Amendment 0003 - PR ER PRMNT RPR (7).pdf
PDF 5 MB Posted
- Solicitation number
- 693C73-22-B-000008
About this file
This solicitation seeks sealed bids from certified small business concerns to perform sign and safety repairs in multiple municipalities in Puerto Rico. The project consists of repairing signs, guardrails, and other items damaged by hurricanes, including traffic sign assemblies, new guardrails, bridge transitions, and removal of existing signs and guardrails. The work will be split into multiple schedules, with the total project value estimated between $10-20 million. The solicitation was issued on March 22, 2022 by the Eastern Federal Lands Highway Division of the Federal Highway Administration, Department of Transportation. Bids are due on the date specified in block 13a of the solicitation form SF1442. Questions regarding construction projects should be directed to the email address provided. Bidders must register in the System for Award Management for payment purposes and complete annual representations and certifications in that system and at the provided websites. Security protocols for facility access are outlined.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7322B000008 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ASHBURN VA 20147
ATTN:CONSTRUCTION
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
ASHBURN VA 20147
ATTN:ACQUISITIONS
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
See Block 1404/29/20220003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/22/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project PR ER PRMNT RPR(7)
The purpose of this Amendment is to:
1) Revise the Solicitation Bid Schedule (B Pages) to:
a) Replace the Cost Proposal Bid Schedules and Cost Proposal Bid Summary to update quantities.
b) See B Pages Changes Summary_Amendment 3.pdf for details.
15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
2) Revise the Plan as follows:
a) Schedule A & D (AC-811578): Delete Sheet 164 (TS 157); and replace Sheets 20 (TS 13), 39 (TS 32), 42 (TS 35), 91 (TS 84), 94 (TS 87), 95 (TS 88), 142 (TS 135), 212 (TS 205), 222 Continued ...
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 29
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
693C7322B000008/0003
(TS 215), 245 (TS 238), 246 (TS 239), 248 (TS
241), 252 (TS 245), and 256 (TS 249).
b) See Amended Plans_Sch A & D_AC-811578_Amendment 3.pdf.
3) Provide a summary of responses to questions/clarifications asked by potential bidders.
4) The Bid Opening date of May 5, 2022 at 2:00 p.m. EST remains unchanged.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Amendment No. 0003
Info Page 1 of 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Project PR ER PRMNT RPR (7)
Signs and Safety Repairs in East & Metro Regions in Puerto Rico Solicitation: 693C73-22-B-000008
The purpose of this Amendment is to:
1) Revise the Solicitation Bid Schedule (B Pages) to:
a) Replace the Cost Proposal Bid Schedules and Cost Proposal Bid Summary to update quantities.
b) See B Pages Changes Summary_Amendment 3.pdf for details.
2) Revise the Plan as follows:
a) Schedule A & D (AC-811578): Delete Sheet 164 (TS 157); and replace Sheets 20
(TS 13), 39 (TS 32), 42 (TS 35), 91 (TS 84), 94 (TS 87), 95 (TS 88), 142 (TS
135), 212 (TS 205), 222 (TS 215), 245 (TS 238), 246 (TS 239), 248 (TS 241), 252
(TS 245), and 256 (TS 249).
b) See Amended Plans_Sch A & D_AC-811578_Amendment 3.pdf.
3) Provide a summary of responses to questions/clarifications asked by potential bidders.
4) The Bid Opening date of May 5, 2022 at 2:00 p.m. EST remains unchanged.
B I D S C H E D U L E Account: ALLSchedule A
Project No: PR ER PRMNT RPR(7)
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
15001-0000 Line A0020 ALL LPSM $
15100-1000 Line A0040 ALL LPSM $
15102-0000 Line A0060 1 CTSM 460,000.00$ 460,000.00$
15401-0000 Line A0080 ALL LPSM $
15401-1000 Line A0100 ALL LPSM $
15501-0000 Line A0120 ALL LPSM $
61101-0000 Line A0140 27 MO $ $
61310-1000 Line A0160 46,350 SQFT $ $
61310-2000 Line A0180 13,560 SQFT $ $
61310-3000 Line A0200 14,120 SQFT $ $
61310-4000 Line A0220 11,580 SQFT $ $
61310-5000 Line A0240 2,280 SQFT $ $
61310-6000 Line A0260 268 SQFT $ $
61310-7000 Line A0280 $ $
61310-8000 Line A0300 $ $
61310-8100 Line A0320 $ $
61311-0000 Line A0340 150 SQFT $ $
61311-2000 Line A0360 3,200 SQFT $ $
Name: Signage Repairs on AC-805578, AC-806578, AC-
807578, AC-811578, AC-825578 & AC-827578
Schedule Total: _________________________
Submitted by: __________________________
Traffic Sign Assembly, Code I
175 SQFT
Traffic Sign Assembly, Code O
Traffic Sign Assembly, Code R
Construction Survey and Staking
Mobilization
Reimbursement for Municipal Tax Payments
Contractor Testing
Cultural Resource Protection and Monitoring
Construction Schedule
Traffic Sign Assembly, Code F
Traffic Sign Assembly, Code G
55 SQFT
Traffic Sign Assembly, Code H
445 SQFT
Field Office
Traffic Sign Assembly, Code A
Traffic Sign Assembly, Code B
Traffic Sign Assembly, Code C
Traffic Sign Assembly, Code D
Traffic Sign Assembly, Code E
B-1
Schedule A
Project No: PR ER PRMNT RPR(7)
Item No. Quantity Unit Unit Price Amount
Name: Signage Repairs on AC-805578, AC-806578, AC-
807578, AC-811578, AC-825578 & AC-827578
61311-3000 Line A0380 224 SQFT $ $
61311-4000 Line A0400 52 SQFT $ $
61312-2000 Line A0420 906 SQFT $ $
61312-3000 Line A0440 558 SQFT $ $
62100-1000 Line A0460 639 Each $ $
62100-2000 Line A0480 2,813 Each $ $
62101-1000 Line A0500 94 Each $ $
63800-1000 Line A0520 ALL LPSM $
66100-1000 Line A0540 24 Each $ $
91300-5000 Line A0560 11,217 Each $ $
91300-6000 Line A0580 14 Each $ $
91300-7000 Line A0600 725 SQFT $ $
93501-0000 Line A0620 45 Each $ $
Removal of Existing Traffic Signs (Ground Mounted)
Removal of Existing Traffic Signs (Breakaway)
Removal of Existing Traffic Signs (Overhead)
Traffic Sign Assembly, Code HH
Kilometer Marker
Hectometer Marker
Locate Utility, Test Pit
Traffic Sign Assembly, Code S
Traffic Sign Assembly, Code U
Traffic Sign Assembly, Code GG
Object Markers
Maintenance of Traffic
Project Funding Sign
B-2
Account: ALLSchedule B
Project No: PR ER PRMNT RPR(7)
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
15001-0000 Line B0020 ALL LPSM $
15100-1000 Line B0040 ALL LPSM $
15102-0000 Line B0060 1 CTSM 173,000.00$ 173,000.00$
15401-0000 Line B0080 ALL LPSM $
15401-1000 Line B0100 ALL LPSM $
15501-0000 Line B0120 ALL LPSM $
21201-1000 Line B0140 1 CTSM 25,000.00$ 25,000.00$
60600-1000 Line B0160 19,350 M $ $
60600-4000 Line B0180 18,180 M $ $
60604-3100 Line B0200 4 Each $ $
61101-0000 Line B0220 8 MO $ $
63800-1000 Line B0240 ALL LPSM $
91001-3000 Line B0260 4 Each $ $
93101-1000 Line B0280 1,535 M $ $
93501-0000 Line B0300 70 Each $ $
Name: Guardrail Repairs on AC-806578 & AC-825578 Schedule Total: _________________________
Submitted by: __________________________
Construction Survey and Staking
Mobilization
Reimbursement for Municipal Tax Payments
Contractor Testing
Cultural Resource Protection and Monitoring
Construction Schedule
Bridge Transition Upgrade
Removal and Disposal of Lead Based Paint (Painted Guardrail)
Locate Utility, Test Pit
Reconditioning of Shoulders and Ditches
W-Beam Guardrail, Single Face
Removal, Storage and Delivery of Existing Guardrail
Thrie-Beam Transition, Type II
Field Office
Maintenance of Traffic
B-3
Account: ALLSchedule C
Project No: PR ER PRMNT RPR(7)
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
15001-0000 Line C0020 ALL LPSM $
15100-1000 Line C0040 ALL LPSM $
15102-0000 Line C0060 1 CTSM 136,000.00$ 136,000.00$
15401-0000 Line C0080 ALL LPSM $
15401-1000 Line C0100 ALL LPSM $
15501-0000 Line C0120 ALL LPSM $
21201-1000 Line C0140 1 CTSM 25,000.00$ 25,000.00$
60600-1000 Line C0160 15,640 M $ $
60600-4000 Line C0180 13,410 M $ $
60604-3100 Line C0200 25 Each $ $
63800-1000 Line C0220 ALL LPSM $
91001-3000 Line C0240 18 Each $ $
91001-5100 Line C0260 7 Each $ $
93101-1000 Line C0280 1,360 M $ $
93101-2000 Line C0300 24 SQM $ $
93501-0000 Line C0320 55 Each $ $
Name: Guardrail Repairs on AC-805578 Schedule Total: _________________________
Submitted by: __________________________
Locate Utility, Test Pit
Construction Survey and Staking
Mobilization
Reimbursement for Municipal Tax Payments
Contractor Testing
Cultural Resource Protection and Monitoring
Construction Schedule
New Transition Module (Less than 45mph)
Removal and Disposal of Lead Based Paint (Painted Guardrail)
Removal and Disposal of Lead Based Paint (Painted Concrete Barrier)
Reconditioning of Shoulders and Ditches
W-Beam Guardrail, Single Face
Removal, Storage and Delivery of Existing Guardrail
Thrie-Beam Transition, Type II
Maintenance of Traffic
Bridge Transition Upgrade
B-4
Account: ALLSchedule D
Project No: PR ER PRMNT RPR(7)
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
15001-0000 Line D0020 ALL LPSM $
15100-1000 Line D0040 ALL LPSM $
15102-0000 Line D0060 1 CTSM 91,000.00$ 91,000.00$
15401-0000 Line D0080 ALL LPSM $
15401-1000 Line D0100 ALL LPSM $
15501-0000 Line D0120 ALL LPSM $
21201-1000 Line D0140 1 CTSM 25,000.00$ 25,000.00$
60600-1000 Line D0160 9,600 M $ $
60600-4000 Line D0180 9,600 M $ $
63800-1000 Line D0200 ALL LPSM $
93101-1000 Line D0220 245 M $ $
93501-0000 Line D0240 35 Each $ $
Name: Guardrail Repairs on AC-811578 Schedule Total: _________________________
Submitted by: __________________________
Construction Survey and Staking
Mobilization
Reimbursement for Municipal Tax Payments
Contractor Testing
Cultural Resource Protection and Monitoring
Construction Schedule
Reconditioning of Shoulders and Ditches
W-Beam Guardrail, Single Face
Removal, Storage and Delivery of Existing Guardrail
Maintenance of Traffic
Removal and Disposal of Lead Based Paint (Painted Guardrail)
Locate Utility, Test Pit
B-5
Account: ALLSchedule E
Project No: PR ER PRMNT RPR(7)
CQ = "Contract Quantity"
Item No. Quantity Unit Unit Price Amount
15001-0000 Line E0020 ALL LPSM $
15100-1000 Line E0040 ALL LPSM $
15102-0000 Line E0060 1 CTSM 69,000.00$ 69,000.00$
15401-0000 Line E0080 ALL LPSM $
15401-1000 Line E0100 ALL LPSM $
15501-0000 Line E0120 ALL LPSM $
21201-1000 Line E0140 1 CTSM 25,000.00$ 25,000.00$
60600-1000 Line E0160 7,650 M $ $
60600-4000 Line E0180 7,630 M $ $
60604-3000 Line E0200 2 Each $ $
60605-3000 Line E0220 3 Each $ $
63800-1000 Line E0240 ALL LPSM $
91001-5000 Line E0260 2 Each $ $
93101-0000 Line E0280 1 CTSM 15,000.00$ 15,000.00$
93101-1000 Line E0300 937 M $ $
93200-0000 Line E0320 1 CTSM 15,000.00$ 15,000.00$
93501-0000 Line E0340 30 Each $ $
Name: Guardrail Repairs on AC-807578 & AC-827578 Schedule Total: _________________________
Submitted by: __________________________
Asbestos Containing Materials Studies
Locate Utility, Test Pit
Construction Survey and Staking
Mobilization
Reimbursement for Municipal Tax Payments
Contractor Testing
Cultural Resource Protection and Monitoring
Construction Schedule
New Transition Module (More than 45mph)
Lead Based Paint Studies
Removal and Disposal of Lead Based Paint (Painted Guardrail)
Reconditioning of Shoulders and Ditches
W-Beam Guardrail, Single Face
Removal, Storage and Delivery of Existing Guardrail
Thrie-Beam Transition, Type I
Crashworthy End Terminal, Type 1, TL-3
Maintenance of Traffic
B-6
B - 7
BID SUMMARY
Project PR ER PRMNT RPR(7)
(1) Schedule A (Base Contract) Bid Total (from Page B-1) = (1) $____________________
(2) Schedule B (Government Option 1) Bid Total (from Page B-3) = (2) $____________________
(3) Schedule C (Government Option 2) Bid Total (from Page B-4) = (3) $____________________
(4) Schedule D (Government Option 3) Bid Total (from Page B-5) = (4) $____________________
(5) Schedule E (Government Option 4) Bid Total (from Page B-6) = (5) $____________________
Total Price of Project (for evaluation purposes only)
EVALUATION TOTAL PRICE OF PROJECT = (1) + (2) + (3) + (4) + (5) $____________________
Maximum Time Allowed for the Contract if all the Schedules are Awarded at the Same Time
If the Government awards the contract as Schedules A + B+ C+ D +E, the performance period to complete all contract work will be 850 calendar days.
If Schedules A, B, C, D, and E are NOT awarded at the same time:
If the Government awards the contract as Schedule A only, the performance period to complete all Schedule A work will be 785 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.
If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period of the contract will be extended 65 calendar days and the performance of Schedule B work is to be simultaneous with the performance of the executed contract.
If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period of the contract will not be extended and the performance of Schedule C work is to be simultaneous with the performance of the executed contract.
If Schedule D (Government Option 3) is exercised after the award of the original contract, the performance period of the contract will not be extended and the performance of Schedule D work is to be simultaneous with the performance of the executed contract.
If Schedule E (Government Option 4) is exercised after the award of the original contract, the performance period of the contract will not be extended and the performance of Schedule E work is to be simultaneous with the performance of the executed contract.
B Pages Changes Summary Page 1 of 1
B Pages changes
1. Delete Amendment No. 2 Cost Proposal Bid Schedules and Cost Proposal Summary, Pages B-1 through B-7, and substitute with the amended Cost Proposal Bid Schedules and Cost Proposal Bid Summary, pages B-1 through B-7.
a) Revised the bid quantities for the following Schedule A pay items:
1. Pay item 61310-1000 Traffic Sign Assembly, Code A
2. Pay item 61310-2000 Traffic Sign Assembly, Code B
CARRETERA KILOMETRO IZQUIERDA DERECHA PUNTO
CARDINAL
PR-924 0.0 X SUR
PR-924 0.1 X SUR
PR-924 0.2 X NORTE
PR-924 0.4 X NORTE
PR-924 0.5 X NORTE
PR-924 1.0 X NORTE
PR-924 1.6 X NORTE
PR-924 1.8 X NORTE
PR-924 2.0 X NORTE
PR-924 2.4 X NORTE
PR-924 3.8 X NORTE
PR-924 4.0 X NORTE
PR-924 6.6 X NORTE
PR-924 6.8 X NORTE
PR-924 7.2 X NORTE
PR-924 7.4 X NORTE
PR-924 7.8 X NORTE
PR-924 7.9 X SUR
PR-759 1.5 X ESTE
PR-759 2.7 X ESTE
PR-759 2.9 X ESTE
PR-759 3.1 X ESTE
PR-759 3.3 X ESTE
PR-759 4.8 X OESTE
PR-759 4.9 X ESTE
PR-759 5.3 X ESTE
PR-759 5.5 X ESTE
PR-759 5.6 X OESTE
PR-759 5.7 X ESTE
PR-759 6.0 X OESTE
PR-759 6.2 X OESTE
PR-759 6.9 X ESTE
PR-759 7.1 X ESTE
PR-759 7.5 X ESTE
PR-759 7.7 X ESTE
PR-759 7.8 X ESTE
PR-759 8.0 X ESTE
PR-759 8.1 X ESTE
PR-759 8.4 X OESTE
PR-759 8.9 OESTE
PR-759 9.0 X X ESTE
PR-759 9.1 X ESTE
AutoCAD SHX Text L E G E N D
AutoCAD SHX Text
NUMBER
AutoCAD SHX Text
CODE
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
NUMBER
AutoCAD SHX Text
CODE
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
PANELS
AutoCAD SHX Text
SIZE OF
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
STRUCTURE
AutoCAD SHX Text
OVERHEAD
AutoCAD SHX Text
TYPE
AutoCAD SHX Text
MANUAL
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
ITEM
AutoCAD SHX Text
TOTAL
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1605,1606,1607
AutoCAD SHX Text 1603,1609
AutoCAD SHX Text 1596,1599
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SEE
AutoCAD SHX Text
TS_253
AutoCAD SHX Text
SEE
AutoCAD SHX Text
TS_253
AutoCAD SHX Text
MANUAL
AutoCAD SHX Text
SEE
AutoCAD SHX Text D.T.P.W.
AutoCAD SHX Text
MANUAL
AutoCAD SHX Text D.T.P.W.
AutoCAD SHX Text
SEE
AutoCAD SHX Text D.T.P.W.
AutoCAD SHX Text
MANUAL
AutoCAD SHX Text
SEE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 36" X 24"
AutoCAD SHX Text 36" X 24"
AutoCAD SHX Text 24" X 30"
AutoCAD SHX Text 21" X 15"
AutoCAD SHX Text 21" X 15"
AutoCAD SHX Text 30" X 30"
AutoCAD SHX Text M1-6D
AutoCAD SHX Text M1-6D
AutoCAD SHX Text R4-7
AutoCAD SHX Text M2-1
AutoCAD SHX Text M6-1L
AutoCAD SHX Text M6-3
AutoCAD SHX Text R1-1
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text N/A
AutoCAD SHX Text 1608,1718,1719
AutoCAD SHX Text
PARE
AutoCAD SHX Text 36" X 24"
AutoCAD SHX Text M1-6D
AutoCAD SHX Text 36" X 24"
AutoCAD SHX Text M1-6D
AutoCAD SHX Text 36" X 24"
AutoCAD SHX Text M1-6D
AutoCAD SHX Text 21" X 15"
AutoCAD SHX Text M6-3
AutoCAD SHX Text M1-6D
AutoCAD SHX Text M1-6D
AutoCAD SHX Text M6-1R
AutoCAD SHX Text 21" X 15"
AutoCAD SHX Text M6-4
AutoCAD SHX Text
INT
AutoCAD SHX Text 21" X 15"
AutoCAD SHX Text 36" X 24"
AutoCAD SHX Text 36" X 24"
AutoCAD SHX Text 21" X 15"
AutoCAD SHX Text
INT
AutoCAD SHX Text 36" X 24"
AutoCAD SHX Text M1-6D
AutoCAD SHX Text N/A
AutoCAD SHX Text 21" X 15"
AutoCAD SHX Text M2-1
AutoCAD SHX Text N/A
AutoCAD SHX Text 36" X 24"
AutoCAD SHX Text M1-6D
AutoCAD SHX Text
AutoCAD SHX Text
TS_253
AutoCAD SHX Text
SEE
AutoCAD SHX Text D.T.P.W.
AutoCAD SHX Text
MANUAL
AutoCAD SHX Text
AutoCAD SHX Text
TS_253
AutoCAD SHX Text
SEE
AutoCAD SHX Text D.T.P.W.
AutoCAD SHX Text
MANUAL
AutoCAD SHX Text
AutoCAD SHX Text
TS_253
AutoCAD SHX Text
SEE
AutoCAD SHX Text D.T.P.W.
AutoCAD SHX Text
MANUAL
AutoCAD SHX Text
AutoCAD SHX Text
TS_253
AutoCAD SHX Text
SEE
AutoCAD SHX Text D.T.P.W.
AutoCAD SHX Text
MANUAL
AutoCAD SHX Text
AutoCAD SHX Text
TS_253
AutoCAD SHX Text
AutoCAD SHX Text 24" X 24"
AutoCAD SHX Text R3-18
AutoCAD SHX Text R E V I S I O N
AutoCAD SHX Text
DATE
AutoCAD SHX Text
FINAL CHECK
AutoCAD SHX Text
CHECK
AutoCAD SHX Text
TRACED
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
DESIGN
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
WORK
AutoCAD SHX Text 005380
AutoCAD SHX Text
FILE NAME
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
DG3A
AutoCAD SHX Text S C A L E :
AutoCAD SHX Text
MAUNABO
AutoCAD SHX Text C
AutoCAD SHX Text
FED. AID H'WAY
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
A.C. PROJECT
AutoCAD SHX Text
CODE NO.
AutoCAD SHX Text
HIGHWAY
AutoCAD SHX Text
MUNICIPALITY
AutoCAD SHX Text
ISLAND
AutoCAD SHX Text
FISCAL
AutoCAD SHX Text
YEAR
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NO.
AutoCAD SHX Text
TOTAL
AutoCAD SHX Text
SHEETS
AutoCAD SHX Text P.R.
AutoCAD SHX Text
RW
AutoCAD SHX Text P.R.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text P.R.-760
AutoCAD SHX Text 4/28/22
AutoCAD SHX Text
DG3A DESIGN GROUP
AutoCAD SHX Text
MAUNABO, P.R. (FROM KM 0.0 TO KM 3.70)
AutoCAD SHX Text
HURRICANE IRMA AND MARÍA RECOVERY EFFORTS SIGNING AND GUARDRAILS PR-760
AutoCAD SHX Text
ER-9999(287)
AutoCAD SHX Text
CONSULTING ENGINEERS
AutoCAD SHX Text
DG3A DESIGN GROUP, PSC
AutoCAD SHX Text
PUERTO RICO HIGHWAY AUTHORITY
AutoCAD SHX Text
AC-811578
AutoCAD SHX Text R119999578
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
TS
AutoCAD SHX Text
AutoCAD SHX Text
SIGN DATA SHEET
AutoCAD SHX Text
AutoCAD SHX Text
GENERAL REVISION
AutoCAD SHX Text
AutoCAD SHX Text 4/27/2022
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PR-99
0 20m10m 30m 40m
PR-974 0.2 X OESTE
PR-974 0.5 X ESTE
PR-974 0.7 X ESTE
PR-974 0.9 X ESTE
PR-974 1.1 X ESTE
PR-974 2.0 X OESTE
PR-974 2.4 X OESTE
PR-181 0.1 X
1.6 X
1.7 X
1.9 X
2 X 2 X
2.1 X
2.3 X
2.4 X
2.5 X
3.3 X
4.6 X
4.9 X
5 X
5.7 X
6.8 X
6.9 X
7 X
7.2 X
7.5 X
7.7 X
7.8 X
8.1 X
8.4 X
9 X
9.2 X
9.9 X
10.1 X
10.5 X
10.8 X
11.9 X
12 X 12 X
12.2 X
12.3 X
13.5 X
13.8 X
16.3 X
16.5 X
17.7 X
17.9 X
18 X
18.5 X
19 X
CARRETERA KILOMETRO IZQUIERDADERECHA PUNTO
CARDINAL
19.1 X
19.2 X
20.5 X
20.7 X
21.8 X
22.1 X
22.7 X
24 X 24 X
24.3 X
24.7 X
25 X 25 X
25.1 X
25.2 X
25.3 X
25.5 X
25.6 X
26.1 X
26.2 X
26.3 X
26.4 X
26.6 X
27 X
27.2 X
27.3 X
27.4 X
27.6 X
28 X
28.1 X
28.4 X
28.7 X
PR-181
CARRETERA KILOMETRO IZQUIERDADERECHA PUNTO
CARDINAL
28.8
28.9 X
29 X
29.3 X
29.5 X
29.7 X
30 X
30.1 X
30.8 X
31.2 X
32 X
32.1 X
32.3 32.4 32.5 32.9
ZONA DE
TSUNAMI
CARRETERA KILOMETRO IZQUIERDA DERECHA PUNTO
CARDINAL
PR-906 0.5 X NORTE
PR-906 0.6 X SUE
PR-906 0.9 X NORTE
PR-906 1.1 X NORTE
PR-906 1.6 X SUR
PR-906 2.0 X NORTE
PR-906 2.1 X NORTE
PR-906 2.3 X NORTE
PR-906 2.4 X SUR
PR-906 2.6 X SUR
PR-906 2.7 X NORTE
PR-906 2.8 X SUR
PR-906 2.9 X NORTE
PR-906 4.0 X X NORTE
PR-906 4.1 X NORTE
PR-906 4.3 X NORTE
PR-906 4.8 X X NORTE
PR-906 5.2 X SUR
PR-906 5.3 X NORTE
PR-906 5.5 X NORTE
PR-906 5.6 X SUR
PR-906 5.7 X NORTE
PR-906 6.0 X SUR
PR-906 6.7 X NORTE
PR-906 7.1 X NORTE
PR-906 7.2 X SUR
PR-906 7.3 X NORTE
PR-906 7.6 X SUR
PR-906 7.7 X NORTE
PR-906 7.8 X SUR
PR-906 8.1 X NORTE
PR-906 8.2 X SUR
PR-906 8.4 X SUR
PR-906 8.6 X SUR
PR-906 9.1 X NORTE
PR-906 9.2 X SUR
PR-906 9.3 X NORTE
PR-906 9.4 X SUR
PR-906 9.6 X SUR
PR-906 9.9 X NORTE
PR-906 10.0 X SUR
PR-906 10.1 X NORTE
PR-906 11.0 X SUR
PR-906 12.0 X SUR
PR-906 12.0 X NORTE
ZONA DE
TSUNAMI
Plan Sheet changes 1 of 2
Plan Sheet changes
Plans_Sch A & D_AC-811578
1. Delete Plan Sheet 20 (TS 13), and substitute with the amended Plan Sheet 20 (TS 13).
a) Sheet 20 (TS 13) updated to revise Sign Code Number 237 sign panel’s dimensions.
2. Delete Plan Sheet 39 (TS 32), and substitute with the amended Plan Sheet 39 (TS 32).
a) Sheet 39 (TS 32) updated to revise Sign Code Number 1’s quantities and Sign Code Number 8 sign panel’s dimensions.
3. Delete Plan Sheet 42 (TS 35), and substitute with the amended Plan Sheet 42 (TS 35).
a) Sheet 42 (TS 35) updated to add a sign panel to the legend and its dimensions to
Sign Code Number 147.
4. Delete Plan Sheet 91 (TS 84), and substitute with the amended Plan Sheet 91 (TS 84).
a) Sheet 91 (TS 84) updated to revise Sign Code Number 1 quantities.
5. Delete Plan Sheets 94 (TS 87) and 95 (TS 88), and substitute with the amended Plan Sheets 94 (TS 87) and 95 (TS 88).
a) Sheets 94 (TS 87) and 95 (TS 88) updated to revise Sign Code Number 60 to 60A.
6. Delete Plan Sheets 142 (TS 135) and 256 (TS 249), and substitute with the amended Plan Sheets 142 (TS 135) and 256 (TS 249).
a) Sheets 142 (TS 135) and 256 (TS 249) updated to revise Sign Code Number 349’s sign panel dimensions.
7. Delete Sheet 164 (TS 157).
8. Delete Plan Sheet 212 (TS 205), and substitute with the amended Plan Sheet 212 (TS 205).
a) Sheet 212 (TS 205) updated to revise Sign Code Numbers 101 and 237 sign panels’ dimensions.
9. Delete Plan Sheet 222 (TS 215), and substitute with the amended Plan Sheet 222 (TS 215).
a) Sheet 222 (TS 215) updated to revise Sign Code Number 237’s quantities.
Plan Sheet changes 2 of 2
10. Delete Plan Sheet 245 (TS 238), and substitute with the amended Plan Sheet 245 (TS 238).
a) Sheet 245 (TS 238) updated to revise Sign Code Numbers 1, 8, 13, 17, 19, and 20 quantities.
11. Delete Plan Sheet 246 (TS 239), and substitute with the amended Plan Sheet 246 (TS 239).
a) Sheet 246 (TS 239) updated to revise the quantities, change Sign Code Number 60 to 60A, and add a new Sign Code Number 60 sign.
12. Delete Plan Sheet 248 (TS 241), and substitute with the amended Plan Sheet 248 (TS 241).
a) Sheet 248 (TS 241) updated to revise the pay item code for Sign Code Numbers 102 and 103.
13. Delete Plan Sheet 252 (TS 245), and substitute with the amended Plan Sheet 252 (TS 245).
a) Sheet 252 (TS 245) updated to revise Sign Code Numbers 237 and 238 quantities.
Questions/Clarifications
Questions/Clarifications
Bidders can send written questions or inquiries for clarification to: eflhd.contracts@dot.gov.
Questions can be submitted at any time, but questions submitted within 9 days of the bid opening may not be answered in time for the bidder to properly incorporate the responses into their bids.
The following questions and issues were asked via email. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included.
The Government’s direct response to the sender may also have been updated below for better clarity.
1. We respectfully ask to revise the quantity for pay item code A.
Response: The plans and bid quantities have been revised as needed.
Please note that payment will be made for the actual quantities of work performed and accepted or material furnished according to the contract. Contractors are required to coordinate with the CO any noted difference in the plans before proceeding with the proposed work in accordance with FAR 52.236-21. The scheduled quantities may be increased, decreased, or deleted. Bids are to take into consideration the quantities and units of measure included in the bid schedule.
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0003 |
| Solicitation: 693C73-22-B-000008 |
| Amended B-Pages_Amendment 3.pdf |
| Bid Schedule.pdf |
| bid_Sch A_All PSEs_Signage |
| bid_Opt B_806578+825578_GR |
| bid_Opt C_805578_GR |
| bid_Opt D_811578_GR |
| bid-Opt E_807578+827578_GR |
| Amended Plans_Sch A & D_AC-811578_Amendment 3.pdf |
| TS-13 |
| Sheets and Views |
| Layout1 |
| TS-32 |
| Sheets and Views |
| Layout2 |
| OLE1 |
| TS-84 |
| Sheets and Views |
| Layout1 |
| TS-87 |
| Sheets and Views |
| Layout2 |
| TS-88 |
| Sheets and Views |
| Layout1 |
| TS-135 |
| Sheets and Views |
| Layout1 (6) |
| TS-157 |
| Sheets and Views |
| Layout1 |
| TS-205 |
| Sheets and Views |
| Layout1 |
| TS-215 |
| Sheets and Views |
| Layout1 |
| TS-238 |
| Sheets and Views |
| Layout1 |
| TS-239 |
| Sheets and Views |
| Layout1 (2) |
| TS-241 |
| Sheets and Views |
| Layout1 (4) |
| TS-245 |
| Sheets and Views |
| Layout1 (8) |
| TS-249 |
| Sheets and Views |
| Layout1 (12) |
| TS-35.pdf |
| Sheets and Views |
| Layout1 |
File details come from the government source that posted it. Updated .