UNAUTHORIZED CHANGES AND USES
CAUTION :
OWNER INFO
HARDENING OF THE
MILLIKEN RAW WATER
PIPELINE
NAPA, CA
LOCATION MAP
sandis.net build on.
CALIFORNIA
MILLIKEN RAW WATER PIPELINE
HARDENING
100% DESIGN
NAPA
UTILITIES DEPARTMENT
DWG NUMBER: "W 2025-021"
VICINITY MAP
SITE
COVER SHEET C0.1
NAPA
VICINITY MAP
PROJECT DIRECTORY
CIVIL ENGINEER
GEOTECHNICAL ENGINEER
CITY OF NAPA, UTILITIES DEPARTMENT: GEOTECHNICAL ENGINEER'S CERTIFICATE: SANDIS CIVIL ENGINEERS:
SHEET INDEX
PROJECT HMGP
9/24/25 09/24/2025 ddemaster Text Box 9/24/2025 sandis.net build on.
CALIFORNIA
MILLIKEN RAW WATER PIPELINE
HARDENING
100% DESIGN
NAPA
UTILITIES DEPARTMENT
DWG NUMBER: "W 2025-021"
NOTES C0.2
LEGEND
EXISTING PROPOSED
Þ
ABBREVIATIONS PROJECT DESCRIPTION
WATER SYSTEM NOTES
CONSTRUCTION STAKING
ADD ALTERNATE DESCRIPTION
DISCREPANCIES
UTILITY/POTHOLE NOTE
CONSTRUCTION NOTES
DIMENSIONS
PROJECT SITE MAINTENANCE
TREE PROTECTION
FIRE HAZARD DURING HOT-WORK
ACTIVITIES
PROJECT SITE MAINTENANCE
UNDERGROUND WORK CAUTION
DEMOLITION NOTES
DUST CONTROL NOTES
GENERAL SITE NOTES
RECORD DRAWING NOTE
HAZARDOUS MATERIALS NOTE
GENERAL UTILITY NOTES
sandis.net build on.
CALIFORNIA
MILLIKEN RAW WATER PIPELINE
HARDENING
100% DESIGN
NAPA
UTILITIES DEPARTMENT
DWG NUMBER: "W 2025-021"
NOTES C0.3
CALIFORNIA
MILLIKEN RAW WATER PIPELINE
HARDENING
100% DESIGN
NAPA
UTILITIES DEPARTMENT
DWG NUMBER: "W 2025-021"
KEY PLAN C0.4
C1.0 C1.1
C1.2
C1.3
C1.4
C1.5
C1.6
C 1.
C1.8
C 1.
C1.10
C2.0
0'
1 INCH =
400'200'100'40'
200 FT
MILLIKEN WATER
TREATMENT PLANT
DIVERSION DAM
MILLIKEN CREEK
C2.2
MILLIKEN WATER
TREATMENT PLANT
DIVERSION DAM
STA. 33+24.06
PIPELINE
CONTROL
VALVE
STA. 47+10.28
PIPELINE
CONTROL
VALVE
S
TA
. 6 5+
.2
P
IP
E
LI
N
E C
O N
TR
O
L V
A
LV
E
S
TA
. 5 +8
9.
FL
U
S H
IN
G
LA
TE
R A
L
STA. 0+50.00
FLUSHING
LATERAL
STA. 22+52.21
PIPELIN
E
C O
N
TR
O L
VALVE
STA. 14+08.96
AIR RELEASE
VALVE
S
TA
. 2 2+
.8
A
IR
R
E
LE
A S
E V
A
LV
E
STA. 31+21.57
AIR RELEASE
VALVE
STA. 34+97.24
AIR RELEASE
VALVE
STA. 39+32.65
AIR RELEASE
VALVE
STA. 40+67.73
AIR RELEASE
VALVE
STA. 58+52.58
PIPELINE
CONTROL
VALVE
S
TA
. 5 +3
7.
A
IR
R E
LE
A
S E
V A
LV
E
STA. -1+13.62
PIPELINE
CO
NTRO
L
VALVE
STA. -1+01.09
AIR RELEASE
VALVE
STA. 32+85.00
AIR RELEASE
VALVE
STA. 51+73.74
AIR
R
ELEASE
VALVE
sandis.net build on.
CALIFORNIA
MILLIKEN RAW WATER PIPELINE
HARDENING
100% DESIGN
NAPA
UTILITIES DEPARTMENT
DWG NUMBER: "W 2025-021"
SYSTEM APPURTENANCE LOCATION PLAN C0.5
0'
1 INCH =
400'200'100'40'
200 FT
MILLIKEN CREEK
W
VWV WVW
V
W
V ARV
WV
FM
MILLIKEN WATER
TREATMENT PLANT
EXISTING
SLUDGE
TANK
EXISTING
WASHWATER
TANK
E
-1+25 -1+00 0+00 1+00 2+00 3+00 4+00 4+50 sandis.net build on.
CALIFORNIA
MILLIKEN RAW WATER PIPELINE
HARDENING
100% DESIGN
NAPA
UTILITIES DEPARTMENT
DWG NUMBER: "W 2025-021"
GENERAL NOTES
RAW WATER LINE PLAN & PROFILE - STA
-1+25 TO 4+50 C1.0
MATCHLINE - S
EE SHEET C1.1
0'
1 INCH =
40'20'10'4'
20 FT
VERTICAL BENDS HORIZONTAL
BENDS
GENERAL NOTES
LEGEND
ARV
V
E
4+50 5+00 6+00 7+00 8+00 9+00 10+00 10+50 sandis.net build on.
CALIFORNIA
MILLIKEN RAW WATER PIPELINE
HARDENING
100% DESIGN
NAPA
UTILITIES DEPARTMENT
DWG NUMBER: "W 2025-021"
RAW WATER LINE PLAN & PROFILE - STA
4+50 TO 10+50 C1.1
M A
TC
H
LI
N
E
S E
E S
H E
E T
C 1.
M
AT
CH
LI
NE
SE
E
SH
EE
T C1
.0 0'
1 INCH =
40'20'10'4'
20 FT
GENERAL NOTES
HORIZONTAL
BENDS
VERTICAL BENDS
ARVE
10+50 11+00 12+00 13+00 14+00 15+00 16+00 16+50 sandis.net build on.
CALIFORNIA
MILLIKEN RAW WATER PIPELINE
HARDENING
100% DESIGN
NAPA
UTILITIES DEPARTMENT
DWG NUMBER: "W 2025-021"
RAW WATER LINE PLAN & PROFILE - STA
10+50 TO 16+50 C1.2
M A
TC
H
LI
N
E
S E
E S
H E
E T
C 1.
M A
TC
H
LI
N
E
S E
E S
H E
E T
C 1.
0'
1 INCH =
40'20'10'4'
20 FT
HORIZONTAL
BENDS
GENERAL NOTES
VERTICAL BENDS
WV
W V
E
16+50 17+00 18+00 19+00 20+00 21+00 22+00 22+50 sandis.net build on.
CALIFORNIA
MILLIKEN RAW WATER PIPELINE
HARDENING
100% DESIGN
NAPA
UTILITIES DEPARTMENT
DWG NUMBER: "W 2025-021"
RAW WATER LINE PLAN & PROFILE - STA
16+50 TO 22+50 C1.3
M A
TC
H
LI
N
E
S E
E S
H E
E T
C 1.
M A
TC
H
LI
N
E
S E
E S
H E
E T
C 1.
0'
1 INCH =
40'20'10'4'
20 FT
VERTICAL BENDS HORIZONTAL
BENDS
GENERAL NOTES
WV W
V
E
E
22+50 23+00 24+00 25+00 26+00 27+00 28+00 28+50 sandis.net build on.
CALIFORNIA
MILLIKEN RAW WATER PIPELINE
HARDENING
100% DESIGN
NAPA
UTILITIES DEPARTMENT
DWG NUMBER: "W 2025-021"
RAW WATER LINE PLAN & PROFILE - STA
22+50 TO 28+50 C1.4
M
ATC
H
LIN
E - SEE SH
EET C
1.5 0'
1 INCH =
40'20'10'4'
20 FT
M A
TC
H
LI
N
E
S E
E S
H E
E T
C 1.
GENERAL NOTES
VERTICAL BENDS HORIZONTAL
BENDS
ARV
W V
E
ARV
WV
ARV
W V
E
28+50 29+00 30+00 31+00 32+00 33+00 34+00 34+50
28+50 29+00 30+00 31+00 32+00 33+00 34+00 34+50 sandis.net build on.
CALIFORNIA
MILLIKEN RAW WATER PIPELINE
HARDENING
100% DESIGN
NAPA
UTILITIES DEPARTMENT
DWG NUMBER: "W 2025-021"
RAW WATER LINE PLAN & PROFILE - STA
28+50 TO 34+50 C1.5
M A
TC
H
LI
N
E
S E
E S
H E
E T
C 1.
M
ATC
H
LIN
E - SEE
SH
EET C
1.4
0'
1 INCH =
40'20'10'4'
20 FT
GENERAL NOTES
VERTICAL BENDS HORIZONTAL
BENDS
HORIZONTAL
WELDS
VERTICAL
WELDS
PROFILE LEGEND
ARV
34+50 35+00 36+00 37+00 38+00 39+00 40+00 40+50 sandis.net build on.
CALIFORNIA
MILLIKEN RAW WATER PIPELINE
HARDENING
100% DESIGN
NAPA
UTILITIES DEPARTMENT
DWG NUMBER: "W 2025-021"
RAW WATER LINE PLAN & PROFILE - STA
34+50 TO 40+50 C1.6
M A
TC
H
LI
N
E
S E
E S
H E
E T
C 1.
M A
TC
H
LI
N
E
S E
E S
H E
E T
C 1.
0'
1 INCH =
40'20'10'4'
20 FT
HORIZONTAL
WELDS
VERTICAL
WELDS
GENERAL NOTES
40+50 41+00 42+00 43+00 44+00 45+00 46+00 46+50 sandis.net build on.
CALIFORNIA
MILLIKEN RAW WATER PIPELINE
HARDENING
100% DESIGN
NAPA
UTILITIES DEPARTMENT
DWG NUMBER: "W 2025-021"
RAW WATER LINE PLAN & PROFILE - STA
40+50 TO 46+50 C1.7
M
AT
C H
LI
N
E
- S
EE
S
H
EE
T C
1.
M A
TC
H
LI
N
E
S E
E S
H E
E T
C 1.
0'
1 INCH =
40'20'10'4'
20 FT
HORIZONTAL
WELDS
VERTICAL
WELDS
GENERAL NOTES
V
ARV
46+50 47+00 48+00 49+00 50+00 51+00 52+00 52+50 sandis.net build on.
CALIFORNIA
MILLIKEN RAW WATER PIPELINE
HARDENING
100% DESIGN
NAPA
UTILITIES DEPARTMENT
DWG NUMBER: "W 2025-021"
RAW WATER LINE PLAN & PROFILE - STA
46+50 TO 52+50 C1.8
M A
TC
H
LI
N
E
S E
E S
H E
E T
C 1.
M A
TC
H
LI
N
E
S E
E S
H E
E T
C 1.
0'
1 INCH =
40'20'10'4'
20 FT
HORIZONTAL
WELDS
VERTICAL
WELDS
GENERAL NOTES
V
52+50 53+00 54+00 55+00 56+00 57+00 58+00 58+50 sandis.net build on.
CALIFORNIA
MILLIKEN RAW WATER PIPELINE
HARDENING
100% DESIGN
NAPA
UTILITIES DEPARTMENT
DWG NUMBER: "W 2025-021"
RAW WATER LINE PLAN & PROFILE - STA
52+50 TO 58+50 C1.9
M A
TC
H
LI
N
E
S E
E S
H E
E T
C 1.
MATCHLINE - SEE
SHEET C1.8
0'
1 INCH =
40'20'10'4'
20 FT
GENERAL NOTES
HORIZONTAL
WELDS
VERTICAL
WELDS
V
WV
WV
W V
58+50 59+00 60+00 61+00 62+00 62+75 sandis.net build on.
CALIFORNIA
MILLIKEN RAW WATER PIPELINE
HARDENING
100% DESIGN
NAPA
UTILITIES DEPARTMENT
DWG NUMBER: "W 2025-021"
RAW WATER LINE PLAN & PROFILE - STA
58+50 TO 62+50 C1.10
MATCHLINE - SEE
SHEET C1.9
0'
1 INCH =
40'20'10'4'
20 FT
HORIZONTAL
WELDS
VERTICAL
WELDS
GENERAL NOTES
MILLIKEN WATER TREATMENT PLANT
EXISTING SLUDGE TANK
ALUM.
TANK
REACTION
TANK
FILTER
TANK
FILTER
TANK
FILTER
TANK
FILTER
TANK
WASHWATER TANK
PUMP ROOM
A
A sandis.net build on.
CALIFORNIA
MILLIKEN RAW WATER PIPELINE
HARDENING
100% DESIGN
NAPA
UTILITIES DEPARTMENT
DWG NUMBER: "W 2025-021"
RAW WATER LINE WASTE LINE PLAN C2.0
0'
1 INCH =
10'5'2.5'1'
5 FT
ARVARV
build on.
CALIFORNIA
MILLIKEN RAW WATER PIPELINE
HARDENING
100% DESIGN
NAPA
UTILITIES DEPARTMENT
DWG NUMBER: "W 2025-021"
ATV BRIDGE DETAILS C2.1
PROFILE LEGEND
LEGEND
0'
1 INCH =
10'5'2.5'1'
V
WV
sandis.net build on.
CALIFORNIA
MILLIKEN RAW WATER PIPELINE
HARDENING
100% DESIGN
NAPA
UTILITIES DEPARTMENT
DWG NUMBER: "W 2025-021"
ADD ALTERNATE VALVE
ACTUATOR INSTALLATION C2.2
0'
1 INCH =
10'5'2.5'1'
DESCRIPTION OF WORK
CALIFORNIA
MILLIKEN RAW WATER PIPELINE
HARDENING
100% DESIGN
NAPA
UTILITIES DEPARTMENT
CONSTRUCTION DETAILS C3.0
CALIFORNIA
MILLIKEN RAW WATER PIPELINE
HARDENING
100% DESIGN
NAPA
UTILITIES DEPARTMENT
CONSTRUCTION DETAILS C3.1
CALIFORNIA
MILLIKEN RAW WATER PIPELINE
HARDENING
100% DESIGN
NAPA
UTILITIES DEPARTMENT
DWG NUMBER: "W 2025-021"
DATA SHEET S0
ABBREVIATIONS
GENERAL NOTES
1. FABRICATION AND ERECTION OF STRUCTURAL STEEL SHALL CONFORM TO THE AMERICAN INSTITUTE OF
STEEL CONSTRUCTION, “MANUAL OF STEEL CONSTRUCTION, ASD” (LATEST EDITION).
2. ALL STEEL DETAILS AND CONNECTIONS SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE AISC
“SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS” (LATEST EDITION).
3. STEEL MATERIALS SHALL CONFORM TO THE FOLLOWING UNLESSS OTHERWISE NOTED ON THE
DRAWINGS:
A. ALL ROLLED SHAPES AND CHANNELS: ASTM A572 OR A992, MIN. YIELD STRENGTH OF 50 KSI
B. MISCELLANEOUS ANGLES: ASTM A36, MIN. YIELD STRENGTH OF 36 KSI
C. HOLLOW STRUCTURAL STEEL SECTIONS (TUBES AND PIPES): ASTM A500 GRADE B, MIN. YIELD
STRENGTH OF 46 KSI FOR TUBES AND 42 KSI FOR PIPES.
4. ALL CONNECTION MATERIAL AND BASE PLATES SHALL CONFORM TO ASTM STANDARD A36 (36 KSI), WITH
50 KSI PLATE WHERE NOTED.
5. ALL BOLTS SHALL CONFORM TO ASTM A325 OR A490, NUTS SHALL CONFORM TO ASTM A563, AND
WASHERS SHALL CONFORM TO ASTM F436.
6. ALL ANCHOR BOLTS/RODS SHALL CONFORM TO ASTM F1554 GRADE 36 WITH WELD ABILITY SUPPLEMENT S1, UNLESS OTHERWISE NOTED. RIGID TEMPLATES SHALL BE UTILIZED FOR ANCHOR ROD INSTALLATION.
7. OVERSIZED OR SLOTTED HOLES SHALL NOT BE USED FOR ANY CONNECTIONS UNLESS SPECIFICALLY
INDICATED ON THE DRAWINGS OR APPROVED IN WRITING BY THE ENGINEER.
8. ALL BUTT AND FULL PENETRATION WELDS SHALL BE MADE USING RUN-OFF TABS WHICH SHALL BE
REMOVED AND GROUND SMOOTH AFTER WELD IS COMPLETED.
9. ALL WELD BACK-UP BARS SHALL BE REMOVED AND GROUND SMOOTH AFTER WELD IS COMPLETED
UNLESS NOTED OTHERWISE.
10. ALL WELDS INDICATED SHALL MEET THE MINIMUM WELD SIZE SPECIFIED BY THE AISC MANUAL OF STEEL
DESIGN (SINGLE PASS AS REQUIRED).
11. ALL SHOP AND FIELD WELDS SHALL BE PERFORMED BY CERTIFIED WELDERS IN ACCORDANCE WITH A.W.S.
SPECIFICATIONS, LATEST EDITIONS. COORDINATE SPECIAL INSPECTIONS WITH CERTIFIED WELDING
SPECIAL INSPECTOR PRIOR TO PERFORMING WORK.
12. ALL WELDING ELECTRODES SHALL CONFORM TO A.W.S. A5.1 GRADE E70. BARE ELECTRODES AND
GRANULAR FLUX SHALL CONFORM TO A.W.S. A5.17, F70 A.W.S. FLUX CLASSIFICATION.
13. ALTERNATE CONNECTIONS SHALL BE ACCEPTED ONLY WITH THE WRITTEN APPROVAL OF THE ENGINEER.
14. TEMPORARY BRACING OR GUYS TO PROVIDE VERTICAL AND LATERAL SUPPORT OF THE STRUCTURE AND INDIVIDUAL ELEMENTS UNTIL PERMANENT FRAME IS COMPLETELY INSTALLED IS THE CONTRACTOR'S
RESPONSIBILITY.
15. ALL STRUCTURAL STEEL EXPOSED TO WEATHER SHALL BE GALVANIZED. ALL MILL SCALE AND COATINGS SHALL BE REMOVED WHERE WELDS ARE APPLIED. REMOVED COATINGS SHALL BE REPAIRED AFTER WELDS
ARE APPROVED BY THE SPECIAL INSPECTOR.
16. ALL TUBE & PIPE SECTIONS EXPOSED TO WEATHER SHALL HAVE OPEN ENDS CAPPED WITH ¼” PLATE
UNLESS OTHERWISE NOTED IN PLANS.
1. All construction, materials and workmanship shall conform to the 2022 Edition of the California Building Code, the 2022 California Electrical Code, 2022 Editions of the California Plumbing and Mechanical Codes, the 2022 edition of the California Residential Code and the 2022 edition of the California Green Building Code and all appendixes thereto.
2. The general contractor shall verify all site conditions and dimensions before starting work. The contractor shall notify the Engineer of any discrepancies.
3. Accept no ink or pencil corrections to these drawings without the Engineer's initials or signature. The Engineer shall be held harmless for all changes not in conformance with this provision.
4. All Users of these drawings agree by using these drawings to hold the Engineer harmless for any and all work that does not conform to requirements and minimum standards of the CBC, local ordinances, and acceptable standards.
5. These drawings are the property of the Engineer and are not to be used in part for any work other than the location shown hereon.
6. The Engineer shall not have control or charge of and shall not be responsible for construction means, methods, techniques, sequences or procedures or for any safety precautions and programs in connection with the work,
7. The Engineer assumes no responsibility for the performance of products or materials not specified in these drawings,
8. Contractor shall verify easements (public or private) for sewer, water, electrical, telephone, cable TV, and gas prior to starting construction.
9. Verify all utility data and locations prior to any work. On-site utilities shall be coordinated with the appropriate agency or utility company.
10. General notes and typical details apply to all structural features unless otherwise shown or noted.
11. If certain features are not fully shown or called for on the drawings or specifications, their construction shall be of same character as for similar conditions.
12. The project specifications form a part of the contract documents.
13. Specifications, codes and standards noted in the contract documents shall be of the latest edition unless otherwise noted.
14. dimensions shall not be scaled.
15. All work shall conform to the minimum standards of the following codes: the 2022 California Building Code, and any other regulating agencies which have authority over any portion of the work, including the Stale of California Division of Industrial Safety, and those codes and standings listed in these notes and the specifications.
16. Manufactured materials shall be approved by the contractor prior to their use. All requirements of those approvals shall be followed.
17. Non-structural features not fully shown or noted on the structural drawings include but are not limited to:
A. Architectural features
- size and location of all door and windows openings
- size and location of all non-bearing partitions
- size and location of all concrete curbs, floor drains, slopes, depressed areas.
- changes in level, chamfers, grooves, inserts etc.
- size and location of all floor and roof openings
- stair framing and details unless detailed on structural drawings
- dimensions not shown on the structural drawings
B. Mechanical, plumbing and electrical features
- Pipe runs, sleeves, hangers, trenches, wall, roof and floor openings, etc., not shown or noted.
- Electrical conduit runs, boxes, outlets in walls and slabs
- Anchorage and bracing for electrical, mechanical or plumbing equipment
- Anchor bolts for motor mounts
- Size and location of machine and equipment bases
18. Openings, pockets, etc. shall not be placed in structural members unless specifically detailed on the structural drawings. Notify the structural engineer when work requires openings, pockets, etc. in structural members not shown on the structural drawings.
19. The contractor shall be responsible for coordinating the work of all trades abd shall check all dimensions and holes and openings required in structural members. All discrepancies shall be called to the attention of the architect and shall be resolved before proceeding with the work.
20. The contract documents represent the finished structure. They do not indicate the method of construction. The contractor shall provide all measures necessary to protect life and property during construction. Such measures shall include, but are not limited to bracing and shoring for loads due to construction equipment and materials. Observations visits to the site by engineer of record shall not include inspection of the above items.
21. Construction materials shall be spread out if placed on framed floors or roofs. Load shall not exceed the design live load per square foot. Provide adequate shoring where overload is anticipated.
22. The lateral system of the structure is designed with lateral restraint at each level. Structural walls or frames are not laterally self-supporting until the entire design lateral restraint system is in place.
1. This section summarizes the specific requirements of chapter 17 of the 2022 CBC as they apply to the special inspection , structural observation and testing of the structural portions of this project.
2. The types of work listed in the submitted special inspection report for this project shall be inspected in accordance with CBC 1704 when indicated as either “continuous” or “periodic”. All tests and inspections shall be performed by a certified special inspector from an independent testing agency who is employed by the owner or agent of the owner and not the contractor.
a. The special inspector shall observe the work assigned for conformance with the approved design drawings and specifications.
b. The special inspector shall furnish inspection reports to the building official, the engineer of record, and other designated persons. All discrepancies shall be brought to the immediate attention of the contractor for correction, then, if uncorrected to the proper design authority and to the building official.
c. The special inspector shall submit a final signed report stating whether the work requiring special inspection was, to the best of the inspector's knowledge, in conformance with the approved plans and specification and the applicable workmanship provisions and standards of the CBC.
d. Continuous and periodic special inspections shall be in accordance with CBC 1702.
3. Structural observation of drilled piers, grade beams and corbels reinforcement steel by Engineer of Record.
STRUCTURAL STEEL NOTES
Structural Observations, Testing and Inspection
1 2
3 4
5 6 7
40-FT ATV BRIDGE SUPERSTRUCTURE PLAN
SCALE: 3 8"=1'-0"
SECTION A-A
SCALE: 38" =1'-0"
sandis.net build on.
CALIFORNIA
MILLIKEN RAW WATER PIPELINE
HARDENING
100% DESIGN
NAPA
UTILITIES DEPARTMENT
STRUCTURAL DETAILS S1
CORRUGATED STEEL
LAGGING, DETAIL 4/SHEET RW3
W5 X 16 STEEL BEAM,
EPOXY COATED
7 FT
BACKFILL DRILLED
HOLE WITH CONCRETE
12 IN
4 FT
M
AX
WATER LINE, SEE CIVIL DWGS
BACKFILL AT 3:1 TO CATCH (E) GRADE
USING ONSITE SOIL COMPACTED
TO 90% RELATIVE COMPACTION
PATHWAY
5 FT MIN
SOLDIER PILES
1. STEEL BEAMS FOR SOLDIER PILES SHALL BE ASTM A572, GRADE 50 OR APPROVED
EQUAL.
2. READY-MIX CONCRETE SHALL BE MIXED AND DELIVERED IN ACCORDANCE WITH
ASTM C94.
3. CEMENT SHALL CONFORM TO ASTM C 150, TYPE II.
4. CONCRETE SHALL HAVE A MINMUM COMPRESSIVE STRENGTH OF 2,500 PSI AT 28
DAYS.
5. STEEL BEAMS SHALL BE PAINTED WITH TWO COATS OF BLACK COAL TAR EPOXY,
CARBOLINE BITUMASTIC NO. 300-M OR APPROVED EQUAL. COAL TAR EPOXY
COATING SHALL EXTEND 12 IN BELOW THE TOP OF CONCRETE ENCASEMENT.
CORRUGATED STEEL LAGGING
1. CORRUGATED STEEL LAGGING SHALL BE 12 GAUGE, 6 IN X 2 IN PREGALVANIZED
STEEL BRIDGE PLANK BY CONTECH OR APPROVED EQUAL.
2. REPAIR WELDS AND ANY DAMAGE TO THE HOT DIP GALVANIZING IN ACCORDANCE
WITH ASTM A780
SOLDIER PILE WALL AT PIPE BURIAL
(NO SCALE)3
AutoCAD SHX Text
BY
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text No.
AutoCAD SHX Text NO PART OF THIS DOCUMENT MAY BE REPRODUCED IN ANY FORM INCLUDING PHOTOCOPY, RECORDING OR ANY INFORMATION RETRIEVABLE AND STORAGE SYSTEM, WITHOUT PERMISSION IN WRITING FROM SANDIS.
AutoCAD SHX Text Copyright by Sandis
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text File: H:\Jobs\3400-3499\3426.003 Sandis - Milliken Diversion Dam Access Walkway\3426.003 - RCA Desktop to Job file Transfer\3426.001 Wall Details, Pipeline Hardening 2025-09-23.dwg Date: Sep 24, 2025 - 3:46 PM
AutoCAD SHX Text
SHEET
AutoCAD SHX Text PROJECT No.:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
CALIFORNIA
AutoCAD SHX Text 9/12/2025
AutoCAD SHX Text 622094
AutoCAD SHX Text
MILLIKEN RAW WATER PIPELINE HARDENING 100% DESIGN
AutoCAD SHX Text
NAPA
AutoCAD SHX Text
UTILITIES DEPARTMENT
AutoCAD SHX Text
WALL AT PIPE BURIAL
AutoCAD SHX Text
RW1
AutoCAD SHX Text G
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text R
AutoCAD SHX Text No. 3031
AutoCAD SHX Text S
AutoCAD SHX Text Exp. 6/30/27
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text C.
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text L
| Sheets and Views |
| C0.1 COVER SHEET |
| C0.2 NOTES |
| C0.3 NOTES |
| C0.4 KEY PLAN |
| X.1 |
| C0.5 SYSTEM APPURTENANCE LOCATION PLAN |
| X.1 |
| C1.0 RAW WATER LINE PLAN & PROFILE - STA -1+25 TO 4+50 |
| X.1 |
| C1.1 RAW WATER LINE PLAN & PROFILE - STA 4+50 TO 10+50 |
| X.1 |
| C1.2 RAW WATER LINE PLAN & PROFILE - STA 10+50 TO 16+50 |
| X.1 |
| C1.3 RAW WATER LINE PLAN & PROFILE - STA 16+50 TO 22+50 |
| X.1 |
| C1.4 RAW WATER LINE PLAN & PROFILE - STA 22+50 TO 28+50 |
| X.1 |
| C1.5 RAW WATER LINE PLAN & PROFILE - STA 28+50 TO 34+50 |
| X.1 |
| C1.6 RAW WATER LINE PLAN & PROFILE - STA 34+50 TO 40+50 |
| X.1 |
| C1.7 RAW WATER LINE PLAN & PROFILE - STA 40+50 TO 46+50 |
| X.1 |
| C1.8 RAW WATER LINE PLAN & PROFILE - STA 46+50 TO 52+50 |
| X.1 |
| C1.9 RAW WATER LINE PLAN & PROFILE - STA 52+50 TO 58+50 |
| X.1 |
| C1.10 RAW WATER LINE PLAN & PROFILE - STA 58+50 TO 62+50 |
| X.1 |
| C2.0 RAW WATER LINE WASTE LINE PLAN |
| X.1 |
| C2.1 ATV BRIDGE DETAILS |
| C2.2 ADD ALTERNATE VALVE ACTUATOR INSTALLATION |
| C3.0 CONSTRUCTION DETAILS |
| C3.1 CONSTRUCTION DETAILS |
| S0 DATA SHEET |
| S1 STRUCTURAL DETAILS |
| ddemaster@cityofnapa.org | |
| 2025-09-24T17:08:24-0700 | |
| Napa, CA | |
| Douglas W. DeMaster | |
| I have reviewed this document |
File details come from the government source that posted it. Updated .