The document is a Categorical Exclusion (CE) for a project to replace the Rock Creek Culvert on the Cosby Entrance Road in the Great Smoky Mountains National Park in Tennessee. The project will replace the existing double barrel culvert with a single span bituminous coated steel arch plate culvert to improve stream flow and reduce the risk of road flooding. The project is planned to go to construction in January 2023 and will require a full road closure from March 1 to April 14, 2023, with a possible extension to April 30. The project will be designed and delivered by the Federal Highway Administration (FHWA). The document includes details on mitigation measures to prevent the spread of invasive species, protect vegetation and wildlife, and comply with regulations such as the Clean Water Act. The related federal contract opportunity is for the rehabilitation of the Cosby Government Quarters and Ranger Station Access Road in the Great Smoky Mountains National Park, with an expected project cost between $2,000,000 and $5,000,000. The solicitation is set aside for certified Small Business Concerns and will be issued around July 29, 2024.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
National Park Service U.S. Department of the Interior
Great Smoky Mountains National Park Date: 06/21/2022
Categorical Exclusion Documentation Form (CE Form)
Project: Replace Rock Creek Culvert (Structure 5406-186P) on Cosby Entrance Road PEPC Project Number: 109201 Description of Action (Project Description):
The Rock Creek Culvert consists of two steel arch culverts each 13' in width and 30' in length. These culverts were installed in the 1970s and need replacement. The concrete footing on which the culverts bare significant scour, the steel barrels are rusted, the bituminous coating has deteriorated and the culverts are undersized to handle the flow during high water events.
This project would replace the double barrel culvert with a single span bituminous coated steel arch plate culvert no less than 30' in width. The new arch plate culvert will be placed on concrete foundations and the new capacity of water will be almost triple the volume of water the existing culverts can accommodate.
New stone masonry headwalls would be constructed on either end of the culvert.
This project will be design and delivered by the Federal Highway Administration (FHWA). The 70% design drawings, culvert inspection report, and existing conditions photos are attached. The compliance for this project must be completed in May 2022 or the FHWA cannot continue with the design. The project is planned to go to construction in January 2023. Replacement of the culvert will require a full road closure from March 1 until April 14, 2023. Replacement work would take about 6 weeks but it is possible we may have to extend the closure until April 30, 2023 which would delay the opening of the campground about 2 weeks. The driver for the dates of the closure is the water and sewer line project that will be going on. Joe Ferowich has the details but that contract will start around Nov 2022 and we need to maintain access for them until February 28, 2023.
Project Locations:
Location County: Sevier State: TN
Mitigation(s):
• Follow guidelines established in GRSM Management Directive #33-Preventing Introduction and Spread of Invasive Non-Native Plants. Consult GRSM Supervisory Forester prior to transporting materials (e.g., soil, gravel, rock) from in-park stockpiles or importing materials from outside the park or obtain materials from pre-approved sources. All equipment and tools shall be cleaned prior to entering the work zone or park to prevent spread of invasive, non-native plant seeds. Equipment shall be inspected for compliance by the Project Leader or delegated park representative. Only use erosion control materials that have no risk of wildlife entanglement and are weed-free and pest-free. Do not use imported hay bales, straw bales, wood chips, mulch, or sod. (Note that wood excelsior products and straw filter logs and blankets that are certified as fumigated and weed-free may be used). Do not use any form of plastic/synthetic mesh netting, including those that are labeled as biodegradable or photodegradable. Reseed with park-approved seed mixes only, which include: • Mix 1 = 130lb/ac total, 30lb hard fescue, 20lb Chewing's fescue, 30lb annual rye, 20lb native grass/forbs, and 30lb red fescue. • Mix 2 = 140lb/ac total, 45lb hard fescue, 45lb red fescue, 25lb Chewing's fescue, and 25lb annual rye. Consult with GRSM Supervisory Forester as needed for technical support on seed mix selection or label review of alternative seed mixes.
• A public information program to notify visitors and the general public of temporary closures, delays, and road hazards during construction shall be implemented. This program would help convey appropriate messages to the public and aid in mitigating potential impacts on visitors' expectations and experiences.
• As few trees as possible shall be removed during this project. Avoid and minimize impacts to retained trees adjacent to the area of disturbance by using management practices such as tree protection fencing, root pruning, and preventing compaction of soil over root systems. Tree removal shall be approved by Project Leader. Consult with GRSM Supervisory Forester or Supervisory Ecologist for technical support on tree removal and protection plan, as needed.
• Staging Areas - Equipment and material staging areas shall be limited to the existing paved and gravel roads and pull-offs or similar areas approved by the NPS Project Leader to protect vegetation, water quality, and archeological resources. Staging areas shall be sited and erosion and sediment control measures used so that runoff does not discharge directly to streams.
• Tree Removal and Bats: When removing large trees (greater than 5 inches DBH) that have characteristics for summer bat roosts (i.e., dead trees with exfoliating bark, tree cavities, and crevices) then follow the decision process: 1). Remove potential roost trees only between Nov 15 and March 31 or 2). Have a qualified individual observe for bats existing in the trees for 30 minutes before and after sunset. If bats are not observed, the tree may be cut the following morning. If bats are observed, do not cut tree and resurvey tree at a later date.
• Project includes in stream work in Rock Creek. FHWA shall determine specific TDEC and COE permitting requirements, include applicable permit conditions in construction documents, obtain permits prior to construction, and ensure work is completed in accordance with the permits as well as applicable BMPs in NPS PM 77-1 Wetland Protection.
• In the event that cultural resources are inadvertently encountered during the project, the site supervisor shall temporarily stop work to protect the resources and immediately notify the Superintendent and GRSM Archeologist. The Superintendent will notify the State Historic Preservation Office and Federally Recognized Indian Tribes, as appropriate, within 48 hours, or as soon as reasonably possible. The Superintendent in consultation with the Project Leader, Section 106 Coordinator, and the appropriate members of the Cultural Resources Management Team, will make reasonable efforts to avoid, minimize, or mitigate adverse effects on those cultural resources in consultation with the SHPO/THPO and Federally recognized Indian Tribes, as appropriate. If human remains or other cultural material that may fall under the provisions of Native American Graves Protection and Repatriation Act (NAGPRA) are present, the Superintendent will comply with NAGPRA and the Archeological Resources Protection Act (ARPA). The Superintendent will ensure that any human remains are left in situ, are not exposed, and remain protected while compliance with NAGPRA, Archaeological Resources Protection Act, or other applicable federal, state, and/or local laws and procedures is undertaken.
• If using erosion netting, a biodegradable matting with a large diameter natural fiber shall be used to prevent entrapment of wildlife.
Comment: Only natural fiber fascines and/or erosion control matting should be used. Biodegradable plastic is NOT PERMITTED.
• Erosion Control: Use proper sediment control measures during excavation, including using duplicate sets of erosion control fencing at all water drainage areas. Clean erosion control fencing areas regularly and discard sediment in appropriate clean fill areas. Cover any excavated material or fill material with a waterproof tarp if it will be exposed overnight or for any extended period of time. Secure tarp with heavy objects to prevent it from blowing off. Re-seed area with park approved seed mix.
CE Citation: 3.3.C.8 Replacement in kind of minor structures and facilities with little or no change in location, capacity or appearance.
CE Justification:
Project involves culvert replacement in the same location. The new culvert would be designed to improve stream flow through the culvert, reduce the chances of the road flooding, and improve resiliency.
Decision: I find that the action fits within the categorical exclusion above. Therefore, I am categorically excluding the described project from further NEPA analysis. No extraordinary circumstances apply.
Signature
Superintendent: Date:
for Cassius M. Cash
Extraordinary Circumstances:
If implemented, would the proposal... Yes/No Explanation A. Have significant impacts on public health or safety? No The new culvert would reduce the chance of road flooding and would improve public safety.
B. Have significant impacts on such natural resources and unique geographic characteristics as historic or cultural resources; park, recreation, or refuge lands;
wilderness areas; wild or scenic rivers; national natural landmarks; sole or principal drinking water aquifers;
prime farmlands; wetlands (Executive Order 11990);
floodplains (Executive Order 11988); national monuments; migratory birds; and other ecologically significant or critical areas?
No Proposed work is limited to replacement of existing culverts in the same location and would not result in significant impacts. See ESF for details of impacts screening.
C. Have highly controversial environmental effects or involve unresolved conflicts concerning alternative uses of available resources (NEPA section 102(2)(E))?
No Potential environmental effects of the action are straightforward, minor, and localized.
Effects are not highly controversial environmental effects or involve unresolved conflicts.
D. Have highly uncertain and potentially significant environmental effects or involve unique or unknown environmental risks?
No Potential effects of the action are well understood, minor and localized. No potentially significant effects have been identified.
E. Establish a precedent for future action or represent a decision in principle about future actions with potentially significant environmental effects?
No Future actions would require separate compliance and decision making processes.
F. Have a direct relationship to other actions with individually insignificant, but cumulatively significant, environmental effects?
No The only other action that would overlap in time and space with this project is pavement preservation of the road. Impacts from both project are negligible or minor and no cumulatively significant impacts are anticipated.
G. Have significant impacts on properties listed or eligible for listing on the National Register of Historic Places, as determined by either the bureau or office?
No See NHPA form.
H. Have significant impacts on species listed or proposed to be listed on the List of Endangered or Threatened Species, or have significant impacts on designated Critical Habitat for these species?
No See ESF and other compliance/consultations form.
I. Violate a federal, state, local or tribal law or requirement imposed for the protection of the environment?
No The project complies with environmental protection laws.
J. Have a disproportionately high and adverse effect on low income or minority populations (EO 12898)?
No The project is not expected to have any adverse effects on human populations, regardless of income or minority status.
K. Limit access to and ceremonial use of Indian sacred sites on federal lands by Indian religious practitioners or adversely affect the physical integrity of such sacred sites
(EO 130007)?
No
L. Contribute to the introduction, continued existence, or spread of noxious weeds or non-native invasive species known to occur in the area or actions that may promote the introduction, growth, or expansion of the range of such species (Federal Noxious Weed Control Act and Executive Order 13112)?
No Standard mitigation measures have been included to avoid introduction and spread of invasive plants.
Great Smoky Mountains National Park
Date: 05/23/2022
ENVIRONMENTAL SCREENING FORM (ESF)
Updated Sept 2015 per NPS NEPA Handbook
A. PROJECT INFORMATION
Project Title: Maintain Clingmans Dome Radio Equipment Building PEPC Project Number: 108074 PMIS Number:
Project Type: Cyclic Maintenance (CYC) Project Location:
County, State: Swain, North Carolina District, Section: South, Other:Clingmans Dome Project Leader: Ricky Killingsworth
B. PROJECT DESCRIPTION
Built in 1985 the 144 square foot Clingmans Dome Radio Equipment Building houses Park radio equipment and batteries for a solar array that powers the radio equipment. The building is about 380 feet southeast of Clingmans Dome Observation Tower and Appalachian Trail (see attached map and photo). The building is surrounded by spruce-fir forest and is not visible from the observation tower, Appalachian Trail, or other visitor use areas. Two solar arrays and a radio tower are also located at the building site, which is accessible by vehicle via paved trail/administrative road. This project includes the following maintenance on the Radio Equipment Building:
1. Replace interior lighting. 2. Minor repairs to exterior. 3. Paint (NPS brown or gray) exterior door, frame, and exterior walls. 3. Replace roof.
The project does not include ground disturbance or vegetation clearing.
C. RESOURCE IMPACTS TO CONSIDER:
Resource Potential for Impact
Potential Issues & Impacts
Air Air Quality
None
Air Climate Change
Biological Areas of high Biological Diversity
Cave/karst Resources
Communities of Special Concern
Nonnative or Exotic Species
Species of Special Concern or Their Habitat
Vegetation
Wildlife and/or Wildlife Habitat including terrestrial and aquatic species
Cultural Archeological Resources
None Issue: See NHPA form
Cultural Cultural Landscapes
None Issue: See NHPA form
Cultural Ethnographic Resources
Museum Collections
Prehistoric/historic structures
None Issue: See NHPA form
Geological Geologic Features
Geological Geologic Processes
Lightscapes Lightscapes
Other Human Health and Safety
Paleontological Paleontological Resources
Socioeconomic Land Use
Minority and low-income populations, size, migration patterns, etc.
Socioeconomic energy/sustainability
Soundscapes Soundscapes
Viewsheds Viewsheds
None Impact: None. The Radio Equipment Building is surrounded by dense spruce-fir forest and is not visible from the Clingmans Dome Tower, Appalachian Trail, or other visitor use areas.
Visitor Use and Experience Recreation Resources
Visitor Use and Experience Visitor Use and Experience
None Impact: None. The Radio Equipment Building is surrounded by dense spruce-fir forest and is not visible from the Clingmans Dome Tower, Appalachian Trail, or other visitor use areas.
Water Floodplains
Water Floodplains
Water Quality or Quantity
Wetlands Wetland
None Issue: Wetland Adjacent to the Building
Impact: Damage to wetland vegetation and hydrologic function.
Wetland has been signed for avoidance and mitigation measure included to avoid potential impact of inadvertent impacts of equipment operation.
Wilderness Wilderness
Approved:
Chief, RMS Division: Date:
Lisa McInnis
Date: 05/23/2022
ASSESSMENT OF ACTIONS HAVING AN EFFECT ON
HISTORIC PROPERTIES
A. DESCRIPTION OF UNDERTAKING
1. Park: Great Smoky Mountains National Park
2. Project Description:
Project Name: Maintain Clingmans Dome Radio Equipment Building Prepared by: Robert Hussey Date Prepared: 04/08/2022 Telephone: 865-430-0339 PEPC Project Number: 108074 Locations:
County, State: Swain, NC District, Section: South, Other: Clingmans Dome Describe project:
Built in 1985 the 144 square foot Clingmans Dome Radio Equipment Building houses Park radio equipment and batteries for a solar array that powers the radio equipment. The building is about 380 feet southeast of Clingmans Dome Observation Tower and Appalachian Trail (see attached map and photo). The building is surrounded by spruce-fir forest and is not visible from the observation tower, Appalachian Trail, or other visitor use areas. Two solar arrays and a radio tower are also located at the building site, which is accessible by vehicle via paved trail/administrative road. This project includes the following maintenance on the Radio Equipment Building:
1. Replace interior lighting.
2. Minor repairs to exterior.
3. Paint (NPS brown or gray) exterior door, frame, and exterior walls.
3. Replace roof.
The project does not include ground disturbance or vegetation clearing.
Area of potential effects (as defined in 36 CFR 800.16[d]) See attached map for Clingmans Dome Radio Equipment building location. Also, the building is located at- 35°33'43.6"N 83°29'50.7"W
3. Has the area of potential effects been surveyed to identify historic properties?
No
X Yes
Source or reference: 2016 Great Smoky Mountains National Park Historic Resource Survey
4. Potentially Affected Resource(s):
Archeological Resources Present: No
Archeological Resources Notes: The APE is limited to the Clingmans Dome Radio Equipment Building interior and exterior. This project does not include ground disturbance or vegetation clearing; thus, this will not impact any potentially undiscovered archeological resources near the building. As such, there will be no archeological resources within the APE.
Historical Structures/Resources Present: No
Historical Structures/Resources Notes: The Radio Equipment building, constructed in 1985, is not eligible for the National Register either as a standalone structure or as a contributing element to the nearby listed or potentially eligible landscapes. The Radio Equipment building itself is not NHRP eligible under Criterions A through D. For example, the Radio Equipment building is not associated with significant events or persons from American History, nor does this structure embody a distinctive characteristic, type, period, or method of construction. Moreover, the building, which is intentionally visually obscured from Clingmans Dome and the Appalachian Trail, does not add to the historic associations, historic architectural qualities, or other National Register Criteria for these nearby cultural resources.
Cultural Landscapes Present: No
Cultural Landscapes Notes: The proposed undertakings are limited to the interior and exterior of a building built in 1985 and intentionally obscured from Clingmans Dome and the Appalachian Trail. The proposed undertakings for PEPC 108074 will not alter any of the characteristics, location, setting, or use of eligible, potentially eligible, or properties listed on the National Register.
Ethnographic Resources Present: No
Ethnographic Resources Notes: Kuwahi
5. The proposed action will: (check as many as apply)
No Destroy, remove, or alter features/elements from a historic structure
No Replace historic features/elements in kind
No Add non-historic features/elements to a historic structure
No Alter or remove features/elements of a historic setting or environment (inc. terrain)
No Add non-historic features/elements (inc. visual, audible, or atmospheric) to a historic setting or cultural landscape
No Disturb, destroy, or make archeological resources inaccessible
No Disturb, destroy, or make ethnographic resources inaccessible>
No Potentially affect presently unidentified cultural resources
No Begin or contribute to deterioration of historic features, terrain, setting, landscape elements, or archeological or ethnographic resources
No Involve a real property transaction (exchange, sale, or lease of land or structures)
Other (please specify):
6. Supporting Study Data:
(Attach if feasible; if action is in a plan, EA or EIS, give name and project or page number.)
B. REVIEWS BY CULTURAL RESOURCE SPECIALISTS
The park 106 coordinator requested review by the park's cultural resource specialist/advisors as indicated by check-off boxes or as follows:
[ X ] Historical Architect Name: Ali Miri Date: 05/16/2022 Comments: The Clingmans Dome Radio Equipment Building is not a historic building and is not contributing to the park's cultural resources. The park's intervention is toward maintaining this building. As a suggestion it would be proper to match the color of the new paint with the existing paint and the roof covering with the existing roof covering. Thank you for consulting with us.
Check if project does not involve ground disturbance [ ] Assessment of Effect: No Potential to Cause Effect X No Historic Properties Affected No Adverse Effect Adverse Effect X Streamlined Review Recommendations for conditions or stipulations:
Doc Method: Streamlined Review (PA) Streamlined Activity:
1. Preservation Maintenance and Repair of Historic Properties
[ X ] Historical Landscape Architect Name: David Hasty Date: 04/22/2022 Comments: Clingmans Dome area is not documented by way of a CRIS-CL record or a CLR, but - as noted - the tower is listed as a historic structure, and the HRS recommends documenting the Clingmans Dome Road as a district. The Radio Equipment Building dates to 1985 and would not be considered a contributing feature of the cultural landscape of a Clingmans Dome district. And the proposed actions would not - as also mentioned - have any effects on the surrounding area (potentially part of a Clingmans Dome historic district). Thus, this project would have no adverse effect on the cultural landscape.
Check if project does not involve ground disturbance [ ] Assessment of Effect: No Potential to Cause Effect No Historic Properties Affected X No Adverse Effect Adverse Effect Streamlined Review Recommendations for conditions or stipulations: It would be good to add Clingmans Dome district to the list of GRSM areas to be documented by a CLI. Suggest adding to PMIS for future funding.
Doc Method: Standard 4-Step Process
[ X ] Other Advisor Name: Stephen Rogers Date: 04/25/2022
Check if project does not involve ground disturbance [ ] Assessment of Effect: No Potential to Cause Effect X No Historic Properties Affected No Adverse Effect Adverse Effect Streamlined Review Recommendations for conditions or stipulations: While historic properties are present this would not affect any of the characteristics that make the property eligible for the NR
Doc Method: Standard 4-Step Process
No Reviews From: Curator, Archeologist, Historian, 106 Advisor, Anthropologist
C. PARK SECTION 106 COORDINATOR'S REVIEW AND RECOMMENDATIONS
1. Assessment of Effect:
No Potential to Cause Effects
X No Historic Properties Affected
No Adverse Effect
Adverse Effect
2. Documentation Method:
[ X ] A. Standard 36 CFR Part 800 Consultation Further consultation under 36 CFR Part 800 is needed.
[ ] B. Streamlined Review Under the 2008 Servicewide Programmatic Agreement (PA) The above action meets all conditions for a streamlined review under section III of the 2008 Servicewide PA for Section 106 compliance.
Applicable Streamlined Review Criteria (Specify 1-16 of the list of streamlined review criteria.)
[ ] C. Undertaking Related to Park Specific or Another Agreement The proposed undertaking is covered for Section 106 purposes under another document such as a park, region or statewide agreement established in accord with 36 CFR 800.7 or 36 CFR 800.14.
[ ] D. Combined NEPA/NHPA Process Process and documentation required for the preparation of an EA/FONSI or an EIS/ROD to comply with Section 106 is in accord with 36 CFR 800.8.c.
[ ] E. Memo to Project File
3. Consultation Information
SHPO Required: Yes SHPO Sent: Apr 12, 2022 SHPO Received: None as of May 23, 2022
THPO Required:
THPO Sent: Apr 12, 2022 THPO Received: None as of May 23, 2022
SHPO/THPO Notes:
Advisory Council Participating: No Advisory Council Notes:
Additional Consulting Parties: No
4. Stipulations and Conditions: Following are listed any stipulations or conditions necessary to ensure that the assessment of effect above is consistent with 36 CFR Part 800 criteria of effect or to avoid or reduce potential adverse effects.
5. Mitigations/Treatment Measures: Measures to prevent or minimize loss or impairment of historic/prehistoric properties: (Remember that setting, location, and use may be relevant.)
Required Mitigations - For the proposed project actions to be within compliance requirements during construction and/or project implementation, the following mitigations must be adhered to:
Heavy equipment use in wetlands must be avoided if at all possible. Heavy equipment used in wetlands must be placed on mats, or other measures must be taken to minimize soil and plant root disturbance and to preconstruction elevations.
Comment: The wetland will be flagged prior to the commencement of work. The Project Leader will coordinate with I&M (Tom Remaley) if work zone needs to include this area.
6. Assessment of Effect Notes:
A "No Historic Properties Affected" finding indicates that there are no properties on, or eligible for inclusion on the National Register of Historic Places (NRHP) that would be impacted by the proposed project.
D. RECOMMENDED BY PARK SECTION 106 COORDINATOR:
Compliance Specialist:
NHPA Specialist
Robert Hussey
Date:
E. SUPERINTENDENT'S APPROVAL
The proposed work conforms to the NPS Management Policies and Cultural Resource Management Guideline, and I have reviewed and approve the recommendations, stipulations, or conditions noted in Section C of this form.
Signature
Superintendent:
for Cassius M. Cash
Date: May 23, 2022
Other Compliance/Consultations Form
Park Name: Great Smoky Mountains National Park PEPC Project Number: 108074 Project Title: Maintain Clingmans Dome Radio Equipment Building Project Type: Cyclic Maintenance Project Location:
County, State: Swain, NC District, Section: South, Other: Clingmans Dome Project Leader: Ricky Killingsworth
ESA
Any Federal Species in the project Area? Yes If species in area: No Effect Was Biological Assessment prepared?
If Biological Assessment prepared, concurred?
Formal Consultation required? No Formal Consultation Notes:
Formal Consultation Concluded:
Any State listed Species in the Project Area? Yes Consultation Information:
General Notes: Potential habitat for listed species including Carolina northern flying squirrel and spruce-fir moss spider exist in the general project area, but the project is limited to routine building maintenance and does not include ground disturbance or vegetation clearing.
Data Entered By: Mark Collins Date: Mar 2, 2022
ESA Mitigations
No ESA mitigations are associated with this project.
Floodplains/Wetlands/§404 Permits
Question Yes No Details
A.1. Is project in 100- or 500-year floodplain or flash flood hazard area?
No Not in floodplain or flash flood hazard area.
A.2. Is Project in wetlands as defined by NPS/DOI?
No Not in wetland as defined by NPS/DOI.
B. COE Section 404 permit needed? No No placement of fill in waters of the United States.
C. State 401 certification? No
D. State Section 401 Permit? No Issue Date:
Expiration Date:
E. Tribal Water Quality Permit? No
F. CZM Consistency determination needed?
N/A
G. Erosion & Sediment Control Plan Required?
No
H. Any other permits required? No Permit Information:
Other Information:
Data Entered By: Mark Collins Date: Mar 2, 2022
FloodPlains & Wetlands Mitigations
Mitigation
ID
Text
127813
Heavy equipment use in wetlands must be avoided if at all possible. Heavy equipment used in wetlands must be placed on mats, or other measures must be taken to minimize soil and plant root disturbance and to preconstruction elevations.
Comments: The wetland will be flagged prior to the commencement of work. The Project Leader will coordinate with I&M (Tom Remaley) if work zone needs to include this area.
Wilderness
Question Yes No
A. Does this project occur in or adjacent to Designated, Recommended, Proposed, Study, Eligible, or Potential Wilderness?
No
B. Is the only place to conduct this project in wilderness?
C. Is the project necessary for the administration of the area as wilderness?
D. Would the project or any of its alternatives adversely affect (directly or indirectly) Designated, Recommended, Proposed, Study, Eligible, or Potential Wilderness? (If Yes, Minimum Requirements Analysis required)
E. Does the project or any of its alternatives involve the use of any of the Wilderness Act Section 4(c) prohibited uses: commercial enterprise, permanent road, temporary road, motor vehicles, motorized equipment, motorboats, landing of aircraft, mechanical transport, structure, or installation? (If Yes, Minimum Requirements Analysis required)
If the answer to D or E above is "Yes" then a Minimum Requirements Analysis is required. Describe the status of this analysis in the column to the right.
Initiation
Completed
Approved
Other Information:
Data Entered By: Mark Collins Date: May 23, 2022
Other Permits/Laws Questions A & B are no longer used.
Question Yes No
C. Wild and scenic river concerns exist? No
D. National Trails concerns exist? No
E. Air Quality consult with State needed? No
F. Consistent with Architectural Barriers, Rehabilitation, and Americans with Disabilities Acts or not Applicable? (If N/A check Yes)
Yes
G. Other:
Other Information:
Question D-The building is about 380 feet southeast of the Appalachian Trail but is not visible from the trail.
Question F-Not applicable because this project is limited to routine maintenance.
Data Entered By: Mark Collins Date: Mar 2, 2022
| PEPC_108074_OtherCompliance_2022_05_23.pdf |
| ESA Mitigations |
| FloodPlains & Wetlands Mitigations |
| 2022-06-21T11:37:00-0400 | |
| ROBERT HUSSEY |
| 2022-06-21T12:51:48-0400 | |
| LISA MCINNIS |
| 2022-06-21T12:52:30-0400 | |
| LISA MCINNIS |
| 2022-06-21T12:53:17-0400 | |
| LISA MCINNIS |