This document is an amendment to a solicitation for the rehabilitation of the Cosby Entrance Road and Cosby Picnic Area within Great Smoky Mountains National Park in Tennessee. Key details include:
The amendment revises the Special Contract Requirements by adding contact information for the utility company, Newport Utilities, and requirements for coordinating with them. It also adds new pay items for system installation and utility disconnection/reconnection. The project plans were revised to reflect these new pay items. The amendment also provides a summary of questions and clarifications from potential bidders, and replaces the Solicitation Bid Schedule with an updated version. The bid opening date of August 29, 2024 remains unchanged.
The overall project is expected to cost between $2,000,000 and $5,000,000 and is set aside for certified Small Business Concerns. The work includes asphalt paving, drainage improvements, signage, pavement markings, and other miscellaneous construction. The contract will be awarded as a base contract with option schedules for additional work.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7324B000016 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ASHBURN VA 20147
ATTN: CONSTRUCTION
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
ASHBURN VA 20147
ATTN: ACQUISITIONS
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
See Block 1408/16/20240001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/29/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment is to:
1) Revise the Special Contract Requirements (J Pages) as follows:
a) Subsection 107.02 to add contact information for Newport Utilities.
b) Subsection 108.01 to add requirements for inviting Newport Utilities.
c) Subsection 109.02 to add definition of Contingent Sum (CTSM).
d) Section 636 to add requirements for disconnecting and reconnecting electric line.
2) Revise the Project Plans as follows:
a) Substitute sheet C02 to add a new Pay Item # 63603-0100 for System Installation, Electrical Company Compensation, and revised description for Pay Item # 64501-
0000, Locate Utilities (And Disconnecting and Reconnecting Utilities).
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 21
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
693C7324B000016/0001
b) Substitute sheet C04 to add a new Pay Item #
63603-0100 for System Installation, Electrical Company Compensation, and revised description for Pay Item # 64501-
0000, Locate Utilities (And Disconnecting and
Reconnecting Utilities).
3) Provide a summary of responses and clarifications to questions asked by potential bidders.
4) Delete and replace the Solicitation Bid
Schedule, B-pages 1 through B-page 11, with the updated Bid Schedule that included new Pay Items
# 63603-0100 and revised Pay Items #
64501-0000.
5) The Bid Opening date of August 29, 2024, at
2:00 pm EDT remains unchanged.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Amendment No. 0001
Info Page 1 of 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0001 Project TN NP GRSM 21(1)
Rehabilitation of Cosby Entrance Road and Cosby Picnic Area Solicitation: 693C73-24-B-000016
The purpose of this Amendment is to:
1) Revise the Special Contract Requirements (J Pages) as follows:
a) Subsection 107.02 to add contact information for Newport Utilities.
b) Subsection 108.01 to add requirements for inviting Newport Utilities.
c) Subsection 109.02 to add definition of Contingent Sum (CTSM).
d) Section 636 to add requirements for disconnecting and reconnecting electric line.
2) Revise the Project Plans as follows:
a) Substitute sheet C02 to add a new Pay Item # 63603-0100 for System Installation, Electrical Company Compensation, and revised description for Pay Item # 64501- 0000, Locate Utilities (And Disconnecting and Reconnecting Utilities).
b) Substitute sheet C04 to add a new Pay Item # 63603-0100 for System Installation, Electrical Company Compensation, and revised description for Pay Item # 64501- 0000, Locate Utilities (And Disconnecting and Reconnecting Utilities).
3) Provide a summary of responses and clarifications to questions asked by potential bidders.
4) Delete and replace the Solicitation Bid Schedule, B-pages 1 through B-page 11, with the updated Bid Schedule that included new Pay Items # 63603-0100 and revised Pay Items # 64501-0000.
5) The Bid Opening date of August 29, 2024, at 2:00 pm EDT remains unchanged.
Special Contract Requirement (J Pages) changes
1. Add the following to Section 107 of the Special Contract Requirements, page J-6:
Add the following to the sixth paragraph of Subsection 107.02:
The electric line at the Rock Creek Culvert and the Culvert at MP 1.989 will be disconnected and reconnected by Newport Utility during construction. Prior to beginning work, coordinate with Newport Utilities. Coordinate all work and agreements through the following contact:
Newport Utilities 170 Cope Boulevard P.O. Box 207 Newport, TN 16403 423-625-2800 Newportutilities.com
2. Delete the first sentence of the second paragraph of Subsection 108.01 of the Special Contract Requirements, page J-11 and substitute the following:
A preconstruction conference will be held after the contract is awarded and at least 7 days before beginning work. Coordinate with the CO to ensure that Newport Utilities is invited to the preconstruction conference.
3. Add the following to Section 109 of the Special Contract Requirements, page J-13:
109.02. Add the following:
(s) Contingent sum, CTSM. Perform the work as authorized by the CO. The estimated total cost for CTSM work is approximate and is considered a maximum cost for the required work. The contract total will be adjusted for authorized changes.
Submit paid invoice receipts as received from Newport Utilities as documentation for payment of CTSM pay items.
4. Add the following to Section 636 of the Special Contract Requirements, page J-68:
636.01. Add the following:
This work includes the contracting and management for the disconnection and reconnection of an underground electric line performed by other.
636.11. Add the following:
SCR changes
SCR changes
Contact Newport Utilities and obtain their services to disconnect and reconnect the existing electric line as required by Subsection 107.02.
636.12. Add the following:
Disconnection and reconnection of electric line will be evaluated under Subsections 106.02 and 106.04.
636.14. Add the following:
Progress payment for disconnection and reconnection of electric line will be paid following submission of paid invoice receipts from Newport Utilities.
Plan Sheet changes
Plan Sheet changes
1. Delete Plan Sheet C02 and substitute the amended Plan Sheet C02.
Plan Sheet C02, Tabulation of Quantities, added pay item 63603-0100 SYSTEM INSTALLATION, ELECTRICAL COMPANY COMPENSATION by CTSM.
Plan Sheet C02, Tabulation of Quantities, revised the description for pay item 64501-0000 from LOCATE UTILITIES to LOCATE UTILITIES (AND DISCONNECTING AND
RECONNECTING UTILITIES).
2. Delete Plan Sheet C04 and substitute the amended Plan Sheet C04.
Plan Sheet C04, Tabulation of Quantities, added pay item 63603-0100 SYSTEM INSTALLATION, ELECTRICAL COMPANY COMPENSATION by CTSM.
Plan Sheet C04, Tabulation of Quantities, revised the description for pay item 64501-0000 from LOCATE UTILITIES to LOCATE UTILITIES (AND DISCONNECTING AND
RECONNECTING UTILITIES).
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
Sheet 2 of 4
AMENDMENT 0001
8/14/24 KA Revised to add pay item 63603-0100 to Sched B.
8/14/24 KA Revised to add supplemental description to pay item 64501-0000.
:3
A
M
A u g u s t
C
P R
O J E
C T
S \g rs m
\2 (1
P ro j_
D e v \C
A D
D \C
-0
X G
R S
M
(1 q n t_
A M
E N
D .d g n
TABULATION OF QUANTITIES
PROJECT
NUMBER
SHEET
C02
NPS No. 133/180556 PMIS No. 157345
TN NP GRSM 21(1)
Sheet 4 of 4
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GREAT SMOKY MOUNTAINS NATIONAL PARK
Revised to add pay item 63603-0100 to Sched D.
Revised to add supplemental description to pay item 64501-0000.
KA
KA
8/14/2024
8/14/2024
AMENDMENT 0001
:4
A
A u g u s t
C
P R
O J E
C T
S \g rs m
\2 (1
P ro j_
D e v \C
A D
D \C
-0
X G
R S
M
(1 q n t_
A M
E N
D .d g n
TABULATION OF QUANTITIES
PROJECT
NUMBER
SHEET
C04
NPS No. 133/180556 PMIS No. 157345
TN NP GRSM 21(1)
Bidders Questions Page 1 of 2
Questions / Clarifications
The following questions and issues were submitted via email at eflhd.contracts@dot.gov. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included. The Government’s direct response to the sender may also have been updated below for better clarity.
1. Will the contractor be responsible for all costs involved with the reconnections of electric, telephone, fiber optic, and water/sewer?
Response: New pay items for utility disconnection and reconnection have been included in Amendment 1.
2. Assuming the sewer line is gravity, has this reconnection been designed in accordance to the proposed culvert location?
Response: The sewer line is a gravity line, and the connection has been designed with sufficient clearance.
3. Can you provide facility owners and contact information so this required cost can be included in bids (facility owners usually will not allow any other entity to reestablish their utilities)?
Response: Utility owner contact information have been included in Amendment 1.
4. It does not appear that the time required to reestablish these utilities has been accounted for per the road closure restrictions for Cosby Entrance Road (March 27th). Will additional road closure(s) be allowed if utilities are not reconnected (will be out of contractors control)?
Response: Single lane closures will be permitted to reconnect utilities.
5. Schedule C is missing a line item for mobilization. Will one be added through an amendment?
Response: No additional mobilization pay item will be added. Schedules A and C can be worked on at the same time.
6. Please provide art files for the signs that have symbols that are not in the MUTCD sign manual.
Response: The file is part of the Uniguide Signs files that are part of the bid documents.
7. Is all rip rap under pay item 25102-0500 to get Natina application? Does all of the applications have to be under the supervision of a manufacture representative?
Response: Yes, all riprap is required to be treated with Natina. The manufacturer must be on site to supervise the application of the reactive color treatment.
mailto:eflhd.contracts@dot.gov
Bidders Questions Page 2 of 2
8. Does the park have a spot nearby where they would accept asphalt milling and ditch spoils? If so, how much can they take?
Response: No, that is the responsibility of the contractor to find a disposal facility. See Section 203 for disposal requirements.
9. Is the use of precast headwalls acceptable?
Response: No, the contract requires stone masonry for the headwalls. See Section 620 for stone masonry requirements.
10. Is a TN standard asphalt mix acceptable?
Response: An alternate state department of transportation asphalt concrete pavement mixture that has the same nominal maximum size aggregate, asphalt binder grade as specified or better, and conforms to either Tables 402-1, 402-1A, and 402-2, or Section 401 may be substituted for approval.
11.The profile of the road says to match existing. The existing road is deteriorating, and a true slope is hard to determine. Is there a % slope that you would like to stay between?
Response: The contractor will be responsible for surveying the road before milling operation to match the existing centerline elevation. The slope of the road can be adjusted to reestablish positive drainage to the existing drainage inlets, waterways, weeps holes and any other drainage structures.
B - 1
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
A0060 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0080 15705-1300 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
170 LNFT $____________ $____________
A0100 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
4,800 LNFT $____________ $____________
A0120 15705-1800 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM
132 LNFT $____________ $____________
A0140 15706-1000 SOIL EROSION CONTROL, INLET PROTECTION
20 EACH $____________ $____________
A0160 15706-2200 SOIL EROSION CONTROL, FILTER BAG
3 EACH $____________ $____________
A0180 20301-1100 REMOVAL OF GATE
1 EACH $____________ $____________
A0200 20301-1200 REMOVAL OF HEADWALL
1 EACH $____________ $____________
A0220 20301-1400 REMOVAL OF INLET
1 EACH $____________ $____________
A0240 20301-2400 REMOVAL OF SIGN
49 EACH $____________ $____________
A0260 20301-3400 REMOVAL OF WHEELSTOP
17 EACH $____________ $____________
A0280 20302-2100 REMOVAL OF PIPE CULVERT
50 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:TN NP GRSM 21(1)
Project Name:Rehabilitation of Cosby Entrance Road and Cosby Picnic Area Road
B - 2
A0300 20425-1000 DITCH, EXCAVATION
600 LNFT $____________ $____________
A0320 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 (NATINA APPLICATION)
180 CUYD $____________ $____________
A0340 30302-1000 DITCH RECONDITIONING
2,700 LNFT $____________ $____________
A0360 30302-2000 SHOULDER RECONDITIONING
28,000 LNFT $____________ $____________
A0380 31301-0000 AGGREGATE-TOPSOIL COURSE
800 TON $____________ $____________
A0400 40201-0100 ASPHALT CONCRETE PAVEMENT, MARSHALL MIX, CLASS A (1/2-INCH
NOMINAL MAXIMUM SIZE AGGREGATE, PG 64-22, TYPE I-B OR TYPE IV
ROUGHNESS)
4,200 TON $____________ $____________
A0460 41202-0000 TACK COAT
5,900 GAL $____________ $____________
A0480 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH
34,100 SQYD $____________ $____________
A0500 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
1,250 SQYD $____________ $____________
A0520 60202-0400 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
50 LNFT $____________ $____________
A0540 60403-1900 INLET, FLH TYPE 6B
1 EACH $____________ $____________
A0560 60406-0000 INLET ADJUSTMENT
5 EACH $____________ $____________
A0580 60704-0000 CLEANING CULVERT IN PLACE
18 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
B - 3
A0600 60706-0000 CLEANING DRAINAGE STRUCTURE (INLETS)
11 EACH $____________ $____________
A0620 60915-1000 WHEELSTOP, CONCRETE
17 EACH $____________ $____________
A0640 61902-0900 GATE, METAL (DOUBLE)
1 EACH $____________ $____________
A0660 62011-0200 STONE MASONRY HEADWALL FOR 15-INCH PIPE CULVERT
1 EACH $____________ $____________
A0680 62011-0500 STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT
1 EACH $____________ $____________
A0700 62501-0000 TURF ESTABLISHMENT
2.1 ACRE $____________ $____________
A0720 63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING
265 SQFT $____________ $____________
A0740 63316-1000 REMOVE AND RESET SIGN
2 EACH $____________ $____________
A0760 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID
3,500 LNFT $____________ $____________
A0780 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID (TRANSVERSE RUMBLE STRIP
MARKINGS)
220 LNFT $____________ $____________
A0800 63405-3250 PAVEMENT MARKINGS, TYPE H, ACCESSIBILITY SYMBOL
5 EACH $____________ $____________
A0820 63411-1500 RECESSED PAVEMENT MARKINGS, TYPE H, SOLID
23,700 LNFT $____________ $____________
A0840 63411-1600 RECESSED PAVEMENT MARKINGS, TYPE H, BROKEN
1,300 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
B - 4
A0860 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
25 EACH $____________ $____________
A0880 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
2 EACH $____________ $____________
A0900 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
50,000 LNFT $____________ $____________
A0920 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
140 SQFT $____________ $____________
A0940 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
400 HOUR $____________ $____________
A0960 63602-6020 SYSTEM INSTALLATION, TRAFFIC DETECTOR WIRE LOOP
1 EACH $____________ $____________
A0980 63610-1000 CONDUIT, 1 1/2-INCH, PVC
30 LNFT $____________ $____________
A1000 63621-1000 UTILITY BOX, PULLBOX
1 EACH $____________ $____________
A1020 64501-0000 LOCATE UTILITIES
ALL LPSM $___LPSM_____ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
B - 5
B0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
B0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
B0060 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
B0080 15705-0100 SOIL EROSION CONTROL, SILT FENCE
550 LNFT $____________ $____________
B0100 15705-1300 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
180 LNFT $____________ $____________
B0120 15705-1800 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM
100 LNFT $____________ $____________
B0140 15706-2200 SOIL EROSION CONTROL, FILTER BAG
3 EACH $____________ $____________
B0160 20301-2700 REMOVAL OF STRUCTURE
1 EACH $____________ $____________
B0180 20801-0000 STRUCTURE EXCAVATION
900 CUYD $____________ $____________
B0200 20803-0000 STRUCTURAL BACKFILL
600 CUYD $____________ $____________
B0220 25102-0500 PLACED RIPRAP, METHOD A, CLASS 5 (NATINA APPLICATION)
315 TON $____________ $____________
B0240 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
96 CUYD $____________ $____________
B0260 55201-1200 STRUCTURAL CONCRETE, CLASS S (SEAL)
32 CUYD $____________ $____________
B0280 55401-1000 REINFORCING STEEL
18,700 LB $____________ $____________
Bid Schedule Schedule:B Schedule Type:Options
B - 6
B0300 60304-0000 STRUCTURAL PLATE ARCH
54 LNFT $____________ $____________
B0320 61902-0900 GATE, METAL (TEMPORARY)
1 EACH $____________ $____________
B0340 62002-0000 STONE MASONRY (FOR HEADWALLS)
75 SQYD $____________ $____________
B0360 62501-0000 TURF ESTABLISHMENT
0.2 ACRE $____________ $____________
B0380 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
2 EACH $____________ $____________
B0400 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
2 EACH $____________ $____________
B0420 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
50 SQFT $____________ $____________
0001 B0430 63603-0100 SYSTEM INSTALLATION, ELECTRICAL COMPANY COMPENSATION
ALL CTSM $___CTSM_____ $22,500.00
0001 B0440 64501-0000 LOCATE UTILITIES (AND DISCONNECTING AND RECONNECTING UTILITIES)
ALL LPSM $___LPSM_____ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:B Schedule Type:Options
B - 7
C0020 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
C0040 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
C0060 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
3,500 LNFT $____________ $____________
C0080 20301-2400 REMOVAL OF SIGN
2 EACH $____________ $____________
C0100 20301-3400 REMOVAL OF WHEELSTOP
26 EACH $____________ $____________
C0120 20302-0500 REMOVAL OF CURB, CONCRETE
122 LNFT $____________ $____________
C0140 20303-0300 REMOVAL OF CONCRETE (TRASH CAN PAD)
6 SQYD $____________ $____________
C0160 20303-3200 REMOVAL OF SIDEWALK, CONCRETE
72 SQYD $____________ $____________
C0180 30302-1000 DITCH RECONDITIONING
90 LNFT $____________ $____________
C0200 30302-2000 SHOULDER RECONDITIONING
1,500 LNFT $____________ $____________
C0220 31301-0000 AGGREGATE-TOPSOIL COURSE
40 TON $____________ $____________
C0240 40201-0100 ASPHALT CONCRETE PAVEMENT, MARSHALL MIX, CLASS A (1/2-INCH
NOMINAL MAXIMUM SIZE AGGREGATE, PG 64-22, TYPE IV ROUGHNESS)
700 TON $____________ $____________
C0260 41202-0000 TACK COAT
500 GAL $____________ $____________
Bid Schedule Schedule:C Schedule Type:Options
B - 8
C0280 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH
1,200 SQYD $____________ $____________
C0300 41401-2000 CRACKS, CLEANING AND SEALING
1,700 LNFT $____________ $____________
C0320 60901-1700 CURB, CONCRETE, 18-INCH DEPTH
122 LNFT $____________ $____________
C0340 60915-1000 WHEELSTOP, CONCRETE
26 EACH $____________ $____________
C0360 61501-0300 SIDEWALK, FIBER REINFORCED COLORED CONCRETE
75 SQYD $____________ $____________
C0380 61504-1000 ACCESSIBILITY RAMP, CONCRETE
20 SQYD $____________ $____________
C0400 61509-0000 DETECTABLE WARNING PANELS
6 SQYD $____________ $____________
C0420 62501-0000 TURF ESTABLISHMENT
0.2 ACRE $____________ $____________
C0440 63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING
20 SQFT $____________ $____________
C0460 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID
600 LNFT $____________ $____________
C0480 63405-2890 PAVEMENT MARKINGS, TYPE H (NO PARKING)
1 EACH $____________ $____________
C0500 63405-3250 PAVEMENT MARKINGS, TYPE H, ACCESSIBILITY SYMBOL
1 EACH $____________ $____________
C0520 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
25 EACH $____________ $____________
C0540 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
117 SQFT $____________ $____________
Bid Schedule Schedule:C Schedule Type:Options
B - 9
C0560 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
200 HOUR $____________ $____________
C0580 64501-0000 LOCATE UTILITIES
ALL LPSM $___LPSM_____ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:C Schedule Type:Options
B - 10
D0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
D0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
D0060 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
D0080 15705-0100 SOIL EROSION CONTROL, SILT FENCE
250 LNFT $____________ $____________
D0100 15705-1300 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
120 LNFT $____________ $____________
D0120 15705-1800 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM
70 LNFT $____________ $____________
D0140 15706-2200 SOIL EROSION CONTROL, FILTER BAG
2 EACH $____________ $____________
D0160 20301-1200 REMOVAL OF HEADWALL
1 EACH $____________ $____________
D0180 20302-2100 REMOVAL OF PIPE CULVERT
65 LNFT $____________ $____________
D0200 20425-1000 DITCH, EXCAVATION
120 LNFT $____________ $____________
D0220 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 (NATINA APPLICATION)
55 CUYD $____________ $____________
D0240 60103-0000 CONCRETE, HEADWALL (FOR 6 FEET SPAN, 5 FEET RISE BOX CULVERT)
2 EACH $____________ $____________
D0260 60220-1250 6 FEET SPAN, 5 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT
65 LNFT $____________ $____________
Bid Schedule Schedule:D Schedule Type:Options
B - 11
D0280 61902-0900 GATE, METAL (TEMPORARY)
1 EACH $____________ $____________
D0300 62002-0000 STONE MASONRY (FOR HEADWALLS)
35 SQYD $____________ $____________
D0320 62501-0000 TURF ESTABLISHMENT
0.1 ACRE $____________ $____________
D0340 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
2 EACH $____________ $____________
D0360 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
2 EACH $____________ $____________
D0380 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
50 SQFT $____________ $____________
0001 D0390 63603-0100 SYSTEM INSTALLATION, ELECTRICAL COMPANY COMPENSATION
ALL CTSM $___CTSM_____ $22,500.00
0001 D0400 64501-0000 LOCATE UTILITIES (AND DISCONNECTING AND RECONNECTING UTILITIES)
ALL LPSM $___LPSM_____ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:D Schedule Type:Options
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0001 |
| Project TN NP GRSM 21(1) |
| Rehabilitation of Cosby Entrance Road and Cosby Picnic Area |
| Solicitation: 693C73-24-B-000016 |
| B Pages - EEBACS (amended).pdf |
| Bid Schedule Instructions.pdf |
| BID SCHEDULE INSTRUCTIONS |
| COMPLETING THE BID SCHEDULE |
| SCHEDULES OF WORK |
| The Government will award the project as a Base Contract (Schedule A) with the option to award Schedules B, C, and D (Government Options 1, 2, and 3); see FAR Clauses 52.217-4 and 52.217-5. |
| COMPLETION OF WORK |
| Bidders are to assume that the award of the contract and approval of the Contractor’s Performance and Payment Bonds (see Block 12a of the SF-1442 and FAR Clause 52.228- 15) may result in the start of construction activities to be no earlier than Decem... |
| BASIS FOR AWARD |
| Schedule A (Base Contract) Bid Total + |
| Schedule B (Government Option 1) Bid Total + |
| Schedule C (Government Option 2) Bid Total + |
| Schedule D (Government Option 3) Bid Total. |
| Amendment 1 info.pdf |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0001 |
| Project TN NP GRSM 21(1) |
| Rehabilitation of Cosby Entrance Road and Cosby Picnic Area |
| Solicitation: 693C73-24-B-000016 |
| Amendment 1 info.pdf |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0001 |
| Project TN NP GRSM 21(1) |
| Rehabilitation of Cosby Entrance Road and Cosby Picnic Area |
| Solicitation: 693C73-24-B-000016 |
File details come from the government source that posted it. Updated .