig h t-o f-w a y o r a s s ta k d
Approach Road
Flatten slope road connection on plan and profile sheet
Example of symbol showing standard approach shown may be varied ±20°.
Under special conditions, the approach road angle 8.
4.
3.
8.
2.
3.
1.
6.
2.
6.
2.
6.
7.
Subgrade edge
Aggregate base edge
End Section A-A
End Section A-A
Total length
Paved length
90° W
Type
Class
Mainline stationing
Typical maximum grade ±10%VPI
VPC
90°
Typical culvert location edge subgrade
Normal
Aggregate base edge
R
Total length
R1
WW
with mainline roadway construction.
Construct cut and fill slopes for approach roads to match locations to be field verified.
Stations shown are approximate locations. Actual maximum.
0% to -2% grade. Under special conditions, use 6% grades within ±2%. In snowy regions restrict this to a
Construct approach roads with landing areas having approach road centerline.
existing radii or widths. R is on the left side of the
Vary radii to fit unusual field conditions. Do not reduce
5. 5.
pavement edge
Asphalt concrete pavement edge
Asphalt concrete
8.
7.
6.
5.
4.
3.
2.
1.
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts A G e n s h t\ ty p a p .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
Sheet 2 of 2
APPROACH ROADS
TYPICAL SECTIONS
A9
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts A G e n s h t\ ty p a p .d
U.S. DEPARTMENT OF TRANSPORTATION
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
Sheet and Description
B3 B4 B5 B6-B9
Grading Summary
Drainage Summary
Surfacing Summary
Miscellaneous Summaries Allowance Bid
Schedule
A0050 15101-0000 MOBILIZATION LPSM ALL
A0100 15214-3000 SURVEY AND STAKING, PARKING AREA LPSM ALL
A0150 15215-1000 SURVEY AND STAKING, APPROACH ROAD EACH 2
A0200 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE EACH 21 1 22
A0250 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL MILE 6.667 6.667
A0300 15236-2000 SURVEY CONTROL, GRADE FINISHING MILE 13.335 13.335
A0350 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0400 15401-0000 CONTRACTOR TESTING LPSM ALL
A0450 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0500 15701-0000 SOIL EROSION CONTROL LPSM ALL
A0550 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL LPSM All ALL
A0600 15720-0000 STORM WATER POLLUTION PREVENTION PLAN LPSM ALL
A0650 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0700 20101-0000 CLEARING AND GRUBBING ACRE 40.8 0.2 41.0
A0750 20301-1900 REMOVAL OF PIPE CULVERT EACH 6 6
A0800 20301-2400 REMOVAL OF SIGN EACH 8 8
A0850 20302-0700 REMOVAL OF FENCE LNFT 280 20 300
A0900 20401-0000 ROADWAY EXCAVATION CUYD 26,406 1,594 28,000
A0950 20402-0000 SUBEXCAVATION CUYD 2,000 2,000
A1000 20420-0000 EMBANKMENT CONSTRUCTION (DEEP PATCH) CUYD 730 40 770
A1050 20441-0000 WASTE CUYD 3,113 187 3,300
A1100 21101-1000 ROADWAY OBLITERATION, METHOD 1 SQYD 1,824 76 1,900
A1150 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 CUYD 51 65 4 120
A1200 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 CUYD 55 5 60
A1250 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4 CUYD 126 4 130
A1300 25120-0200 RIPRAP DITCH, METHOD A, CLASS 2 LNFT 1,990 110 2,100
A1400 30101-0000 AGGREGATE BASE TON 18,358 642 19,000
A1450 30401-5300 FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH MILE 4.950 0.050 5.000
A1500 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH
NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL TON 15,711 489 16,200
A1600 40105-3000 ANTISTRIP ADDITIVE, TYPE 3 TON 157 3 160
A1700 40601-0000 FOG SEAL TON 40 1 41
A1750 41102-1000 PRIME COAT, METHOD 1 SQYD 96,339 2,661 99,000
A1800 41105-0000 BLOTTER TON 140
A1850 41201-0000 TACK COAT TON 41 1 42
A1900 60103-0160 CONCRETE, HEADWALL FOR 30-INCH PIPE CULVERT EACH 1 1
A1950 60103-0700 CONCRETE, HEADWALL FOR DOUBLE 48-INCH PIPE CULVERT EACH 2 2
A2000 60103-0780 CONCRETE, HEADWALL FOR DOUBLE 72-INCH PIPE CULVERT EACH 2 2
A2050 60201-0600 18-INCH PIPE CULVERT LNFT 66 66
A2100 60201-0800 24-INCH PIPE CULVERT LNFT 540 20 560
MileStone: 100% Date Completed: 08/14/21 Report Date: 08/14/21
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A
-A ug
-2
2:
P
M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities
N
U T\ ut
(1
R oa dw ay
\C A D
D _S he et s\ B -S um m
\S pr ea ds he et s\ [S
O Q
_f in al .x ls m
]S he et
STATE PROJECT
B1UT FLAP 2500(1)
Taylor Mountain RoadUT
SHEET
NUMBER
Sheet and Description
B3 B4 B5 B6-B9
Grading Summary
Drainage Summary
Surfacing Summary
Miscellaneous Summaries Allowance Bid
Schedule
A2150 60201-0900 30-INCH PIPE CULVERT LNFT 203 7 210
A2200 60201-1100 42-INCH PIPE CULVERT LNFT 51 4 55
A2250 60201-1200 48-INCH PIPE CULVERT LNFT 143 7 150
A2300 60201-1600 72-INCH PIPE CULVERT LNFT 164 6 170
A2350 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT EACH 26 26
A2400 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT EACH 10 10
A2450 60210-1100 END SECTION FOR 42-INCH PIPE CULVERT EACH 2 2
A2500 60210-1200 END SECTION FOR 48-INCH PIPE CULVERT EACH 2 2
A2550 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 620 620
A2600 61901-0600 FENCE, BARBED WIRE LNFT 280 20 300
A2650 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY HOUR 40
A2700 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
24-INCH WIDTH HOUR 40
A2750 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 40
A2800 62201-1350 BULLDOZER, 200HP MINIMUM FLYWHEEL POWER HOUR 40
A2850 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 40
A2900 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY HOUR 40
A2950 62301-0000 GENERAL LABOR HOUR 40
A3000 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR 40
A3050 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (BIOLOGIST) HOUR 16
A3100 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 40
A3150 62406-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH ACRE 7.5 0.5 8.0
A3200 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 7.5 0.5 8.0
A3250 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 7.5 0.5 8.0
A3300 63301-0000 SIGN SYSTEM EACH 5 5
A3350 63308-3000 OBJECT MARKER, TYPE 3 EACH 12 12
A3400 63309-0000 DELINEATOR EACH 42 3 45
A3450 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID MILE 31.0 31.0
A3500 63402-0400 PAVEMENT MARKINGS, TYPE B, BROKEN MILE 13.0 13.0
A3550 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 200 200
A3600 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 400 400
A3650 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A EACH 8 8
A3700 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B EACH 8 8
A3750 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN EACH 2 2
A3800 63502-3900 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN EACH 38 2 40
A3850 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 LNFT 48 48
A3900 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE LNFT 500 500
A3950 63505-1000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS MILE 13.3 13.3
A4000 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 3,700 3,700
A4050 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 1,500 1,500
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-A ug -2
2:
P M
MileStone: 100% Date Completed: 08/14/21 Report Date: 08/14/21
N
U T\ ut
(1
R oa dw ay
\C A D
D _S he et s\ B -S um m
\S pr ea ds he et s\ [S
O Q
_f in al .x ls m
]S he et
2) SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number
STATE PROJECT
B2UT FLAP 2500(1)
Taylor Mountain RoadUT
SHEET
NUMBER
GRADING SUMMARY
B3
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts B S u m m Q u a n ti ti e s .d
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
DRAINAGE SUMMARY
B4
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts B S u m m Q u a n ti ti e s .d
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
SURFACING SUMMARY
B5
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts B S u m m Q u a n ti ti e s .d
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
MISCELLANEOUS SUMMARIES
B6
Sheet 1 of 4
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts B S u m m Q u a n ti ti e s .d
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
Sheet 2 of 4
B7
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts B S u m m Q u a n ti ti e s .d
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
Sheet 3 of 4
B8
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts B S u m m Q u a n ti ti e s .d
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
B9
Sheet 4 of 4
MISCELLANEOUS SUMMARIES
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts B S u m m Q u a n ti ti e s .d
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
Y I E
L D
T
W A
R N I N
G U
G
E L E
C T
R I C
A L B
O X
T T3
N
L S R
M
N C
O R S
E C
18 IN CPP
5791.8
S E
W E
R
D I
5794.8
36IN X 36IN
C U
W C
D
N
W
T 3 M
P H
S E
W E
R
T3
W A
R N I N
G U
G
T
N
E M
CONTINUES SOUTH
G R
E E
N P
A I N
T
N O G
A S N
O S
N B
W A
R N I N
G U
G
BW OLD
T
N
T T
T I
M B
E R
L I N
E
N
S E
W E
R
T P
O S
T O
N L
Y
N
W
H D J
A C
K S
O N
J
A C
K S
O N R
A N
C H H
D W A
T E
R
C A
T T
L E X I N
G
W A
R N I N
G U
G
T I
M B
E R
L I N
E R
E N
T A
L S L
L C
A P
N
C
A
A
A
A
A P
O T
.0
P C
.3
P T
.2
Y I E
L D
T
W A
R N I N
G U
G
E L E
C T
R I C
A L B
O X
T T3
N
L S R
O R S
E C
18 IN CPP
5791.8
S E
W E
R
D I
5794.8
36IN X 36IN
C U
W C
D
N
W
T 3 M
P H
S E
W E
R
T3
W A
R N I N
G U
G
T
N
E M
CONTINUES SOUTH
G R
E E
N P
A I N
T
N O G
A S N
O S
N B
W A
R N I N
G U
G
BW OLD
T
N
T T
T I
M B
E R
L I N
E
N
S E
W E
R
T P
O S
T O
N L
Y
N
W
H D J
A C
K S
O N
J
A C
K S
O N R
A N
C H H
D W A
T E
R
C A
T T
L E X I N
G
W A
R N I N
G U
G
W A
R N I N
G U
G
W J
A C
K S
O N R
A N
C H R
D S
T R
A T
A N
E T
W O
R K
S
W A
R N I N
G U
G
W A
R N I N
G U
G
B
A
P C
.8
P T
.5
P C
.7
P T
.1
P C
.1
P T
.7
W A
R N I N
G U
G
W J
A C
K S
O N R
A N
C H R
D S
T R
A T
A N
E T
W O
R K
S
W A
R N I N
G U
G
W A
R N I N
G U
G
STATE PROJECT
A
M N U
T u t2
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
Taylor Mountain Road
UT FLAP 2500(1)
C1
33+50 to 62+00
PLAN SHEET
TAYLOR MOUNTAIN ROAD
200'100'0
Scale in Feet
200'100'0
Scale in Feet
E 2175072.31
N 7358880.41
Station 33+50
Begin Rehabilitation
Begin Project D
PI 43+48.33
Curve = MAIN-1
R = 5,000.00'
T = 16.95'
L = 33.90'
Curve = MAIN-2
PI 49+91.20
R = 5,000.00'
T = 11.31'
L = 22.63'
D
L = 89.38'
T = 44.69'
R = 5,000.00'
Curve = MAIN-3
PI 58+36.42
D e = NC e = NC e = NC
APN: 03-094-0021
TIMBERLINE RENTALS LLCVERNAL ROD & GUN CLUB
APN:
BUREAU OF LAND
MANAGEMENT
TIMBERLINE RENTALS LLC
APN: 03-094-0021
ASHLEY VALLEY WTP Lab
APN:
APN:
Electric Lines
0 6
6085 6
TT
W A
R N I N
G U
G E
M
W A
R N I N
G
W A
R N I N
G U
G
W A
R N I N
G P
W A
R N U
G
A
A
A
A
A
P T
.7
P C
.0
P T
.9
TT
W A
R N I N
G U
G E
M
W A
R N I N
G
W A
R N I N
G U
G
W A
R N I N
G P
W A
R N U
G
0 6
6085 6
.5
I N C
M P
W A
R N U
G
I N C
M P
.8
W A
R N U
G E
M
L A
T H
E B
L M S
T A
T E
A
A
A
P C
.1
P T
.2
P C
.3
P
T
.4
.5
I N C
M P
W A
R N U
G
I N C
M P
.8
W A
R N U
G E
M
L A
T H
E B
L M S
T A
T E
STATE PROJECT
A
M N U
T u t2
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
Taylor Mountain Road
UT FLAP 2500(1)
A
A
A
A
A
A
A
A
C2
62+00 to 92+00
PLAN SHEET
TAYLOR MOUNTAIN ROAD
200'100'0
Scale in Feet
200'100'0
Scale in Feet
Riprap ditch, Rt.
and Riprap, Class 2 RT with end sections LT and RT
62+87 Install 43' x 24" CMP
Do not disturb 18" CMP
Curve = MAIN-6
PI 80+66.76
D
R = 840.00'
T = 215.63'
L = 422.14'
Curve = MAIN-7
PI 88+64.90
D
R = 5,000.00'
T = 6.56'
L = 13.12'
Curve = MAIN-5
L = 378.94'
T = 195.70'
D
R = 615.00'
PI 71+61.70
Curve = MAIN-4
L = 134.56'
T = 67.29'
PI 61+46.47
D
R = 5,000.00' e = NC e = 5.2 e = NCe = 4.6
STATE LANDS
STATE LANDS
BUREAU OF LAND
MANAGEMENT
BUREAU OF LAND
MANAGEMENT
6130 6135
6130 6135
W A
R N I N
G U
G
W A
R N I N
G
W A
R N I N
G
P
T O
P
O U
T C
R O
P
R O
K
W A
R N I N
G U
G
A
A
A
P C
.8
P T
.3
P C
.3
0 P T
.8
W A
R N I N
G U
G
W A
R N I N
G
W A
R N I N
G
P
T O
P
O U
T C
R O
P
R O
K
W A
R N I N
G U
G
W A
R N I N
G
W A
R N
IN
G
P -1
W A
R N I N
G F I B
E R O
P T I C C
A B
L E
W A
R N
IN
G
A
A
P T
.8
P C
.9
P T
.3
P C
.2
P T
.9
P C
.1
P T
.2
W A
R N I N
G
W A
R N
IN
G
P -1
W A
R N I N
G F I B
E R O
P T I C C
A B
L E
W A
R N
IN
G
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
Taylor Mountain Road
UT FLAP 2500(1)
C3
200'100'0
Scale in Feet
200'100'0
Scale in Feet
92+00 to 121+00
PLAN SHEET
TAYLOR MOUNTAIN ROAD
and Riprap, Class 2 RT with end sections LT and RT
95+32 Install 40' x 24" CMP and Riprap, Class 2 RT with end sections LT and RT
108+68 Install 48' x 24" CMP
MANAGEMENT
BUREAU OF LAND
L = 542.54'
Curve = MAIN-8
D
T = 271.54'
R = 5,000.00'
PI 97+96.34
Curve = MAIN-9
PI 105+46.62
R = 670.00'
T = 88.23'
L = 175.44'
D
Curve = MAIN-10
PI 111+58.27
D
R = 940.00'
T = 68.36'
L = 136.48'
Curve = MAIN-11
PI 115+52.12
D
R = 5,000.00'
T = 69.83'
L = 139.64' e = NC e = 5.0 e = 4.4 e = NC
MANAGEMENT
BUREAU OF LAND
MANAGEMENT
BUREAU OF LAND
MANAGEMENT
BUREAU OF LAND
construction.
subsidiary to 20420-0000, embankment trail section around new outlet. Work is
Lightly grade to realign approx. 90' of
W A
R N
IN
G
W A
R N I N
G
A
P T
.2
P C
.0
P T
.3
P C
.3
P T
.1
W A
R N
IN
G
W A
R N I N
G
.2
IN
C
M P
B W
U G F
O E
M E
M
W A
R N
IN
G F
O C
P
.3
W A
R N
IN
G
A
A3
A
P T
.1
P C
.4
P T
.4
P C
.3
P T
.0
.2
IN
C
M P
B W
U G F
O E
M E
M
W A
R N
IN
G F
O C
P
.3
W A
R N
IN
G
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
Taylor Mountain Road
UT FLAP 2500(1)
C4
121+00 to 150+00
PLAN SHEET
TAYLOR MOUNTAIN ROAD
200'100'0
Scale in Feet
200'100'0
Scale in Feet and Riprap, Class 3 RT with end sections LT and RT
141+17 Install 33' x 30" CMP
Curve = MAIN-12
PI 120+54.22
D
R = 5,000.00'
T = 68.06'
L = 136.12'
Curve = MAIN-13
PI 129+48.39
D
R = 3,400.00'
T = 287.31'
L = 573.26'
Curve = MAIN-14
PI 135+07.84
D
R = 2,500.00'
T = 126.54'
L = 252.86'
Curve = MAIN-16
PI 143+23.65
D
R = 5,000.00'
T = 29.34'
L = 58.69'
Curve = MAIN-15
PI 139+92.56
D
R = 700.00'
T = 62.16'
L = 124.00' e = NC e = 2.0 e = 2.4 e = 5.0 e = NC
BUREAU OF LAND
MANAGEMENT
BUREAU OF LAND
MANAGEMENT
BUREAU OF LAND
MANAGEMENT
BUREAU OF LAND
MANAGEMENT
Offset= 33.00 RT
Sta= 150+40.67
Offset= 75.00 RT
Sta= 150+40.67
O ffs e t=
.0
L
T
S ta
.6
O ffs e t=
.0
L
T
S ta
.6
.0
.2
I N C
M P
B W
U G F
O
6006.2 18 IN CMP
6007.7
W A
R N I N
G
BW
E x te n d H o m e o w n e r P ip e to R
O W R
O W
P C
.2
P T
.6
P C
.4
P T
.8
.0
.2
I N C
M P
B W
U G F
O
6006.2 18 IN CMP
6007.7
W A
R N I N
G
BW
18 IN CMP
.1
I
N C
M P
.3
W A
R I N
G E
M
DUP68
T
T P
O S
T
BW CONTINUES
S T
R A
T A N
E T
W O
R K
S P
U G C
A B
L E
A
P T
.8
P C
.4
P T
.9
P C
.0
P T
.8
P C
.1
18 IN CMP
.1
I
N C
M P
.3
W A
R I N
G E
M
DUP68
T
T P
O S
T
BW CONTINUES
S T
R A
T A N
E T
W O
R K
S P
U G C
A B
L E
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
Taylor Mountain Road
UT FLAP 2500(1)
C5
200'100'0
Scale in Feet
200'100'0
Scale in Feet
150+00 to 180+00
PLAN SHEET
TAYLOR MOUNTAIN ROAD
and Riprap, Class 3 LT with end sections LT and RT
Install (2) 38' x 30" CMP
149+99 Remove existing 24" CMP and Riprap, Class 2 LT with end sections LT and RT
156+74 Install 39' x 24" CMP and Riprap, Class 3 LT with end sections LT and RT
Install (2) 44' x 30" CMP
170+82 Remove existing 24" CMP
CROW MANAGEMENT INC
APN: 03-085-0008
APN: 03-085-0003
JAY ABPLANALP
CROW MANAGEMENT INC
APN: 03-085-0008
Curve = MAIN-17
L = 498.37'
T = 249.22'
R = 12,200.00'
PI 155+87.50
D e = NC
L = 559.35'
T = 279.91'
D e = NC
R = 5,500.00'
PI 162+74.40
Curve = MAIN-18
APN: 03-085-0014
SHERRYL GALE
BARRY GALE
APN: 03-085-0007
MONICA NIELSON
RON R NIELSON
Curve = MAIN-20
PI 176+01.47
R = 9,000.00'
T = 155.43'
L = 310.82'
D e = NC
BARRY GALE
SHERRYL GALE
APN: 03-085-0005
BUREAU OF LAND
MANAGEMENT
APN: 03-085-0011
KATHLEEN ANN ADAMS
L = 263.54'
T = 132.62'
R = 950.00'
PI 168+96.07
Curve = MAIN-19
D e = 4.4
APN: 03-085-0011
KATHLEEN ANN ADAMS
APN: 03-085-0003
JAY ABPLANALP
APN: 03-085-0003
JAY ABPLANALP
Verify final location and size with the CO
161+50 Install 66' x 18" CMP
60906090
60906090
6015 60
5 6025
603060
6015 60
5 6025
603060
IN
C
M P
.8
.6
STO
N E
W A
R N I N
G
W A
R N I N
G
W A
R N I N
GB
H .1
W A
R N I N
G
B H .1
W A
R N I N
G
W A
R N I N
G
W A
R N I N
G
P .1
B
H .1
D N
A I L
STEEL PIPE
W
F O C
A B
L E
BW
O ffs e t=
.0
L
T
S ta
.4
O ffs e t=
.0
L
T
S ta
.3
O ffs e t=
.0
R
T
S ta
.4
O ffs e t=
.0
R
T
S ta
.4
O ffs e t=
.0
R
T
S ta
.3
O ffs e t=
.0
R
T
S ta
.9
O ffs e t=
.0
L
T
S ta
.6
O ffs e t=
.0
L
T
S ta
.2
O ffs e t=
.0
L
T
S ta
.2
O ffs e t=
.0
L
T
S ta
.4
O ffs e t=
.0
L
T
S ta
.4
A
A
3A
P C
.1
P T
.1
P C
.1
P T
.1
P C
.0
P T
.6
P C
.7
P T
.2
IN
C
M P
.8
.6
STO
N E
W A
R N I N
G
W A
R N I N
G
W A
R N I N
GB
H .1
W A
R N I N
G
B H .1
W A
R N I N
G
W A
R N I N
G
W A
R N I N
G
P .1
B
H .1
D N
A I L
STEEL PIPE
W
F O C
A B
L E
BW
60906090
60906090
W A
R N I N
G
BW
STRATA NETWORKS
.4
P .7
IRON 6
.9
I
N C
M P
BW
B W
W A
R N I N
G
A1
P T
.2
P C
.7
P T
.9
P C
.4
P T
.9
W A
R N I N
G
BW
STRATA NETWORKS
.4
P .7
IRON 6
.9
I
N C
M P
BW
B W
W A
R N I N
G
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
Taylor Mountain Road
UT FLAP 2500(1)
C6
180+00 to 209+00
PLAN SHEET
TAYLOR MOUNTAIN ROAD
200'100'0
Scale in Feet
200'100'0
Scale in Feet
Remove and replace 280' of fence and Riprap, Class 2 RT with end sections LT and RT
202+65 Install 40' x 24" CMP
Spring Cre ek
Curve = MAIN-21
PI 180+84.25
R = 1,000.00'
T = 123.08'
L = 244.94'
D
Curve = MAIN-22
T = 99.04'
L = 198.06'
PI 187+00.17
D
R = 7,000.00'
D
PI 191+10.02
Curve = MAIN-23
T = 120.98'
R = 1,800.00'
L = 241.59' L = 203.49'
T = 103.44'
R = 460.00'
PI 194+15.17
Curve = MAIN-24
D
Curve = MAIN-25
PI 198+21.98
D
R = 3,200.00'
T = 165.26'
L = 330.22' e = 4.2 e = NC e = 3.0 e = 5.8 e = NC
UFFORD INVESTMENTS LTD
APN: 03-085-0016
APN: 03-085-0013
LANORE J LANCE
DARRELL D LANCE
BUREAU OF LAND
MANAGEMENT
APN: 03-085-0017
CLAUDIA T REYNOLDS
GARY RAY REYNOLDS
APN: 03-085-0014
SHERRYL GALE
BARRY GALE
GARY RAY REYNOLDS
CLAUDIA T REYNOLDS
APN: 03-085-0017
APN: 03-085-0016
UFFORD INVESTMENTS LTD
APN: 03-085-0016
UFFORD INVESTMENTS LTD
UFFORD INVESTMENTS LTD
APN: 03-082-0003
existing 18" CPP
Do not distrub and Riprap, Class 4 LT with headwall and wingwalls LT and RT
Install (2) 82' x 72" CMP
185+10 Remove existing 60" CMP
See Special 204-B.
Install full width deep patch.
181+35 to 184+00
Riprap ditch, Rt.
Offset= 45.00 RT
Sta= 208+21.28
Offset= 33.00 RT
Sta= 208+21.28
Offset= 45.00 RT
Sta= 207+98.47
Offset= 45.00 RT
Sta= 207+70.69
Offset= 33.00 RT
Sta= 207+70.69
O ffs e t=
.0
L
T S ta
.8
O ffs e t=
.0
L
T S ta
.8
O ffs e t=
.0
L
T S ta
.6
O ffs e t=
.0
L
T S ta
.6
O ffs e t=
.0
L
T S ta
.4
O ffs e t=
.0
R
T S ta
.2
O ffs e t=
.0
R
T S ta
.2
O ffs e t=
.0
R
T S ta
.2
O ffs e t=
.0
R
T S ta
.2
O ffs e t=
.0
L
T S ta
.2
O ffs e t=
.0
L
T S ta
.2
O ffs e t=
.0
L
T S ta
.2
O ffs e t=
.0
L
T S ta
.2
UFFORD INVESTMENTS LTD
APN: 03-085-0016
Install headwall LT
207+97 Extend 30" CMP 6' LT
BW
.3
I N C
M P
.4
F O C
A B
L
E BW
W A
R N I N
G
C O
N T I N
U E S
O ffs e t=
.0
R
T
S ta
.3
O ffs e t=
.0
R
T
S ta
.3
O ffs e t=
.0
R
T
S ta
.9
O ffs e t=
.0
R
T
S ta
.6
O ffs e t=
.0
R
T
S ta
.6
O ffs e t=
.0
R
T
S ta
.6
O ffs e t=
.0
R
T
S ta
.6
O ffs e t=
.0
L
T
S ta
.8
O ffs e t=
.0
L
T
S ta
.8
O ffs e t=
.0
L
T
S ta
.4
P T
.9
P C
.8
P T
.1
BW
.3
I N C
M P
.4
F O C
A B
L
E BW
W A
R N I N
G
C O
N T I N
U E S
S T
R A
T A N
E T
W O
R K
S
S T
R A
T A N
E T
W O
R K
S
M
P H
O ffs e t=
.0
R
T
S ta
.7
O ffs e t=
.0
R
T
S ta
.7
O ffs e t=
.0
R
T
S ta
.8
O ffs e t=
.0
R
T
S ta
.8
O ffs e t=
.0
R
T
S ta
.1
O ffs e t=
.0
R
T
S ta
.0
O ffs e t=
.0
L
T
S ta
.1
O ffs e t=
.0
L
T
S ta
.1
O ffs e t=
.0
L
T
S ta
.6
O ffs e t=
.0
L
T
S ta
.6
O ffs e t=
.0
L
T
S ta
.7
O ffs e t=
.0
L
T
S ta
.7
A
P C
.4
P T
.5
P C
.6
P T
.0
S T
R A
T A N
E T
W O
R K
S
S T
R A
T A N
E T
W O
R K
S
M
P H
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
Taylor Mountain Road
UT FLAP 2500(1)
C7
209+00 to 238+00
PLAN SHEET
TAYLOR MOUNTAIN ROAD
200'100'0
Scale in Feet
200'100'0
Scale in Feet and Riprap, Class 2 RT with end sections LT and RT
222+38 Install 54' x 24" CMP and Riprap, Class 2 RT with end sections LT and RT
235+07 Install 43' x 24" CMP and Riprap, Class 2 RT with end sections LT and RT
Install 46' x 24" CMP
217+41 Remove existing 30" CMP
Curve = MAIN-26
L = 211.51'
T = 107.18'
R = 530.00'
PI 209+05.65
D
L = 67.33'
T = 33.67'
Curve = MAIN-27
D
R = 7,000.00'
PI 216+85.50
L = 35.10'
T = 17.55'
R = 7,000.00'
PI 225+42.03
Curve = MAIN-28
D
Curve = MAIN-29
PI 230+97.83
L = 134.42'
T = 67.22'
R = 3,000.00'
D e = NC e = NC e = NC e = 5.6
UFFORD INVESTMENTS LTD
APN: 03-082-0003
UFFORD INVESTMENTS LTD
APN: 03-082-0003
MANAGEMENT
BUREAU OF LAND
MANAGEMENT
BUREAU OF LAND
MANAGEMENT
BUREAU OF LAND
TANYA BULLOCK TE
APN: 03-082-0009
APN: 03-082-0012
UFFORD INVESTMENTS LTD
MANAGEMENT
BUREAU OF LAND
M
P H
W A
R N
IN
G
R O
A D D
A M
A G
E
BW
S T
R A
T A N
E T
W O
R K
S R O
A D D
A M
A G
E
S T E E L
BW 4 STRAND STEEL POST
T
F O P
U L L B
O X
A
A
P C
.1
P T
.7
P C
.8
M
P H
W A
R N
IN
G
R O
A D D
A M
A G
E
BW
S T
R A
T A N
E T
W O
R K
S R O
A D D
A M
A G
E
S T E E L
BW 4 STRAND STEEL POST
T
F O P
U L L B
O X
I
N C
M P D
I R O
N L
Y D I R O
N L
Y
BW
W A
R N I N
G T I
M B
E R
L I N
E
C O
N T I N
U E S
BW
T P
O S
T
O ffs e t=
.0
R
T S ta
.5
O ffs e t=
.0
R
T S ta
.9
O ffs e t=
.0
R
T S ta
.8
O ffs e t=
.0
R
T S ta
.9
O ffs e t=
.0
R
T S ta
.9
O ffs e t=
.0
R
T S ta
.4
O ffs e t=
.0
R
T S ta
.4
A
A
A
P C
.8
P T
.3
P C
.3
P T
.0
P C
.3
P T
.6
I
N C
M P D
I R O
N L
Y D I R O
N L
Y
BW
W A
R N I N
G T I
M B
E R
L I N
E
C O
N T I N
U E S
BW
T P
O S
T
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
Taylor Mountain Road
UT FLAP 2500(1)
C8
238+00 to 265+00
PLAN SHEET
TAYLOR MOUNTAIN ROAD
200'100'0
Scale in Feet
200'100'0
Scale in Feet and Riprap, Class 4 RT with end sections LT and RT
239+10 Install 51' x 42" CMP and Riprap, Class 2 RT with end sections LT and RT
260+44 Install 37' x 24" CMP
L = 410.70'
T = 220.17'
R = 460.00'
PI 243+91.27
Curve = MAIN-30
D
L = 180.49'
Curve = MAIN-31
D
R = 410.00'
T = 91.73'
PI 254+87.56
L = 65.70'
T = 32.85'
Curve = MAIN-32
D
R = 5,000.00'
PI 260+24.15
L = 50.29'
R = 5,000.00'
T = 25.14'
PI 264+59.50
Curve = MAIN-33
D e = 5.8 e = 6.0 e = NC e = NC
TIMAFEY I MARTUSHEV
CARO A NORTON
APN: 03-082-0024
UFFORD INVESTMENTS LTD
APN: 03-082-0011
UFFORD INVESTMENTS LTD
APN: 03-082-0012
APN: 03-082-0009
TANYA BULLOCK TE
STATE LANDS
UFFORD INVESTMENTS LTD
APN: 03-077-0004
UFFORD INVESTMENTS LTD
APN: 03-082-0001
APN: 03-082-0011
UFFORD INVESTMENTS LTD
CARO A NORTON
APN: 03-082-0024
TIMAFEY I MARTUSHEV
and Riprap, Class 4 RT with end sections LT and RT
Install 45' x 48" CMP
245+42 Remove existing 18" CPP
See Special 605-A.
Standard underdrain, Lt.
245+00 to 246+20
See Detail C204-51.
Subexcavation full width.
245+50 to 246+50
Do not disturb fence
Offset= 50.00 LT
Sta= 246+03.42
Offset= 50.00 LT
Sta= 245+41.84Offset= 33.00 LT
Sta= 245+41.84
O ffs e t=
.0
L
T
S ta
.4
O ffs e t=
.0
R
T
S ta
.7
O ffs e t=
.0
R
T
S ta
.7
O ffs e t=
.0
R
T
S ta
.8
O ffs e t=
.0
R
T
S ta
.8
Offset= 33.000 LT
Sta= 242+94.181
Offset= 100.584 LT
Sta= 242+34.829
O ffs e t=
.0
L
T
S ta
.0
O ffs e t=
.7
L
T
S ta
.0
O ffs e t=
.0
L
T
S ta
.2
O ffs e t=
.0
L
T
S ta
.2
O ffs e t=
.0
L
T
S ta
.7
O ffs e t=
.0
R
T
S ta
.7
O ffs e t=
.0
R
T
S ta
.7
O ffs e t=
.0
R
T
S ta
.2
O ffs e t=
.0
R
T
S ta
.2
BW
T P
O S
T
.2
IN
C
M P
.1
BW
P
BW
P C
.3
P T
.6
P C
.6
P T
.9
P C
.4
P T
.4
P C
.9
BW
T P
O S
T
.2
IN
C
M P
.1
BW
P
BW
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
Taylor Mountain Road
UT FLAP 2500(1)
5 6
BW
P
2 STRAND AND CHICKEN WIRE FENCE STEEL POST
STEEL WOOD CORRAL
S T
E E
L G
A T
E
A
P C
.9
P T
.1
P C
.6
P T
.6
P C
.6
P T
.5
P C
.4
P T
.6
5 6
BW
P
2 STRAND AND CHICKEN WIRE FENCE STEEL POST
STEEL WOOD CORRAL
S T
E E
L G
A T
E
C9
200'100'0
Scale in Feet
200'100'0
Scale in Feet
265+00 to 293+00
PLAN SHEET
TAYLOR MOUNTAIN ROAD
and Riprap, Class 2 RT with end sections LT and RT
293+00 Install 34' x 24" CMP
Curve = MAIN-34
L = 177.25'
T = 88.64'
R = 5,000.00'
PI 271+47.31
D
L = 412.98'
T = 210.55'
R = 860.00'
PI 275+05.04
Curve = MAIN-35
D
L = 326.20'
T = 164.56'
R = 1,000.00'
PI 280+07.50
Curve = MAIN-36
D
L = 107.97'
T = 54.01'
R = 1,500.00'
Curve = MAIN-37
PI 282+93.64
D
L = 333.88'
Curve = MAIN-38
PI 285+95.09
D
R = 1,800.00'
T = 167.42'
L = 65.21'
T = 32.60'
Curve = MAIN-39
D
R = 5,000.00'
PI 290+57.04
e = NC e = 4.6 e = 4.2 e = 3.4 e = 3.0 e = NC
STATE LANDS
UFFORD INVESTMENTS LTD
APN: 03-077-0004
APN: 03-077-0004
UFFORD INVESTMENTS LTD
UFFORD INVESTMENTS LTD
APN: 03-077-0004
STATE LANDS
and Riprap, Class 4 RT with headwall and wingwalls LT and RT
Install (2) 49' x 48" CMP
276+89 Remove existing 36" CMP
Offset= 33.00 LT
Sta= 277+75.62
Offset= 60.00 LT
Sta= 277+75.62Offset= 60.00 LT
Sta= 276+05.09
Offset= 33.00 LT
Sta= 276+05.09
O ffs e t=
.0
R
T
S ta
.6
O ffs e t=
.0
R
T
S ta
.6
O ffs e t=
.0
R
T
S ta
.0
O ffs e t=
.0
R
T
S ta
.0
3 A
3A
P C
.9
P T
.1
P C
.4
P T .8
P C .6
,3
.2
E L
,3
.4
+7.2
+5.3 00%
250' VC
K = 132
SSD = 693'
E L
,3
.8
+5.3 00%
+10 .4
320' VC
K = 63
E L
,4
.0
+10 .4
+6.9
300' VC
K = 86
SSD = 458'
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
Superelevation Diagram
UT
Taylor Mountain Road
UT FLAP 2500(1)
-2.00%
-2.00% -2.00%
5.00%
-5.00%
5.00%
-5.00%
293+00 294+00 295+00 296+00 297+00 298+00 299+00 300+00 301+00
301+00 302+00 303+00 304+00 305+00 306+00 307+00
C10
200'100'0
Scale in Feet
LT & RT EOP
Profile grade and axis of rotation
LT EOP
RT EOP
Profile grade
Existing ground
Begin Reconstruction
End Rehabilitation
Station 295+00
See D1
Curve = MAIN-40
L = 80.16'
T = 40.08'
D
R = 5,000.00'
PI 294+48.03
D
L = 824.36'
T = 469.39'
R = 690.00'
PI 303+19.85
Curve = MAIN-41 e = NC e = 5.0
STATE LANDS
STATE LANDS
See C251-51
Placed riprap, class 2
See C251-51
Placed riprap, class 2
See C251-51
Placed riprap, class 2
B O
L T C
O N
C A
C
3 A
3A
PT
.8
PC
.6
P T .4
P C .5
P T
.2
B O
L T C
O N
C A
C
E L
,4
.4
+6.9
+11 .4
400' VC
K = 89
E L
,5
.9
+11 .4
+6.1 00%
340' VC
K = 64
SSD = 374'
5.00%
-5.00%
5.00%
-5.00%
5.00%
-5.00%
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
Superelevation Diagram
UT
5.00%
-5.00%
5.00%
-5.00%
5.00%
-5.00%
307+00 308+00 309+00 310+00 311+00 312+00 313+00
313+00 314+00 315+00 316+00 317+00 318+00
318+00 319+00 320+00 321+00
C11
200'100'0
Scale in Feet
Profile grade and axis of rotation
LT EOP
RT EOP
Profile grade Existing ground
Riprap ditch, Rt.
6570 6570 e = 5.0 L = 1,080.74'
T = 698.92'
R = 670.00'
PI 315+07.58
Curve = MAIN-42
D
STATE LANDS
See C251-51
Placed riprap, class 2
P .1
P C
.5
P T
.2
P C
.5
P .1
E L
,6
.5
+6.1 00%
.0
E L
,7
.6
.0
+9.
0%
342' VC
K = 114
SSD = 531'
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
Superelevation Diagram
UT
-2.00% -2.00%
4.60%
-4.60% -2.00% -2.00%
321+00 322+00 323+00 324+00 325+00 326+00 327+00 328+00
328+00 329+00 330+00 331+00 332+00 333+00
333+00 334+00 335+00
C12
200'100'0
Scale in Feet
Profile grade and axis of rotation
LT & RT EOPLT EOP
RT EOP
Profile grade
Existing ground
Riprap ditch, Rt.
I n s ta ll x
C
M P w it h e n d s e c ti o n s L
T a n d R
T a n d R ip r a p
C la s s R
T
Curve = MAIN-43
T = 126.92'
L = 251.75'
D
R = 800.00'
PI 321+66.45
e = 4.6
STATE LANDS
STATE LANDS
See C251-51
Placed riprap, class 2
See C251-51
Placed riprap, class 2
O ffs e t=
.0
L
T
S ta
.9
O ffs e t=
.0
L
T
S ta
.4
O ffs e t=
.0
L
T
S ta
.6
P T
.8
P C
.0
P T
.4
E L
,8
.4
+9.
0%
.0
.0
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
Superelevation Diagram
UT
-2.00%
5.60%
-5.60%
-2.00%
-2.00%
335+00 336+00 337+00 338+00 339+00 340+00 341+00
341+00 342+00 343+00 344+00 345+00 346+00
346+00 347+00 348+00 349+00
C13
200'100'0
Scale in Feet
Profile grade and axis of rotation
LT & RT EOP
LT EOP
RT EOP
Profile grade
Existing ground
T = 415.98'
R = 4,200.00'
PI 337+50.52
Curve = MAIN-44
D
Curve = MAIN-45
PI 347+27.97
R = 490.00'
T = 95.89'
L = 189.39'
D e = 5.6 e = NC
STATE LANDS
See C251-51
Placed riprap, class 2
See C251-51
Placed riprap, class 2
P T
.4
P C
.8
P T
.5
P C
.2
P T
.4
P C
.4
P T
.3
E L
,9
.7
.0
+1.700%
1,326' VC
K = 129
SSD = 527'
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
Superelevation Diagram
UT
356+07
5.60%
-5.60%
5.60%
-5.60%
2.80%
-2.80%
2.80%
-2.80%
349+00 350+00 351+00 352+00 353+00 354+00 355+00
355+00 356+00 357+00 358+00 359+00 360+00 361+00 362+00 363+00
C14
200'100'0
Scale in Feet
Profile grade and axis of rotation
LT EOP
RT EOP
Profile grade
Existing ground
T = 208.23'
R = 490.00'
PI 352+70.02
Curve = MAIN-46
D
Curve = MAIN-47
T = 235.72'
D
PI 358+23.91
R = 2,000.00'
L = 216.96'
T = 110.29'
R = 490.00'
PI 362+89.69
Curve = MAIN-48
D e = 5.6 e = 2.8 e = 5.6
STATE LANDS
STATE LANDS
CLIFTON D MERKLEY
SHIRLEY R MERKLEY
APN: 03-073-0001
CLIFTON D MERKLEY
SHIRLEY R MERKLEY
APN: 03-073-0001
See C251-51
Placed riprap, class 2
Offset= 56.401 LT
Sta= 350+91.899
Offset= 150.000 LT
Sta= 350+91.899
Offset= 50.000 LT
Sta= 349+94.166
Offset= 150.000 LT
Sta= 349+21.879
Offset= 50.000 LT
Sta= 349+21.879
See D1
Offset= 50.000 LT
Sta= 359+37.924
Offset= 50.000 RT
Sta= 358+50.635
P C
.4
P T
.3
P C
.7
P T
.1
P C
.9
P T
.5
P C
.3
P T
.6
E L
,9
.5
7+1.700%
.5
480' VC
K = 49
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
Superelevation Diagram
UT
369+13
370+92
5.60%
-5.60%
5.80%
-5.80%
3.40%
-3.40% -3.80%
3.80%
363+00 364+00 365+00 366+00 367+00 368+00 369+00 370+00 371+00 372+00 373+00
373+00 374+00 375+00 376+00 377+00
C15
200'100'0
Scale in Feet
Profile grade and axis of rotation
LT EOP
RT EOP
Profile grade
Existing ground
Riprap ditch, Lt.
I n s ta ll x
C
M P w it h e n d s e c ti o n s L
T a n d R
T a n d R ip r a p
C la s s R
T
61' VC
.5
K = 29
SSD = 544'
V P I
E L
,0
.7
+9.
0%
T = 217.75'
L = 404.39'
Curve = MAIN-49
D
R = 440.00'
PI 367+63.45
D e = 5.8 e = 3.4 e = 3.8
SHIRLEY R MERKLEY
APN: 03-073-0001
CLIFTON D MERKLEY
SHIRLEY R MERKLEY
APN: 03-073-0001
CLIFTON D MERKLEY
Curve = MAIN-50
PI 372+13.80
D
R = 1,500.00'
T = 153.82'
L = 306.57'
Curve = MAIN-51
PI 376+50.37
D
R = 1,300.00'
T = 125.03'
L = 249.29'
Offset= 50.000 LT
Sta= 370+59.986
Offset= 33.000 LT
Sta= 370+59.986
Offset= 33.000 LT
Sta= 373+16.240
Offset= 50.000 LT
Sta= 373+16.240 Offset= 50.000 LT
Sta= 373+66.553
Offset= 51.294 LT
Sta= 377+52.048
Offset= 34.294 LT
Sta= 377+52.149
Offset= 33.000 RT
Sta= 373+64.517
Offset= 50.000 RT
Sta= 373+64.493
Offset= 33.000 RT
Sta= 373+23.612
Offset= 50.000 RT
Sta= 373+23.108
Offset= 32.558 RT
Sta= 376+00.193
Offset= 39.558 RT
Sta= 376+00.231
S T E E L
S
T R
A N
D B
W 7 P
E R
C E
N T G
R A
D E
O B J E
C T M
A R
K E
R S
A S
H L E
Y N
A T F
O R
E S
T
ASHLEY NATIONAL FORESTCAMPI
NG
DAY 1
6 D
AYS
X
X
X
X
X
X
X
X
S T
E E
L
S T
E E
L
S T
E E
L
X
X
P T
.6
P C
.4
P T
.9
P C
.2
P T
.1
P O
T
.1
S T E E L
S
T R
A N
D B
W 7 P
E R
C E
N T G
R A
D E
O B J E
C T M
A R
K E
R S
A S
H L E
Y N
A T F
O R
E S
T
ASHLEY NATIONAL FORESTCAMPI
NG
DAY 1
6 D
AYS
X
X
X
X
X
X
X
X
S T
E E
L
S T
E E
L
S T
E E
L
X
X
V P I
E L
,0
.0
+9.
0%
+6.5 13%
329' VC
V P I
E L
,0
.0
+9.
0%
+6.5 13%
329' VC
K = 114
SSD = 538'
,1
.1
,1
.1
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts C
M L P
P P
N P
C .d g n
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
Superelevation Diagram
UT
3 -2.00%-2.00%-3.80%
5.40%
-5.40%
384+12
4.00%
-4.00%
377+00 378+00 379+00 380+00 381+00 382+00 383+00 384+00
384+00 385+00
C16
200'100'0
Scale in Feet
Profile grade and axis of rotation
LT EOP
RT EOP
Profile grade
Existing ground
Riprap ditch, Lt.
a n d R ip r a p
C la s s R
T w it h e n d s e c ti o n s L
T a n d R
T
I n s ta ll x
C
M P
See D2 for parking lot details e = 5.4 e = 4.0
APN: 03-073-0001
SHIRLEY R MERKLEY
CLIFTON D MERKLEY
FOREST
NATIONAL
ASHLEY
E 2175895.94
N 7391252.39
End Reconstruction
End Project
Station 385+53.19
Curve = MAIN-52
PI 381+28.76
D
R = 550.00'
T = 133.27'
L = 261.50'
Curve = MAIN-53
PI 384+12.19
D
R = 600.00'
T = 15.96'
L = 31.92'
Do not disturb cattleguard.
Cattleguard to be replaced prior to construction.
Offset= 51.294 LT
Sta= 377+52.048
Offset= 34.294 LT
Sta= 377+52.149
Offset= 31.637 LT
Sta= 379+98.938
Offset= 34.483 RT
Sta= 380+21.380
Offset= 40.958 RT
Sta= 380+24.028
Taper paved width from 24' to 16'
Sta. 384+28.15 to Sta. 385+53.19
P O
T
.0
P C
.4
P O
T
.2
P O
T
.0
P C
.0
PT 600+
75.61
601+
PO
T 601+
81.42
P O
T
.0
0PT 600+
75.61 601+
PO
T 601+
81.42
V P I
E L
,8
.6
+4.29 3% -1.423%
,8
.1
,8
.2
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts D
M in o r P
P D
J C
F .d g n
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
Taylor Mountain Road
UT FLAP 2500(1)
100'50'0
Scale in Feet
100'50'0
Scale in Feet
D1
Curve = AP350-1
PI 600+48.88
R = 60.00'
D
T = 31.87'
L = 58.60'
D
Curve = AP302-1
PI 501+04.83
R = 100.00'
T = 27.39'
L = 53.46'
6,870
6,865
6,860
6,855
6,850
6,845
6,840
6,880
6,875
6,440
6,880
6,875
6,870
6,865
6,860
6,855
6,850
6,840
6,845
6,885 6,885
6,420
6,415
6,410
6,405
6,400
6,425
6,430
6,435
6,420
6,415
6,410
6,405
6,400
6,425
6,430
6,435
6,440
351+00
350+00
349+00
2+
R=25'
Approach road 600+00
Mainline 350+58.33
End approach road
Sta. 601+81.42
End approach road
Sta. 501+04.25
Approach road 500+00
Mainline 302+72.04
R=25'
AP302 AP350
600+00 601+81.42
Existing ground
6,395 6,395
Match existing sta 501+04.25
Profile grade
Existing ground Profile grade
Match existing sta 601+81.42
500+00 501+04.25 601+00
Approach road 500+00
Mainline 302+72.04=
Approach road AP302
Approach road 600+00
Mainline 350+58.33=
Approach road AP350
-7.600%
+5.0 21%
,4
.4
V P I
E L
,4
.9
V P I
E L
,4
.6
-2.000%
R=50'
S T E E L
S
T R
A N
D B
W
P
E R
C E
N T G
R A
D E
O B
JE
C T M
A R
K E
R S
A S
H L E
Y N
A T F
O R
E S
T
ASHLEY NATIONAL FOREST
CAM
PI
NG
DAY
D
AYS
X
X
X
X
X
X
X
X 6S
T E
E L
S T
E E
L
S T
E E
L
X
X
POT 700+00.00
700+00
PC 7
00+
23.
P C
C
.9
P C
C
.7
P T
.1
P C
.6
PT 704+20.27
POT 704+31.02
V P I
E L
,0
.7
+5.3 87%7
,0 .0
V P I
E L
,0
.6
+9.
4%
+4.00 0%
V P I
E L
,0
.8
+4.00 0%
V P I
E L
,0
.5
+8.5
+2.405%
,0
.8
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts D
M in o r P
P D
J C
F .d g n
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
Taylor Mountain Road
UT FLAP 2500(1)
100'50'0
Scale in Feet
D2
8,005
7,085
7,080
7,075
7,070
7,065
7,090
7,095
8,000
7,060
PARKING
8,005
8,000
7,095
7,090
7,085
7,080
7,075
7,070
7,065
7,060
Existing ground
Profile grade
704+36.78
PARKING 704+31.02
Mainline 383+79.86=
PARKING 700+00
Mainline 380+47.45=
700+00 701+00 702+00 703+00
PARKING 704+31.02
Mainline 383+79.86=
PARKING 700+00
Mainline 380+47.45=
50'R
R
4.7 'R
Curve = PARKING-1
PI 700+66.17
D
R = 40.00'
T = 42.84'
L = 65.58'
Curve = PARKING-2
PI 701+98.45
D
R = 623.23'
T = 109.55'
L = 216.89'
R = 50.00'
Curve = PARKING-3
PI 703+16.61
D
T = 10.82'
L = 21.32'
R = 15.00'
Curve = PARKING-4
PI 704+12.92
D
T = 9.30'
L = 16.65'
.3
R
.0
R
R
20'R
4.7'R
Replace material with embankment material.
Excavate rock 5' below finish grade.
Construct 10'x20' pad for forest sign.
reset on pad by Forest.
Sign will be removed and
See Sheets Y10-Y29
Place 6" of aggregate base on contractor staging in parking lot.
2. See section 105.04 of the SCRs for details
See Y10-Y29 for parking lot cross-sections.
1. Place 6" of aggregate base on parking lot.
NOTE:
Begin asphalt pavement
Sta. 704+08.60
End asphalt pavement
Sta. 700+21.01
ASHLEY
NATIONAL
FOREST
APN: 03-073-0001
SHIRLEY R MERKLEY
CLIFTON D MERKLEY
ASHLEY
NATIONAL
FOREST
TEMPORARY CULVERT
SECTION B-B
PLAN
Ø embankment
Roadway embankment
Roadway
Temporary culvert backfill
Subgrade
Bedding backflow into natural channel
Use sandbags to prevent
Permanent natural channel
Earthwork limits
Permanent culvert
Roadway centerline
A
A
BB
Flow
Natural ground
D e te rm in e d
T o B
Natural Channel
Bedding
SECTION A-A
SANDBAG BARRIER
Sandbags
7.
6.
5.
4.
3.
2.
1.
backflow into natural channel temporary barrier and prevent
Use sandbags to construct
DIVERSION
diversion channel is included in the Dewatering pay item.
All materials and work required for installation of temporary dissipator, geotextile mats, etc.
system including temporary culvert, assoicated fill, energy
Remove all dewatering components upon removal of dewatering
Construct dewatering pipe at a minimum of 0.5 percent grade.
wetlands and the pipe.
temporary pipe over the wetlands, install a geotextile between the possible when installing the dewatering cluvert. If spanning the
Reduce temporary impacts to the wetlands to the greatest extent must meet a Q2 flow of 14 cubic feet per second.
elbows, connections, energy dissipators at outlet, etc. Bypass pipes
Contractor is responsible for sizing all pumps, dams, bypass pipes, saturated soils in the stream after dewatering.
stream is conducted. Geotextile mats may be used for work on
The dewatering system must be in place before any work in the
Dewatering Plan.
control measures, and anticipated stream flow volumes in the
Include layout, methods, equipment, soil erosion and sediment
Dewatering Plan to the CO as required by SCR Section 157.
Dewatering is the responsibility of the Contractor. Submit a
STATE PROJECT
NUMBER
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
UT
FEDERAL LANDS HIGHWAY
SPECIAL
U.S. CUSTOMARY SPECIAL
157-A
U
S
U
T u t2
R o a d w a y C
A D
D S h e e ts E S
P A .d g n
Taylor Mountain Road
UT FLAP 2500(1)
E1
DIVERSION
TEMPORARY
P
J u n e
NOTE:
channel
Temporary diversion
DETAIL APPROVED FOR USE 12/2012
SUBEXCAVATION
NO SCALE C204-51
See bench detail than 2 ft Bench if greater Varies (2 ft typ.)
max.
2 ft
1 ft min.
6.
5.
4.
3.
2.
1.
NOTE:
the CO.
not construct slopes steeper than 1:2 unless approved by slope adjustments to match the subgrade hinge point. Do
At daylight locations, match the existing fill slope or make roadway cross slope when steeper than 2%.
toward the daylight for drainage, or match the existing subgrade hinge point. Slope the excavation bottom 2%
Daylight to drain when the excavation is within 4 ft of the every 2 ft of subexcavation depth.
in bottom layers. Provide a 1 ft min. bench width for
Widen top of subexcavation area to allow for bench width
Do not place backfill material within the structural section.
Minimum subexcavation dimensions are 6 ft wide x 6 ft long.
unless otherwise specified.
Replace unsuitable material according to Subsection 204.07
REVISED: 08/2014
NUMBER
SHEET
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY DETAIL
DETAIL
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts F C .d g n
U s e r k e ll y .t e r r e ll
F1
Stabilization geogrid
See typical sections for structural section
Finished grade
Backfill with material according to Section 204
TYPICAL SECTION
SUBEXCAVATION
BENCH DETAIL
Total subexcavation width
Width of need according to Section 204
Backfill with material structural section
See typical sections for
Finished grade geotextile, class 1, type B
Separation-stablization
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts F C .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
U.S. DEPARTMENT OF TRANSPORTATION
REVISED:
DETAIL
U.S. CUSTOMARY DETAIL
DETAIL APPROVED FOR USE
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
NUMBER
SHEET
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts F C .d g n
U s e r k e ll y .t e r r e ll
F2
EMBANKMENT BENCHING
204-A
NOTE:
2.
1.
EMBANKMENT BENCHING
8' bench height (typ.)
Top of subgrade bench height.
meet 12' minimum bench width and 8' typical
Bench into existing slope as necessary to
1V:3H or flatter.
Benching is not required for ground sloped at
12' (min.)
See Note 2
Proposed em bankm ent slope
Existing ground
Height varies pattern benching
Typical
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts F C .d
SPECIAL
U.S. CUSTOMARY SPECIAL
U s e r k e ll y .t e r r e ll
NUMBER
SHEET
UT
NO SCALE 204-B
DEEP PATCH
2% min.
FULL WIDTH DEEP PATCH
1' max.
see Special 605-A sheetdrain, Geocomposite
3.
2.
1.
NOTE:
Construct Deep Patch in accordance with Section 261.
Backfill material conforming to Subsection 704.03 (b)
F3
(Deep Patch).
are included in item 20420-0000 Embankment Construction
Pay for excavation, sheetdrains, geogrid, and backfill material according to Sections 157, 624, and 625.
Furnish erosion control, topsoil, and seeding and mulching
:1 m a x
1:
1:4
:2 m a x
Reinforcement geogrid, Type 1 (typ.)
2'
STATE PROJECT
P
M N U
T u t2
R o a d w a y C
A D
D S h e e ts F A .d g n
CENTRA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .