This document is an invitation for bid (IFB) for a bridge construction project located in Arizona. The IFB requests bids for the AZ FS 24(1) Buffalo Crossing Bridge project, which includes replacing an existing bridge over the North Fork East Black River.

The Federal Highway Administration (FHWA) is the issuing agency. The bid opening date is March 7, 2023. The project involves replacing the existing bridge with a new prefabricated steel bridge and approach roadway work. The contractor must follow all applicable state and federal requirements, including prevailing wage rates, certifications, and permits. The completion date for the project work is June 14, 2024.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION FOR BID

SOLICITATION NUMBER: 6982AF23B000004

SOLICITATION TYPE: FULL AND OPEN COMPETITION (UNRESTRICTED)

PROJECT NUMBER: AZ FS 24(1)

PROJECT NAME: BUFFALO CROSSING BRIDGE

BID OPENING DATE:

This solicitation cites Standard Specifications for Construction of Roads and Bridges on

Federal Highway Projects, FP-14 US Customary Units

ISSUING OFFICE:

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 W. DAKOTA AVENUE, SUITE 360

LAKEWOOD, CO 80228

Web site: https://highways.dot.gov/federal-lands E-mail: CFLContracts@dot.gov

TABLE OF CONTENTS

APPENDICES

PROJECT OVERVIEW

SPECIAL CONTRACT REQUIREMENTS (SCRs)

The following Special Contract Requirements amend and supplement the Standard Specification for Construction of Roads and Bridges on Federal Highway Projects

I. PRE-BID INFORMATION

ELECTRONIC BIDS WILL NOT BE ACCEPTED. Submit a printed copy of your bid to the address listed on the SF-1442 (Page A-1, Item 8). Submit the following documents with your Bid Package– o

Notice of SAM Registration

Representations and Certifications – NAICS 237310

45.0 4 .0

Vets-4212 Reporting: -

This Solicitation Contains a Price Evaluation Factor

52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns

52.219-14, Limitations on Subcontracting

Bid Guarantee 52.228-1 Bid Guarantee

Accuracy and Completeness of Bid-

Request for Technical Information –

Modifications to Bids prior to the time specified for receipt of bids

STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total.

FAX Number to submit modifications to bids for this project is (720) 963-3360

Email Address to submit modifications to bids for this project is cflcontracts@dot.gov

II. POST AWARD INFORMATION

CFLHD will no longer be providing paper copies of the conformed contract to the Awarded Prime Contractor.

Subcontracting 52.219-8, Utilization of Small Business Concerns

52.219-9, Small Business Subcontracting Plan, Alternate I

TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE

ACCEPTED AFTER 4 P.M. ON FEBRUARY 28, 2023

5.206, Notice of Subcontracting Opportunities, NOTE:

FHWA Small Business Subcontracting Goals (As of FY 2022) Business Size Goal (%)

Insurance requirements

EEBACS - Engineer’s Estimating, Bidding, Award, and Construction System (EEBACS), Inspector’s Daily Record of Construction Operations” Contractors Daily Reports)

“EEBACS for Construction Contractors”

SOLICITATION, OFFER

AND AWARD

(Construction, Alteration or Repair)

(IFB)

(RFP)

IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.

(Include area code)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)

2. DEPARTMENT OF LABOR, CONSTRUCTION WAGE RATE REQUIREMENT RATES

3. SPECIAL CONTRACT REQUIREMENTS

4. PLANS

5. BID SCHEDULE

6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY

PROJECTS, FP-14, U.S. CUSTOMARY UNITS

7. SUBCONTRACTING PLAN (IF APPLICABLE)

*Refer to Subsection 108.01 as amended in the Special Contract Requirements.

(If "YES," indicate within how many calendar days after award in Item 12B.)

3/07/2023 (

02/02/2023

OFFEROR (Must be fully completed by offeror) (Include ZIP Code) (Include area code)

(Include only if different than Item 14)

(Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

(Type or print)

AWARD (To be completed by Government)

(4 copies unless otherwise specified)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return copies to issuing office.)

(Contractor is not required to sign this document.)

(Type or print) (Type or print)

Item 8: LOCATION OF PUBLIC BID OPENING:

Item 9: FOR GENERAL INFORMATION:

FOR TECHNICAL INFORMATION (plans and specifications):

Item 11: COMPLETION DATE:

Subsection 108.01 of the SCRs.

Item 12A: PERFORMANCE AND PAYMENT BONDS: Clause 52.228-15 Performance and Payment Bonds-Construction

Item 13B: BID BOND AMOUNT: 52.228-1 Bid Guarantee Subsection 102.03 Bid Guarantee

Item 19: ACKNOWLEDGMENT OF AMENDMENTS:

IN ITEM 19 OF THE SF-1442,

Item 24: SUBMITTING INVOICES: Subsection 109.08 Progress Payments

ESTIMATED

PRICE:

Bid Schedule Instructions

Basis for Award

Partnering

Subsection 103.05 Partnering

Bid Schedule

Project No:AZ FS 24(1) Project Name:Buffalo Crossing Bridge

Contract Quantity Pay Items

Item No. Pay Item No. Description Quantity Unit Unit Price Amount

Bid Schedule Schedule:A Schedule Type:Base

Bid Schedule Schedule:A Schedule Type:Base

Corporate Certificate

Limited Liability Certificate

Authority to Bind Partnership

Authority to Bind Joint Venture

Sole Proprietorship Requirement

BUY AMERICAN ACT- CONSTRUCTION MATERIALS

NOTE TO CONTRACTOR:

[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] [Please include name, address, telephone number and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include all applicable supporting information.]

HAZARDOUS MATERIALS

USE OF RECOVERED MATERIALS ON FEDERAL LANDS HIGHWAY PROJECTS

Comprehensive Guidelines for Procurement of Products Containing Recovered Materials

BID BOND

(See instructions on reverse)

OMB Control Number: 9000-0045 Expiration Date: 8/31/2025

PRINCIPAL (Legal name and business address) TYPE OF ORGANIZATION ("X" one)

STATE OF INCORPORATION

SURETY(IES) (Name and business address)

PERCENT

OF BID

PRICE

PENAL SUM OF BOND

AMOUNT NOT TO EXCEED

MILLION(S) THOUSAND(S) HUNDRED(S) CENTS

BID IDENTIFICATION

BID DATE INVITATION NUMBER

PRINCIPAL

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1. 2.

2.

3.

3.

(Seal) (Seal) (Seal) Corporate Seal

INDIVIDUAL SURETY(IES)

SIGNATURE(S)

NAME(S)

(Typed)

1.

1.

2.

2.

(Seal) (Seal)

CORPORATE SURETY(IES)

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1.

2.

2. Corporate Seal

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is NOT usable

STANDARD FORM 24 (REV. 8/2016)

Prescribed by GSA - FAR (48 CFR) 53.228(a)

FOR (Construction, Supplies or Services)

OBLIGATION:

We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.

CONDITIONS:

The Principal has submitted the bid identified above.

THEREFORE:

The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.

Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government.

Notice to the surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.

WITNESS:

The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.

DATE BOND EXECUTED (Must not be later than bid opening date)

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0045. We estimate that it will take 1 hour to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

JOINT VENTURE

OTHER (Specify)

PARTNERSHIPINDIVIDUAL

CORPORATION

6982AF2 B0000

INSTRUCTIONS

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the LIABILITY LIMIT block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.

(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY(IES)." In the space designated "SURETY(IES)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.

(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond.

The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror."

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1.

2.

2. Corporate Seal

Corporate Seal

LIABILITY LIMIT ($)STATE OF INCORPORATION

2.

2.

1.

1.NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INCORPORATION

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INCORPORATION

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INCORPORATION

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INCORPORATION

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME &

ADDRESS

STANDARD FORM 24 (REV. 8/2016) BACK

BIDDER’S INFORMATION

Employer ID Number (EIN)

Solicitation Provisions

52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. (SEP 2007)

52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements-Representation. (JAN 2017)

52.204-5 Women-Owned Business (Other Than Small Business). (OCT 2014)

52.204-7 System for Award Management. (OCT 2018)

52.204-8 Annual Representations and Certifications. (MAY 2022)

52.204-16 Commercial and Government Entity Code Reporting (AUG 2020)

52.204-17 Ownership or Control of Offeror (AUG 2020)

52.204-20 Predecessor or Offeror (AUG 2020)

52.204-22 Alternative Line Item Proposal (JAN 2017)

52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (NOV 2021)

52.204-26 Covered Telecommunications Equipment or Services-Representation. (OCT 2020)

52.209-5 Certification Regarding Responsibility Matters. (AUG 2020)

52.209-7 Information Regarding Responsibility Matters (OCT 2018)

52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law (FEB 2016)

52.209-13 Violation of Arms Control Treaties or Agreements – Certification (NOV 2021)

52.211-6 Brand Name or Equal. (AUG 1999)

52.214-3 Amendments to Invitations for Bids. (DEC 2016)

52.214-4 False Statements in Bids. (APR 1984)

52.214-5 Submission of Bids. (DEC 2016)

52.214-6 Explanation to Prospective Bidders. (APR 1984)

52.214-7 Late Submissions, Modifications, and Withdrawals of Bids. (NOV 1999)

52.214-18 Preparation of Bids - Construction. (APR 1984)

52.214-19 Contract Award - Sealed Bidding - Construction. (AUG 1996)

52.214-31 Facsimile Bids (DEC 1989)

52.214-34 Submission of Offers in the English Language. (APR 1991)

52.214-35 Submission of Offers in U.S. Currency. (APR 1991)

52.215-5 Facsimile Proposals. (OCT 1997)

52.216-1 Type of Contract. (APR 1984)

FIRM FIXED PRICE

52.222-5 Construction Wage Rate Requirements Secondary Site of the Work. (MAY 2014)

52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction. (FEB 1999)

Federal Register

Goals for Minority Participation for Each Trade

Goals for Female Participation for Each Trade

27% - Greenlee County, Arizona 6.9%

B-10

(c)

(d)

(1)

52.222-38 Compliance with Veterans' Employment Reporting Requirements. (FEB 2016)

52.223-22 Public Disclosure of Greenhouse Gas Emissions and Reduction Goals— Representation (DEC 2016)

52.225-10 Notice of Buy American Requirement—Construction Materials (MAY 2014)

52.225-20 Prohibition on Conducting Restricted Business Operations in Sudan-- Certification. (AUG 2009)

52.228-1 Bid Guarantee. (SEP 1996)

(e) As used in this Notice, and in any contract resulting from this solicitation, the covered area is Greenlee County, AZ.

e.g twenty (20%) percent $3,000,000.00

52.233-2 Service of Protest. (SEP 2006)

Mr. Joseph Wilson Contracting Officer Federal Highway Administration 12300 West Dakota Avenue, Suite 360 Lakewood, Colorado 80228

In anticipation of a winter advertisement and prior to the project being advertised, access to the site visit was provided between November 14th – 17th 2022.

52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998) http://www.acquisition.gov/far

52.252-3 Alterations in Solicitation. (APR 1984)

Included FAR 52.211-6(e)

1252.239–92 Information and Communication Technology Accessibility Notice (NOV 2022)

Contract Clauses

52.202-1 Definitions. (JUN 2020)

52.203-3 Gratuities. (APR 1984)

52.203-5 Covenant Against Contingent Fees. (MAY 2014)

52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020)

52.203-7 Anti-Kickback Procedures. (JUN 2020)

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (MAY 2014)

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (MAY 2014)

52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (JUN 2020)

52.203-13 Contractor Code of Business Ethics and Conduct (NOV 2021)

52.203-14 Display of Hotline Poster(s) (NOV 2021)

Definition.

United States

Display of fraud hotline poster(s).

General Fraud https://www.oig.dot.gov/sites/default/files/files/OIG-generic-2.pdf

Subcontracts.

52.203-17 Contractor Employee Whistleblower Rights and Requirements to Inform Employees of Whistleblower Rights (JUN 2020)

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)

52.204-1 Approval of Contract (DEC 1989)

Acquisitions Branch Chief

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper.

(MAY 2011)

52.204-9 Personal Identity Verification of Contractor Personnel. (JAN 2011)

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (JUN 2020)

52.204-13 System for Award Management Maintenance. (OCT 2018)

52.204-14 Service Contract Reporting Requirements (OCT 2016)

52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020)

52.204-19 Incorporation by Reference of Representations and Certifications. (DEC 2014)

52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021)

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (NOV 2021)

52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021)

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (NOV 2015)

52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) Alternate I

(APR 1984)

ten (10)

{Refer to Subsection 108.01 of the SCRs}.

52.211-12 Liquidated Damages - Construction. (SEP 2000)

(see FP-14 section 108)

52.211-13 Time Extensions. (SEP 2000)

52.211-18 Variation in Estimated Quantity. (APR 1984)

52.214-26 Audit and Records – Sealed Bidding. (JUN 2020)

52.214-27 Price Reduction for Defective Certified Cost or Pricing Data – Modifications – Sealed Bidding. (JUN 2020)

52.214-28 Subcontractor Certified Cost or Pricing Data – Modifications – Sealed Bidding.

(JUN 2020)

52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns. (OCT 2022)

52.219-8 Utilization of Small Business Concerns (OCT 2022)

52.219-9 Small Business Subcontracting Plan (OCT 2022) - Alternate I (NOV 2016)

52.219-14 Limitations on Subcontracting (OCT 2022)

52.219-16 Liquidated Damages -- Subcontracting Plan (SEP 2021)

52.219-28 Post-Award Small Business Program Rerepresentation (OCT 2022)

52.222-1 Notice to the Government of Labor Disputes. (FEB 1997)

52.222-3 Convict Labor. (JUN 2003)

52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation. (MAY 2018)

52.222-6 Construction Wage Rate Requirements. (AUG 2018)

52.222-7 Withholding of Funds. (MAY 2014)

52.222-8 Payrolls and Basic Records. (JUL 2021)

52.222-9 Apprentices and Trainees. (JUL 2005)

52.222-10 Compliance with Copeland Act Requirements. (FEB 1988)

52.222-11 Subcontracts (Labor Standards). (MAY 2014)

52.222-12 Contract Termination - Debarment. (MAY 2014)

52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations. (MAY 2014)

52.222-14 Disputes Concerning Labor Standards. (FEB 1988)

52.222-15 Certification of Eligibility. (MAY 2014)

52.222-21 Prohibition of Segregated Facilities. (APR 2015)

52.222-26 Equal Opportunity. (SEP 2016)

52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015)

52.222-35 Equal Opportunity for Veterans. (JUN 2020)

52.222-36 Affirmative Action for Workers with Disabilities. (JUN 2020)

52.222-37 Employment Reports on Veterans (JUN 2020)

52.222-40 Notification of Employee Rights Under the National Labor Relations Act (DEC 2010)

52.222-50 Combating Trafficking in Persons (NOV 2021)

52.222-54 Employment Eligibility Verification (MAY 2022)

52.222-55 Minimum Wages Under Executive Order 13658 (JAN 2022)

52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2022)

52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEP 2013)

52.223-3 Hazardous Material Identification and Material Safety Data. (FEB 2021)

52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2011)

52.223-6 Drug-Free Workplace. (MAY 2001)

52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts (AUG 2018)

52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. (JUN 2020)

52.223-21 Foams (JUN 2016)

52.224-1 Privacy Act Notification. (APR 1984)

52.224-2 Privacy Act. (APR 1984)

52.225-9 Buy American-Construction Materials (OCT 2022)

Definitions

Commercially available off-the-shelf (COTS) item

Cost of components means

Critical component

Critical item

Domestic construction material

Fastener

Foreign construction material

Foreign iron and steel

Predominantly of iron or steel or a combination of both

Steel

None

For domestic construction material that is not a critical item or does not contain critical components

(1)

(2)

For domestic construction material that is a critical item or contains critical components

(1)

(2)

Data

Construction material description

Unit of measure Quantity Price (dollars) *

Item 1

Foreign construction material Domestic construction material Item 2

Foreign construction material Domestic construction material

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]

52.227-1 Authorization and Consent. (JUN 2020)

52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement. (JUN 2020)

52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007)

52.228-2 Additional Bond Security. (OCT 1997)

52.228-5 Insurance - Work on a Government Installation. (JAN 1997)

52.228-11 Pledges of Assets. (FEB 2021)

52.228-12 Prospective Subcontractor Requests for Bonds. (DEC 2022)

52.228-14 Irrevocable Letter of Credit (Nov 2014)

52.228-15 Performance and Payment Bonds - Construction. (JUN 2020)

52.229-3 Federal, State, and Local Taxes. (FEB 2013)

52.232-5 Payments under Fixed-Price Construction Contracts. (MAY 2014)

52.232-17 Interest. (MAY 2014)

52.232-23 Assignment of Claims. (MAY 2014)

52.232-27 Prompt Payment For Construction Contracts. (JAN 2017)

52.232-33 Payment by Electronic Funds Transfer – System for Award Management

(OCT 2018)

52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013)

52.232-40 Providing Accelerated Payments to Small Business Subcontractors (NOV 2021)

52.233-1 Disputes. (MAY 2014) - Alternate I (DEC 1991)

52.233-3 Protest after Award. (AUG 1996)

52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)

52.236-1 Performance of Work by the Contractor (APR 1984)

52.236-2 Differing Site Conditions. (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)

52.236-4 Physical Data. (APR 1984)

PAVEMENT & MATERIALS FINAL RECOMMENDATIONS, JANUARY 12, 2021

FINAL GEOTECHNICAL REPORT, APRIL 2021

HYDRAULICS REPORT, JANUARY 2021

AS BUILT BRIDGE REPORT

PITS REPORT

Contact National Weather Service .

52.236-5 Material and Workmanship. (APR 1984)

52.236-6 Superintendence by the Contractor. (APR 1984)

52.236-7 Permits and Responsibilities. (NOV 1991)

52.236-8 Other Contracts. (APR 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984)

52.236-10 Operations and Storage Areas. (APR 1984)

52.236-11 Use and Possession Prior to Completion. (APR 1984)

52.236-12 Cleaning Up. (APR 1984)

52.236-13 Accident Prevention. (NOV 1991)

52.236-15 Schedules for Construction Contracts. (APR 1984)

52.236-17 Layout of Work. (APR 1984)

52.236-21 Specifications and Drawings for Construction. (FEB 1997)

52.236-26 Preconstruction Conference. (FEB 1995)

52.242-13 Bankruptcy. (JUL 1995)

52.242-14 Suspension of Work. (APR 1984)

52.243-4 Changes. (JUN 2007)

52.243-6 Change Order Accounting. (APR 1984)

52.244-6 Subcontracts for Commercial Products and Commercial Services. (OCT 2022)

52.245-1 Government Property (SEP 2021) - Alternate I (APR 2012)

52.245-9 Use and Charges. (APR 2012)

52.246-12 Inspection of Construction. (AUG 1996)

52.247-64 Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV 2021)

52.248-3 Value Engineering - Construction. (OCT 2020)

52.249-2 Termination for Convenience of the Government (Fixed-Price). (APR 2012) - Alternate I (SEP 1996)

52.249-10 Default (Fixed-Price Construction). (APR 1984)

52.252-2 Clauses Incorporated by Reference. (FEB 1998) http://www.acquisition.gov/far

52.252-4 Alterations in Contract. (APR 1984)

NONE

52.253-1 Computer Generated Forms. (JAN 1991)

1252.201-70 Contracting Officer’s Representative (NOV 2022)

1252.222–72 Contractor Cooperation in Equal Employment Opportunity and Anti- Harassment Investigations (NOV 2022)

1252.223-70 Removal or Disposal of Hazardous Substances (NOV 2022)

1252.223-71 Accident and Fire Reporting (NOV 2022)

1252.223-73 Seat Belt Use Policies and Programs (NOV 2022)

1252.228-74 Notification of Payment Bond Protection (NOV 2022)

1252.232–70 Electronic Submission of Payment Requests (NOV 2022)

1252.239–93 Information and Communication Technology Accessibility (NOV 2022)

POST-AWARD EVALUATION OF CONTRACTOR PERFORMANCE

Contractor Performance Evaluations

"General Decision Number: AZ20230009 01/06/2023

Superseded General Decision Number: AZ20220009

State: Arizona

Construction Type: Highway

Counties: Apache, Cochise, Gila, Graham, Greenlee, La Paz, Navajo and Santa Cruz Counties in Arizona.

HIGHWAY CONSTRUCTION PROJECTS

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/06/2023

CARP0408-007 07/01/2022

APACHE, COCHISE & SANTA CRUZ COUNTIES

Rates Fringes

CARPENTER (Including Cement Form Work).......................$ 32.90 13.62

ENGI0428-004 06/01/2022

Rates Fringes

POWER EQUIPMENT OPERATOR

Oiler Driver................$ 33.41 12.57

IRON0075-006 08/01/2022

Apache, Cochise, Gila, Graham, Greenlee, La Paz, Navajo Counties

Rates Fringes

Ironworker, Rebar................$ 28.50 18.16

Zone 1: 0 to 50 miles from City Hall in Phoenix or Tucson Zone 2: 050 to 100 miles - Add $4.00 Zone 3: 100 to 150 miles - Add $5.00 Zone 4: 150 miles & over - Add $6.50

SUAZ2009-002 04/23/2009

Rates Fringes

CARPENTER

Gila, Graham, Greenlee, La Paz & Navajo................$ 21.71 3.82

CEMENT MASON.....................$ 17.74 3.59

ELECTRICIAN......................$ 24.43 5.38

IRONWORKER, Rebar Santa Cruz county...........$ 21.75 13.59

LABORER

Asphalt Raker...............$ 14.97 ** 5.88 Concrete Worker.............$ 13.38 ** 4.50 Fence Builder...............$ 12.20 ** 3.84 Flagger.....................$ 12.31 ** 3.96 General/Cleanup.............$ 12.78 ** 2.50 Guard Rail Installer........$ 12.20 ** 3.84 Landscape Laborer...........$ 11.02 ** Water Blaster...............$ 14.90 ** 2.90

OPERATOR: Power Equipment Backhoe < 1 cu yd...........$ 17.76 3.89 Compactor Self Propelled (with blade-grade operation.$ 22.53 6.57 Compactor Small Self Propelled (with blade-backfill, ditch operation)..$ 22.29 6.31 Concrete Pump...............$ 20.31 6.48 Crane (under 15 tons).......$ 22.98 4.26 https://sam.gov/wage-determination/AZ20230009/0

Drilling Machine (including wells)...........$ 21.79 4.10 Grade Checker...............$ 23.41 6.54 Hydrographic Seeder.........$ 19.73 5.40 Mass Excavator..............$ 23.33 6.98 Milling Machine/Rotomill....$ 21.87 6.84 Power Sweeper...............$ 19.33 4.85 Roller (all types asphalt)..$ 17.46 5.58 Roller (excluding asphalt)..$ 19.23 5.09 Scraper (pneumatic tire)....$ 22.41 6.90 Screed......................$ 20.90 6.72 Skip Loader (all types 3 < 6 cu yd)....................$ 20.91 7.35 Skip Loader (all types 6 < 10 cu yd)...................$ 22.24 6.83 Skip Loader < 3 cu yd.......$ 17.97 6.60 Tractor (dozer, pusher-all)........................$ 22.53 6.47 Tractor (wheel type)........$ 24.62 7.57

PAINTER..........................$ 13.94 ** 2.56

TRUCK DRIVER

2 or 3 axle Dump or Flatrack....................$ 16.17 ** 4.24 Oil Tanker Bootman..........$ 21.94 Pickup......................$ 12.88 ** 1.73 Water Truck < 2500 gal......$ 19.59 5.90 Water Truck > 3900 gal......$ 18.70 4.79 Water Truck 2500 < 3900 gal.........................$ 17.13

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658 ($12.15). Please see the Note at the top of the wage determination for more information.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

E-1

AZ FS 24(1)

Buffalo Crossing Bridge

SPECIAL CONTRACT REQUIREMENTS

The following Special Contract Requirements amend and supplement the Standard Specifications for Construction of Roads and Bridges, on Federal Highway Projects (FP-14), U.S. Department of Transportation, Federal Highway Administration.

E-2

Section 101. — TERMS, FORMAT, AND DEFINITIONS

101.03 Abbreviations.

(a) Acronyms. Add the following:

EEBACS — Engineer’s Estimating, Bidding, Award, and Construction System GSA – General Services Administration

(b) US Customary abbreviations and symbols. Delete the text and substitute the following:

ºF — degrees Fahrenheit temperature A — ampere electric current

ac. — acre area BTU — British Thermal Unit energy

cu. in. or in3 — cubic inches volume

cu. ft., cf, ft3 or CUFT — cubic feet volume

cu. yd., cy, yd3 or CUYD — cubic yards volume D — day time deg. or º — degree plane angle Fc — foot-candles luminous intensity

fl. oz. — fluid ounces volume

ft. or ' — foot or feet length gal. or GAL — gallon volume H — Henry inductance

hr. or HR — hour time Hz — hertz (s-1) frequency

in. or " inch or inches length K — kelvin temperature lb or LB, lbs — pound, pounds mass Lbf — pound-force force lnft or LNFT linear foot length

mi. — miles length min. or m — minute time min. or ' — minute plane angle

oz. — ounces mass Psi — pounds/square inch pressure Q — cubic feet/second flow rate sec. or s — second time sec. or " — second plane angle

sq. in. or in2 — square inches area

sq. ft., sf, ft2 or SQFT — square feet area

sq. yd., sy, yd2 or SQYD — square yards area

E-3

T — short ton (2000 lbs) mass V — volt (W/A) electric potential W — watt (J/s) power yd or YD — yard or yards length

— ohm V/A electric resistance

(c) Metric unit abbreviations and symbols. Delete the text and substitute the following:

A — ampere electric current Cd — candella luminous intensity oC — degree Celsius temperature D — day time deg. or º — degree plane angle g or gram — gram mass H — Henry inductance Ha — hectare area

hr. or HR — hour time Hz — hertz (s-1) frequency J — Joule (N.m) energy K — kelvin temperature Kg — kilogram mass L — liter volume Lx — lux illuminance M — meter length mm — millimeter length m2 — meter squared area m3 — cubic meter volume min. or m — minute time min. or ' — minute plane angle N — Newton (kg.m/s2) force Pa — Pascal (N/m2) pressure sec. or s — second time sec. or " — second plane angle T — metric ton Mass V — volt (W/A) electric potential W — watt (J/s) Power

— ohm V/A electric resistance

101.04 Definitions.

Add the following:

EEBACS — Engineer’s Estimating, Bidding, Award, and Construction System. A web-based system used by the Government, Construction Contractors, and Subcontractors on this

E-4

Government contract to prepare “Inspector’s Daily Record of Construction Operations” (Contractors Daily Reports) and measurement notes (pay notes and field measurement documentation).

Roadway Prism Delete the text and substitute the following:

Roadway Prism – The volume defined by the area between the original terrain cross-section and the final design cross-section multiplied by the horizontal distance between the centroids (geometric center) of the area.

Subcontractor Delete the text and substitute the following:

Subcontractor – An individual or legal entity with which the Contractor sublets part of the work.

This includes subcontractors and material suppliers at any tier.

Section 104. — CONTROL OF WORK

104.03 Specifications and Drawings.

Add the following to Subsection (b)(2):

(o) Gabion details and installation procedures.

Section 105. — CONTROL OF MATERIAL

105.01 Source of Supply and Quality Requirements. Add the following:

Materials containing petroleum-based solvents such as cutback asphalts and traffic paints may be restricted from use by local laws or ordinances in certain geographic areas. Upon presenting proof of such restrictions, alternate materials considered acceptable to the CO may be substituted for the materials specified in the contract.

Add the following:

Certify, according to Subsection 107.10 (d)(2), that sources of rock, sand, gravel, earth, subsoil, or other natural material imported into the project construction limits are noxious weed free.

105.02 Material Sources

(d) Government-Listed sources. Add the following:

The government listed sources below are possible material sources. The Government makes no representation as to the quality or quantity of material, or rights to the availability of material

E-5 from these sources. These sources are considered to be Contractor-located sources under Subsection 105.02(c).

Material for use in the production of unclassified borrow for embankment construction under Section 204 may be obtained from the following sources:

Bardman Pit, Lat 33.729108° Long -109.269979° Burro Mountain Pit, Lat 33.929962° Long -109.479182° Pit #1, Lat 33.763728° Long -109.416349° Pit #2 (Burn Pit), Lat 33.718822° Long -109.351592° Pit #3, Lat 33.823250° Long -109.366119°

Refer to government furnished data, Pits Report, for location map of the sources, and other information.

The contractor is responsible for attaining a special use permit(s) with the USFS for the use of these sources. Contact Mr. Chris Miller, Apache-Sitgreaves Forest Engineer at chris.w.miller@usda.gov or (928) 222-6274 for coordination in regard to the listed sources.

105.04 Storing and Handling Material. Add the following after the third sentence of the second paragraph:

For Contractor-located, non-commercial staging, storing, and material handling areas, secure environmental clearances according to Subsection 107.10.

Add the following:

The Contractor may use the parking area on the southwest side of the bridge and the closed section of roadway for a staging area/storage of materials.

Use all products according to the manufacturer’s recommendations for handling, storage, and disposal. Follow the requirements of FAR Clause 52.236-10 Operations and Storage Areas and FAR Clause 52.236-12 Cleaning Up. Maintain the staging and storage areas in a clean, neat, and orderly condition satisfactory to the CO.

Store construction materials within the limits indicated on the contract drawings. Properly store materials according to the applicable permit and the requirements in Section 107, 157, 203, 204, 624, and 625. Check the storage areas weekly and according to the applicable permit.

Store construction, building and waste materials, and containers in designated areas indoors or protect with a suitable covering.

Submit a site map showing the material storage and stockpile locations at least 14 calendar days prior to the start of construction activities.

E-6

Keep the manufacturer’s MSDS, an inventory of the material, and emergency numbers near the storage area. Take appropriate measures to ensure that incompatible chemicals are not stored next to each other.

Section 106. — ACCEPTANCE OF WORK

106.01 Conformity with Contract Requirements. Delete (a) and (b) and substitute the following:

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

(1) Sampling method

(2) Number of samples

(3) Sample transport

(4) Test procedures

(5) Testing laboratories

(6) Reporting

(7) Estimated time and costs

(8) Validation process

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

(1) Have the work accepted at a reduced price; or

(2) Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

Add the following after (b):

The number of significant figures used in the calculations will be according to ASTM E 29, absolute method.

Where sample/testing procedures make reference to AASHTO, ASTM, or other standards (designated as FLH T), the procedure as modified in the Materials Manual shall govern. Where

E-7 the specifications make reference to AASHTO Test T11, “Procedure B - Washing Using a Wetting Agent” shall be the procedure followed.

Where the specifications make reference to AASHTO Test T310, “Direct Transmission Method of In-Place Nuclear Density and Moisture Content” shall be the procedure followed.

106.02 Visual Inspection. Delete the Subsection and substitute the following:

106.02 Visual Inspection. Acceptance is based on visual inspection of the work for compliance with the contract requirements. In the absence of specific contract requirements or tolerances, use prevailing industry standards.

106.03 Certification. Add the following after the second paragraph:

See Table 106-3 for schedule for full or partial acceptance by material certification. Submit certification and sample of material for testing as required.

Delete the third paragraph and substitute the following:

Check certifications before incorporating the material into the work to ensure that the requirements of the contract have been met. Mark the certifications with the following information:

Project number and name;

Pay item number and description;

Contractor signed certification stating “to the best of our knowledge the materials certified by the attached certification represent the materials incorporated into the work of this contract”; and

Date.

Table 106-3 Schedule For Full or Partial Acceptance by Materials Certification. Add Table 106-3 following Table 106-2.

Table 106-3 Schedule For Full or Partial Acceptance by Materials Certification

Section Description Material Material Property Or Specification

Frequency Certification Sample

302 Minor Crushed Aggregate Crushed Aggregate Source, Quality and Gradation 1 per source 1 per source

312 Dust Palliative

Calcium Chloride Magnesium Chloride, Lignosulfonate, As specified 1 per shipment First shipment

403 Asphalt Concrete Aggregate Asphalt Mix

Source quality, Gradation, Stability, and Grade

1 per mix 1 per source

E-8

Section Description Material Material Property Or Specification

Frequency Certification Sample

634 and

Permanent Pavement Markings, Temporary Traffic Control

634.02 as applicable, 635 as applicable As specified 1 per source -----

701 Hydraulic Cement

Portland Cement, Blended Hydraulic Cement, Masonry and Mortar Cement

AASHTO M 85, M

240, ASTM C 91 and ASTM C1392 as applicable

1 per shipment 1 per 100 tons

702.01 Asphalt Material Asphalt Cement

AASHTO M 226

or M 320, as applicable

1 per shipment 1 per shipment

702.02 Asphalt Material Emulsified Asphalt

AASHTO M 140

or

M 208 as applicable

1 per shipment 1 per shipment

702.03 Asphalt Material

Asphalt Materials used for Damproofing and Waterproofing

Concrete and Masonry Surfaces

As specified for each type of asphalt material 1 per shipment -----

702.05 Antistrip As specified As applicable 1 per shipment -----

706 Concrete and Plastic Pipe As specified As applicable 1 per shipment -----

707 Metal Pipe As specified As applicable 1 per shipment ----- 708 Plastic Pipe As specified As applicable 1 per shipment -----

709 Reinforcing and Prestressing Steel As specified As applicable 1 per shipment

For 709.01 submit 3, 1-yard (1-meter) bars of each size and grade of bar furnished.

709.02 submit

6-foot (2-meter) length for each size furnished

710 Fence and Guardrail As specified As applicable 1 per shipment -----

Concrete Curing

Material and Admixtures

As specified As applicable 1 per material source per material type

712 Joint Material (all) As specified As applicable 1 per shipment -----

E-9

Section Description Material Material Property Or Specification

Frequency Certification Sample

Roadside

Improvement Materials (all)

As specified As applicable 1 per shipment -----

714 Geosynthetic Material (all) As specified As applicable 1 per shipment 1 per project per type 715 Piling As specified As applicable 1 per shipment -----

716 Material for Timber Structures

Timber and Hardware As applicable 1 per shipment -----

717 Structural Metal As specified As applicable 1 per shipment

717.01(e) minimum

6 per shipment for each size used.

717.10

1 per project

Traffic Signing and Marking Material (all)

As specified As applicable 1 per shipment -----

719 Paint As specified As applicable 1 per batch\lot

1 sample for quantities

> 25 gallons (100L)

Structural Wall and Stabilized Embankment Material (all)

As specified As applicable 1 per shipment per material type

Electrical and Illumination Material (all)

As specified As applicable 1 per shipment per material type

722 Anchor Material As specified As applicable 1 per shipment per material type

725 Miscellaneous materials As specified As applicable

1 per shipment per material type

Section 107. — LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC

107.01 Laws to be Observed. Add the following:

Section 401 and 404 of the…