Milliken_Pipeline_Available_Laydown_Space_20250821.pdf
PDF 1 MB Posted
- Attached to
- Milliken Raw Water Pipeline Hardening HMGP
- Solicitation number
- 2025-IFB - PC-064
- Issued by
- Napa County, California
About this file
This document is a site access and laydown space exhibit for the Milliken Pipeline project, dated 8/21/2025, showing a detailed aerial map of a facility with specific access and staging requirements. The exhibit indicates a required access road of 15 feet wide (minimum) marked in red, which provides comprehensive access to multiple critical areas including plant doors, staff access to a tank, doors on the northeast side of the building, sludge tank, and a shed. The map delineates two types of available laydown areas: a flat green area and a green-yellow area to be graded at the contractor's option.
The site map provides precise topographical details with elevation markers ranging from approximately 300 to 350 feet, showing a wooded and contoured terrain surrounding the facility. The exhibit appears to be a critical planning document for pipeline infrastructure work, detailing precise movement and staging zones for construction or maintenance activities. The red-lined access road ensures clear, unobstructed pathways to key facility components, suggesting meticulous planning for operational continuity and emergency access. The laydown space options offer flexibility for contractor staging and equipment placement, with the color-coded areas indicating different preparation requirements.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
bcancimilla Image bcancimilla PolyLine bcancimilla Line bcancimilla Polygon bcancimilla Polygon bcancimilla Polygon bcancimilla Rectangle bcancimilla Text Box Available laydown area (flat) jeshelman Rectangle jeshelman Text Box Available laydown area (sloped) - to be graded at contractor option jeshelman Text Box Milliken Pipeline Available Laydown Space Exhibit Date: 8/21/2025 jeshelman Text Box Required access road (15 feet wide min.)
jeshelman Line chrisjones Polygon ddemaster Callout Ensure Staff Access to Tank ddemaster Callout Ensure doors on northeast side of building are accessible.
ddemaster Callout Ensure Access to Shed ddemaster Callout Ensure Access to sludge tank ddemaster Callout Ensure Access to plant doors