PB RFI #5 Door A101B frost slab note.pdf

PDF 170 KB Posted

Attached to
RFP - Welding Lab
Solicitation number
RFP VBI 260000002075 3
Issued by
Van Buren County, Michigan

About this file

Summary: PB RFI #5 Door A101B Frost Slab Note

This document is a Request for Information (RFI) response note related to architectural specifications for the Welding Lab project in Michigan. The file addresses a specific technical question regarding Door A101B and frost slab construction details. The note clarifies design specifications and construction requirements for the door assembly in relation to the building's foundation frost slab system. This RFI response provides clarification on how the door frame should be positioned and installed relative to the frost slab elevation to ensure proper functionality and structural integrity of the building envelope.

The document serves as a technical addendum to the project specifications, ensuring that bidders and contractors have clear guidance on this particular construction detail. As an RFI response, this note becomes part of the official project documentation and must be reviewed by all bidders to accurately prepare their proposals and cost estimates for the Welding Lab project. The clarification provided in this frost slab note is essential for consistent interpretation of the construction documents across all bidding parties.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GDK Construction Co.

12 W. 8th St. Ste. 250 Holland, Michigan 49423 P: (616) 355-0300

Project: Van Buren ISD Career & Technical Education Improvements

250 South Street Lawrence, Michigan 49064

RFI #Pre-Bid 5: Door A101B frost slab note

Revision 0 Status Open

To Dawn Kirkland (GMB Architects Engineers) From Ross Kruithof (GDK Construction Co.)

12 W. 8th St. Ste. 250 Holland, Michigan 49423

Date Initiated Jun 3, 2026 Due Date Jun 6, 2026

Location Project Stage

Cost Impact Schedule Impact

Spec Section Cost Code

Drawing Number Reference

Linked Drawings

Received From Ross Kruithof (GDK Construction Co.)

Copies To Lisa Knoll (GDK Construction Co.), Travis Vruggink (GMB Architects Engineers)

Activity

Question Question from Ross Kruithof GDK Construction Co. on Wednesday, Jun 3, 2026 at 08:45 AM EDT On the civil plan there is a note to see architectural for a frost slab at door A101B. Is there a new foundation required here or are we to follow detail 3/A6.1.01?

Awaiting an Official Response

GDK Construction Co. Page 1 of 1 Printed On: Jun 3, 2026 03:29 PM EDT

There is no foundation work so this note may be omitted / no frost slab in scope.

Travis Vruggink, GMB 06.05.2026