QnA 11 17 2021.pdf

PDF 397 KB Posted

Attached to
UT FLAP 2500(1) Taylor Mountain Road
Solicitation number
6982AF21B000017
Issued by

About this file

This document contains questions and answers from a pre-bid meeting for a federal-aid highway project solicitation. The project involves rehabilitation, restoration, and resurfacing of approximately 4.95 miles and reconstruction of approximately 1.71 miles of Taylor Mountain Road located six miles north of Vernal, Utah. Major work elements include widening the road, vertical and horizontal alignment changes, cut and fill slopes, embankment stabilization, aggregate base course, paving, drainage improvements including large and deep pipes and headwalls, pavement markings, signage updates, and parking/pullout and intersection rehabilitation or reconstruction. Significant quantities include clearing and grubbing 41 acres, embankment construction 18,000 cubic yards, aggregate base 19,000 tons, full depth reclamation 5 miles, and asphalt concrete pavement varying in thickness over 4.95 miles. The solicitation number is 6982AF21B000017 and was issued by the Utah Department of Transportation and Federal Highway Administration for construction to begin upon award.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for UT FLAP 2500(1), Taylor Mountain Road

November 2, 2021

Questions Answers 1 I cannot find any trench depth information for the culverts that are in the “Full depth reclamation” area of this project.

Sheet T7 in the Plans show pipe bedding details and culvert cross sections are shown on Sheets Z1 through Z11 in the Cross Sections file.

November 8, 2021

1 I am not seeing what we are to do in the structural section of the

Subexcavation & Deep Patch Bid Items. It doesn’t show placing & paying for Aggregate Base and Asphalt in those items and summary sheets don’t show any quantities for these materials in those locations either.

Match the pavement structural section as shown in the typical section on sheet A6 and the quantities are paid for and included as shown in the surfacing summary on sheet B5, for the respective station range and pay items.

November 17, 2021

1 RE: Traffic control devices. Where do I put labor for our maintainer and also an assistant when needed?

Refer to the following Sections in the FP-14: 635.01 "..work consists of furnishing, installing, maintaining….", 635.04 General "Furnish, install, and maintain temporary traffic control devices…."