This solicitation is for sign and safety repairs in Puerto Rico's East and Metro regions. The project consists of repairing signs and guardrails damaged by Hurricanes Irma and Maria, including traffic sign assemblies, new guardrails, bridge transition upgrades, traffic sign and guardrail demolition and removal, and temporary traffic control. The work will be split into multiple schedules with the total project cost expected between $10-20 million. Sealed bids from certified Small Business Concerns are due on the date specified in Block 13a of the solicitation. The Department of Transportation Federal Highway Administration is the issuing agency.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PUERTO RICO
A.C CODE NO. 810541
DESIGN AREA
COMMONWEALTH OF PUERTO RICO
DEPARTMENT OF TRANSPORTATION
AND PUBLIC WORKS
HIGHWAY AND TRANSPORTATION
AUTHORITY
ORACLE NO. LPE1099541
SHEETS
TOTAL
NO.
SHEET
YEAR
FISCALISLAND
2018PR
MUNICIPALITY
VIEQUES
P.R.
HIGHWAY
VARIES
CODE NO.
AC. PROJECT
R259999578
AC-825578C
R/W
PROJECT NO.
FED.AID H'WAY
1 70
AUTHORITY
HIGHWAY AND TRANSPORTATION
COROZAL, PUERTO RICO 00783
J. O. V. & ASSOCIATESJ
V
P.O. BOX NO. 865MARINA ST. NO. 6 ALTOS,
ENGINEERING AND ARCHITECTURAL FIRM
ER-9999(292 )
PROJECT SITE
SITE
VIEQUES
HURRICANE MARIA EFFORTS FOR SIGNING
AND GUARDRAIL
SCHEDULE OF DRAWINGS
SHEET
No. DESCRIPTION DWG No.
SECTION "GR" GENERAL
1 TITLE SHEET GR/1
2 INDEX OF SHEETS GR/2
3 GENERAL NOTES AND LEGEND GR/3
4 TYPICAL SECTIONS GR/4
SECTION "MOT" MAINTENANCE OF TRAFFIC
5 - 9 MAINTENANCE OF TRAFFIC MOT/1 TO MOT/5
10 - 11 CONSTRUCTION SIGN TABLE MOT/6 TO MOT/7
SECTION "TS" SIGNING AND ROADSIDE SAFETY PLAN
12 - 46 SIGNING & ROADSIDE SAFETY PLAN TS/1 TO TS/30
47 GUARDRAIL INSTALLATION TABLES TS/31
48 - 50 SIGN DATA SHEET TS/32 TO TS/34
51 - 52 GUIDE SIGN DETAILS TS/35 TO TS/36
53 TABLE OF KILOMETER AND HECTOMETER POST MARKERS TS/37
54 SMALL TRAFFIC SIGN ROUTE MARKER TS/38
55 - 70 INTERIM STANDARD DRAWINGS TS/39 TO TS/54
HUMACAO
VIEQUESLAS
PIEDRAS
TRUJILLO
ALTO
AGUAS
BUENAS
JUNCOS
GURABO
CAYEY
CIDRA
CAGUAS
BAYAMON
INDEX OF SHEETS
SHEET No. DESCRIPTIONSHEET No. DESCRIPTION SECTIONAL
REFERENCE
SECTION "GR" GENERAL
1 TITLE SHEET GR/1
2 INDEX OF SHEETS GR/2
3 GENERAL NOTES AND LEGEND GR/3
4 TYPICAL SECTIONS GR/4
SECTION "MOT" MAINTENANCE OF TRAFFIC
5 MAINTENANCE OF TRAFFIC MOT/1
6 MAINTENANCE OF TRAFFIC MOT/2
7 MAINTENANCE OF TRAFFIC MOT/3
8 MAINTENANCE OF TRAFFIC MOT/4
9 MAINTENANCE OF TRAFFIC MOT/5
10 - 11 CONSTRUCTION SIGN TABLE MOT/6 TO MOT/7
SECTION "TS" SIGNING AND ROADSIDE SAFETY PLAN
12 PR-200 KEY MAP GR/5
13 - 20 PR-200 SIGNING & ROADSIDE SAFETY PLAN TS/1 TO TS/8
21 PR-201 KEY MAP GR/6
22 - 29 PR-201 SIGNING & ROADSIDE SAFETY PLAN TS/9 TO TS/16
30 PR-995 KEY MAP GR/7
31 - 34 PR-995 SIGNING & ROADSIDE SAFETY PLAN TS/17 TO TS/20
35 PR-996 KEY MAP GR/8
36 - 39 PR-996 SIGNING & ROADSIDE SAFETY PLAN TS/21 TO TS/24
40 PR-997 KEY MAP GR/9
41 - 46 PR-997 SIGNING & ROADSIDE SAFETY PLAN TS/25 TO TS/30
47 GUARDRAIL INSTALLATION TABLES TS/31
48 - 50 SIGN DATA TABLES TS/32 TO TS/34
51 - 52 GUIDE SIGN DETAILS TS/35 TO TS/36
53 TABLE OF KILOMETER AND HECTOMETER POST MARKERS TS/37
54 SMALL TRAFFIC SIGN ROUTE MARKER TS/38
55 - 70 INTERIM STANDARD DRAWINGS TS/39 TO TS/54
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
NOT TO SCALEJ. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
2 70
GR
INDEX OF SHEETS
1 - THE COORDINATES USED IN THIS CONTRACT ARE BASED ON THE NAD 83 REV. 97
COORDINATES SYSTEM.
2 - THE DATUM USED FOR THE VERTICAL CONTROL SYSTEM IS MEAN SEA LEVEL.
3 - THE METRIC SYSTEM HAS BEEN USED THROUGHOUT THE PLANS FOR THIS PROJECT EXCEPT
WHERE OTHERWISE SPECIFIED.
4 - ARROWS ON PIPES AND CULVERTS INDICATES THE DIRECTION OF FLOW.
5 - NORTH ARROW POINTS TO THE TRUE NORTH.
TO EXISTING PAVEMENT SLOPES AND ELEVATIONS, EXCEPT WHERE NECESSARY TO
6 - FINAL GRADING ELEVATIONS SHOWN ALONG EXISTING ROADWAYS GENERALLY CONFORM
INCREASE CROSS SLOPE TO MINIMUM REQUIRED FOR ADEQUATE DRAINAGE PURPOSES.
7 - THE CONTRACTOR SHALL MAINTAIN FREE ACCESS TO ALL PROPERTIES ALONG THE LENGTH OF THE PROJECT THROUGHOUT THE DURATION OF THE CONTRACT FOR THE CONSTRUCTION OF THIS PROJECT.
8 - ANY UTILITY DAMAGE OCCURRING THAT ARE NOT SCHEDULE IN THE PLANS SHALL BE
REPAIRED AT THE CONTRACTOR'S EXPENSES.
9 - UNSUITABLE MATERIAL SHALL BE DISPOSED OFF BY THE CONTRACTOR IN LOCATIONS APPROVED
BY THE RESIDENT ENGINEER. THE COST OF REMOVAL AND DISPOSAL SHALL BE CONSIDERED
IN THE PRICE FOR UNCLASSIFIED EXCAVATION.
10 - CONTINUOUS MAINTENANCE SHALL BE KEPT FOR ALL PERMANENT AND PROVISIONAL DRAINS
DURING THE CONSTRUCTION OF BASE COURSE.
11 - NEW CONSTRUCTION SHALL MEET HORIZONTAL AND VERTICAL ALIGNMENTS OF EXISTING
12 - THE CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING ANY MEASURES REQUIRED TO PREVENT
WATER POLLUTION, RESULTING FROM SOIL EROSION AT ALL TIMES DURING ALL THE
CONSTRUCTION PHASES AS PER SECTION 107.09 OF THE GENERAL PROVISIONS. ALL PERMANENT
PROJECT POLLUTION CONTROL FEATURES MUST BE PERFORMED AT THE EARLIEST PRACTICABLE
TIME CONSISTENT WITH GOOD CONSTRUCTION PRACTICES.
13 - THE GEOTHECHNICAL REPORT FOR THIS PROJECT SHALL BE EXAMINED BY THE CONTRACTOR.
FACILITIES.
G E N E R A L N O T E S :135.35
EXISTINGPROPOSED
SYMBOL
B.M. NO.3
S W S W
PL
or or or or
W x x dem.
FEATURE REMARKS
STANDARD SYMBOLS
V-3
T.O.C.
T.O.S. T.O.S.
T.O.C.
(a) WHEN MORE THAN ONE (1) LINE COINCIDE, THEY SHOULD BE IDENTIFY AS APPLICABLE .
14 - THE CONTRACTOR MUST CLEAN ALL THE EXISTING DRAINAGE SYSTEM.
AMERICAN SOCIETY OF TESTING MATERIALS
HIGHWAY TRANSPORTATION OFFICIALS
AMERICAN ASSOCIATION OF STATE AND
A B B R E V I A T I O N S :
BITUMINOUS COATED CORRUGATED
KSI
J.B.
INV.
I.E.
HYD.
IN.
GRD.
HOR.
H.W.
GRAV.
G.V.
KIPS PER SQUARE INCH
INVERT ELEVATION
JUNCTION BOX
HYDRANT
INVERT
INCHES
HIGH WATER
GAS VALVE
HORIZONTAL
GROUND
GRAVEL
GALV.
G.
G.I.
FWD.
F.L.
FAS
F.F.
F.
FAP
FA
E.F.
F. TO F.
E.H.W.
EXT.
E
EXIST.
E.G.
EXP.
EST.
Exc.
GALVANIZED IRON
FEDERAL AID SECONDARY
FEDERAL AID PRIMARY
GALVANIZE
FORWARD
FLOW LINE
GAS
FRONT FACE
FEDERAL AID
FILL
EXISTING GROUND
EXTERNAL DISTANCE
EXTREME HIGH WATER
EACH FACE
EXTERNAL
FACE TO FACE
ESTIMATE
EXCAVATION
EXISTING
EXPANSION
E. TO E.
ELEV.
ENGR.
DWY.
EL.
DIAM.
DWG.
DIM.
DEG.
DIA.
CULV.
CS
C.
C.M.P.
CU.M.
C.O.A.
COORD.
C.M.
COM.
CONC.
ELEVATION
DRIVEWAY
ELEVATION
END TO END
ENGINEER
DIAMETER
DIAMETER
DIMENSION
DRAWING
DEGREE
COMMUNICATIONS
CONTROL OF ACCESS
CORRUGATED METAL
CORRUGATED METAL PIPE
CURVE TO SPIRAL
CUBIC METER
CULVERT
CUT
CONCRETE
COORDINATES
C.L. & L
C. TO C.
CTD.
COL.
CL.
C
C.I.
C.I.P C.B.
BLDG.
B.W.F.
BIT.CONC.
B.C.C.M.P.
B.M.
B & S B.V.
B.F.
B.L.
AVG.
BK.
CENTER TO CENTER
CENTER LINE
COATED
COLUMN
CLEAR
METAL PIPE
BUILDING
CAST IRON
CATCH BASIN
CAST IRON PIPE
BARBED WIRE FENCE
BELL AND SPIGOT
BITUMINOUS CONCRETE
BEARING VALUE
BENCH MARK
BACK FACE
AVERAGE
BASE LINE
BACK
ASB.
AWS.
ASPH.
ALT.
AL.
ABUT.
AGG.
AH.
A.S.T.M.
A.A.S.H.T.O.
AMERICAN WELDING SOCIETY
ALTERNATE
ALUMINUM
ASBESTOS
ASPHALT
ABUTMENT
AGGREGATE
AHEAD
SQUARE METERSSQ. MTS.
V.C. VERTICAL CURVE
N.I.C.
VERT.
W.M.
W.MTR.
W.V.
W.W.
W.M.F.
W.I.
NOT INCLUDED IN CONTRACT
WIRE MESH FENCE
WING WALL
WROUGHT IRON
VERTICAL
WATER MAIN
WATER METER
WATER VALVE
S.G.
TYP.
T.G.
T.E.
T.P.
TEL
TS
S.L.
UG.
T
STA.
STD.
SW.
SC
ST
SQ.M.
STR.
S.S.
STR.
SUBGRADE
TELEPHONE POLE
TANGENT TO SPIRAL
TANGENT DISTANCE OF CURVE
TYPICAL
TOP OF GRADE
TOP ELEVATION
UNDERGROUND
TELEPHONE
SURVEY LINE
SPIRAL TO CURVE
SPIRAL TO TANGENT
SQUARE METER
STATION
STRUCTURE
STORM SEWER
STRAIGHT
STANDARD
SIDEWALK
MEAN SEA LEVELM.S.L.
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
POINT OF VERTICAL INTERSECTION
POINT OF COMPOUND CURVATURE
PROPOSEDPROP.
RT.
SC.
S
RDWAY.
R.O.W.
RD.
RDWAY.
SAN.S.
S.M.H.
SHDR.
P.S.F.
P.R.H.A.
POT
R.C.P.
RR.
R
P.V.I.
P.G.
RET.
RIGHT
SANITARY SEWER
SANITARY SEWER MANHOLE
SLOPE
SHOULDER
SCALE
ROADWAY
RIGHT OF WAY
ROADWAY
ROAD
POUNDS PER SQUARE FOOT
POINT OF TURNING
REINFORCED CONCRETE PIPE
RADIOUS OF CURVATURE
PROPOSED GRADE
RAILROAD
RETAINING
PCC
PDA
P.L.
P.P.
PWR.
P.C.C.
PT
PRC
PI
PC
NO.
M.P.H.
MTS.
PVMT.
O. TO O.
O.D.
O.C.
MON.
MIN.
PILE DRIVING ANALYZER
PORTLAND CEMENT CONCRETE
POINT OF TANGENCY
POINT OF REVERSE CURVE
POINT OF INTERSECTION
POINT OF CURVATURE
PROPERTY LINE
POWER POLE
POWER
MILES PER HOUR
OUTSIDE TO OUTSIDE
OUTSIDE DIAMETER
NUMBER
PAVEMENT
ON CENTER
METERS
MONUMENT
MINIMUM
M/SEC.
L L.C.
M.H.W.
MAX.
M.H.
M.L.
M.B.
L.P.
L
LT.
METERS PER SECOND
MEAN HIGH WATER
LENGTH OF CURVE
MAXIMUM
MANHOLE
MAIN LINE
MAIL BOX
LONG CHORD
LIGHT POLE
LENGTH
LEFT
W.P. WORKING POINT
EXISTING SCHOOL.
EXISTING CHURCH.
EXISTING BASEBALL FIELD.
SPECIAL SYMBOLS FOR URBAN AREA:
EXISTING FIREHOUSE.
EXISTING BRIDGE.
EXISTING GUARD RAIL TO BE REMOVED AND REPLACE.
PRIMARY NETWORK.
PRIMARY URBAN NETWORK.
SECONDARY NETWORK.
TERTIARY NETWORK.
EXISTING CEMETERY.
EXISTING POLICE STATION.
INDUSTRIAL PARK.
EXISTING US POSTAL SERVICE STATION.
EXISTING PEDESTRIAN BRIDGE.
EXISTING MEDICAL CENTER.
LOCATION NUMBER
NOTE:
FOR COLOR, SHAPE AND DIMENSION OF THE ROUTE MARKER SIGNS AND AUXILIAR PLATE REFERS TO SHEETS SIGN DATA TABLE. ALL ROUTE SIGNS AUXILIARIES SHALL MATCH COLOR COMBINATION
OF THE ROUTE SIGN THAT THEY SUPPLEMENT.
15 - THE METAL BARRIER W-BEAM GUARDRAIL SHALL COMPLY WITH DRAWING NO. MB-1 TO MB-30
OF THE PRHTA STANDARD. DRAWING REV. JUNE 2018.
NOT TO SCALEJ. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
3 70
GR
GENERAL NOTES AND LEGEND
TYPICAL SECTION OF PR-200
( Vieques: from Km. 0.00 to Km. 7.80 )
SCALE : 1 : 100
TYPICAL SECTION OF PR-201
( Vieques: from Km. 0.00 to Km. 8.98 )
SCALE : 1 : 100
TYPICAL SECTION OF PR-995, PR-996 & PR-997
SCALE : 1 : 100
(From Km. 0.00 to Km. 5.20) PR-995 (Vieques) (From Km. 0.00 to Km. 4.80) PR-996 (Vieques) (From Km. 0.00 to Km. 7.80) PR-997 (Vieques)
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
GR
TYPICAL SECTIONS
SCALE : 1 : 100
LEGEND:
GENERAL NOTES:
1. NO WORK OTHER THAN MOBILIZATION, TRAFFIC CONTROL AND PROJECT OFFICE, SHALL BE PERFORMED
UNTIL THE PROGRESS SCHEDULE IS APPROVED BY THE ENGINEER.
2. ALL TEMPORARY CONTROL DEVICES SHALL COMPLY WITH THE SUPPLEMENTAL SPECIFICATION NUMBER 638-"MAINTENANCE AND PROTECTION OF TRAFFIC" OF THE STANDARD SPECIFICATION FOR ROAD AND BRIDGE
CONSTRUCTION, 2005 EDITION.
3. EQUIPMENT, MATERIALS AND OTHER DEVICES USED FOR CONSTRUCTION SHALL BE REMOVED FROM THE ROADWAY AFTER WORK HOURS AND SHALL BE STAGED A MINIMUM OF 10 METERS FROM THE TRAVEL WAY.
4. THE DRUM SPACING SHALL BE 5 METERS.
5. ANY ALTERATION TO THE SCHEDULE THAT MAY IMPROVE TRAFFIC OPERATIONS WITHIN THE CONSTRUCTION AREA, IN ACCORDANCE WITH THE CURRENT MUTCD AND WITH NO ADDITIONAL COST TO THE AUTHORITY, SHALL BE SUBMITTED TO THE ENGINEER AT LEAST TWENTY ONE(21) CALENDAR DAYS IN ADVANCE TO THE PROPOSED DATE OF IMPLEMENTATION FOR REVIEW. IF THE PROPOSED ALTERATION IS APPROVED IT SHALL
BE IMPLEMENTED AS DIRECTED BY THE ENGINEER.
6. THE CONTRACTOR CAN PERFORM, WITH THE APPROVAL OF THE ENGINEER, SEVERAL SIMULTANEOUS ACTIVITIES WITHIN A PHASE, AND AS PERMITTED BY THE CONTRACT PROPOSAL QUANTITIES ON THE TRAFFIC
CONTROL ITEMS.
7. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER THE INSTALLATION OF TEMPORARY TRAFFIC CONTROL DEVICES FOR EACH PHASE AT LEAST FOURTEEN (14) CALENDAR DAYS IN ADVANCE FOR THE RELEASE OF PUBLIC NOTICE. THE CONTRACTOR SHALL NOT COMMENCE ANY OF THE CONSTRUCTION PHASES
WITHOUT A PUBLIC NOTICE IS ISSUED OR WITHOUT DIRECT CONSENT FROM THE ENGINEER.
8. THE CONSTRUCTION SIGNS INSTALLATION SHOULD BE IN ACCORDANCE TO THE TEMPORARY TRAFFIC SIGNS
MOUNTING DETAILS, SHEET NO. MPT-23 OF THE PRHTA STANDARD DRAWING REV. JUNE 2012.
9. THE USE, LOCATION AND MESSAGES OF THE PORTABLE CHANGEABLE MESSAGE SIGN (PCMS) SHALL BE
ONLY AS DIRECTED BY THE ENGINEER.
10. THE CONTRACTOR SHALL FURNISH TEMPORARY TRAFFIC CONTROL DEVICES THAT MEET THE NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM REPORT (NCHRP) CURRENT CRITERIA FOR THE APPLICABLE
CRASH WORTHINESS STANDARD.
11. ALL EXISTING SIGNS AND TRAFFIC CONTROL SIGNS DETERMINED BY THE ENGINEER TO BE UNNECESSARY FOR THE APPLICABLE CONSTRUCTION OPERATION SHALL BE IMMEDIATELY COVERED IN ITS ENTIRETY WITH NON ABRASIVE MATERIAL AND SHALL BE INSPECTED DURING DAY AND NIGHT TIME TO ENSURE THAT THE SIGN IS NOT READABLE. THIS WORK IS A SUBSIDIARY OBLIGATION OF THE CONTRACT UNDER EXISTING PAY ITEMS.
12. DURING THE CONSTRUCTION OPERATIONS, THE CONTRATOR SHALL TAKE ALL THE NECESSARY PRECAUTIONS AND MEASURES TO AVOID FALLING DEBRIS, TOOLS, EQUIPMENT OR ANY OTHER MATERIALS INTERFERE OR IMPACT THE MOTORING PUBLIC IN THE ROADWAY. ALL THE MATERIALS, LABOR EQUIPMENT, AND WORK NECESSARY FOR IMPLEMENTING THIS REQUIREMENT IS SUBSIDIARY OBLIGATION OF THE
CONTRACT UNDER EXISTING PAY ITEMS.
13. THE CONTRACTOR SHALL MAINTAIN ACCESS AT ALL TIMES TO ADJACENT PROPERTIES DURING CONSTRUCTION. THIS WORK WILL REQUIRE COORDINATION WITH BUSINESSES AND PRIVATE OWNERS. ALL THE MATERIALS, LABOR, EQUIPMENT, AND WORK NECESSARY FOR IMPLEMENTING THIS REQUIREMENT IS
SUBSIDIARY OBLIGATION OF THE CONTRACT UNDER EXISTING PAY ITEMS.
14. TEMPORARY CONCRETE BARRIER END SECTION SHALL COMPLY WITH DRAWING NO. MPT-03 OF THE PRHTA
STANDARD. DRAWING REV. JUNE 2012.
15. NO EXCAVATION AND/OR PAVEMENT DROP-OFF SHALL REMAIN OPEN WITHIN THE TRAVELED WAY WHEN THE CONTRACTOR OR ITS PERSONNEL IS NOT WORKING AND PHYSICALLY PRESENT AT THE WORK SITE.
16. IN CASE THAT THE WORKS AFFECTED THE EXISTING LUMINARY THE CONRACTOR SHALL PROVIDE ADEQUATE ILLUMINATION IN THE AFFECTED AREA BUT THE GLARE OF THE SAME NO AFFECT THE VISIBILITY OF
THE DRIVERS.
17. TEMPORARY CONCRETE BARRIER SHALL BE USED TO PROTECT VEHICULAR TRAFFIC FROM EXCAVATION OR PAVEMENT DROP-OFF AREAS EQUAL OR GREATER THAN 0.30 METERS DEEP THAT WILL REMAIN OPEN FOR
A DURATION OF MORE THAN ONE DAY, AS APPROVED BY THE ENGINEER.
18. IN ALL CONSTRUCTION OPERATIONS UNDER THIS CONTRACT, ALL PRECAUTIONS SHALL BE EXERCISED IN ORDER THAT THE MOVEMENT OF EQUIPMENT AND CONSTRUCTION WORK SHALL BE PERFORMED IN SUCH A
WAY AS TO AVOID UNNECESSARY INCONVENIENCES TO TRAFFIC.
19. PROVISIONAL SIGNING AND TRAFFIC CONTROL SHALL BE AS PROVIDED IN PART 6 "TEMPORARY TRAFFIC CONTROL" OF THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (M.U.T.C.D), 2009 EDITION.
20. ALL TRAFFIC CONTROL DEVICES SHALL BE CLEANED, REPAINTED, REFLECTORIZED OR REPLACED AS
NECESSARY TO PROVIDE ADEQUATE VISIBILITY AND LEGIBILITY AT ALL TIMES.
21. THE PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY IT DOES RESERVES THE RIGHT TO STOP THE WORKS AT ANY TIME IF THE CONTRACTOR DO NOT COMPLY WITH THE MAINTENANCE OF TRAFFIC AND THE
SAFETY REGULATIONS.
CONSTRUCTION SCHEDULE
THE FOLLOWING CONSTRUCTION SCHEDULE AND SPECIAL INSTRUCTIONS SHALL BE FOLLOWED, IN
ORDER TO MAINTAIN TRAFFIC FLOW WITH "THE LEAST POSSIBLE INTERFERENCE FROM
CONSTRUCTION OPERATIONS".
TYPICAL APPLICATIONS ARE SUMITTED FOR THE TEMPORARY TRAFFIC CONTROL ACTIVITIES FOR A
VARIETY OF SITUATIONS COMMONLY ENCOUNTERED. IT IS REQUIRED FROM THE ENGINEER TO
ADJUST THESE GUIDELINES TO FIELD CONDITIONS.
SPECIFIC SITUATIONS NOT COVERED BY THESE APPLICATIONS SHALL BE BROUGHT UP TO THE
ENGINEER FOR APPROPIATE DIRECTION AND CLARIFICATION 10 DAYS BEFORE THE BEGINNING OF
THE CONSTRUCTION WORK IN THAT AREA.
CONSTRUCTION:
1. IMPLEMENT THE WORK ZONE TEMPORARY TRAFFIC CONTROL IN ACCORDANCE WITH THE
MAINTENANCE OF TRAFFIC INDICATED ON THE PLANS (MOT-2 TO MOT-6).
2. INSTALL PCMS TO COMPLEMENT SIGNING AS REQUIRED BY EACH ACTIVITY TYPE.
3. THE DETAILS SHOWN SHALL BE USED IN BOTH DIRECTIONS.
TRAFFIC:
1. THE TRAFFIC WILL BE FLOWING AS INDICATED ON THE MAINTENANCE OF TRAFFIC USED FOR THE
CONSTRUCTION AREA.
2. ALL WORK TO BE PERFORMED SHALL BE COORDINATED WITH THE TRAFFIC ENGINEERING OFFICE
PERSONNEL.
3. NO WORK SHALL BE ALLOWED DURING PEAK HOURS. THE PEAK HOURS ARE DEFINED AS 6:00 AM -
9:00 AM AND 3:00 PM - 6:00 PM FROM MONDAY TO FRIDAY.
4. ALL ACTIVITIES PROPOSED FOR THE PROJECT THAT AFFECT THE NORMAL FLOW OF TAFFIC, SHALL BE COORDINATED WITH ALL PROJECTS THAT ARE WITHIN A COVERAGE RADIUS OF TWO MILES OF
THE WAY THAT THEY DO NOT AFFECT EACH OTHER.
5. THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER THE ACCESS POINTS FOR
CONSTRUCTION VEHICLES. INSTALL SIGN W8-6 (TRUCK CROSSING - 36" X 36") TO ALERT ROAD USERS
OF LOCATIONS WHERE UNEXPECTED TRAVEL BY CONSTRUCTION VEHICLES MIGHT OCCUR.
FLASHING ARROW PANEL
FLAGGER
(SEQUENTIAL CHEVRON)
TRAFFIC SIGN LOCATION
TRAFFIC FLOW
WORK AREA
LOCATION NUMBER
CODE NUMBER
PLASTIC DRUMS
LEGEND:
FLASHING ARROW PANEL
ARROW PANEL SUPPORT OR
TRAILER (SHOWN FACING DOWN)
FLASHING ARROW PANEL
(CAUTION MODE)WORK VEHICLE
SHADOW VEHICLE
SHADOW VEHICLE WITH
TMA AND FLASHING ARROW
PORTABLE CHANGEABLE
MESSAGE SIGNS (PCMS)
LOCATION
PCMS - X
BUFFER
(Mts.)
12'=3.65 Mts.MPH
Taper lenght (L)
HIGHWAY
A B
100m.
150m.
100m.
150m.RURAL
C
100m.
150m.
URBAN
DISTANCE BETWEEN SIGNS
L = ( Mts. ) and Buffer Space for a typical lane of
3.65 mts.
<25
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
NOT TO SCALE
MOT
MAINTENANCE OF TRAFFIC
TYPICAL APPLICATIONS
mts.
30 mts. 30 mts.
30 mts. 150 mts. 30 mts.30 mts.
150 mts.
A B C
BUFFER WORK
AREATAPER
A B
WORK AREA
mts.
mts.
A B C
BUFFER WORK
AREA
TAPER
30 mts.
30 mts.
150 mts.
30 mts. 30 mts.
A B C TAPER
30 mts.
mts.
BUFFER WORK
AREA
30 mts.
150 mts.15 mts.
A
150 mts.
10 30 mts.
150 mts.
30 mts.
A
30 mts.
A
150 mts.
30 mts. 30 mts.
A
150 mts.
NOTE:
- FOR EACH TYPICAL APPLICATION, THE DISTANCE BETWEEN SIGNS,
TAPER AND BUFFER LONGITUDINAL LENGTH SEE THE TABLE
ON SHEET MOT/1.
- THE WORK AREA LONGITUDINAL LENGTH IT WILL DEPEND OF
THE PROJECT ENGINEER APPROVAL BUT IT SHALL NOT EXCEED
THE 100 MTS OF LENGTH FOR THE STATE ROAD AND NO MORE THAN
60 MTS FOR THE OTHER ROADS.
TYPICAL APPLICATION DIAGRAM I
TYPICAL APPLICATION DIAGRAM III
TYPICAL APPLICATION DIAGRAM II
TYPICAL APPLICATION DIAGRAM IV
LANE
LANE
LANE
MEDIANMEDIAN
LANE
LANE
MEDIAN
LANE
LANE
MEDIAN
LANE
LANE
LANE
LANE
LANE
LANE
LANE
MEDIAN
LANE
LANE
LANE
LANE
MEDIAN MEDIANMEDIAN
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
NOT TO SCALE
MOT
TYPICAL APPLICATIONS
BUFFER
WORK
AREA
TAPER
30 mts.30 mts.
150 mts.
30 mts.30 mts.
150 mts.
BA
30 mts.
30 mts.
150 mts.
A B C
WORK
AREA
A
30 mts. 30 mts.
150 mts.
1 4
BA
30 mts.
30 mts.
B A
W O
R K
AR
EA
C
TA
PE
R
BU
FF
ER
150 mts.
150 mts.
B A
C
TA
PE
R
BU
FF
ER 4
150 mts.
10 W
O R
K
AR
EA
30 mts. 30 mts.
A
150 mts.
BUFFER
WORK
AREA
TAPERA B C
30 mts. 30 mts.
A
150 mts.
40 m ts
40 m ts
A
15 m ts mts.
NOTE:
- FOR EACH TYPICAL APPLICATION, THE DISTANCE BETWEEN SIGNS,
TAPER AND BUFFER LONGITUDINAL LENGTH SEE THE TABLE
ON SHEET MOT/1.
- THE WORK AREA LONGITUDINAL LENGTH IT WILL DEPEND OF
THE PROJECT ENGINEER APPROVAL BUT IT SHALL NOT EXCEED
THE 100 MTS OF LENGTH FOR THE STATE ROAD AND NO MORE THAN
60 MTS FOR THE OTHER ROADS.
TYPICAL APPLICATION DIAGRAM V
TYPICAL APPLICATION DIAGRAM VII
TYPICAL APPLICATION DIAGRAM VI
TYPICAL APPLICATION DIAGRAM IXTYPICAL APPLICATION DIAGRAM VIII
LANE
LANE
LANE
LANE
LANE
LANE
LANE
LANE
LANE
LANE
LANE
MEDIANMEDIAN
LANE
MEDIAN MEDIAN
MEDIAN
LANE
LANE
LANE
LANE
MEDIAN
LANE
LANE
LANE
LANE
LANE
LANE
LANE
LANE
MEDIAN MEDIAN
MEDIAN MEDIAN
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
NOT TO SCALE
MOT
SHOULDERWORK
AREASHOULDER
TRUCK-MOUNTED-ATTENUATOR
FLASHING ARROW
(CAUTION MODE)
TYPICAL APPLICATION DIAGRAM XI
OUTSIDE SHOULDER CLOSURE
TEMPORARY AND PERMANENT TRAFFIC SIGNS INSTALLATION
SHORT-DURATION OR MOBILE OPERATION
TYPICAL APPLICATIONS
150 mts.
30 mts. 30 mts.
150 mts.
1 4
B A
WORK
AREA
C
TA
PE
R
BU
FF
ER
150 mts.
30 mts.
A
TYPICAL APPLICATION DIAGRAM X
NOTE:
- FOR EACH TYPICAL APPLICATION, THE DISTANCE BETWEEN SIGNS,
TAPER AND BUFFER LONGITUDINAL LENGTH SEE THE TABLE
ON SHEET MOT/1.
- THE WORK AREA LONGITUDINAL LENGTH IT WILL DEPEND OF
THE PROJECT ENGINEER APPROVAL BUT IT SHALL NOT EXCEED
THE 100 MTS OF LENGTH FOR THE STATE ROAD AND NO MORE THAN
60 MTS FOR THE OTHER ROADS.
LANE
LANE
LANE
LANE
MEDIAN MEDIAN
TYPICAL APPLICATION DIAGRAM XII
TYPICAL APPLICATION DIAGRAM LEFT LANE CLOSURE XIV
TYPICAL APPLICATION DIAGRAM RIGHT LANE CLOSURE XIII
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
NOT TO SCALE
MOT
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
NOT TO SCALE
MOT
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
NOT TO SCALE
MOT
STRUCTURE
OVERHEAD
SIGN
SIZE OF
TYPEPANELS
SIGNLOCATIONCODE
NUMBER NUMBER CODE L E G E N D
TOTALREFERENCE
MANUAL ITEM
4 4
5 1
6 1
GUIDE
SEE
SIGN 18
MUTCD
D.T.P.W.
SEE
MANUAL
MANUAL
SEE
D.T.P.W.
MANUAL
SEE
D.T.P.W.
MANUAL
SEE
D.T.P.W.
MANUAL
SEE
D.T.P.W.
D.T.P.W.
SEE
MANUAL
D.T.P.W.
SEE
MANUAL OFFSET REQUIREMENTS
ROUTE FROM
ALL PROJECT
TO
.60 mts.
OFFSET
ALL PROJECT
1,5,7,9
W21-4
W20-5
36" X 36"
36" X 36"
TRABAJO
EN CARRETERA
ADELANTE
CARRIL
CERRADO
300 MTS
IZQUIERDO
N/A
N/A
4,6,8,10
W4-2
W20-5a
W4-2
36" X 36"
36" X 36"
36" X 36" N/A
N/A
13 W21-4 36" X 36" N/A
N/A
N/A
PARE
AQUI CON
LUZ ROJA14 R10-6 24" X 36" N/A
15 R1-2 36"x36"X36 N/A
CEDA
TRABAJO
EN CARRETERA
XX MTS
W21-5 36"X36""17
G20-2A 48"X36"
CARRETERA
TERMINA
TRABAJO EN
DETAIL
N/A
SEE
MUTCD
SEE
CARRIL
CERRADO
DERECHO
300 MTS
STRUCTURE
OVERHEAD
SIGN
SIZE OF
TYPEPANELS
SIGNLOCATIONCODE
NUMBER NUMBER CODE L E G E N D
TOTALREFERENCE
MANUAL ITEM
15 1
D.T.P.W.
MANUAL
MANUAL
SEE
D.T.P.W.
D.T.P.W.
SEE
MANUAL
D.T.P.W.
SEE
MANUAL
W21-4 36" X 36" N/A
W20-5A
W21-5A 36" X 36"
36" X 36" N/A
23,24 W20-6 36" X 36" N/A
N/A
25,26 W20-7(A) 36" X 36" N/A
CARRETERA
DE
UN CARRIL
SEE
PASEO
CERRADO
DERECHO
150 MTS
N/A11 16 1
SEE
W21-5 36"X36"
TRABAJO
PASEO
EN
MANUAL
D.T.P.W.
TRABAJO
EN CARRETERA
150 MTS
PASEO
CERRADO
IZQUIERDO
150 MTS
14 1D.T.P.W.
MANUAL
20 W20-5A 36" X 36" N/A
SEEPASEO
CERRADO
IZQUIERDO
300 MTS
1D.T.P.W.
SEE
MANUAL
22 W21-5A 36" X 36" N/A
PASEO
CERRADO
DERECHO
300 MTS
MTS
W13-1
MTS
W16-2p 24" X 18" D.T.P.W.
SEE
MANUAL
LEYEND: BLACK (NO REFLECTIVE)
BACKGROUND: WHITE (REFLECTIVE)
COLORS
SIGN CODE: R10-6
PARE
AQUI CON
LUZ ROJA
*GRADUAL DECREASE OF THE AXIS
CAN BE USED
TRABAJO
EN
PASEO
ADELANTE
RURAL
URBAN ALL PROJECT .60 mts.ALL PROJECT
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
NOT TO SCALE
MOTMAINTENANCE OF TRAFFIC
CONSTRUCTION SIGN TABLE
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
NOT TO SCALE
12 70
GR
PR-200 KEY MAP
TS-1
TS-8
TS-6
TS-5
TS-2
TS-4TS-3
TS-7
PR-200
MAXIMA
VELOCIDAD
ESTACIONE
NO
PARE
PARE
PARE
PARE
PARE
PARE
PARE
ENTRE
NO BACK
TO
BACK
CEDA
9221 9217
2009216
PARE
PARE
PARE
ESTACIONE
NO
ESCUELA
VELOCIDAD
MAXIMA
6AM-7PM
PARE
PARE
PARE
ESCOLAR
TERMINA
ZONA
ESTACIONE
NO
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
13 70
TS
M A T C H L I N E K m
0 . 7
M A
T C
H
L I
N E
K m
. 4
M A T C H L I N E K m
0 . 7
PR-200 SIGNING & ROADSIDE SAFETY PLAN
FROM KM 0.0 TO KM 1.4
INT
INT
997 200597
997594
PARE
PARE
PARE
PARE
ESCUELA
VELOCIDAD
MAXIMA
6AM-7PM
PARE
PAREADELANTE
PILON
AEROPUERTO
PARE
PARE
ESPERANZA
ESCOLAR
TERMINA
ZONA
201200
INT
INT
AEROPUERTO
ISABEL II
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
14 70
TS
VIEQUES
M A T C
H L I N
E K m
1 . 4 M A
T
. 1
M A
T
. 1
M A T C
H L I N
E K m
2 . 8
PR-200 SIGNING & ROADSIDE SAFETY PLAN
FROM KM 1.4 TO KM 2.8
201200
INT
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
15 70
TS
M A T C
H L I N
E K m
2 . 8
M A T
I N
3 .
M A T C
H L I N
E K m
4 . 2
M A T C
E
K m
3 .
PR-200 SIGNING & ROADSIDE SAFETY PLAN
FROM KM 2.8 TO KM 4.2
ESTACIONE
NO
AEROPUERTO
DE
VIEQUES
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
16 70
TS
M A
T
. 2
M A T C
H L I N
E K m
4. 9
M A
T
. 9
M A
T
. 7
PR-200 SIGNING & ROADSIDE SAFETY PLAN
FROM KM 4.2 TO KM 5.7J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
591 9563
INT
INT
995 200
995200
INT
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
17 70
TS
M A T C H L I N E K m
5 . 7
M A T C
H L I N
E K m
6 . 5
M A T C
H L I N
E K m
6 . 5
M A T C
H L I N
E K m
7 . 2
PR-200 SIGNING & ROADSIDE SAFETY PLAN
FROM KM 5.7 TO KM 7.2
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
18 70
TS
M A T C
H L I N
E K m
8 . 3
M A
T
. 2
PR-200 SIGNING & ROADSIDE SAFETY PLAN
FROM KM 7.2 TO KM 8.3
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
19 70
TS
PR-200
M A
T
. 0
M A T C
H L I N
E K m
8 . 3
M A
T
. 0
M A
T
. 7
PR-200 SIGNING & ROADSIDE SAFETY PLAN
FROM KM 8.3 TO KM 9.7
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
20 70
TS
PR-200
M A
T
. 7
PR-200 SIGNING & ROADSIDE SAFETY PLAN
FROM KM 9.7 TO KM 11.0
M A T C H L I N E K m
1 0 . 4
M A
T
TS-10
TS-11 TS-12 TS-13
TS-14 TS-15
TS-16
201 201
TS-9
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
NOT TO SCALE
21 70
GR
PR-201 KEY MAP
PR-201
PARE
PARE
PARE
PARE
9514 PARE
M.P.H
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
22 70
TS
PR-201
M A T C H L I N
E K m
0 . 7
M A T C H L I N E K m .
1 . 4
M A
T
. 7
PR-201 SIGNING & ROADSIDE SAFETY PLAN
FROM KM. 0.0 TO KM. 1.4
M.P.H
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
23 70
TS
M A
T
.1
M A T C H L I N E K m .
1 . 4
PR-201
FROM KM. 1.4 TO KM. 2.1
M.P.H.
M.P.H.
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
24 70
TS
M A
T
.1
M A T C
H L I N
E K m
2 . 8
PR-201
FROM KM. 2.1 TO KM. 2.8
M.P.H.
M.P.H.
0M
.P.H.
M .P .H
PARE
PARE
PILON
ESPERANZA
PUERTO REAL
M.P.H.
9497 9496
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
25 70
TS
M A T C H L I N E K m .
3 . 5
PR-201
M A T C
H L I N
E K m
2 . 8
M A T C
H L I N
E K m
3 . 5
M A
T
. 2
PR-201 SIGNING & ROADSIDE SAFETY PLAN
FROM KM. 2.8 TO KM. 4.2
INT
996201
INT
201996
INT
ADELANTE
ESCUELA
VELOCIDAD
MAXIMA
6AM-7PM
ESCOLAR
TERMINA
ZONA
PARE
PARE
PARE
M.P.H.
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
26 70
TS
M A
T
. 9
M A
T
. 6
M A T C H L I N
E K m
4 . 9
M A T C H L I N
E K m
4 . 2
PR-201
PR-201 SIGNING & ROADSIDE SAFETY PLAN
FROM KM. 4.2 TO KM. 5.6
INT
995 201
INT
995201
5M .P .H
369604
M.P.H.
PARE
M.P.H.
LA HUECA
PUERTO REAL
ESCOLAR
TERMINA
ZONA
ESCUELA
VELOCIDAD
MAXIMA
6AM-7PM
ADELANTE
PARE
M.P.H.
M.P.H.
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
27 70
TS
M A T
6 .
M A T C H L I N E K m . 7 . 0
PR-201
M A
T
. 6
M A T C
H L I N
E K m
6 . 3
PR-201 SIGNING & ROADSIDE SAFETY PLAN
FROM KM. 5.6 TO KM. 7.0
INT
INT
996 201
INT
996201
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
28 70
TS
M A T C H L I N E K m
7 . 7
M A
T
. 4
M A T C H L I N E K m
7 . 0
M A T C H L I N E K m .
7 . 7
PR-201
FROM KM. 7.0 TO KM. 8.4
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
29 70
TS
PR-201
M A T C
H L I N
E K m
8 . 4
FROM KM. 8.4 TO KM. 8.87
TS
-1
TS-18
TS-19
TS-20
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
NOT TO SCALE
30 70
GR
PR-995 KEY MAP
PR-995
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
31 70
TSPR-995 SIGNING & ROADSIDE SAFETY PLAN
FROM KM. 0.00 TO KM. 1.4
PR-995
M A T C
H L I N
E K m
0 . 7
M A
T
. 4
M A
T
. 7
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
32 70
TSPR-995 SIGNING & ROADSIDE SAFETY PLAN
FROM KM. 1.4 TO KM. 2.8
PR-995
M A T C
H L I N
E K m
1 . 4
M A
T
. 8
M A T
C H
2 .
M A
T
. 1
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
33 70
TSPR-995 ROADSIDE SAFETY PLAN
FROM KM. 2.8 TO KM. 4.1
PR-995
M A T C H L I N E K m .
2 . 8
M A T C H L I N E K m . 3 . 5
M A
T
. 5
M A T C H L I N E K m . 4 . 1
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
34 70
TSPR-995 SIGNING & ROADSIDE SAFETY PLAN
FROM KM. 4.1 TO KM. 5.19
PR-995
M A
T
. 8
M A T C H L I N E K m .
4 . 1
M A T C H L I N E K m .
4 . 8
-2
TS-22
TS-23
TS-24
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
NOT TO SCALE
35 70
GR
PR-996 KEY MAP
PR-996
617 20
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
M A T C
. 7
M A
T
SCALE : 1 : 1,000
36 70
TSPR-996 SIGNING & ROADSIDE SAFETY PLAN
FROM KM. 0.00 TO KM. 1.4
PR-996
M A T C
H L I N
E K m . 1. 4
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
37 70
TSPR-996 SIGNING & ROADSIDE SAFETY PLAN
FROM KM. 1.4 TO KM 2.9
PR-996
M A
T
. 4
M A T C
H L I N
E K m
2 . 0
M A T C H L I N E K m . 2 . 9
M A T C H L I N E K m .
2 . 0
PARE
PARE
9546 996997
996 997
INT
CEDA
PARE
ESTACIONE
NO
ESTACIONE
NO
PARE
PARE
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
M A
T
SCALE : 1 : 1,000
38 70
TSPR-996 SIGNING & ROADSIDE SAFETY PLAN
FROM KM. 2.9 TO KM. 4.4
PR-996
M A T C
H L I N
E K m . 4 . 4
M A T C
H L I N
E K m
2 . 9
M A T C
H L I N
E K m
3 . 6
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
39 70
TSPR-996 SIGNING & ROADSIDE SAFETY PLAN
FROM KM 4.4 TO KM. 4.88
PR-996
M A T C
H L I N
E K m
4 . 4
-2
TS-26
TS-28
TS-27
TS-29
TS-30
996200
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
NOT TO SCALE
40 70
GR
PR-997 KEY MAP
PR-997
ESCUELA
VELOCIDAD
MAXIMA
6AM-7PM
ESCUELA
VELOCIDAD
MAXIMA
6AM-7PM
ESCOLAR
TERMINA
ZONA
ESCOLAR
TERMINA
ZONA
PARE
997613
9143 997
PARE
PARE
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
41 70
TS
M A T C
H L I N
E K m
0 . 7
M A T C H L I N
E K m .
1 . 4
M A T C H L I N E K m .
0 . 7
PR-997 SIGNING & ROADSIDE SAFETY PLAN
FROM KM. 0.0 TO KM. 1.4
PR-997
HOSPITAL
HOSPITAL
PARE
PARE
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
42 70
M A
T
. 4
M A T C H L I N E K m
2 . 1
M A T C H L I N E K m
2 . 1
M A
T
. 8
TSPR-997 SIGNING & ROADSIDE SAFETY PLAN
FROM KM. 1.4 TO KM. 2.8
PR-997
PARE
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
43 70
M A
T
. 8
M A T C
H L I N
E K m
3 . 5
M A T C H L I N E K m . 4 . 0
TSPR-997 SIGNING & ROADSIDE SAFETY PLAN
FROM KM.2.8 TO KM. 4.0
PR-997
M A T C
H L I N
E K m
3 . 5
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
44 70
TSPR-997 SIGNING & ROADSIDE SAFETY PLAN
FROM KM. 4.0 TO KM. 5.5
PR-997
M A T C
H L I N
E K m
4 . 0
M A
T
. 7
M A
T
. 7
M A
T
. 4
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
45 70
M A
T
. 2
M A T C
H L I N
E K m
6 . 2
M A
T
. 9
TSPR-997 SIGNING & ROADSIDE SAFETY PLAN
FROM KM. 5.4 TO KM. 6.9
PR-997
M A T C H L I N
E K m .
5 . 4
997 996
INT
INT
INT
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
SCALE : 1 : 1,000
46 70
M A
T
. 5
M A
T
. 5
TSPR-997 ROADSIDE SAFETY PLAN
FROM KM. 6.9 TO KM. 7.95
PR-997
M A T C
H L I N
E K m
6 . 9
Highway
Reference Location Guardrail to be installed Terminals
Number Roadside From KM To KM Transition
Length Quantity
(LnM) Full or Partial Replacement
"Entrance Terminal "
"Exit Terminal "
880 West 7.70 7.80 15.24 15.24 Partial MB Connect to existing Guardrail
Highway Reference Location Guardrail to be installed Terminals
Number Roadside From KM To KM Transition
Length Quantity
(LnM) Full or Partial Replacement
"Entrance Terminal "
"Exit Terminal "
883(***) North 1.26 1.50 0.00 20.00 Full MB MC
884 South 2.30 2.40 0.00 18.00 Full MB MC
885 North 4.80 4.90 0.00 14.00 Full MB MC
886 North 6.00 6.03 0.00 30.00 Full MB MC
887 South 6.90 7.00 15.24 15.24 Partial MB Connect to existing Guardrail
888 North 6.80 7.00 15.24 16.00 Partial Connect to existing Guardrail MC
Highway Reference Location Guardrail to be installed Terminals
Number Roadside From KM To KM Transition
Length Quantity
(LnM) Full or Partial Replacement
"Entrance Terminal "
"Exit Terminal "
889 East 4.40 4.50 0.00 12.00 Full MB MC
Highway Reference Location Guardrail to be installed Terminals
Number Roadside From KM To KM Transition
Length Quantity
(LnM) Full or Partial Replacement
"Entrance Terminal "
"Exit Terminal "
890 West 4.10 4.20 15.24 46.00 Partial Connect to existing Guardrail MC
891 West 4.10 4.20 0.00 17.00 Full MB MC
Highway Reference Location Guardrail to be installed Terminals
Number Roadside From KM To KM Transition
Length Quantity
(LnM) Full or Partial Replacement
"Entrance Terminal "
"Exit Terminal "
876 North 1.12 1.13 0.00 13.00 Full MB MC
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO 31
TS
GUARDRAIL INSTALLATION TABLESNOT TO SCALE
47 70VARIES
S I G N T A B L E
SIGN
ROUTE OFFSETFROM TO
OFFSET REQUIREMENTS
ALL PROJECT 0.60 METERS**
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
48 70
TSSIGN DATA SHEET
(1 OF 3)NOT TO SCALE
CODE
NUMBER LOCATION NUMBER
PAY
ITEM
CODE
SIGN
CODE L E G E N D
SIZE OF
SIGN
PANELS
OVERHEA
D
STRUCTU
RE TYPE
REFERENC
E
MANUAL
TOTA
L
ITEM
9145, 9148, 9153, 9155, 9157, 9161, 9162, 9164, 9168, 9170, 9183, 9198, 9218, 9226, 9229, 9231, 9233, 9234, 9239, 9243, 9244, 9245, 9248, 9252, 9260, 9262, 9263, 9264, 9267, 9269, 9270, 9281, 9306, 9323, 9325, 9326, 9349, 9360, 9469, 9474, 9483, 9485, 9486, 9488, 9489, 9493, 9508, 9519, 9523, 9524, 9531, 9532, 9534, 9538, 9544, 9597, 9560, 9591, 9598, A R1-1 30" x 30" N/A
SEE
D.T.P.W.
MANUAL
2 9537 B R1-2 36" x 36" x 36" N/A
SEE
D.T.P.W.
MANUAL
3 9230 A R2-1 24" x 30" N/A
SEE
D.T.P.W.
MANUAL
36 9468, 9500, 9604 A W1-2(L) W13-1P
30"x30" 18"X18" N/A
SEE
D.T.P.W.
MANUAL
71 9482, 9487, 9513, 9517 A W11-7 30"X30" N/A
SEE
D.T.P.W.
MANUAL
72 7110, 9175 A W11-8 30"X30" N/A
SEE
D.T.P.W.
MANUAL
74 9169 A W11-10 30"X30" N/A
SEE
D.T.P.W.
MANUAL
7081, 7082, 7083, 7084, 7085, 7086, 7087, 7088, 7089, 7090, 7091, 7092, 7093, 7094, 7095, 7096, 7097, 7098, 7099, 7100, 7101, 7102, 7103, 7104, 7105, 7111, 7114, N/A 0M-3R 12"X36" N/A
SEE
M.U.T.C.D.
9254, 9255, 9287, 9293, 9295, 9297, 9301, 9302, 9303, 9304, 9305, 9309, 9310, 9312, 9336, 9338, 9339, 9341, 9344, 9345, 9346, 9347, 9351, 9357, 9358, 9359, 9547, N/A 0M-3R 12"X36" N/A
SEE
M.U.T.C.D.
85 9138, 9178, 9238, 9265, 9599, 9607 A S1-1 W16-9P
30X30 30X12 N/A
SEE
D.T.P.W.
MANUAL
AND GUIDE
SIGN
DETAIL
86 7078, 7109, 9137, 9240, 9593, 9595 A S5-1-A 24X48 N/A
SEE
D.T.P.W.
MANUAL
PARE
CEDA
MAXIMA
VELOCIDAD
M.P.H
ADELANTE
ESCUELA
VELOCIDAD
MAXIMA
6AM-7PM
CODE
NUMBER
LOCATION
NUMBER
PAY
ITEM
CODE
SIGN
CODE L E G E N D
SIZE OF
SIGN
PANELS
OVERHEA
D
STRUCTU
RE TYPE
REFERENC
E
MANUAL
TOTA
L
ITEM
88 9179, 9181, 9222, 9241, 9242 A S1-1
W16-7P 30X30 24X12 N/A
SEE
D.T.P.W.
MANUAL
AND
MUTCD
7077, 7108, 7117, 7118, 9140, 9247
A S5-2 24"X30" N/A
SEE
GUIDE
SIGN
DETAIL
93 9481, 9587, 9603 A W1-2(R) W13-1P
30"x30" 18"X18" N/A
SEE
D.T.P.W.
MANUAL
94 9479, 9497, 9516, 9584 A W1-2(R)
W13-1P 30"X30" 18"X18" N/A
SEE
D.T.P.W.
MANUAL
95 9498, 9505 A W1-2(L) W13-1P
30"X30" 18"X18" N/A
SEE
D.T.P.W.
MANUAL
96 9156 A W1-5(L) W13-1P
30"x30" 18"X18" N/A
SEE
D.T.P.W.
MANUAL
97 9552 A W1-5(R) W13-1P
30"x30" 18"X18" N/A
SEE
D.T.P.W.
MANUAL
114 9144, 9177 A D9-2
D9-13AP
24"X24" 24"X6" N/A
SEE
D.T.P.W.
MANUAL
SEE TABLE OF
KILOMETER
AND
HECTOMETER
POST MARKERS
IN THIS SHEET
D10-1 10"X18" N/A
SEE
STANDARD
DRAWINGS
SEE TABLE OF
KILOMETER
AND
HECTOMETER
POST MARKERS
IN THIS SHEET
D10-2 10"X27" N/A
SEE
STANDARD
DRAWINGS
SEE TABLE OF
KILOMETER
AND
HECTOMETER
POST MARKERS
IN THIS SHEET
D10-1A 10"X27" N/A
SEE
STANDARD
DRAWINGS
SEE TABLE OF
KILOMETER
AND
HECTOMETER
POST MARKERS
IN THIS SHEET
D10-2A 10"X36" N/A
SEE
STANDARD
DRAWINGS
213 9236, 9290, 9528, 9530 A R7-1 12"X18" N/A
SEE
D.T.P.W.
MANUAL
ESCOLAR
TERMINA
ZONA
M.P.H
M.P.H
M.P.H
M.P.H
HOSPITAL
KM
X
X X
KM
KM
X X
X X X
KM
ESTACIONE
NO
M.P.H
VARIES
S1-1
YY
S5-1
YY
S5-2
YY
S1-1
YY
S1-1
YY
S1-1
YY
S5-2
YY
S5-1
YY
TYPICAL SIGNING FOR SCHOOL AREA TRAFFIC
CONTROL WITH SCHOOL SPEED LIMITS
CODE
NUMBER
LOCATION
NUMBER
PAY
ITEM
CODE
SIGN
CODE L E G E N D SIZE OF SIGN
PANELS
OVERHEAD
STRUCTURE
TYPE
REFERENCE
MANUAL
TOTAL
ITEM
301 9235 A R7-1(L) ESTACIONE
NO
12"X18" N/A
SEE
D.T.P.W.
MANUAL
591 7075, 9490, 9555 C M2-1 M1-6D
INT
21" x 15" 36" x 24" N/A
SEE
DTPW
MANUAL
AND TS/327
592 7080, 9221, 9333 C M1-6D M6-4
200 36"X24" 21"X15" N/A
SEE
DTPW
MANUAL
AND TS/327
593 7076, 7113, 9159 C M1-6D 997 36"X24" N/A SEE
TS/327 3
594 9157, 9223 C M1-6D M6-1(R)
36"X24" 21"X15" N/A
SEE
DTPW
MANUAL
AND TS/327
7107, 7126, 9216, 9335, 9353, 9253
C M1-6D 200 36"X24" N/A SEE
TS/327 6
596 7112, 9227, 9541 C M2-1 M1-6D
INT
21" x 15" 36" x 24" N/A
SEE
DTPW
MANUAL
AND TS/327
597 9219 D M1-6D M1-6D M6-1(L) M6-3
997 200 36X24 36X24 21X15 21X15 N/A
SEE
DTPW
MANUAL
AND TS/327
598 9217 B R2-1
R5-1 BACK TO BACK
CEDA
ENTRE
NO 36"x36"x36" 30" x 30" N/A
SEE
D.T.P.W.
MANUAL
599 9271 C M1-6D M6-2(R)
200 36"X24" 21"X15" N/A
SEE
DTPW
MANUAL
AND TS/327
600 7079, 7116, 9256, 7205 C M2-1
M1-6D
INT
21" x 15" 36" x 24" N/A
SEE
DTPW
MANUAL
AND TS/327
CODE
NUMBER
LOCATION
NUMBER
PAY
ITEM
CODE
SIGN
CODE L E G E N D
SIZE OF
SIGN
PANELS
OVERHEA
D
STRUCTU
RE TYPE
REFERENC
E
MANUAL
TOTA
L
ITEM
601 9251 R D1-3 6'-0" X 3'-6" N/A
SEE GUIDE
SIGN
DETAILS
602 6249 D M1-6D M1-6D M6-1L M6-3
36X24 36X24 21X15 21X15 N/A
SEE
DTPW
MANUAL
AND TS/327
603 9491 B D1-2 5'-6" X 3' N/A
SEE GUIDE
SIGN
DETAILS
604 9259 D M1-6D M1-6D M6-3 M6-1R
36X24 36X24 21X15 21X15 N/A
SEE
DTPW
MANUAL
AND TS/327
605 9521, 9509, 9470, 7123, 7124 C M1-6D 36"X24" N/A SEE
TS/327 5
606 9563, 9580 C M1-6D 36"X24" N/A SEE
TS/327 2
607 7106, 7119, 7120, 7186 C M2-1
M1-6D 21"X15" 36"X24" N/A
SEE
DTPW
MANUAL
AND TS/327
608 9285 D M1-6D M1-6D M6-1L M6-3
36X24 36X24 21X15 21X15 N/A
SEE
DTPW
MANUAL
AND TS/327
609 9332 D M1-6D M1-6D M6-3 M6-1R
36X24 36X24 21X15 21X15 N/A
SEE
DTPW
MANUAL
AND TS/327
610 9294 B D1-2 2'-6' X 4'-6" N/A
SEE GUIDE
SIGN
DETAILS
201200
201200
INT
995 200
995200
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
49 70
TSSIGN DATA SHEET
(2 OF 3)NOT TO SCALE
996 997
CODE
NUMBER
LOCATION
NUMBER
PAY
ITEM
CODE
SIGN
CODE L E G E N D SIZE OF SIGN
PANELS
OVERHEAD
STRUCTURE
TYPE
REFERENCE
MANUAL
TOTAL
ITEM
611 9180 B D1-2 7'-0" X 2'-6" N/A
SEE GUIDE
SIGN
DETAILS
612 9143 C M1-6D M6-2(L)
36"X24" 21"X15" N/A
SEE
DTPW
MANUAL
AND TS/327
613 9173 C M1-6D M6-4
997 36"X24" 21"X15 N/A
SEE
DTPW
MANUAL
AND TS/327
614 9189 A W1-4 30"X30" N/A
SEE
M.U.T.C.D
7115, 7125, 9206, 9475, C M2-1
M1-6D
INT
21"X15" 36"X24" N/A
SEE
DTPW
MANUAL
AND TS/327
616 9207 C M1-6D
M6-6(R) 996 36"X24"
21"X15" N/A
SEE
DTPW
MANUAL
AND TS/327
617 7125, 9543, 9556, 7187 C M1-6D 996 36"X24" N/A SEE
TS/327 4
618 9546 D M1-6D M1-6D
M6-1(L) M6-1(R)
996997 36X24 36X24 21X15 21X15 N/A
SEE
DTPW
MANUAL
AND TS/327
619 9540 D M1-6D M1-6D
M6-1(L) M6-3
997996 36X24 36X24 21X15 21X15 N/A
SEE
DTPW
MANUAL
AND TS/327
620 9514 C M1-6D
M6-2(R)
36"X24" 21"X15" N/A
SEE
DTPW
MANUAL
AND TS/327
CODE
NUMBER
LOCATION
NUMBER
PAY
ITEM
CODE
SIGN
CODE L E G E N D SIZE OF SIGN
PANELS
OVERHEAD
STRUCTURE
TYPE
REFERENCE
MANUAL
TOTAL
ITEM
621 9473 D M1-6D M1-6D M6-3 M6-2
996201 36X24 36X24 21X15 21X15 N/A
SEE
DTPW
MANUAL
AND TS/327
622 9496 D M1-6D M1-6D M6-1L M6-1R
201996 36X24 36X24 21X15 21X15 N/A
SEE
DTPW
MANUAL
AND TS/327
623 9477 R D1-3 6'-6" X 3'-6" N/A
SEE GUIDE
SIGN
DETAILS
624 7122 D M1-6D M1-6D M6-1(L) M6-3
201995 36X24 36X24 21X15 21X15 N/A
SEE
DTPW
MANUAL
AND TS/327
625 7121, 7126 C M1-6D M6-4
201 36"X24" 21"X15" N/A
SEE
DTPW
MANUAL
AND TS/327
626 9585 D M1-6D M1-6D M6-3 M6-1(R)
996201 36X24 36X24 21X15 21X15 N/A
SEE
DTPW
MANUAL
AND TS/327
627 9602 B D1-2 6'X3' N/A
SEE GUIDE
SIGN
DETAILS
628 7127 D M1-6D M1-6D M6-1(L) M6-3
201996 36X24 36X24 21X15 21X15 N/A
SEE
DTPW
MANUAL
AND TS/327
629 7128 D M1-6D M1-6D M6-3 M6-1(R)
996201 36X24 36X24 21X15 21X15 N/A
SEE
DTPW
MANUAL
AND TS/327
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
HURRICANE MARIA EFFORTS FOR
SIGNING AND GUARDRAIL
PUERTO RICO
50 401
TSSIGN DATA SHEET
(3 OF 3)NOT TO SCALE
J. O. VIRELLA & ASSOCIATES
CONSULTING ENGINEER
PUERTO RICO HIGHWAY AND TRANSPORTATION AUTHORITY
TOTAL
SHEETS
SHEET
No.
FISCAL
YEARISLANDMUNICIPALITYHIGHWAY
PR
A.C. PROJECT
CODE No.
FED AID HIGHWAY
PROJECT No.
C R/W
R E V I S I O N SDATE
VIEQUES P.R. 2019
ER-9999(292) AC-825578
R259999578
This is the start of the file's text. The full file is on GovTribe.