This document is a Culvert Inspection Report for a federal infrastructure asset, the Rock Creek Culvert located in Great Smoky Mountains National Park. The report details the inspection findings, recommended maintenance and rehabilitation actions, and associated cost estimates. Key findings include deformation of the culvert barrels, undermining of the north footing, and deterioration of the bituminous coating. Recommended actions include repairing the deformations, constructing headwalls and wingwalls, and repairing the undermined footing. The preliminary cost estimate for rehabilitation is in the range of $XX,XXX, and the priority of improvement is classified as moderate. The report provides details on the structure inventory, load rating, and condition assessments. This information would be used to inform future contracting and maintenance requirements for the federal asset.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CULVERT INSPECTION REPORT
ROCK CREEK CULVERT
COSBY CAMPGROUND ACCESS ROAD OVER ROCK CREEK
GREAT SMOKY MOUNTAINS NATIONAL PARK
LN
STRUCTURE NO. 5460-186P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 5/11/2022
ED
Report prepared by:
Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5460-186P
ROCK CREEK CULVERT INSPECTION DATE : 05/11/2022
226 PRIORITY OF IMPROVEMENT C
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
Item No.
Maintenance Recommendations
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
62.5
REMOVE ROCK ACCUMULATION AND DRIFT IN BARRELS.
1 LS
222.7
INSTALL MARKERS OVER EACH SIDE OF STRUCTURE.
2 EA
PRELIM. MAINTENANCE TOTAL :
Item REHABILITATION/RECONSTRUCTION
UNIT
UNIT PRELIM. COST ESTIMATES
No. (TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. COST
REHAB RECONSTR
62.1,62.3, 62.4,62.7
REPAIR DEFORMATION OF BARRELS AT
UPSTREAM END, CONSTRUCT HEADWALLS
AND WINGWALLS ON BOTH SIDES, AND REPAIR
FOOTINGS AS NECESSARY.
1 LS
62.6 REPAIR UNDERMINING OF NORTH FOOTING
WITH GROUT AND PLACE ENGINEERED RIPRAP
AS NECESSARY TO MITIGATE FURTHER
SCOUR.
1 LS
62.1 CLEAN AND COAT BARRELS WITH APPROVED
COATING AS NECESSARY. 1 LS
CONTRACT COSTS FOR MOBILIZATION,
TRAFFIC CONTROL, AND CONTINGENCIES. 1 LS
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5460-186P
ROCK CREEK CULVERT INSPECTION DATE : 05/11/2022
226 PRIORITY OF IMPROVEMENT C
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL :
PRELIM. REHABILITATION TOTAL :
PRELIM. RECONSTRUCTION TOTAL : ..
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL * :
(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)
Remarks : Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
STRUCTURE LOAD RATING STRUCTURE NO. 5460-186P
ROCK CREEK CULVERT INSPECTION DATE: 05/10/2022
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 36 33 61 55
HS 65 59 109 99
TYPE 3 45 41 76 69
TYPE 3S2 65 59 109 99
TYPE 3-3 73 66 122 111
DESIGN LOADING: 0 - UNKNOWN
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 05/16/2016
LOAD RATING CONTROLLED BY: COVER OVER CULVERT
REMARKS: SEE STRUCTURE FILE FOR LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460-186P
STRUCTURE IDENTIFICATION
(201) PARK: GREAT SMOKY MOUNTAINS NATIONAL PARK
(202) STRUCTURE NAME:..............ROCK CREEK CULVERT
(203) STRUCTURE KIND:............... 2 - CULVERT
(204) STRUCTURE NUMBER:.........5460-186 P
4 - SOUTHEAST(205) NPS REGION:
(206) ROUTE CODE NUMBER:
(207) ROAD SECTION NO:............. 186P
(208) NPS ROAD CLASS:............... 2 - CONNECTOR ROAD
(209) WITHIN NPS BNDRY?:.......... Yes
(210) OPERATING UNIT:.................N. DIST.
(211) PROJECT NO(S):
(212) DRAWING NUMBERS:...........NONE
(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE
(22) OWNER:................................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY / PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR:
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORIC DESIGNATION:
474 - TENNESSEE
47029 COCKE
00000
1 6 4 00021 0
ROCK CREEK
COSBY CAMPGROUND ACCESS
ROAD
5460186P0000000
1.7 MILES SOUTH FROM TN ROUTE
32.
99.99 FT ( 99.99 M)
1.70 (KM PT: 2.74 )
3 - ON FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL:..........3 - STEEL (44A) APPR. STR. MATERIAL:............ 0 - Other
(43B) MAIN STR. TYPE:.................. 19 - CULVERT (INCLUDES FRAME (44B) APPR. STR. TYPE:.................... 00 - OTHER
CULVERTS)
(45) NO. OF MAIN SPANS:..............002 (46) NO OF APPROACH SPANS:
(48) MAX. SPAN LENGTH:..............13 FT ( 4 M)
(49) STRUCTURE LENGTH:........... 28.5 FT ( 8.7 M) (108) WEAR SURFACE/PROTECT SYSTEM:
(216A) ABUTMENT #1 FDN:........... 2 - SPREAD FTG ON BEARING MAT'L A) TYPE WEARING SURFACE:.. N - NA
(216B) ABUTMENT #2 FDN:........... 2 - SPREAD FTG ON BEARING MAT'L B) TYPE MEMBRANE:................. N - NA
(217A) PREDOM. PIER FDN:.......... 2 - SPREAD FTG ON BEARING MAT'L C) TYPE PROTECTION:.............. N - NA
(217B) SECOND. PIER FDN:.......... 6 - N/A (218) IS SALT USED?.......................... NO
(107) DECK TYPE:.......................... N - NOT APPLICABLE
LOAD RATING AND POSTING
(31) DESIGN LOAD:.........................0 - UNKNOWN (41) LOAD RESTRICTION:.................. A - OPEN
(66) INVENTORY RATING:..............65.0 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGALTONS ( 59
LOADS
(64) OPERATING RATING:..............99.9 TONS ( 90.6 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 05/11/2022 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N
(220) SPECIAL STUDY TYPE: 0 - NONE INSP. EVERY MONTHS - LAST INSP:
(221) SPECIAL STUDY DATE: (B) UNDERWATER:..................... N
INSP. EVERY MONTHS - LAST INSP:
(C) SPECIAL INSPECTION:........ N
INSP. EVERY MONTHS - LAST INSP:
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460-186P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE:................................ 35° 45'40.60" N (51) CURB TO CURB WIDTH:............ 0 0 FT ( 0 M)
(17) LONGITUDE:............................ 83°12 '37 20" W (52) DECK WIDTH:.......................... 0 0 FT ( 0 M)
(19) DETOUR LENGTH:.................. 0 MI ( 0 KM) (32) APPR. ROADWAY WIDTH:...... 27.0 FT ( 8.2 M)
(28A) LANES ON STRUCT:.............02 (213) APPR. PAVEMENT WIDTH:... 19.0 FT ( 5.8 M)
(28B) LANES UNDER STRUCT:......00 LEFT SHOULDER:............... 4 0 FT ( 1.2 M)
(42A) SERVICE ON:.........................1 - HIGHWAY RIGHT SHOULDER:.......... 4 0 FT ( 1.2 M)
(42B) SERVICE UNDER:................. 5 - WATERWAY (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN
(29) AVG DAILY TRAFFIC:..............1 (34) SKEW ANGLE:......................... 30 °
(30) YEAR OF ADT:......................... 2019 (35) STRUCTURE FLARED:............ 0 - NO FLARE
(114) FUTURE ADT:.........................2 (47) TOTAL HORIZ. CLEARANCE:.. 27 FT ( 8.2 M)
(115) YEAR OF FUTURE ADT:........2039 (50) SIDEWALKS
(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 0 0 FT ( 0 M)
(38) NAVIGATION CONTROL:.........0 - NO NAVIGATION CONTROL ON RIGHT:.................................. 0 0 FT ( 0 M)
WATERWAY (BRIDGE PERMIT NOT
REQUIRED)
(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE
0 - N/A(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:
(111) ABUT OR PIER PROT:........... MATERIAL:........................... 0 - N/A
LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 0 - N/A
(55) RIGHT:...............................00 FT ( 0 M) (215) BRIDGE RAIL HEIGHT:.......... .00 FT ( 0 M)
(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)
(54) MIN. VRT. UNDRCLRANCE:... .00 FT ( 0 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:....................................... N (67) STRUCTURAL EVALUATION:
(59) SUPERSTRUCTURE:...............N (68) DECK GEOMETRY:......................N
(60) SUBSTRUCTURE:.......... N (69) UNDERCLEARANCES:................ N
(61) CHANNEL:................................6 (71) WATERWAY ADEQUACY:
(62) CULVERT:.................................4 (72) APPROACH ALIGNMENT:
(222) APPROACHES:...................... 7 (113) SCOUR CRITICAL:.................... 4 - ACTION IS REQUIRED TO
PROTECT EXPOSED FOUNDATIONS
(223) RETAINING WALL:.................N (225) PURPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION
(36) TRAFFIC SAFETY FEAT: N N N N (226) PRIORITY OF IMPROVEMENT: C - MODERATE
(75A) TYPE OF WORK:................... (227) MAINTENANCE COST:
(75B) WORK DONE BY:.................. (228) REHAB / RECNSTR COST:
(76) IMPROVEMENT LENGTH:....... FT ( 0 M) (229) CONSTRUCTION COST:
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2009-ROADWAY REPAVED.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIGURATION INFORMATION:
Inspector: Mike Putallaz Structure Number: 5460186P0000000
Inspection Date: 05/11/2022 Facility Carried: COSBY CAMPGROUND
Culvert Inspection Report
Pictures
PHOTO 3
Description LOOKING SOUTH TOWARD COSBY CAMPGROUND
PHOTO 4
Description WEST (UPSTREAM) SIDE; NOTE DEFORMATION OF BARRELS
Culvert Inspection Report
Pictures
PHOTO 5
Description GENERAL TOPSIDE VIEW LOOKING SOUTH
PHOTO 6
Description TYPICAL CRACKING OF ASPHALT PAVEMENT; PAVEMENT OVER STRUCTURE SHOWN
Culvert Inspection Report
Pictures
PHOTO 7
Description DEPRESSED ASPHALT PATCHING IN NORTHBOUND LANE AT SOUTH APRROACH
PHOTO 8
Description TYPICAL STRIPPING OF ASPHALT PAVEMENT FINISH COURSE AT SOUTH APPROACH
Culvert Inspection Report
Pictures
PHOTO 9
Description GENERAL UNDERSIDE VIEW LOOKING EAST, NORTH BARREL; NOTE TYPICAL
DETERIORATION OF BITUMINOUS COATING ON BARRELS
PHOTO 10
Description GENERAL VIEW OF NORTH SIDE, NORTH BARREL
Culvert Inspection Report
Pictures
PHOTO 11
Description GENERAL VIEW OF SOUTH SIDE, NORTH BARREL
PHOTO 12
Description TYPICAL DEFORMATION OF WEST ENDS OF BARRELS DUE TO WEIGHT OF EMBANKMENT;
NORTH BARREL SHOWN
Culvert Inspection Report
Pictures
PHOTO 13
Description TYPICAL RUSTING OF BARREL PLATE CONNECTION HARDWARE; SOUTH SIDE OF NORTH
BARREL SHOWN
PHOTO 14
Description TYPICAL CRACKING WITH EFFLORESCENCE ON NORTH FOOTING; NOTE TYPICAL
DETERIORATION OF BITUMINOUS COATING ON BARRELS
Culvert Inspection Report
Pictures
PHOTO 15
Description TYPICAL CRACKING OF NORTH FOOTING; FOOTING NEAR WEST END SHOWN
PHOTO 16
Description TYPICAL DETERIORATION OF NORTH FOOTING AT ENDS; WEST END SHOWN; ALSO NOTE
EROSION BENEATH BOULDER AT END
Culvert Inspection Report
Pictures
PHOTO 17
Description TYPICAL DETERIORATION OF CENTER FOOTING AT ENDS; WEST END SHOWN; ALSO
NOTE TYPICAL SEPARATION OF BARRELS FROM FOOTINGS AT ENDS
PHOTO 18
Description TYPICAL DETERIORATION OF CENTER FOOTING AT ENDS; EAST END SHOWN
Culvert Inspection Report
Pictures
PHOTO 19
Description TYPICAL ROCK ACCUMULATION IN BARRELS; NORTH BARREL SHOWN
PHOTO 20
Description UNDERMINING OF NORTH FOOTING NEAR WEST END
Culvert Inspection Report
Pictures
PHOTO 21
Description UPSTREAM CHANNEL
PHOTO 22
Description DOWNSTREAM CHANNEL