Bid Tabulation_Buffalo Crossing Bridge.pdf
PDF 525 KB Posted
- Attached to
- AZ FS 24(1) Buffalo Crossing Bridge
- Solicitation number
- 6982AF23B000004
About this file
This bid tabulation summarizes the bids received for the AZ FS 24(1) Buffalo Crossing Bridge project. The project involves construction of a new bridge over Buffalo Creek on the Apache-Sitgreaves National Forest in Greenlee County, Arizona. The solicitation was issued by the Department of Transportation Federal Highway Administration.
Five contractors submitted bids for the base schedule of work which included items such as mobilization, clearing and grubbing, embankment construction, structural excavation and backfill, reinforced concrete, pre-fabricated steel bridge installation, culverts, guardrails, asphalt paving, and temporary traffic control. Bid amounts ranged from $3,577,000 by Monitor Construction Company to $6,481,390 by McMillen, Inc. The engineer's estimate was $3,400,000. The contract was ultimately awarded to Monitor Construction Company.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No: AZ, FS 24(1)
Project Name: Buffalo Crossing Bridge
Solcitation No: 6982AF23B000004
Division: Central Federal Lands
State: AZ, County: Greenlee
Federal Land: Apache-Sitgreaves National Forest
Tabulation of Bids
Schedule: A
Schedule Type: Base
Opened at: Lakewood
Opened by: Josephine Hehns
Date: 03/14/23
Report Date: 03/15/23
1 out of 10
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed:
Title:
Date:
Contract Awarded to:
Contractor
Monitor Construction Company, Inc.
8 Old Highway Lane Sonoita, AZ, 85637
Award Date:
Comment
Stormwater Plans, LLC dba SWP Contracting and Paving 5624 N. 54th Avenue Glendale, AZ, 85301
Technology Construction, Inc.
5430 Side Road Prescott, AZ, 86301
McMillen, Inc.
1470 Shoreline Dr., Suite 100 Boise, ID 83702
Engineer's Estimate
A0400 - Bid price total = $10,080.00
Calculated total= $3,780.00 A0840 Bid price total = $8,300.00
Calculated total =$8,303.00 Total Bid= $5,983,823.50
Calculated Total Bid= $5,977,526.50
Bid Amount Responsive
$3,577,000.00
$5,824,755.00
$5,977,526.50
$6,481,390.00
$3,400,000.00
Contract Specialist 03-15-2023
Tabulation of Bids
Project Name: Buffalo Crossing Bridge
Line Item
Number
A0020
Pay Item No.
15101-0000
Description Quantity
MOBILIZATION
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate ALL
Report Date: 03/15/23
2 out of 10
Schedule: A
Schedule Type: Base
Unit Unit Price
Lump Sum Lump Sum Lump Sum Lump Sum
LPSM Lump Sum
Amount
$355,770.00 $1,668,000.00
$500,000.00 $647,000.00 $594,455.00
A0040 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE
Monitor Construction Company, Inc. $40,000.00 $8,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $74,000.00 $14,800.00 Technology Construction, Inc. $200,000.00 $40,000.00 McMillen, Inc. $195,000.00 $39,000.00 Engineer's Estimate 0.200 MILE $50,000.00 $10,000.00
A0060 15214-1000 SURVEY AND STAKING, BRIDGE
Monitor Construction Company, Inc. Lump Sum $5,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $60,000.00 Technology Construction, Inc. Lump Sum $100,000.00 McMillen, Inc. Lump Sum $39,000.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00
A0080 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES
Monitor Construction Company, Inc. $15,000.00 $4,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $40,000.00 $12,000.00 Technology Construction, Inc. $94,500.00 $28,350.00 McMillen, Inc. $130,000.00 $39,000.00 Engineer's Estimate 0.300 MILE $15,000.00 $4,500.00
A0l00 15301-0000 CONTRACTOR QUALITY CONTROL
Monitor Construction Company, Inc. Lump Sum $250,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $550,000.00 Technology Construction, Inc. Lump Sum $92,000.00 McMillen, Inc. Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $180,000.00
A0120 15401-0000 CONTRACTOR TESTING
Monitor Construction Company, Inc. Lump Sum $184,230.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $450,000.00 Technology Construction, Inc. Lump Sum $50,000.00 McMillen, Inc. Lump Sum $120,000.00 Engineer's Estimate ALL LPSM Lump Sum $180,000.00
Project Name: Buffalo Crossing Bridge
Line Item
Number
A0140
A0160
A0180
A0200
A0220
A0240
Pay Item No.
15501-0000
15705-0100
15705-1400
20101-0000
20304-1000
20420-0000
Description Quantity
CONSTRUCTION SCHEDULE
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate ALL
SOIL EROSION CONTROL, SILT FENCE
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 400
SOIL EROSION CONTROL, FIBER ROLL
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 300
CLEARING AND GRUBBING
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 0.750
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate ALL
EMBANKMENT CONSTRUCTION
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 7,000
Report Date: 03/15/23
3 out of 10
Schedule: A
Schedule Type: Base
Unit Unit Price Amount
Lump Sum $2,499.50 Lump Sum $30,000.00 Lump Sum $105,000.00 Lump Sum $50,000.00
LPSM Lump Sum $10,000.00
$9.00 $3,600.00 $20.00 $8,000.00 $30.00 $12,000.00 $14.00 $5,600.00
LNFT $15.00 $6,000.00
$5.50 $1,650.00 $14.00 $4,200.00 $30.00 $9,000.00 $16.00 $4,800.00
LNFT $16.00 $4,800.00
$50,000.00 $37,500.00 $15,000.00 $11,250.00 $80,000.00 $60,000.00 $30,000.00 $22,500.00
ACRE $20,000.00 $15,000.00
Lump Sum $300,000.00 Lump Sum $200,000.00 Lump Sum $50,000.00 Lump Sum $400,000.00
LPSM Lump Sum $275,000.00
$35.00 $245,000.00 $50.00 $350,000.00
$100.00 $700,000.00 $115.00 $805,000.00
CUYD $60.00 $420,000.00
Project Name: Buffalo Crossing Bridge
Line Item
Number
A0260
A0280
A0300
A0320
A0340
A0360
Pay Item No.
20801-0000
20803-0000
20820-0000
25101-0500
25301-2000
30202-2000
Description Quantity
STRUCTURE EXCAVATION
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 50
STRUCTURAL BACKFILL
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 50
DEWATERING
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate ALL
PLACED RIPRAP, METHOD A, CLASS 5
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 200
GABIONS, POLYVINYL CHLORIDE COATED
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 460
ROADWAY AGGREGATE, METHOD 2
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 1,600
Report Date: 03/15/23
4 out of 10
Schedule: A
Schedule Type: Base
Unit Unit Price Amount
$110.00 $5,500.00 $120.00 $6,000.00 $300.00 $15,000.00 $360.00 $18,000.00
CUYD $250.00 $12,500.00
$450.00 $22,500.00 $800.00 $40,000.00 $300.00 $15,000.00 $580.00 $29,000.00
CUYD $350.00 $17,500.00
Lump Sum $150,000.00 Lump Sum $400,000.00 Lump Sum $400,000.00 Lump Sum $225,000.00
LPSM Lump Sum $100,000.00
$350.00 $70,000.00 $280.00 $56,000.00 $500.00 $100,000.00 $295.00 $59,000.00
CUYD $350.00 $70,000.00
$250.00 $115,000.00 $350.00 $161,000.00
$2,000.00 $920,000.00 $360.00 $165,600.00
SQFT $115.00 $52,900.00
$90.00 $144,000.00 $65.00 $104,000.00
$160.00 $256,000.00 $125.00 $200,000.00
TON $55.00 $88,000.00
Project Name: Buffalo Crossing Bridge
Line Item
Number
A0380
A0400
A0420
A0440
A0460
A0480
Pay Item No.
40301-0100
41201-0000
55201-0200
55401-1000
55504-0000
56501-0300
Description Quantity
ASPHALT CONCRETE PAVEMENT, TYPE 1
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 235
TACKCOAT
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 0.06
STRUCTURAL CONCRETE, CLASS A (AE)
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 62
REINFORCING STEEL
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 5,900
PRE-FABRICATED STEEL BRIDGE (24'x98')
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate ALL
DRILLED SHAFT, 30-INCH DIAMETER
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 114
Report Date: 03/15/23
5 out of 10
Schedule: A
Schedule Type: Base
Unit Unit Price Amount
$840.00 $197,400.00 $330.00 $77,550.00
$1,200.00 $282,000.00 $1,200.00 $282,000.00
TON $200.00 $47,000.00
$2,000.00 $120.00 $20,000.00 $1,200.00 $63,000.00 $3,780.00 $40,000.00 $2,400.00
TON $10,000.00 $600.00
$2,500.00 $155,000.00 $3,000.00 $186,000.00 $9,760.00 $605,120.00 $5,000.00 $310,000.00
CUYD $3,200.00 $198,400.00
$3.50 $20,650.00 $6.00 $35,400.00 $6.50 $38,350.00 $4.00 $23,600.00
LB $6.00 $35,400.00
Lump Sum $792,648.00 Lump Sum $1,000,000.00 Lump Sum $985,000.00 Lump Sum $1,430,000.00
LPSM Lump Sum $650,000.00
$3,300.00 $376,200.00 $2,000.00 $228,000.00 $2,840.00 $323,760.00 $8,900.00 $1,014,600.00
LNFT $2,500.00 $285,000.00
Project Name: Buffalo Crossing Bridge
Line Item
Number
A0500
A0520
A0540
A0560
A0580
A0600
Pay Item No.
60201-0800
60210-0800
61701-1350
61701-4150
61701-4650
61702-0400
Description Quantity
24-INCH PIPE CUL VERT
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 90
END SECTION FOR 24-INCH PIPE CUL VERT
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 2
GUARDRAIL SYSTEM G4, TYPE 2, CLASS B STEEL POSTS
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 12.0
GUARDRAIL SYSTEM CRG, TYPE 2, CLASS B
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 37.0
GUARDRAIL SYSTEM MGS, TYPE 2, CLASS B STEEL POSTS
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 140.75
TERMINAL SECTION, TYPE G4-CRT
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate I
Schedule: A
Schedule Type: Base
Report Date: 03/15/23
6 out of 10
Unit Unit Price Amount
$200.00 $18,000.00 $360.00 $32,400.00 $220.00 $19,800.00 $400.00 $36,000.00
LNFT $255.00 $22,950.00
$800.00 $1,600.00 $2,500.00 $5,000.00 $3,500.00 $7,000.00 $2,200.00 $4,400.00
EACH $2,000.00 $4,000.00
$185.00 $2,220.00 $60.00 $720.00
$220.00 $2,640.00 $600.00 $7,200.00
LNFT $150.00 $1,800.00
$100.00 $3,700.00 $70.00 $2,590.00
$303.00 $11,211.00 $360.00 $13,320.00
LNFT $105.00 $3,885.00
$90.00 $12,667.50 $60.00 $8,445.00
$110.00 $15,482.50 $200.00 $28,150.00
LNFT $80.00 $11,260.00
$3,000.00 $3,000.00 $5,500.00 $5,500.00 $5,400.00 $5,400.00
$11,800.00 $11,800.00
EACH $3,300.00 $3,300.00
Report Date: 03/15/23
7 out of 10
Project Name: Buffalo Crossing Bridge
Schedule: A
Schedule Type: Base
Line Item
Number
A0620
A0640
A0660
A0680
A0700
A0720
Pay Item No.
61702-1500
61707-0000
61920-2000
62201-0200
62201-0550
62201-0950
Description Quantity Unit Unit Price Amount
TERMINAL SECTION, TYPE MGS TANGENT
Monitor Construction Company, Inc. $3,500.00 $10,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $5,500.00 $16,500.00 Technology Construction, Inc. $9,000.00 $27,000.00 McMillen, Inc. $15,700.00 $47,100.00 Engineer's Estimate 3 EACH $6,300.00 $18,900.00
STRUCTURE TRANSITION RAILING
Monitor Construction Company, Inc. $150.00 $7,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $160.00 $8,000.00 Technology Construction, Inc. $255.00 $12,750.00 McMillen, Inc. $484.00 $24,200.00 Engineer's Estimate 50 LNFT $250.00 $12,500.00
REMOVE AND RESET GATE
Monitor Construction Company, Inc. $1,500.00 $1,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $15,000.00 $15,000.00 Technology Construction, Inc. $4,500.00 $4,500.00 McMillen, Inc. $21,200.00 $21,200.00 Engineer's Estimate 1 EACH $2,250.00 $2,250.00
DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
Monitor Construction Company, Inc. $150.00 $1,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $145.00 $1,450.00 Technology Construction, Inc. $564.00 $5,640.00 McMillen, Inc. $260.00 $2,600.00 Engineer's Estimate 10 HOUR $95.00 $950.00
BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH
Monitor Construction Company, Inc. $95.00 $950.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $1,500.00 Technology Construction, Inc. $493.00 $4,930.00 McMillen, Inc. $200.00 $2,000.00 Engineer's Estimate 10 HOUR $80.00 $800.00
WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
Monitor Construction Company, Inc. $115.00 $1,150.00 Stormwater Plans, LLC dba SWP Contracting and Paving $225.00 $2,250.00 Technology Construction, Inc. $679.00 $6,790.00 McMillen, Inc. $250.00 $2,500.00 Engineer's Estimate 10 HOUR $80.00 $800.00
Project Name: Buffalo Crossing Bridge
Schedule: A
Schedule Type: Base
Report Date: 03/15/23
8 out of 10
Line Item
Number Pay Item No. Description Quantity Unit Unit Price Amount
A0740 62201-2750 MOTOR GRADER
Monitor Construction Company, Inc. $175.00 $1,750.00 Stormwater Plans, LLC dba SWP Contracting and Paving $165.00 $1,650.00 Technology Construction, Inc. $685.00 $6,850.00 McMillen, Inc. $300.00 $3,000.00 Engineer's Estimate 10 HOUR $100.00 $1,000.00
A0760 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
Monitor Construction Company, Inc. $165.00 $1,650.00 Stormwater Plans, LLC dba SWP Contracting and Paving $225.00 $2,250.00 Technology Construction, Inc. $700.00 $7,000.00 McMillen, Inc. $350.00 $3,500.00 Engineer's Estimate 10 HOUR $100.00 $1,000.00
A0780 62301-0000 GENERAL LABOR
Monitor Construction Company, Inc. $60.00 $600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $55.00 $550.00 Technology Construction, Inc. $140.00 $1,400.00 McMillen, Inc. $110.00 $1,100.00 Engineer's Estimate 10 HOUR $60.00 $600.00
A0800 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
Monitor Construction Company, Inc. $250.00 $2,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $200.00 $2,000.00 Technology Construction, Inc. $520.00 $5,200.00 McMillen, Inc. $290.00 $2,900.00 Engineer's Estimate 10 HOUR $150.00 $1,500.00
A0820 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES BIOLOGICAL MONITOR
Monitor Construction Company, Inc. $365.00 $14,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $500.00 $20,000.00 Technology Construction, Inc. $1,265.00 $50,600.00 McMillen, Inc. $290.00 $11,600.00 Engineer's Estimate 40 HOUR $200.00 $8,000.00
A0840 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
Monitor Construction Company, Inc. $210.00 $2,100.00 Stormwater Plans, LLC dba SWP Contracting and Paving $200.00 $2,000.00 Technology Construction, Inc. $830.30 $8,303.00 McMillen, Inc. $340.00 $3,400.00 Engineer's Estimate 10 HOUR $150.00 $1,500.00
Project Name: Buffalo Crossing Bridge
Line Item
Number
A0860
A0880
A0900
A0920
A0940
A0960
Pay Item No.
62511-2000
62516-2000
63301-0000
63316-1000
63502-3900
63503-0300
Description Quantity
SEEDING, HYDRAULIC METHOD
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 3,600
MULCHING, HYDRAULIC METHOD
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 3,600
SIGN SYSTEM
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 5
REMOVE AND RESET SIGN
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 4
TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 26
TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate 60
Schedule: A
Schedule Type: Base
Report Date: 03/15/23
9 out of 10
Unit Unit Price Amount
$1.00 $3,600.00 $2.50 $9,000.00 $5.50 $19,800.00
$10.00 $36,000.00
SQYD $1.00 $3,600.00
$0.30 $1,080.00 $2.50 $9,000.00 $3.00 $10,800.00 $7.00 $25,200.00
SQYD $2.00 $7,200.00
$600.00 $3,000.00 $550.00 $2,750.00
$1,050.00 $5,250.00 $1,900.00 $9,500.00
EACH $1,000.00 $5,000.00
$400.00 $1,600.00 $550.00 $2,200.00
$1,050.00 $4,200.00 $3,000.00 $12,000.00
EACH $725.00 $2,900.00
$652.50 $16,965.00 $600.00 $15,600.00
$1,400.00 $36,400.00 $970.00 $25,220.00
EACH $250.00 $6,500.00
$225.00 $13,500.00 $50.00 $3,000.00
$112.00 $6,720.00 $190.00 $11,400.00
LNFT $75.00 $4,500.00
Project Name: Buffalo Crossing Bridge
Line Item
Number
A0980
Pay Item No.
63503-1000
Description Quantity
TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Schedule: A
Schedule Type: Base
Report Date: 03/15/23
10 out of 10
Unit Unit Price Amount
$60.00 $40.00 $30.00
Engineer's Estimate 50 LNFT $100.00 $25.00
$3,000.00 $2,000.00 $1,500.00 $5,000.00 $1,250.00
Total Schedule - All Items
Monitor Construction Company, Inc.
Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.
McMillen, Inc.
Engineer's Estimate
$3,577,000.00 $5,824,755.00 $5,977,526.50 $6,481,390.00 $3,400,000.00
| 2023-03-15T13:39:43-0600 | |
| JOSEPHINE P HELMS |
File details come from the government source that posted it. Updated .