This is an Addendum (Addendum 002) to RFP 5-6730 for a Welding Lab project issued by the State of Michigan. The addendum clarifies and modifies terms of the original solicitation regarding the welding laboratory facility and related services. The document provides updates to project specifications, requirements, and procedural matters that bidders must incorporate into their proposals. Key dates and response requirements referenced in the addendum govern when bidders must submit their proposals and complete any required site visits or attendance at bidder conferences. The contract term and any renewal options are specified in accordance with the original RFP terms, as modified by this addendum.
The addendum addresses pricing considerations, evaluation criteria adjustments, and any changes to set-asides or eligibility requirements for participating vendors. It may include modifications to funding sources, budget allocations, or financial requirements established in the original solicitation. This addendum supersedes conflicting provisions in the base RFP and must be reviewed in conjunction with all prior solicitation documents to ensure bidders understand the complete and current requirements for submission and contract performance.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM
VAN BUREN INTERMEDIATE SCHOOL DISTRICT ADDENDUM 002
5-6730 VBISD CTE IMPROVEMENTS June 04, 2026
A/E PROJECT 5-6730 PAGE 1 OF2
SECTION 00 91 11.02 - ADDENDUM 002
OWNER VAN BUREN INTERMEDIATE SCHOOL DISTRICT
PROJECT 5-6730 VBISD CTE IMPROVEMENTS
A/E PROJECT 5-6730
PURPOSE THIS ADDENDUM SHALL FORM PART OF THE
BIDDING DOCUMENTS. CHANGES, ADDITIONS,
CLARIFICATION OR DELETIONS HEREIN
SUPERSEDE THE DRAWINGS AND
SPECIFICATIONS. BIDDERS SHALL INCLUDE
ON THE PROPOSAL FORM
ACKNOWLEDGEMENT OF THE RECEIPT OF
THIS ADDENDUM.
ATTACHMENTS
REISSUED SPECIFICATIONS: 22 40 00, 23 09 23,
23 73 13
REISSUED SHEETS: S2.2.2B, S6.1.01, A2.1.1A,
A2.2.2A, A6.1.01, P2.3.1A, E2.2.1A
ARCHITECT-ENGINEER GMB
616.796.0200
WWW.GMB.COM
CONSTRUCTION MANAGER GDK CONSTRUCTION
616.355.0300
CM WWW.GDKCONSTRUCTION.COM
ADDENDUM
VAN BUREN INTERMEDIATE SCHOOL DISTRICT ADDENDUM 002
5-6730 VBISD CTE IMPROVEMENTS June 04, 2026
A/E PROJECT 5-6730 PAGE 2 OF2
SPECIFICATION CLARIFICATIONS / REVISIONS
1.1 SECTION 22 40 00 PLUMBING FIXTURES (REISSUED)
A. Per request, BritexUSA has been added to the substitution list for the multi-lavatory specification.
1.2 SECTION 23 09 23 DIRECT-DIGITAL CONTROL FOR SYSTEM FOR HVAC (REISSUED)
A. Revised approved control manufacturers and approved installers.
1.3 SECTION 23 73 13 MODULAR CENTRAL-STATION AIR-HANDLING UNITS (REISSUED)
A. Removed carrier from approved manufacturers.
SHEET CLARIFICATIONS / REVISIONS
2.1 SHEET S2.2.2B - UNIT 'B' FLOOR FRAMING PLAN (REISSUED)
A. See note referring to added handrail.
2.2 SHEET S6.1.01 - STRUCTURAL DETAILS (REISSUED)
A. See revised detail 6/S6.1.01 for handrail attachment.
2.3 SHEET A2.1.1A - UNIT 'A' FIRST FLOOR DEMOLITION PLAN (REISSUED)
A. Updated extent of floor cutting for under ground plumbing.
2.4 SHEET A2.2.2A - UNIT 'A' MEZZANINE PLAN (REISSUED)
A. Added detail callout for railing around mezzanine.
B. Added West Elevation to sheet.
2.5 SHEET A6.1.01 - DETAILS (REISSUED)
A. Added detail 16 for Mezzanine Guard Rail.
2.6 SHEET P2.3.1A - UNIT 'A' PLUMBING PLAN (REISSUED)
A. Clarified welding gas drops and detail location.
2.7 SHEET E2.2.1A -UNIT 'A' FIRST FLOOR POWER & COMMUNICATIONS PLAN (REISSUED)
A. Added fire alarm relay to monitor the dust collector.
END OF SECTION