Phase 1 Environmental Site Assessment prepared by BL Companies December 2018.pdf

PDF 49 MB Posted

Attached to
Request for Qualifications (RFQ) for Design-Build Services for a New United States Courthouse in Hartford, CT
Solicitation number
47PB5126R0013
Issued by
Not on record

About this file

This is a Phase 1 Environmental Site Assessment prepared by BL Companies in December 2018 for the proposed new U.S. Courthouse site in Hartford, Connecticut. The assessment evaluates environmental conditions at the project location to identify potential contamination, hazardous materials, and environmental liabilities that could affect the design-build project. The Phase 1 ESA is a standard preliminary environmental investigation that typically includes a review of the property's historical uses, regulatory records, site reconnaissance, and interviews with property owners and occupants to assess the presence or likelihood of hazardous substances and petroleum products in soil, groundwater, and building materials.

This environmental assessment document serves as a critical reference for the Design-Build Firm responding to GSA's Request for Qualifications (RFQ 47PB5126R0013). The findings and recommendations from this Phase 1 ESA will inform site development planning, construction methodology, and cost estimates for the 281,000 gross square foot courthouse facility. Design-build offerors must review this assessment to understand existing environmental conditions, identify any required remediation or special handling procedures, and incorporate findings into their technical proposals and pricing for the project.

View the file

Other files

File Type Posted
Amendment 2 -GSA Hartford New Federal Courthouse Solicitation SF30 42226.pdf PDF
Amendment 1 -GSA Hartford New Federal Courthouse Solicitation SF30 .pdf PDF
Allyn St. Site Plan, prepared by Close Jensen Miller, April 1991.pdf PDF
Pre-Site Analysis Report II_Michael Maltzan Architecture.pdf PDF
Pre-Site Analysis Report I_Michael Maltzan Architecture.pdf PDF
GSA Hartford Courthouse Project - Draft Pricing Template - 2025-03-11.xlsx XLSX spreadsheet
GSA New Federal Courthouse RFI Form.xlsx XLSX spreadsheet
Utility Assessment Report prepared by Fuss ONeill August 2024.pdf PDF
Environmental Review and Status Report prepared by GeoQuest dated June 2019.pdf PDF
Hartford Solicitation 47PB5126R0013_DB_2_Phase_Part_I_DECEMBER 2025.pdf PDF
DRAFT Hartford Agreement_DB_DECEMBER 2025.pdf PDF
HartfordSmallBusinessParticipationCommitmentDocument.docx DOCX document
Phase II_III Site Investigation prepared by BL April 2019.pdf PDF
Results of Environmental Soil Pre-Characterization Sampling.pdf PDF
260115_Hartford Courthouse Division 1 Specifications Draft.pdf PDF
DRAFT Hartford SF 1442.pdf PDF
2025-10-31 HFCH Site Risk Assessment Report - FINAL CIVIL.pdf PDF
Proprietary Information Agreement - Sample Template .docx DOCX document
Hartford Federal Courthouse Prelim Geo Rpt (GEI_09-15-25).pdf PDF
GSA Hartford Courthouse Project Selected Prior RFI QA.pdf PDF
Phase 2 Site Investigation (Draft) prepared by BL dated January 2018.pdf PDF
Allyn Street Data Gap Review prepared by Solve March 2024.pdf PDF
Past Performance Questionnaire Hartford.docx DOCX document
Hartford_POR - Appendix A _DRAFT.pdf PDF
Preliminary Geotechnical Considerations prepared by GEI Consultants June 2024.pdf PDF
Hartford_POR - Parts 1 2 _DRAFT.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .