About this file

This is a draft pricing template for the GSA Hartford Courthouse Project, structured using the Uniformat classification system for building cost estimation. The template is designed to capture elemental cost data for a new Hartford U.S. Courthouse with a maximum gross area of 281,000 square feet, organized by construction divisions including foundations, basement construction, superstructure, exterior enclosure, roofing, interior construction, stairs, interior finishes, conveying systems, plumbing, HVAC, fire protection/alarm systems, electrical systems, equipment, furnishings, special construction, selective demolition, and sitework.

The template provides line items for detailed cost breakdowns across all major building systems, with columns for quantities, unit rates, total costs, and cost per square foot calculations. Each division contains multiple subdivision categories with associated measurement units (square feet, linear feet, each, stories, flights, etc.) to accommodate various construction elements. The template includes a project cost summary section that rolls up direct costs, applies contingency, adds general conditions/profit/bond, and applies escalation to reach a base contract total. However, the current version contains formula errors (#REF! and #DIV/0!) indicating this is a preliminary draft requiring data population and formula reconciliation before use for actual pricing submissions in response to GSA Solicitation 47PB5126R0013.

View the file

Other files

File Type Posted
Amendment 2 -GSA Hartford New Federal Courthouse Solicitation SF30 42226.pdf PDF
Amendment 1 -GSA Hartford New Federal Courthouse Solicitation SF30 .pdf PDF
Hartford Solicitation 47PB5126R0013_DB_2_Phase_Part_I_DECEMBER 2025.pdf PDF
Phase 1 Environmental Site Assessment prepared by BL Companies December 2018.pdf PDF
Environmental Review and Status Report prepared by GeoQuest dated June 2019.pdf PDF
Hartford Federal Courthouse Prelim Geo Rpt (GEI_09-15-25).pdf PDF
HartfordSmallBusinessParticipationCommitmentDocument.docx DOCX document
DRAFT Hartford Agreement_DB_DECEMBER 2025.pdf PDF
Pre-Site Analysis Report I_Michael Maltzan Architecture.pdf PDF
Allyn St. Site Plan, prepared by Close Jensen Miller, April 1991.pdf PDF
DRAFT Hartford SF 1442.pdf PDF
Proprietary Information Agreement - Sample Template .docx DOCX document
Utility Assessment Report prepared by Fuss ONeill August 2024.pdf PDF
Phase II_III Site Investigation prepared by BL April 2019.pdf PDF
Results of Environmental Soil Pre-Characterization Sampling.pdf PDF
260115_Hartford Courthouse Division 1 Specifications Draft.pdf PDF
2025-10-31 HFCH Site Risk Assessment Report - FINAL CIVIL.pdf PDF
Phase 2 Site Investigation (Draft) prepared by BL dated January 2018.pdf PDF
Preliminary Geotechnical Considerations prepared by GEI Consultants June 2024.pdf PDF
Allyn Street Data Gap Review prepared by Solve March 2024.pdf PDF
Pre-Site Analysis Report II_Michael Maltzan Architecture.pdf PDF
Hartford_POR - Parts 1 2 _DRAFT.pdf PDF
Hartford_POR - Appendix A _DRAFT.pdf PDF
Past Performance Questionnaire Hartford.docx DOCX document
GSA Hartford Courthouse Project Selected Prior RFI QA.pdf PDF
GSA New Federal Courthouse RFI Form.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Cost Detail Uniformat

PROJECT COST SUMMARY TEMPLATE DRAFT
HARTFORD US COURTHOUSE
Project:New Hartford CourthouseGross Area (SF):Date:DRAFT
Location:Hartford, CT
AmountTotal CostRate $/SF%Elemental Cost Data
$$Gross Floor AreaQuantitiesUnitNotesUnit Rate
A10FOUNDATIONS$0ERROR:#REF!0.00ERROR:#DIV/0!
A1010Standard FoundationsERROR:#REF!ERROR:#REF!SF1ERROR:#DIV/0!
A1020Special FoundationsERROR:#REF!ERROR:#REF!SF1ERROR:#DIV/0!
A1030Slab On GradeERROR:#REF!ERROR:#REF!SF1ERROR:#DIV/0!
A20BASEMENT CONSTRUCTION$0ERROR:#REF!CY2ERROR:#DIV/0!
A2010Basement ExcavationERROR:#REF!ERROR:#REF!0.00CY3ERROR:#DIV/0!
A2020Basement WallsERROR:#REF!ERROR:#REF!SF4ERROR:#DIV/0!
B10SUPERSTRUCTURE$0ERROR:#REF!0.00SF5ERROR:#DIV/0!
B1010Floor ConstructionERROR:#REF!ERROR:#REF!SF6ERROR:#DIV/0!
B1020Roof ConstructionERROR:#REF!ERROR:#REF!SF7ERROR:#DIV/0!
B20EXTERIOR ENCLOSURE$0ERROR:#REF!SF8ERROR:#DIV/0!
B2010Exterior WallsERROR:#REF!ERROR:#REF!SF8ERROR:#DIV/0!
B2020Exterior WindowsERROR:#REF!ERROR:#REF!SF9ERROR:#DIV/0!
B2030Exterior DoorsERROR:#REF!ERROR:#REF!EA10ERROR:#DIV/0!
B30ROOFING$0ERROR:#REF!SF11ERROR:#DIV/0!
B3010Roof CoveringsERROR:#REF!ERROR:#REF!SF11ERROR:#DIV/0!
C10INTERIOR CONSTRUCTION$0ERROR:#REF!SF12ERROR:#DIV/0!
C1010PartitionsERROR:#REF!ERROR:#REF!SF13ERROR:#DIV/0!
C1020Interior DoorsERROR:#REF!ERROR:#REF!LEF14ERROR:#DIV/0!
C1030FittingsERROR:#REF!ERROR:#REF!SF12ERROR:#DIV/0!
C20STAIRS$0ERROR:#REF!FLT15ERROR:#DIV/0!
C2010Stair ConstructionERROR:#REF!ERROR:#REF!FLT15ERROR:#DIV/0!
C2020Stair FinishesERROR:#REF!ERROR:#REF!SF16ERROR:#DIV/0!
C30INTERIOR FINISHES$0ERROR:#REF!SF17ERROR:#DIV/0!
C3010Wall FinishesERROR:#REF!ERROR:#REF!SF18ERROR:#DIV/0!
C3020Floor FinishesERROR:#REF!ERROR:#REF!SF19ERROR:#DIV/0!
C3030Ceiling FinishesERROR:#REF!ERROR:#REF!SF20ERROR:#DIV/0!
D10CONVEYING$0ERROR:#REF!STY21ERROR:#DIV/0!
D1010Elevators & LiftsERROR:#REF!ERROR:#REF!STP22ERROR:#DIV/0!
D1020Escalators & Moving WalksERROR:#REF!ERROR:#REF!0.00LF23ERROR:#DIV/0!
D1090Other Conveying SystemsERROR:#REF!ERROR:#REF!EAERROR:#DIV/0!
D20PLUMBING$0ERROR:#REF!EA24ERROR:#DIV/0!
D2010Plumbing FixturesERROR:#REF!ERROR:#REF!EA24ERROR:#DIV/0!
D2020Domestic Water DistributionERROR:#REF!ERROR:#REF!EA24ERROR:#DIV/0!
D2030Sanitary WasteERROR:#REF!ERROR:#REF!EA24ERROR:#DIV/0!
D2040Rain Water DrainageERROR:#REF!ERROR:#REF!SF25ERROR:#DIV/0!
D2050Other Plumbing SystemsERROR:#REF!ERROR:#REF!1.00EA260
D30HVAC$0ERROR:#REF!MBH27ERROR:#DIV/0!
D3010Energy SupplyERROR:#REF!ERROR:#REF!MBH28ERROR:#DIV/0!
D3020Heat Generating SystemsERROR:#REF!ERROR:#REF!MBH28ERROR:#DIV/0!
D3030Cooling Generating SystemsERROR:#REF!ERROR:#REF!TON29ERROR:#DIV/0!
D3040Distribution SystemsERROR:#REF!ERROR:#REF!MBH30ERROR:#DIV/0!
D3050Terminal and Package UnitsERROR:#REF!ERROR:#REF!MBH30ERROR:#DIV/0!
D3060Controls and InstrumentaionERROR:#REF!ERROR:#REF!MBH30ERROR:#DIV/0!
D3070Systems Testing and BalancingERROR:#REF!ERROR:#REF!MBH30ERROR:#DIV/0!
D3090Other HVAC Systems and EquipmentERROR:#REF!ERROR:#REF!EA31ERROR:#DIV/0!
D40FIRE PROTECTION/ALARM$0ERROR:#REF!SF12ERROR:#DIV/0!
D4010Fire Alarm & Detection SystemsERROR:#REF!ERROR:#REF!SF12ERROR:#DIV/0!
D4020Fire Suppression Water Supply and EquipmentERROR:#REF!ERROR:#REF!LF32ERROR:#DIV/0!
D4030Standpipe SystemERROR:#REF!ERROR:#REF!EA33ERROR:#DIV/0!
D4040SprinklersERROR:#REF!ERROR:#REF!EA33ERROR:#DIV/0!
D4050Fire Protection SpecialtiesERROR:#DIV/0!ERROR:#REF!EA34ERROR:#DIV/0!
D4090Other Fire Protection SystemsERROR:#DIV/0!ERROR:#REF!EA35ERROR:#DIV/0!
D50ELECTRICAL$0ERROR:#REF!AMP12ERROR:#DIV/0!
D5010Electrical Service & DistributionERROR:#REF!ERROR:#REF!AMP12ERROR:#DIV/0!
D5020Lighting & Branch WiringERROR:#REF!ERROR:#REF!SF36ERROR:#DIV/0!
D5030Communications and SecurityERROR:#REF!ERROR:#REF!SF36ERROR:#DIV/0!
D5090Other Electrical SystemsERROR:#REF!ERROR:#REF!SF12ERROR:#DIV/0!
E10EQUIPMENT$0ERROR:#REF!SF12ERROR:#DIV/0!
E1010Commercial EquipmentERROR:#REF!ERROR:#REF!SF36ERROR:#DIV/0!
E1020Institutional EquipmentERROR:#REF!ERROR:#REF!SF36ERROR:#DIV/0!
E1030Vehicular EquipmentERROR:#REF!ERROR:#REF!EA37ERROR:#DIV/0!
E1090Other EquipmentERROR:#REF!ERROR:#REF!SF36ERROR:#DIV/0!
E20FURNISHINGS$0ERROR:#REF!SF36ERROR:#DIV/0!
E2010Fixed FurnishingsERROR:#REF!ERROR:#REF!SF36ERROR:#DIV/0!
E2020Moveable FurnishingsERROR:#REF!ERROR:#REF!ERROR:#DIV/0!
F10SPECIAL CONSTRUCTION$0ERROR:#REF!SF36ERROR:#DIV/0!
F1010Special StructuresERROR:#REF!ERROR:#REF!SF36ERROR:#DIV/0!
F1020Integrated ConstructionERROR:#REF!ERROR:#REF!SF36ERROR:#DIV/0!
F1030Special Construction SystemsERROR:#REF!ERROR:#REF!SF38ERROR:#DIV/0!
F1040Special FacilitiesERROR:#REF!ERROR:#REF!SF38ERROR:#DIV/0!
F1050Special Controls and InstrumentationERROR:#REF!ERROR:#REF!XXERROR:#DIV/0!
F20SELECTIVE BUILDING DEMOLITION$0ERROR:#REF!SF42ERROR:#DIV/0!
F2010Building Elements DemolitionERROR:#REF!ERROR:#REF!SF42ERROR:#DIV/0!
F2020Hazardous Components AbatementERROR:#REF!ERROR:#REF!SF42ERROR:#DIV/0!
G10SITEWORK - BUILDING RELATED$0ERROR:#REF!ERROR:#DIV/0!
G1010Site PreparationERROR:#REF!ERROR:#REF!ACR39ERROR:#DIV/0!
G1020Site ImprovementsERROR:#REF!ERROR:#REF!SF43ERROR:#DIV/0!
G1030Site Civil/Mechanical UtilitiesERROR:#REF!ERROR:#REF!EA40ERROR:#DIV/0!
G1040Site Electrical UtilitiesERROR:#REF!ERROR:#REF!EA41ERROR:#DIV/0!
G20SITEWORK - NON-BUILDING RELATED$0ERROR:#REF!ERROR:#DIV/0!
G2010Site PreparationERROR:#REF!ERROR:#REF!ACR39ERROR:#DIV/0!
G2020Site ImprovementsERROR:#REF!ERROR:#REF!SF43ERROR:#DIV/0!
G2030Site Civil/Mechanical UtilitiesERROR:#REF!ERROR:#REF!EA40ERROR:#DIV/0!
G2040Site Electrical UtilitiesERROR:#REF!ERROR:#REF!EA41ERROR:#DIV/0!
G30OTHER SITE CONSTRUCTION$0ERROR:#REF!LSERROR:#DIV/0!
G3010Service and Pedestrian TunnelsERROR:#REF!ERROR:#REF!XXERROR:#DIV/0!
G3020Other Site ConstructionERROR:#REF!ERROR:#REF!XXERROR:#DIV/0!
DIRECT COST SUBTOTAL$0ERROR:#REF!
CONTINGENCY (Based on subtotal)ERROR:#REF!ERROR:#REF!
SUBTOTAL$0ERROR:#REF!ERROR:#REF!
GENERAL CONDITIONS, PROFIT, BONDERROR:#REF!ERROR:#REF!
SUBTOTAL$0ERROR:#REF!ERROR:#REF!
ESCALATION FROMTOERROR:#REF!ERROR:#REF!
BASE CONTRACT TOTAL$0ERROR:#REF!
Notes:
1Footprint Area at Grade22Number of Stops
2Volume of Excavation23Length of stairs or walks
3Area of basement plan measured to outside of enclosing wall and average depth of finished grade to underside of slab on grade24Number of fixtures
25Area of Roof
26Number of Special fixtures, etc.
4Area of Wall27Total MBH Capacity
5Sum of area of supported floors and roof structure28Total power of heating system
6Area of Supported Floors29Total Power of Cooling Capacity
7Area of Supported Roof30Power
8Area of Exterior Walls31Number of special mechanical systms
9Area of Windows32Length of system
10Number of Doors33Number of sprinkler heads
11Gross Area of Roof34Number of extinguishers
12Gross Floor Area35Each System
13Area of Partitions36Floor Area
14Number of Leaves37Pieces of Equipment
15Number of Flights38Area of Room
16Area of finished landings, treads, risers39Total Area of Site
17Area of finishing40Each Utility
18Area of Finished Walls41Systems Total
19Area of Finished Floors42Square Foot of affected area
20Area of Ceilings43Square Foot of improved area
21Number of Stories

File details come from the government source that posted it. Updated .