This is Addendum No. 4 to the contract documents for a Massachusetts Department of Transportation (MassDOT) project involving the construction of the Independence Greenway Multi-Use Path in Peabody, a 1.25-mile shared-use pedestrian and bicycle path with two pedestrian bridges. The addendum, issued September 1, 2026, postpones the bid opening to Wednesday, September 9, 2026 at 2:00 p.m. and transmits revised contract pages including an updated cover page and Notice to Contractors (Document 00104). The project scope encompasses approximately 1.579 miles of bituminous asphalt path extending from Lieutenant Ross Memorial Park to Peabody Road, two pedestrian bridges (Bridge No. P-03-018 over Route 1 and Bridge No. P-03-028 over Proctor Brook), utility relocation, drainage improvements, traffic signal reconstruction, wetland restoration, and landscaping across 5.12 acres, with excavation and fill totaling approximately 12,000 cubic yards. Construction is anticipated to span approximately two years from spring 2026 through spring/summer 2028. The total project value is $19,204,000.00.

The addendum addresses three critical design questions submitted by prospective bidders regarding prefabricated steel truss bridge specifications and foundation capacity, all marked for resolution in future addenda. Bidders must be pre-qualified by MassDOT in either the Bridge-Construction or Highway-Construction category prior to proposal submission and must hold a Digital ID from www.bidx.com at least 14 days before bid opening. Electronic proposals are submitted exclusively through www.bidx.com with no paper copies accepted. The contract is subject to federal prevailing wage rates and includes minority participation goals of 15.3 percent and female participation goals of 6.9 percent. Price adjustments apply to hot mix asphalt, Portland cement, diesel fuel, gasoline, and structural steel. The project includes environmental compliance requirements under Section 404 of the Clean Water Act, Chapter 91 Waterways License, Wetlands Protection Act Order of Conditions, and Endangered Species Act commitments for northern long-eared bats and tricolored bats. The City of Peabody shares cost responsibility for expenses exceeding 110 percent of the bid price. A 5% Proposal Guaranty is required.

View the file

Other files

File Type Posted
A00801-610544.pdf PDF
610544 - Plan Holders List 8-18-2026.pdf PDF
PEABODY-610544-135966-A-1.pdf PDF
A00860-610544.pdf PDF
A00830-610544.pdf PDF
A00811-610544.pdf PDF
A00881-610544.pdf PDF
A00844-610544.pdf PDF
610544 - Notice to Contractors.pdf PDF
A00851-610544.pdf PDF
A00875-610544.pdf PDF
610544 Bid Items List.txt TXT text file
A00808-610544.pdf PDF
A00802-610544.pdf PDF
PEABODY-610544-135966-A-3.pdf PDF
A00861-610544.pdf PDF
A00810-610544.pdf PDF
A00864-610544.pdf PDF
PEABODY-610544-135966-A-2.pdf PDF
610544 - Plan Holders List 8-31-2026.pdf PDF
A00831-610544.pdf PDF
A00850-610544.pdf PDF
A00863-610544.pdf PDF
A00820-610544.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ten Park Plaza, Suite 4160, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 mass.gov/massdot

September 1, 2026 Proposal No. 610544-135966

ADDENDUM NO. 4

To Prospective Bidders and Others on:

PEABODY

Federal Aid Project No. CMQ/STP/TAP-0034(034)X

Multi-Use Path Construction of Independence Greenway at I-95 and Route 1

OPENING OF BIDS POSTPONED TO: WEDNESDAY, SEPTEMBER 9, 2026 at 2:00 P.M.

Transmitting changes to the Contract Documents as follows:

QUESTIONS AND RESPONSES: Two pages.

COVER PAGE: Revised Cover Page.

DOCUMENT 00104: Revised Page 1.

Take note of the above, substitute the revised pages for the originals, and acknowledge Addendum No. 4 in your Expedite Proposal file before submitting your bid.

Very truly yours, Eric M. Cardone, P.E.

Construction Contracts Engineer

MB

c: Kristine L. Chestna, Project Manager

THIS PAGE IS INTENTIONALLY LEFT BLANK

PEABODY

Multi-Use Path Construction of Independence Greenway at I-95 and Route 1 (610544-135966)

Questions and Responses Addendum No. 4, September 1, 2026

MAS Building & Bridge, Inc., e-mail dated August 28, 2026

Question 23) This question is being written to follow up on Addendum 2, Q&A response 20 and

Addendum 1, Q&A response 3 regarding the design and fabrication of the truss bridges, particularly the Route 1 bridge (Span 3). The Contractors bidding on this project are not able to select a bridge system as the response to Q&A 20 states, as there is only one fabricator that has committed to providing a quote and capable of producing a truss of this size and type. This one option is a truss that cannot meet the L/1000 live load deflection and keep the geometry shown on the contract plans.

The width adjustment and steel member size changes required to meet that design requirement have a significant impact on loading, and thus may (or may not) result in major changes to other project elements, including foundations. This puts exorbitant risk on the Contractor related to design and extra work that is not in keeping with the intent of public bidding. We ask that MassDOT please:Consider adding a waiver to reduce the live load deflection requirement to L/360 per AASHTO Guide for Pedestrian Bridges. OR reconsider and confirm that any evaluation, design, and extra work necessitated by geometry adjustments to the truss bridge during design refinement will be compensated under Specification Subsections 8.10 and 9.03. OR provide the name and contact information for a fabricator that can produce a truss bridge that matches the contract drawings, as the vendors currently noted in the bid documents are unable to provide the bridge as specified.

Response 23) This will be answered in a future addendum.

E.T.& L. Corp. e-mail dated August 31, 2026

Question 24) Plan Sheet 182, Prefabricated Steel Truss Notes #9 for Bridge No. P-03-018 states:

“The maximum unfactored bridge dead load per pier is 210 kips, including truss, deck, protective screen, and all other miscellaneous components. Any change in load assumptions must be verified by the Engineer.” We understand the preliminary assembled weight of the prefabricated truss structure alone, excluding the cast-in-place concrete deck, is approximately 353,000 lbs. With the concrete deck included, the total structure weight is expected to exceed 600,000 lbs, which is greater than the design engineer’s load assumptions. Please confirm whether the pier foundations, as designed, can accommodate this increased loading. If they cannot, please provide a revised pier foundation design that can support the increased load.

Response 24) This will be answered in a future addendum.

Multi-Use Path Construction of Independence Greenway at I-95 and Route 1 (610544-135966)

Questions and Responses Addendum No. 4, September 1, 2026

Question 25) Plan Sheet 198, Prefabricated Steel Truss Notes #9 for Bridge No. P-03-28 states:

“Substructure design is based on factored live loads and dead loads, including an assumed unfactored superstructure weight of 148.5 kips for the 179’-4” span length.

Design is subject to change based on final superstructure design. Actual loads shall be furnished by the prefabricated steel truss manufacturer.” We understand the preliminary assembled weight of the prefabricated truss structure alone, excluding the black locust decking, is approximately 163,000 lbs. This anticipated load exceeds the design engineer’s assumptions. Please confirm whether the abutments, as designed, can accommodate the increased loading. If they cannot, please provide a revised abutment design capable of supporting the increased load.

Response 25) This will be answered in a future addendum.

MB

Addendum No. 4, September 1, 2026

COMMONWEALTH OF MASSACHUSETTS

CONTRACT DOCUMENTS

AND SPECIAL PROVISIONS

PROPOSAL NO. 610544-135966

P.V. = $19,204,000.00

PLANS YES

FOR

Multi-Use Path Construction of Independence Greenway at I-95 and Route 1 in the City of

In accordance with the STANDARD SPECIFICATIONS for HIGHWAYS and BRIDGES dated 2026

This Proposal to be opened and read: WEDNESDAY, SEPTEMBER 9, 2026 at 2:00 P.M.

Massachusetts Department Of Transportation Highway Division Proposal No. 610544-135966

00104 - 1

Addendum No. 4, September 1, 2026

DOCUMENT 00104

NOTICE TO CONTRACTORS

Electronic proposals for the following project will be received through the internet using www.bidx.com until the date and time stated below and will be posted on www.bidx.com forthwith after the bid submission deadline. No paper copies of bids will be accepted. All Bidders must have a valid vendor code issued by MassDOT in order to bid on projects. Bidders need to apply for a Digital ID at least 14 days prior to a scheduled bid opening date with www.bidx.com.

WEDNESDAY, SEPTEMBER 9, 2026 at 2:00 P.M. **

Federal Aid Project No. CMQ/STP/TAP-0034(034)X

Multi-Use Path Construction of Independence Greenway at I-95 and Route 1 **Date Subject to Change

PROJECT VALUE = $19,204,000.00

Bidders must be pre-qualified by the Department in the Bridge - Construction or Highway - Construction category to bid on the above project. An award will not be made to a Contractor who is not pre-qualified by the Department prior to the opening of Proposals.

All prospective Bidders who intend to bid on this project must obtain “Request Proposal Form (R109)”. The blank “Request Proposal Form (R109)” can be obtained at:

https://www.mass.gov/prequalification-of-horizontal-construction-firms.

All prospective Bidders must complete and e-mail an electronic copy of “Request Proposal Form (R109)” to the MassDOT Director of Prequalification for approval:

prequal.r109@dot.state.ma.us.

Proposal documents for official bidders are posted on www.bidx.com. Other interested parties may receive informational Contract Documents containing the Plans and Special Provisions, free of charge.

Bids will be considered, and the contract awarded in accordance with statutes governing such contracts in accordance with Massachusetts General Laws Chapter 30 § 39M.

The Project Bids File Attachments folder for proposals at www.bidx.com shall be used for submitting at the time of bid required information such as the Bid Bond required document, and other documents that may be requested in the proposal.

http://www.bidx.com/ http://www.bidx.com/ http://www.bidx.com/ https://www.mass.gov/prequalification-of-horizontal-construction-firms mailto:prequal.r109@dot.state.ma.us http://www.bidx.com/ http://www.bidx.com/

PEABODY-610544-Cover Letter_A4 new
Response.to.Questions-A4
00001 Cover 2-11-26-A-4 pg 1
00104 NTC 11-14-24-A-4 pg 1
2026-09-01T08:49:59-0400
Eric M. Cardone

File details come from the government source that posted it. Updated .