Pits Report.pdf
PDF 30 MB Posted
- Attached to
- AZ FS 24(1) Buffalo Crossing Bridge
- Solicitation number
- 6982AF23B000004
About this file
This invitation for bid (IFB) solicits contractors to replace the Buffalo Crossing Bridge located on Arizona State Route 24(1). Bidders should review the attached PDF document titled "IFB 6982AF23B000004 AZ FS 24(1) Buffalo Crossing Bridge" for full project details. The IFB was issued by the Department of Transportation Federal Highway Administration to replace the bridge over Dry Creek. Bids are due by April 15, 2023 and the contract is to be awarded by May 1, 2023. The project includes removing the existing structure and constructing a new single-span concrete bridge on new alignment, with an estimated cost between $2-5 million.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pits Report Elal Segev
Burro Mountain Pit
Burro Mountain Pit Materials LAT 33.920062° Long -109.479182°
Pit #1 Lat 33.763728°
Long -109.416349°
Pit #2 (Burn Pit) Lat 33.718822°
Long -109.351592°
Pit #3 Lat 33.823250°
Long -109.366119°
Bardman Pit Lat 33.729108° Long -109.269979°
Bardman Pit Materials
AZ FS 24(1)
Buffalo Crossing Bridge Borrow Pit Locations
Legend Pit and Bridge Location
7 mi N
N © 2021 Google
© 2021 Google
© 2021 Google
| Pits Report |
| Burro Mountain Pit |
| Burro Mountain Pit Materials� LAT 33.920062° Long -109.479182° |
| Pit #1�Lat 33.763728° �Long -109.416349° |
| Pit #2 (Burn Pit)�Lat 33.718822°�Long -109.351592° |
| Pit #3�Lat 33.823250°�Long -109.366119° |
| Bardman Pit�Lat 33.729108°�Long -109.269979° |
| Bardman Pit Materials |
File details come from the government source that posted it. Updated .