This bid tabulation summarizes the bids received for the AZ FS 24(1) Buffalo Crossing Bridge project. The project involves construction of a new bridge over Buffalo Creek on the Apache-Sitgreaves National Forest in Greenlee County, Arizona. The solicitation was issued by the Department of Transportation Federal Highway Administration.

Five contractors submitted bids for the base schedule of work which included items such as mobilization, clearing and grubbing, embankment construction, structural excavation and backfill, reinforced concrete, pre-fabricated steel bridge installation, culverts, guardrails, asphalt paving, and temporary traffic control. Bid amounts ranged from $3,577,000 by Monitor Construction Company to $6,481,390 by McMillen, Inc. The engineer's estimate was $3,400,000. The contract was ultimately awarded to Monitor Construction Company.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No: AZ, FS 24(1)

Project Name: Buffalo Crossing Bridge

Solcitation No: 6982AF23B000004

Division: Central Federal Lands

State: AZ, County: Greenlee

Federal Land: Apache-Sitgreaves National Forest

Tabulation of Bids

Schedule: A

Schedule Type: Base

Opened at: Lakewood

Opened by: Josephine Hehns

Date: 03/14/23

Report Date: 03/15/23

1 out of 10

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed:

Title:

Date:

Contract Awarded to:

Contractor

Monitor Construction Company, Inc.

8 Old Highway Lane Sonoita, AZ, 85637

Award Date:

Comment

Stormwater Plans, LLC dba SWP Contracting and Paving 5624 N. 54th Avenue Glendale, AZ, 85301

Technology Construction, Inc.

5430 Side Road Prescott, AZ, 86301

McMillen, Inc.

1470 Shoreline Dr., Suite 100 Boise, ID 83702

Engineer's Estimate

A0400 - Bid price total = $10,080.00

Calculated total= $3,780.00 A0840 Bid price total = $8,300.00

Calculated total =$8,303.00 Total Bid= $5,983,823.50

Calculated Total Bid= $5,977,526.50

Bid Amount Responsive

$3,577,000.00

$5,824,755.00

$5,977,526.50

$6,481,390.00

$3,400,000.00

Contract Specialist 03-15-2023

Tabulation of Bids

Project Name: Buffalo Crossing Bridge

Line Item

Number

A0020

Pay Item No.

15101-0000

Description Quantity

MOBILIZATION

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate ALL

Report Date: 03/15/23

2 out of 10

Schedule: A

Schedule Type: Base

Unit Unit Price

Lump Sum Lump Sum Lump Sum Lump Sum

LPSM Lump Sum

Amount

$355,770.00 $1,668,000.00

$500,000.00 $647,000.00 $594,455.00

A0040 15206-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING STAKE

Monitor Construction Company, Inc. $40,000.00 $8,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving $74,000.00 $14,800.00 Technology Construction, Inc. $200,000.00 $40,000.00 McMillen, Inc. $195,000.00 $39,000.00 Engineer's Estimate 0.200 MILE $50,000.00 $10,000.00

A0060 15214-1000 SURVEY AND STAKING, BRIDGE

Monitor Construction Company, Inc. Lump Sum $5,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $60,000.00 Technology Construction, Inc. Lump Sum $100,000.00 McMillen, Inc. Lump Sum $39,000.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00

A0080 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES

Monitor Construction Company, Inc. $15,000.00 $4,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $40,000.00 $12,000.00 Technology Construction, Inc. $94,500.00 $28,350.00 McMillen, Inc. $130,000.00 $39,000.00 Engineer's Estimate 0.300 MILE $15,000.00 $4,500.00

A0l00 15301-0000 CONTRACTOR QUALITY CONTROL

Monitor Construction Company, Inc. Lump Sum $250,000.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $550,000.00 Technology Construction, Inc. Lump Sum $92,000.00 McMillen, Inc. Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $180,000.00

A0120 15401-0000 CONTRACTOR TESTING

Monitor Construction Company, Inc. Lump Sum $184,230.00 Stormwater Plans, LLC dba SWP Contracting and Paving Lump Sum $450,000.00 Technology Construction, Inc. Lump Sum $50,000.00 McMillen, Inc. Lump Sum $120,000.00 Engineer's Estimate ALL LPSM Lump Sum $180,000.00

Project Name: Buffalo Crossing Bridge

Line Item

Number

A0140

A0160

A0180

A0200

A0220

A0240

Pay Item No.

15501-0000

15705-0100

15705-1400

20101-0000

20304-1000

20420-0000

Description Quantity

CONSTRUCTION SCHEDULE

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate ALL

SOIL EROSION CONTROL, SILT FENCE

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 400

SOIL EROSION CONTROL, FIBER ROLL

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 300

CLEARING AND GRUBBING

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 0.750

REMOVAL OF STRUCTURES AND OBSTRUCTIONS

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate ALL

EMBANKMENT CONSTRUCTION

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 7,000

Report Date: 03/15/23

3 out of 10

Schedule: A

Schedule Type: Base

Unit Unit Price Amount

Lump Sum $2,499.50 Lump Sum $30,000.00 Lump Sum $105,000.00 Lump Sum $50,000.00

LPSM Lump Sum $10,000.00

$9.00 $3,600.00 $20.00 $8,000.00 $30.00 $12,000.00 $14.00 $5,600.00

LNFT $15.00 $6,000.00

$5.50 $1,650.00 $14.00 $4,200.00 $30.00 $9,000.00 $16.00 $4,800.00

LNFT $16.00 $4,800.00

$50,000.00 $37,500.00 $15,000.00 $11,250.00 $80,000.00 $60,000.00 $30,000.00 $22,500.00

ACRE $20,000.00 $15,000.00

Lump Sum $300,000.00 Lump Sum $200,000.00 Lump Sum $50,000.00 Lump Sum $400,000.00

LPSM Lump Sum $275,000.00

$35.00 $245,000.00 $50.00 $350,000.00

$100.00 $700,000.00 $115.00 $805,000.00

CUYD $60.00 $420,000.00

Project Name: Buffalo Crossing Bridge

Line Item

Number

A0260

A0280

A0300

A0320

A0340

A0360

Pay Item No.

20801-0000

20803-0000

20820-0000

25101-0500

25301-2000

30202-2000

Description Quantity

STRUCTURE EXCAVATION

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 50

STRUCTURAL BACKFILL

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 50

DEWATERING

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate ALL

PLACED RIPRAP, METHOD A, CLASS 5

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 200

GABIONS, POLYVINYL CHLORIDE COATED

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 460

ROADWAY AGGREGATE, METHOD 2

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 1,600

Report Date: 03/15/23

4 out of 10

Schedule: A

Schedule Type: Base

Unit Unit Price Amount

$110.00 $5,500.00 $120.00 $6,000.00 $300.00 $15,000.00 $360.00 $18,000.00

CUYD $250.00 $12,500.00

$450.00 $22,500.00 $800.00 $40,000.00 $300.00 $15,000.00 $580.00 $29,000.00

CUYD $350.00 $17,500.00

Lump Sum $150,000.00 Lump Sum $400,000.00 Lump Sum $400,000.00 Lump Sum $225,000.00

LPSM Lump Sum $100,000.00

$350.00 $70,000.00 $280.00 $56,000.00 $500.00 $100,000.00 $295.00 $59,000.00

CUYD $350.00 $70,000.00

$250.00 $115,000.00 $350.00 $161,000.00

$2,000.00 $920,000.00 $360.00 $165,600.00

SQFT $115.00 $52,900.00

$90.00 $144,000.00 $65.00 $104,000.00

$160.00 $256,000.00 $125.00 $200,000.00

TON $55.00 $88,000.00

Project Name: Buffalo Crossing Bridge

Line Item

Number

A0380

A0400

A0420

A0440

A0460

A0480

Pay Item No.

40301-0100

41201-0000

55201-0200

55401-1000

55504-0000

56501-0300

Description Quantity

ASPHALT CONCRETE PAVEMENT, TYPE 1

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 235

TACKCOAT

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 0.06

STRUCTURAL CONCRETE, CLASS A (AE)

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 62

REINFORCING STEEL

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 5,900

PRE-FABRICATED STEEL BRIDGE (24'x98')

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate ALL

DRILLED SHAFT, 30-INCH DIAMETER

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 114

Report Date: 03/15/23

5 out of 10

Schedule: A

Schedule Type: Base

Unit Unit Price Amount

$840.00 $197,400.00 $330.00 $77,550.00

$1,200.00 $282,000.00 $1,200.00 $282,000.00

TON $200.00 $47,000.00

$2,000.00 $120.00 $20,000.00 $1,200.00 $63,000.00 $3,780.00 $40,000.00 $2,400.00

TON $10,000.00 $600.00

$2,500.00 $155,000.00 $3,000.00 $186,000.00 $9,760.00 $605,120.00 $5,000.00 $310,000.00

CUYD $3,200.00 $198,400.00

$3.50 $20,650.00 $6.00 $35,400.00 $6.50 $38,350.00 $4.00 $23,600.00

LB $6.00 $35,400.00

Lump Sum $792,648.00 Lump Sum $1,000,000.00 Lump Sum $985,000.00 Lump Sum $1,430,000.00

LPSM Lump Sum $650,000.00

$3,300.00 $376,200.00 $2,000.00 $228,000.00 $2,840.00 $323,760.00 $8,900.00 $1,014,600.00

LNFT $2,500.00 $285,000.00

Project Name: Buffalo Crossing Bridge

Line Item

Number

A0500

A0520

A0540

A0560

A0580

A0600

Pay Item No.

60201-0800

60210-0800

61701-1350

61701-4150

61701-4650

61702-0400

Description Quantity

24-INCH PIPE CUL VERT

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 90

END SECTION FOR 24-INCH PIPE CUL VERT

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 2

GUARDRAIL SYSTEM G4, TYPE 2, CLASS B STEEL POSTS

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 12.0

GUARDRAIL SYSTEM CRG, TYPE 2, CLASS B

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 37.0

GUARDRAIL SYSTEM MGS, TYPE 2, CLASS B STEEL POSTS

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 140.75

TERMINAL SECTION, TYPE G4-CRT

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate I

Schedule: A

Schedule Type: Base

Report Date: 03/15/23

6 out of 10

Unit Unit Price Amount

$200.00 $18,000.00 $360.00 $32,400.00 $220.00 $19,800.00 $400.00 $36,000.00

LNFT $255.00 $22,950.00

$800.00 $1,600.00 $2,500.00 $5,000.00 $3,500.00 $7,000.00 $2,200.00 $4,400.00

EACH $2,000.00 $4,000.00

$185.00 $2,220.00 $60.00 $720.00

$220.00 $2,640.00 $600.00 $7,200.00

LNFT $150.00 $1,800.00

$100.00 $3,700.00 $70.00 $2,590.00

$303.00 $11,211.00 $360.00 $13,320.00

LNFT $105.00 $3,885.00

$90.00 $12,667.50 $60.00 $8,445.00

$110.00 $15,482.50 $200.00 $28,150.00

LNFT $80.00 $11,260.00

$3,000.00 $3,000.00 $5,500.00 $5,500.00 $5,400.00 $5,400.00

$11,800.00 $11,800.00

EACH $3,300.00 $3,300.00

Report Date: 03/15/23

7 out of 10

Project Name: Buffalo Crossing Bridge

Schedule: A

Schedule Type: Base

Line Item

Number

A0620

A0640

A0660

A0680

A0700

A0720

Pay Item No.

61702-1500

61707-0000

61920-2000

62201-0200

62201-0550

62201-0950

Description Quantity Unit Unit Price Amount

TERMINAL SECTION, TYPE MGS TANGENT

Monitor Construction Company, Inc. $3,500.00 $10,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $5,500.00 $16,500.00 Technology Construction, Inc. $9,000.00 $27,000.00 McMillen, Inc. $15,700.00 $47,100.00 Engineer's Estimate 3 EACH $6,300.00 $18,900.00

STRUCTURE TRANSITION RAILING

Monitor Construction Company, Inc. $150.00 $7,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $160.00 $8,000.00 Technology Construction, Inc. $255.00 $12,750.00 McMillen, Inc. $484.00 $24,200.00 Engineer's Estimate 50 LNFT $250.00 $12,500.00

REMOVE AND RESET GATE

Monitor Construction Company, Inc. $1,500.00 $1,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $15,000.00 $15,000.00 Technology Construction, Inc. $4,500.00 $4,500.00 McMillen, Inc. $21,200.00 $21,200.00 Engineer's Estimate 1 EACH $2,250.00 $2,250.00

DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY

Monitor Construction Company, Inc. $150.00 $1,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $145.00 $1,450.00 Technology Construction, Inc. $564.00 $5,640.00 McMillen, Inc. $260.00 $2,600.00 Engineer's Estimate 10 HOUR $95.00 $950.00

BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH

Monitor Construction Company, Inc. $95.00 $950.00 Stormwater Plans, LLC dba SWP Contracting and Paving $150.00 $1,500.00 Technology Construction, Inc. $493.00 $4,930.00 McMillen, Inc. $200.00 $2,000.00 Engineer's Estimate 10 HOUR $80.00 $800.00

WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY

Monitor Construction Company, Inc. $115.00 $1,150.00 Stormwater Plans, LLC dba SWP Contracting and Paving $225.00 $2,250.00 Technology Construction, Inc. $679.00 $6,790.00 McMillen, Inc. $250.00 $2,500.00 Engineer's Estimate 10 HOUR $80.00 $800.00

Project Name: Buffalo Crossing Bridge

Schedule: A

Schedule Type: Base

Report Date: 03/15/23

8 out of 10

Line Item

Number Pay Item No. Description Quantity Unit Unit Price Amount

A0740 62201-2750 MOTOR GRADER

Monitor Construction Company, Inc. $175.00 $1,750.00 Stormwater Plans, LLC dba SWP Contracting and Paving $165.00 $1,650.00 Technology Construction, Inc. $685.00 $6,850.00 McMillen, Inc. $300.00 $3,000.00 Engineer's Estimate 10 HOUR $100.00 $1,000.00

A0760 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY

Monitor Construction Company, Inc. $165.00 $1,650.00 Stormwater Plans, LLC dba SWP Contracting and Paving $225.00 $2,250.00 Technology Construction, Inc. $700.00 $7,000.00 McMillen, Inc. $350.00 $3,500.00 Engineer's Estimate 10 HOUR $100.00 $1,000.00

A0780 62301-0000 GENERAL LABOR

Monitor Construction Company, Inc. $60.00 $600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $55.00 $550.00 Technology Construction, Inc. $140.00 $1,400.00 McMillen, Inc. $110.00 $1,100.00 Engineer's Estimate 10 HOUR $60.00 $600.00

A0800 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES

Monitor Construction Company, Inc. $250.00 $2,500.00 Stormwater Plans, LLC dba SWP Contracting and Paving $200.00 $2,000.00 Technology Construction, Inc. $520.00 $5,200.00 McMillen, Inc. $290.00 $2,900.00 Engineer's Estimate 10 HOUR $150.00 $1,500.00

A0820 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES BIOLOGICAL MONITOR

Monitor Construction Company, Inc. $365.00 $14,600.00 Stormwater Plans, LLC dba SWP Contracting and Paving $500.00 $20,000.00 Technology Construction, Inc. $1,265.00 $50,600.00 McMillen, Inc. $290.00 $11,600.00 Engineer's Estimate 40 HOUR $200.00 $8,000.00

A0840 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES

Monitor Construction Company, Inc. $210.00 $2,100.00 Stormwater Plans, LLC dba SWP Contracting and Paving $200.00 $2,000.00 Technology Construction, Inc. $830.30 $8,303.00 McMillen, Inc. $340.00 $3,400.00 Engineer's Estimate 10 HOUR $150.00 $1,500.00

Project Name: Buffalo Crossing Bridge

Line Item

Number

A0860

A0880

A0900

A0920

A0940

A0960

Pay Item No.

62511-2000

62516-2000

63301-0000

63316-1000

63502-3900

63503-0300

Description Quantity

SEEDING, HYDRAULIC METHOD

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 3,600

MULCHING, HYDRAULIC METHOD

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 3,600

SIGN SYSTEM

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 5

REMOVE AND RESET SIGN

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 4

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 26

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate 60

Schedule: A

Schedule Type: Base

Report Date: 03/15/23

9 out of 10

Unit Unit Price Amount

$1.00 $3,600.00 $2.50 $9,000.00 $5.50 $19,800.00

$10.00 $36,000.00

SQYD $1.00 $3,600.00

$0.30 $1,080.00 $2.50 $9,000.00 $3.00 $10,800.00 $7.00 $25,200.00

SQYD $2.00 $7,200.00

$600.00 $3,000.00 $550.00 $2,750.00

$1,050.00 $5,250.00 $1,900.00 $9,500.00

EACH $1,000.00 $5,000.00

$400.00 $1,600.00 $550.00 $2,200.00

$1,050.00 $4,200.00 $3,000.00 $12,000.00

EACH $725.00 $2,900.00

$652.50 $16,965.00 $600.00 $15,600.00

$1,400.00 $36,400.00 $970.00 $25,220.00

EACH $250.00 $6,500.00

$225.00 $13,500.00 $50.00 $3,000.00

$112.00 $6,720.00 $190.00 $11,400.00

LNFT $75.00 $4,500.00

Project Name: Buffalo Crossing Bridge

Line Item

Number

A0980

Pay Item No.

63503-1000

Description Quantity

TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Schedule: A

Schedule Type: Base

Report Date: 03/15/23

10 out of 10

Unit Unit Price Amount

$60.00 $40.00 $30.00

Engineer's Estimate 50 LNFT $100.00 $25.00

$3,000.00 $2,000.00 $1,500.00 $5,000.00 $1,250.00

Total Schedule - All Items

Monitor Construction Company, Inc.

Stormwater Plans, LLC dba SWP Contracting and Paving Technology Construction, Inc.

McMillen, Inc.

Engineer's Estimate

$3,577,000.00 $5,824,755.00 $5,977,526.50 $6,481,390.00 $3,400,000.00