This document contains questions and answers from a pre-bid meeting for a federal-aid highway project. The project involves rehabilitation and resurfacing of approximately 4.95 miles and reconstruction of approximately 1.71 miles of Taylor Mountain Road located in Uintah County, Utah. Major work elements include widening the roadway, vertical and horizontal alignment adjustments, cut and fill slopes, embankment and embankment stabilization, aggregate base course, asphalt paving, drainage improvements including large and deep pipes and concrete headwalls, pavement markings, and signage updates. Selected parking areas and access road intersections will also be rehabilitated or reconstructed. Significant work quantities include clearing and grubbing of 41 acres, 18,000 cubic yards of embankment construction, 19,000 tons of aggregate base, 5 miles of full depth reclamation, and asphalt concrete paving.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for UT FLAP 2500(1), Taylor Mountain Road
November 2, 2021
Questions Answers 1 I cannot find any trench depth information for the culverts that are in the “Full depth reclamation” area of this project.
Sheet T7 in the Plans show pipe bedding details and culvert cross sections are shown on Sheets Z1 through Z11 in the Cross Sections file.
November 8, 2021
Questions Answers 1 I am not seeing what we are to do in the structural section of the
Subexcavation & Deep Patch Bid Items. It doesn’t show placing & paying for Aggregate Base and Asphalt in those items and summary sheets don’t show any quantities for these materials in those locations either.
Match the pavement structural section as shown in the typical section on sheet A6 and the quantities are paid for and included as shown in the surfacing summary on sheet B5, for the respective station range and pay items.