Part 7A - Drawings 657-20-109JB Building 23 and 25 HVAC.pdf

PDF 7 MB Posted

Attached to
Z2DA--FCA - Replace Mechanical Equipment in Buildings 23 and 25 PN: 657-20-109JB
Solicitation number
36C25522R0021
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DUCT LEAKAGE CLASSIFICATION AND ALLOWABLE LEAKAGE

SEAL CLASSDUCT PRESSURE

C

APPLICABLE SEALINGS SMACNA LEAKAGE CLASS

CLASS, W.G.

3" B TRAVERSE JOINTS AND SEAMS 12

4", 6", 10" A JOINTS, SEAMS AND ALL WALL PENETRATIONS6 3

12TRAVERSE JOINTS ONLY

RECTANGULAR

DUCT DUCT

ROUND

FAN

SYSTEM

REMARKSS.P.

DROPMAX.MIN.

CFM

HW

LOCATION

AIR FLOW MEASURING DEVICES

UNIT

NO.

DUCT SIZE

TYPE

DUCT

N 2"

P 4"

SUPPLY

FROM ROOM OUTLETS TO EXHAUST FAN.

FROM TERMINAL BOXES TO ROOM OUTLETS.

2"NCOIL.

FROM OUTSIDE AIR LOUVER OR RETURN SMOKE DAMPER TO

CLASS W.G.

PRESSURE

MINUMUM

PRESSURE

OR NEGATIVE (N)

POSITIVE (P)

DUCT INVOLVEDFAN TYPE

DUCT PRESSURE CLASSES

FROM FAN DISCHARGE TO TERMINAL BOXES.

AFMS-OA1 60 32 O.A. 25-EAHU-1.06

1. MOUNT AIR FLOW STATIONS AT INLETS TO FAN USING PROBE ARRAY DESIGNED FOR THE PURPOSE.

P 2"

1/2", 1", 2"

NOTE:

N 2"FROM RA GRILLE TO AHU INLET

DESIGN ALTITUDE 538 FT.

AIR CONDITIONING DESIGN DATA-

%RH.

INSIDE

D.B.W.B.D.B.

OUTSIDE

SUMMER

D.B. W.B.

DESIGN

AREA OUTSIDE

D.B.

INSIDE

WINTER

%RH.

50693.04.096 75 5069LAB AREAS

OFFICE AREAS 40703.04.05075

DUCTWORK -

FAN

EXHAUST

FAN

RETURN

AIR FAN

96 75

100% O.A. AIR HANDLING UNIT SCHEDULE - (BASIS OF DESIGN)

PIPING INSULATION SCHEDULE (INDOOR)

MECHANICAL SCHEDULES

BUILDING 25

CONSULTANTS: ARCHITECT/ENGINEERS:

Revisions: Date:

Drawing Title

VA Health Care System Approval:

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Drawing # of

Veterans Health

Administration

FCA - REPLACE MECHANICAL

EQUIPMENT IN BUILDINGS 23 & 25

657-20-109JB

www.daengineering.com www.daengineering.com voice (317) 464-9090 2707 Rand Road Indianapolis, Indiana 46241 fax (317) 464-9393

Mechanical, Electrical, and Energy Engineering

DESIGN-AIRE ENGINEERING, INC. JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

07-09-2021 DEH MV

ARCHITURA CORPORATION

9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384

PH: (317) 348-1000

POC: Michael Conly, AIA, NCARB, President

P R O F E S S I O N A L E N G I N E E R

PE-2021014461

HANNAH

ROSE

KIGER

S

TA

TE

OF MI SSOUR

I

25-MG-602

BID DOCUMENTS

19 36

BASEMENT MECHANICAL PIPING

DEMOLITION PLAN

SCALE: 1/8" = 1'-0"

PLAN NOTES:

1. DISCONNECT CHWS&R PIPING AND CONDENSATE DRAIN FROM FAN COIL,

PREPARE PIPING FOR NEW UNITS AS REQUIRED.

2. REMOVE FAN COIL AND PREPARE PIPING AND SPACE FOR INSTALLATION OF

NEW FAN COIL.

3. DEMO CHWS&R BRANCH PIPING BACK TO THIS POINT AND CAP.

4. REMOVE FAN COIL, CONTROLS, HANGERS COMPLETE.

5. DISCONNECT FAN COIL FROM EXISTING SA PLENUM AND DUCTWORK AS

REQUIRED TO REPLACE FAN COIL.

6. DISCONNECT PIPING AND CAP IN THIS LOCATION.

7. SEE ENLARGED PLAN, THIS SHEET, FOR MORE DETAIL.

8. REMOVE EXISTING UNIT HEATER AND CONTROLS COMPLETE.

9. EXISTING PIPING TO REMAIN; TYPICAL.

INFORMATION CONCERNING THE LOCATION(S) AND SIZES OF EXISTING MECHANICAL

EQUIPMENT, ELECTRICAL EQUIPMENT, PIPING, PLUMBING AND DUCTWORK WAS OBTAINED

FROM ORIGINAL DESIGN DRAWINGS AND/OR CURSORY FIELD OBSERVATION, HOWEVER,

ACTUAL "ASBUILT" DRAWINGS WERE NOT AVAILABLE, CERTAIN INFORMATION CONCERNING

THE LOCATION OF THE EXISTING MECHANICAL EQUIPMENT, ELECTRICAL EQUIPMENT, PIPING,

PLUMBING AND DUCTWORK HAS BEEN ASSUMED IN THIS DRAWING. THE EXACT LOCATION(S)

AND DIRECTION OF FLOW OF ALL EXISTING WORK IS UNKNOWN. REASONABLE EFFORT HAS

BEEN MADE TO ACCURATELY DEPICT THE EXISTING CONDITIONS, HOWEVER, ALL EXISTING

WORK MUST BE VERIFIED IN THE FIELD TO DETERMINE THE EXACT LOCATIONS, DIRECTIONS

OF FLOW, DEPTH, SIZE, ETC.. PRIOR TO STARTING CONSTRUCTION. ANY CONFLICT BETWEEN

THESE PLANS AND ACTUAL FIELD CONDITIONS SHALL BE REPORTED IMMEDIATELY TO THE

ENGINEER FOR VERIFICATION AND/OR CORRECTION.

MEN

TOILET

G12

STORAGE

G13

WASH

ROOM

G13A

TRASH

ROOM

G13B

BATTERY

STORAGE

G13C

STORAGE

G14

WOMEN

LOCKER

G15

WOMEN

TOILET

G16

MECHANICAL

ROOM

G17

EP

FEC

C O

N N

EC

TI

N G

C O

R R

ID

O

R C

O N

N

EC

TI

N

G C

O R

R

ID

O R

CONFERENCE

ROOM

G04

WORK

ROOM

G05

OFFICE

G01A

DME SUPPLY/

DISTRIBUTION

G01

ELECT

ROOM

G03

MECH.

ROOM

G02

CORRIDOR

H003

ELEVATOR

E-1

STAIRWELL

NO. 1

S1

STAIRWELL

NO. 2

S2

CHARGING

STATION

G07

STORAGE

G08

FES

STORAGE

G09A

FES

STORAGE

G09

SAFETY

OFFICE

G10

MALE

LOCKER

G11

IN-HOUSE

CONSTRUCTION/

STORAGE

G23

PROSTHETICS

STORAGE

G26

CORRIDOR

H002

OI&T

CLOSET

H002A

DOCK

AREA

CORRIDOR

H001

PROSTHETICS

STORAGE

G25

FEC

CONFERENCE

ROOM

G04

WORK

ROOM

G05

ENLARGED G04 & G05 MECHANICAL

PIPING DEMO PLAN

SCALE: 1/4" = 1'-0"

GENERAL PLAN NOTES:

1. RE-INSULATE EXISTING PIPING THAT HAD PIPE INSULATION ABATED. SEE HA

SERIES DRAWINGS FOR MORE INFORMATION ON ABATED PIPING. ALL WALL

PENETRATIONS TO BE FIRE STOPPED. SEE SPECIFICATION SECTION 07 84 00.

2. THE CONTRACTOR IS RESPONSIBLE FOR TRACKING THE EE NUMBERS OF ALL

EQUIPMENT REMOVED FROM THE SPACE AND ALL NEW EQUIPMENT BEING

INSTALLED. AT THE COMPLETION OF THE PROJECT, THE CONTRACTOR WILL

PRESENT THE COR WITH A LIST OF ALL EQUIPMENT REMOVED AND ALL NEW

EQUIPMENT ADDED.

3. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING, MOVING, AND

STORING FURNITURE AND MOVABLE EQUIPMENT, AND RETURNING IT TO THE

SPACE WHEN WORK IS COMPLETE. ANY NON-MOVABLE EQUIPMENT IN THE

SPACE WILL BE COVERED IN 6 MIL PLASTIC AND TAPED TO PREVENT DAMAGE

FROM DUST AND WATER DAMAGE AT ALL TIMES DURING CONSTRUCTION.

BASEMENT MECHANICAL

PIPING DEMOLITION PLAN

BUILDING 23

CONSULTANTS: ARCHITECT/ENGINEERS:

Revisions: Date:

Drawing Title

VA Health Care System Approval:

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Drawing # of

Veterans Health

Administration

FCA - REPLACE MECHANICAL

EQUIPMENT IN BUILDINGS 23 & 25

657-20-109JB

www.daengineering.com www.daengineering.com voice (317) 464-9090 2707 Rand Road Indianapolis, Indiana 46241 fax (317) 464-9393

Mechanical, Electrical, and Energy Engineering

DESIGN-AIRE ENGINEERING, INC. JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

07-09-2021 DEH MV

ARCHITURA CORPORATION

9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384

PH: (317) 348-1000

POC: Michael Conly, AIA, NCARB, President

P R O F E S S I O N A L E N G I N E E R

PE-2021014461

HANNAH

ROSE

KIGER

S

TA

TE

OF MI SSOUR

I

23-MD-1B1

20 36

H101H103

109 110 111 112

114 115 116

113A

H103A

112A

112B

H103A

BLDG. 25 ENLARGED FIRST FLOOR

MECHANICAL DEMOLITION PLAN

SCALE: 1/4" = 1'-0"

PLAN NOTES:

1. DEMO EXISTING AHU COMPLETE INCLUDING HANGER. UNIT

IS SUSPENDED FROM CEILING.

2. DISCONNECT AND REMOVE STEAM AND CONDENSATE

PIPING FROM AHU. CAP ALL PIPING. SEE DETAIL

F7/25-MP-112.

3. DEMO OA DUCT CONNECTED TO LOUVER COMPLETE.

PREPARE LOUVER FOR NEW DUCT / FILTER CONNECTION.

4. DEMO SUPPLY DUCT TO TRANSITION. 30"X 12" DUCT

SHALL REMAIN. PREPARE FOR CONNECTION TO NEW

SUPPLY DUCT.

5. AHU HANGERS ARE EXISTING TO BE REMOVED COMPLETE.

6. DEMO CHILLED WATER SUPPLY AND RETURN

CONNECTIONS BACK TO RESPECTIVE MAINS AND CAP.

7. DEMO STEAM PIPING BACK TO MAIN AND CAP.

8. DEMO STEAM CONDENSATE BACK TO MAIN AND CAP. SEE

DETAIL F7/25-MP-112.

9. EXISTING PIPING AND EQUIPMENT ARE EXISTING TO

REMAIN, UNLESS NOTED OTHERWISE.

10. EXISTING FIRE PROTECTION DEVICES TO BE REMOVED

AND RELOCATED IN NEW DUCTWORK AS REQUIRED.

BLDG. 25 FIRST FLOOR MECHANICAL

DEMOLITION PLAN

SCALE: 1/8" = 1'-0"

FIELD VERIFY:

INFORMATION CONCERNING THE LOCATION(S) AND SIZES OF EXISTING

MECHANICAL EQUIPMENT, ELECTRICAL EQUIPMENT, PIPING, PLUMBING AND

DUCTWORK WAS OBTAINED FROM ORIGINAL DESIGN DRAWINGS AND/OR CURSORY

FIELD OBSERVATION, HOWEVER, ACTUAL "ASBUILT" DRAWINGS WERE NOT

AVAILABLE, CERTAIN INFORMATION CONCERNING THE LOCATION OF THE EXISTING

MECHANICAL EQUIPMENT, ELECTRICAL EQUIPMENT, PIPING, PLUMBING AND

DUCTWORK HAS BEEN ASSUMED IN THIS DRAWING. THE EXACT LOCATION(S) AND

DIRECTION OF FLOW OF ALL EXISTING WORK IS UNKNOWN. REASONABLE EFFORT

HAS BEEN MADE TO ACCURATELY DEPICT THE EXISTING CONDITIONS, HOWEVER,

ALL EXISTING WORK MUST BE VERIFIED IN THE FIELD TO DETERMINE THE EXACT

LOCATIONS, DIRECTIONS OF FLOW, DEPTH, SIZE, ETC.. PRIOR TO STARTING

CONSTRUCTION. ANY CONFLICT BETWEEN THESE PLANS AND ACTUAL FIELD

CONDITIONS SHALL BE REPORTED IMMEDIATELY TO THE ENGINEER FOR

VERIFICATION AND/OR CORRECTION.

C

C

SEE ENLARGED

PLAN C7

EX 30"X 12"

EXISTING LPS

CHWS

CHWR

EX-CHWS

PUMP

EX-CHWS

PUMP

GENERAL PLAN NOTES:

1. RE-INSULATE EXISTING PIPING THAT HAD PIPE

INSULATION ABATED. SEE HA SERIES DRAWINGS

FOR MORE INFORMATION ON ABATED PIPING.

2. THE CONTRACTOR IS RESPONSIBLE FOR TRACKING

THE EE NUMBERS OF ALL EQUIPMENT REMOVED

FROM THE SPACE AND ALL NEW EQUIPMENT BEING

INSTALLED. AT THE COMPLETION OF THE PROJECT,

THE CONTRACTOR WILL PRESENT THE COR WITH A

LIST OF ALL EQUIPMENT REMOVED AND ALL NEW

EQUIPMENT ADDED.

3. THE CONTRACTOR IS RESPONSIBLE FOR

PROTECTING, MOVING, AND STORING FURNITURE

AND MOVABLE EQUIPMENT, AND RETURNING IT TO

THE SPACE WHEN WORK IS COMPLETE. ANY

NON-MOVABLE EQUIPMENT IN THE SPACE WILL BE

COVERED IN 6 MIL PLASTIC AND TAPED TO PREVENT

DAMAGE FROM DUST AND WATER DAMAGE AT ALL

TIMES DURING CONSTRUCTION.

EXISTING LOUVER

TO REMAIN

FIRST FLOOR HVAC AND

MECHANICAL PIPING

DEMOLITION PLAN BULDING 25

CONSULTANTS: ARCHITECT/ENGINEERS:

Revisions: Date:

Drawing Title

VA Health Care System Approval:

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Drawing # of

Veterans Health

Administration

FCA - REPLACE MECHANICAL

EQUIPMENT IN BUILDINGS 23 & 25

657-20-109JB

www.daengineering.com www.daengineering.com voice (317) 464-9090 2707 Rand Road Indianapolis, Indiana 46241 fax (317) 464-9393

Mechanical, Electrical, and Energy Engineering

DESIGN-AIRE ENGINEERING, INC. JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

07-09-2021 DEH MV

ARCHITURA CORPORATION

9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384

PH: (317) 348-1000

POC: Michael Conly, AIA, NCARB, President

P R O F E S S I O N A L E N G I N E E R

PE-2021014461

HANNAH

ROSE

KIGER

S

TA

TE

OF MI SSOUR

I

25-MD-112

21 36

H203

212A

H201

H203

212A

210 209

209A

209B

209C 209D

207 205

208A

208B

PLAN NOTES:

1. DEMO EXISTING AHU. UNIT IS

SUSPENDED FROM CEILING.

EX 16"X 14" SUPPLY

DUCT

MECHANICAL PIPING

DETAIL HEATING SIDE

BLDG. 25 SECOND FLOOR

MECHANICAL DEMOLITION PLAN

SCALE: 1/8" = 1'-0"

PLAN NOTES:

1. DEMO EXISTING AHU COMPLETE INCLUDING

HANGERS.

2. DISCONNECT AND REMOVE STEAM AND

CONDENSATE PIPING FROM AHU. CAP AT RISERS.

INSULATE ALL CAPS.

3. DEMO CONNECTED DUCT COMPLETE.

4. DEMO SUPPLY DUCT TO TRANSITION. 30"X 12" DUCT

SHALL REMAIN. PREPARE FOR CONNECTION TO NEW

SUPPLY DUCT.

5. DEMO CHWS, CHWR, AND COOLING CONDENSATE TO

THIS POINT AND CAP. INSULATE ALL CAPS.

6. DEMO DUCTWORK COMPLETE.

7. EXISTING WINDOW/LOUVER TO REMAIN. BLANK OFF

LOUVER WITH SHEET METAL THAT IS INSULATED

WITH 2" THICK BEARD INSULATION.

8. EXISTING PIPING TO REMAIN.

9. DEMO PIPING FROM EXISTING AHU ON THIS FLOOR.

CAP AT THIS POINT.

10. EXISTING FIRE PROTECTION DEVICES TO BE

REMOVED AND RELOCATED IN NEW DUCTWORK AS

REQUIRED.

BLDG. 25 SECOND FLOOR

MECHANICAL DEMOLITION PLAN

SCALE: 1/8" = 1'-0"

SEE ENLARGED

PLAN C7

C

C

FIELD VERIFY:

INFORMATION CONCERNING THE LOCATION(S) AND SIZES OF EXISTING

MECHANICAL EQUIPMENT, ELECTRICAL EQUIPMENT, PIPING, PLUMBING AND

DUCTWORK WAS OBTAINED FROM ORIGINAL DESIGN DRAWINGS AND/OR CURSORY

FIELD OBSERVATION, HOWEVER, ACTUAL "ASBUILT" DRAWINGS WERE NOT

AVAILABLE, CERTAIN INFORMATION CONCERNING THE LOCATION OF THE EXISTING

MECHANICAL EQUIPMENT, ELECTRICAL EQUIPMENT, PIPING, PLUMBING AND

DUCTWORK HAS BEEN ASSUMED IN THIS DRAWING. THE EXACT LOCATION(S) AND

DIRECTION OF FLOW OF ALL EXISTING WORK IS UNKNOWN. REASONABLE EFFORT

HAS BEEN MADE TO ACCURATELY DEPICT THE EXISTING CONDITIONS, HOWEVER,

ALL EXISTING WORK MUST BE VERIFIED IN THE FIELD TO DETERMINE THE EXACT

LOCATIONS, DIRECTIONS OF FLOW, DEPTH, SIZE, ETC.. PRIOR TO STARTING

CONSTRUCTION. ANY CONFLICT BETWEEN THESE PLANS AND ACTUAL FIELD

CONDITIONS SHALL BE REPORTED IMMEDIATELY TO THE ENGINEER FOR

VERIFICATION AND/OR CORRECTION.

EX SUPPLY AIR

DUCT

MECHANICAL PIPING

DETAIL COOLING SIDE

GENERAL PLAN NOTES:

1. RE-INSULATE EXISTING PIPING THAT HAD PIPE

INSULATION ABATED. SEE HA SERIES DRAWINGS

FOR MORE INFORMATION ON ABATED PIPING.

2. THE CONTRACTOR IS RESPONSIBLE FOR TRACKING

THE EE NUMBERS OF ALL EQUIPMENT REMOVED

FROM THE SPACE AND ALL NEW EQUIPMENT BEING

INSTALLED. AT THE COMPLETION OF THE PROJECT,

THE CONTRACTOR WILL PRESENT THE COR WITH A

LIST OF ALL EQUIPMENT REMOVED AND ALL NEW

EQUIPMENT ADDED.

3. THE CONTRACTOR IS RESPONSIBLE FOR

PROTECTING, MOVING, AND STORING FURNITURE

AND MOVABLE EQUIPMENT, AND RETURNING IT TO

THE SPACE WHEN WORK IS COMPLETE. ANY

NON-MOVABLE EQUIPMENT IN THE SPACE WILL BE

COVERED IN 6 MIL PLASTIC AND TAPED TO PREVENT

DAMAGE FROM DUST AND WATER DAMAGE AT ALL

TIMES DURING CONSTRUCTION.

SECOND FLOOR HVAC AND

MECHANICAL PIPING DEMOLITION

PLAN BUILDING 25

CONSULTANTS: ARCHITECT/ENGINEERS:

Revisions: Date:

Drawing Title

VA Health Care System Approval:

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Drawing # of

Veterans Health

Administration

FCA - REPLACE MECHANICAL

EQUIPMENT IN BUILDINGS 23 & 25

657-20-109JB

www.daengineering.com www.daengineering.com voice (317) 464-9090 2707 Rand Road Indianapolis, Indiana 46241 fax (317) 464-9393

Mechanical, Electrical, and Energy Engineering

DESIGN-AIRE ENGINEERING, INC. JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

07-09-2021 DEH MV

ARCHITURA CORPORATION

9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384

PH: (317) 348-1000

POC: Michael Conly, AIA, NCARB, President

P R O F E S S I O N A L E N G I N E E R

PE-2021014461

HANNAH

ROSE

KIGER

S

TA

TE

OF MI SSOUR

I

25-MD-123

22 36

303A

304 305 306

308A

308B 308C

309 310

312304A 307A

309A

BLDG. 25 THIRD FLOOR MECHANICAL

DEMOLITION PLAN

SCALE: 1/8" = 1'-0"

303A

304 305 306 304A

BLDG. 25 THIRD FLOOR MECHANICAL

DEMOLITION PLAN

SCALE: 1/8" = 1'-0"

FIELD VERIFY:

INFORMATION CONCERNING THE LOCATION(S) AND SIZES OF EXISTING

MECHANICAL EQUIPMENT, ELECTRICAL EQUIPMENT, PIPING, PLUMBING AND

DUCTWORK WAS OBTAINED FROM ORIGINAL DESIGN DRAWINGS AND/OR CURSORY

FIELD OBSERVATION, HOWEVER, ACTUAL "ASBUILT" DRAWINGS WERE NOT

AVAILABLE, CERTAIN INFORMATION CONCERNING THE LOCATION OF THE EXISTING

MECHANICAL EQUIPMENT, ELECTRICAL EQUIPMENT, PIPING, PLUMBING AND

DUCTWORK HAS BEEN ASSUMED IN THIS DRAWING. THE EXACT LOCATION(S) AND

DIRECTION OF FLOW OF ALL EXISTING WORK IS UNKNOWN. REASONABLE EFFORT

HAS BEEN MADE TO ACCURATELY DEPICT THE EXISTING CONDITIONS, HOWEVER,

ALL EXISTING WORK MUST BE VERIFIED IN THE FIELD TO DETERMINE THE EXACT

LOCATIONS, DIRECTIONS OF FLOW, DEPTH, SIZE, ETC.. PRIOR TO STARTING

CONSTRUCTION. ANY CONFLICT BETWEEN THESE PLANS AND ACTUAL FIELD

CONDITIONS SHALL BE REPORTED IMMEDIATELY TO THE ENGINEER FOR

VERIFICATION AND/OR CORRECTION.

SEE ENLARGED

PLAN C7

C

C

PLAN NOTES:

EX 16"X 14" SUPPLY

DUCT

PLAN NOTES:

1. DEMO EXISTING AHU. UNIT IS

SUSPENDED FROM CEILING.

MECHANICAL PIPING

DETAIL HEATING SIDE

MECHANICAL PIPING

DETAIL COOLING SIDE

GENERAL PLAN NOTES:

1. RE-INSULATE EXISTING PIPING THAT HAD PIPE

INSULATION ABATED. SEE HA SERIES DRAWINGS

FOR MORE INFORMATION ON ABATED PIPING.

2. THE CONTRACTOR IS RESPONSIBLE FOR TRACKING

THE EE NUMBERS OF ALL EQUIPMENT REMOVED

FROM THE SPACE AND ALL NEW EQUIPMENT BEING

INSTALLED. AT THE COMPLETION OF THE PROJECT,

THE CONTRACTOR WILL PRESENT THE COR WITH A

LIST OF ALL EQUIPMENT REMOVED AND ALL NEW

EQUIPMENT ADDED.

3. THE CONTRACTOR IS RESPONSIBLE FOR

PROTECTING, MOVING, AND STORING FURNITURE

AND MOVABLE EQUIPMENT, AND RETURNING IT TO

THE SPACE WHEN WORK IS COMPLETE. ANY

NON-MOVABLE EQUIPMENT IN THE SPACE WILL BE

COVERED IN 6 MIL PLASTIC AND TAPED TO PREVENT

DAMAGE FROM DUST AND WATER DAMAGE AT ALL

TIMES DURING CONSTRUCTION.

1. DEMO EXISTING AHU COMPLETE INCLUDING

HANGERS.

2. DISCONNECT AND REMOVE STEAM AND

CONDENSATE PIPING FROM AHU. CAP AT RISERS.

INSULATE ALL CAPS.

3. DEMO CONNECTED DUCT COMPLETE.

4. DEMO SUPPLY DUCT TO TRANSITION. 30"X 12" DUCT

SHALL REMAIN. PREPARE FOR CONNECTION TO NEW

SUPPLY DUCT.

5. DEMO CHWS, CHWR, AND COOLING CONDENSATE TO

THIS POINT AND CAP. INSULATE ALL CAPS.

6. DEMO DUCTWORK COMPLETE.

7. EXISTING WINDOW/LOUVER TO REMAIN. BLANK OFF

LOUVER WITH SHEET METAL THAT IS INSULATED

WITH 2" THICK BEARD INSULATION.

8. EXISTING PIPING TO REMAIN.

9. DEMO PIPING FROM EXISTING AHU ON THIS FLOOR.

CAP AT THIS POINT.

10. EXISTING FIRE PROTECTION DEVICES TO BE

REMOVED AND RELOCATED IN NEW DUCTWORK AS

REQUIRED.

THIRD FLOOR HVAC AND

MECHANICAL PIPING

DEMOLITION PLAN BUILDING 25

CONSULTANTS: ARCHITECT/ENGINEERS:

Revisions: Date:

Drawing Title

VA Health Care System Approval:

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Drawing # of

Veterans Health

Administration

FCA - REPLACE MECHANICAL

EQUIPMENT IN BUILDINGS 23 & 25

657-20-109JB

www.daengineering.com www.daengineering.com voice (317) 464-9090 2707 Rand Road Indianapolis, Indiana 46241 fax (317) 464-9393

Mechanical, Electrical, and Energy Engineering

DESIGN-AIRE ENGINEERING, INC. JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

07-09-2021 DEH MV

ARCHITURA CORPORATION

9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384

PH: (317) 348-1000

POC: Michael Conly, AIA, NCARB, President

P R O F E S S I O N A L E N G I N E E R

PE-2021014461

HANNAH

ROSE

KIGER

S

TA

TE

OF MI SSOUR

I

25-MD-134

23 36

MEN

TOILET

G12

STORAGE

G13

WASH

ROOM

G13A

TRASH

ROOM

G13B

BATTERY

STORAGE

G13C

STORAGE

G14

WOMEN

LOCKER

G15

WOMEN

TOILET

G16

MECHANICAL

ROOM

G17

EP

FEC

C O

N N

EC

TI

N G

C O

R R

ID

O

R C

O N

N

EC

TI

N

G C

O R

R

ID

O R

CONFERENCE

ROOM

G04

WORK

ROOM

G05

OFFICE

G01A

DME SUPPLY/

DISTRIBUTION

G01

ELECT

ROOM

G03

MECH.

ROOM

G02

CORRIDOR

H003

ELEVATOR

E-1

STAIRWELL

NO. 1

S1

STAIRWELL

NO. 2

S2

CHARGING

STATION

G07

STORAGE

G08

FES

STORAGE

G09A

FES

STORAGE

G09

SAFETY

OFFICE

G10

MALE

LOCKER

G11

IN-HOUSE

CONSTRUCTION/

STORAGE

G23

PROSTHETICS

STORAGE

G26

CORRIDOR

H002

OI&T

CLOSET

H002A

DOCK

AREA

CORRIDOR

H001

PROSTHETICS

STORAGE

G25

BASEMENT MECHANICAL

HVAC REVISED PLAN

1. LOCATE UNIT AT APPROXIMATELY 7'-6" AFF TO

BOTTOM OF UNIT IN THIS APPROXIMATE OPEN

SPACE ON WALL.

2. RECONNECT THIS UNIT TO EXISTING SA PLENUM

AND DUCTWORK AS REQUIRED.

3. NEW UNIT IN EXISTING LOCATION; TYPICAL UNLESS

NOTED OTHERWISE

GENERAL PLAN NOTES:

1. THE CONTRACTOR IS RESPONSIBLE FOR TRACKING

THE EE NUMBERS OF ALL EQUIPMENT REMOVED

FROM THE SPACE AND ALL NEW EQUIPMENT BEING

INSTALLED. AT THE COMPLETION OF THE PROJECT,

THE CONTRACTOR WILL PRESENT THE COR WITH A

LIST OF ALL EQUIPMENT REMOVED AND ALL NEW

EQUIPMENT ADDED.

2. THE CONTRACTOR IS RESPONSIBLE FOR

PROTECTING, MOVING, AND STORING FURNITURE

AND MOVABLE EQUIPMENT, AND RETURNING IT TO

THE SPACE WHEN WORK IS COMPLETE. ANY

NON-MOVABLE EQUIPMENT IN THE SPACE WILL BE

COVERED IN 6 MIL PLASTIC AND TAPED TO PREVENT

DAMAGE FROM DUST AND WATER DAMAGE AT ALL

TIMES DURING CONSTRUCTION.

BASEMENT MECHANICAL

REVISED PLAN BUILDING 23

CONSULTANTS: ARCHITECT/ENGINEERS:

Revisions: Date:

Drawing Title

VA Health Care System Approval:

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Drawing # of

Veterans Health

Administration

FCA - REPLACE MECHANICAL

EQUIPMENT IN BUILDINGS 23 & 25

657-20-109JB

www.daengineering.com www.daengineering.com voice (317) 464-9090 2707 Rand Road Indianapolis, Indiana 46241 fax (317) 464-9393

Mechanical, Electrical, and Energy Engineering

DESIGN-AIRE ENGINEERING, INC. JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

07-09-2021 DEH MV

ARCHITURA CORPORATION

9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384

PH: (317) 348-1000

POC: Michael Conly, AIA, NCARB, President

P R O F E S S I O N A L E N G I N E E R

PE-2021014461

HANNAH

ROSE

KIGER

S

TA

TE

OF MI SSOUR

I

23-MH-1B1

24 36

BLDG. 25 FIRST FLOOR

MECHANICAL REVISED PLAN

SCALE: 1/4" = 1'-0"

PLAN NOTES:

1. MOTORIZED DAMPER AND MANUAL VOLUME DAMPER; TYPICAL. SEE DETAIL

B8/25-MH-112.

2. FIRE DAMPER AT WALL PENETRATION AND 14"x 14" DUCT ACCESS DOOR ON

SIDE OF DUCT IN MECH. ROOM.

3. CONNECT NEW DUCT TO EXISTING 30"X 12" DUCT TRANSITION IN THIS AREA

AS REQUIRED. INSTALL 14"x 14' ACCESS DOOR IN BOTTOM OF DUCT.

4. SIDE MOUNTED PRE-FILTER SECTION. SEE AIR FILTER SCHEDULE.

5. TRANSITION FROM FAN SUPPLY UP TO 34'x 18".

6. TRANSITION FROM 32"x 36" TO 18"x 36'.

7. 44"x67"x6" O.A. PLENUM ON NECK OF LOUVER.

8. SAW CUT FLOOR. CUT SHALL BE CENTERED ON CENTER OF CONCRETE PAN

BETWEEN CONCRETE WEBS; TYPICAL OF ALL FLOORS.

9. ACCESS PANEL.

10. DUCT TO BE MOUNTED ABOVE LIGHT FIXTURES AND BELOW FAN COIL

DUCTWORK. THIS WILL REQUIRE FIRE SPRINKLER PIPING, HANGERS, MISC.

ELECTRICAL CONDUIT TO BE RELOCATED.

11. 25-EAHU-1 FACTORY POWER CONTROL TERMINAL PANEL TO BE LOCATED ON

WALL ACROSS FROM AHU, UNDER LOUVER.

12. FLOOR PRESSURE SENSOR LOCATED ABOVE FINISHED CEILING, MOUNTED

TO WALL FOR FIRST FLOOR.

GENERAL PLAN NOTES:

1. SEE ELEVATION PLANS FOR MORE DETAILS, SHEET 25-MH-201.

2. EVERYTHING SHOWN IS NEW UNLESS OTHERWISE NOTED.

3. THE CONTRACTOR IS RESPONSIBLE FOR TRACKING THE EE NUMBERS OF ALL

EQUIPMENT REMOVED FROM THE SPACE AND ALL NEW EQUIPMENT BEING

INSTALLED. AT THE COMPLETION OF THE PROJECT, THE CONTRACTOR WILL

PRESENT THE COR WITH A LIST OF ALL EQUIPMENT REMOVED AND ALL NEW

EQUIPMENT ADDED.

4. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING, MOVING, AND STORING

FURNITURE AND MOVABLE EQUIPMENT, AND RETURNING IT TO THE SPACE WHEN

WORK IS COMPLETE. ANY NON-MOVABLE EQUIPMENT IN THE SPACE WILL BE

COVERED IN 6 MIL PLASTIC AND TAPED TO PREVENT DAMAGE FROM DUST AND

WATER DAMAGE AT ALL TIMES DURING CONSTRUCTION.

5. SEE DUCT CONNECTION DETAILS ON SHEET 00-MG-002.

6. FOR PICTURE REFERENCES ON THIS SHEET; SEE SHEET 00-GR-002.

B8 DUCT DAMPER DETAIL

NO SCALE

M

MOTORIZED FLOOR

DAMPER

MANUAL VOLUME

DAMPER

H103

109 110 111 112

H103A

EX 30"X 12"

BLDG. 25 FIRST FLOOR

PICTURE REFERENCE PLAN

SCALE: 1/4" = 1'-0"

H103

109 110 111 112

H103A

EX 30"X 12"

SUPPLY AIR DUCTWORK TO RUN

ABOVE LIGHT FIXTURES AND

BELOW FAN COIL DUCTING.

25-EAHU-1

25-1FBC

EX OUTSIDE

AIR LOUVER

25-EAHU-1

EX OUTSIDE

AIR LOUVER

25-1FBC

25-SH-1

UP TO SECOND

FLOOR; SEE

SHEET 25-MH-12334"x 12"

FD

34"x 18"

M 18 "x

2"

H

E7

E3

FSD

FIRE SMOKE

DETECTOR

P

FIRST FLOOR HVAC REVISED

PLAN BUILDING 25

CONSULTANTS: ARCHITECT/ENGINEERS:

Revisions: Date:

Drawing Title

VA Health Care System Approval:

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Drawing # of

Veterans Health

Administration

FCA - REPLACE MECHANICAL

EQUIPMENT IN BUILDINGS 23 & 25

657-20-109JB

www.daengineering.com www.daengineering.com voice (317) 464-9090 2707 Rand Road Indianapolis, Indiana 46241 fax (317) 464-9393

Mechanical, Electrical, and Energy Engineering

DESIGN-AIRE ENGINEERING, INC. JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

07-09-2021 DEH MV

ARCHITURA CORPORATION

9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384

PH: (317) 348-1000

POC: Michael Conly, AIA, NCARB, President

P R O F E S S I O N A L E N G I N E E R

PE-2021014461

HANNAH

ROSE

KIGER

S

TA

TE

OF MI SSOUR

I

25-MH-112

25 36

BLDG. 25 SECOND FLOOR

SCALE: 1/4" = 1'-0"

PLAN NOTES:GENERAL PLAN NOTES:

1. EVERYTHING SHOWN IS NEW UNLESS

OTHERWISE NOTED.

3. THE CONTRACTOR IS RESPONSIBLE FOR

TRACKING THE EE NUMBERS OF ALL

EQUIPMENT REMOVED FROM THE SPACE

AND ALL NEW EQUIPMENT BEING

INSTALLED. AT THE COMPLETION OF THE

PROJECT, THE CONTRACTOR WILL

PRESENT THE COR WITH A LIST OF ALL

EQUIPMENT REMOVED AND ALL NEW

EQUIPMENT ADDED.

4. THE CONTRACTOR IS RESPONSIBLE FOR

PROTECTING, MOVING, AND STORING

FURNITURE AND MOVABLE EQUIPMENT,

AND RETURNING IT TO THE SPACE WHEN

WORK IS COMPLETE. ANY NON-MOVABLE

EQUIPMENT IN THE SPACE WILL BE

COVERED IN 6 MIL PLASTIC AND TAPED TO

PREVENT DAMAGE FROM DUST AND

WATER DAMAGE AT ALL TIMES DURING

CONSTRUCTION.

5. SEE DUCT CONNECTION DETAILS ON

SHEET 00-MG-002.

1. 12"x 34" DOWN TO FIRST FLOOR AND UP TO THIRD FLOOR.

2. NEW 18"X 12" DUCT.

3. CONNECT NEW DUCT TO EXISTING 30"X 12" DUCT

TRANSITION IN THIS AREA AS REQUIRED.

4. MOTORIZED DAMPER AND MANUAL VOLUME DAMPER;

TYPICAL. SEE DETAIL B8/25-MH-112.

5. FLOOR PRESSURE SENSOR LOCATED ABOVE FINISHED

CEILING, MOUNTED TO WALL FOR FIRST FLOOR.

H203

212A

209A

EX-SA DUCT

M P

SECOND FLOOR HVAC

REVISED PLAN BUILDING 25

CONSULTANTS: ARCHITECT/ENGINEERS:

Revisions: Date:

Drawing Title

VA Health Care System Approval:

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Drawing # of

Veterans Health

Administration

FCA - REPLACE MECHANICAL

EQUIPMENT IN BUILDINGS 23 & 25

657-20-109JB

www.daengineering.com www.daengineering.com voice (317) 464-9090 2707 Rand Road Indianapolis, Indiana 46241 fax (317) 464-9393

Mechanical, Electrical, and Energy Engineering

DESIGN-AIRE ENGINEERING, INC. JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

07-09-2021 DEH MV

ARCHITURA CORPORATION

9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384

PH: (317) 348-1000

POC: Michael Conly, AIA, NCARB, President

P R O F E S S I O N A L E N G I N E E R

PE-2021014461

HANNAH

ROSE

KIGER

S

TA

TE

OF MI SSOUR

I

25-MH-123

26 36

BLDG. 25 THIRD FLOOR

SCALE: 1/8" = 1'-0"

PLAN NOTES:GENERAL PLAN NOTES:

1. EVERYTHING SHOWN IS NEW UNLESS

OTHERWISE NOTED.

1. 12"x 34" DOWN TO SECOND FLOOR.

2. NEW 18"x 12" DUCT.

3. CONNECT NEW DUCT TO EXISTING 30"X 12" DUCT

TRANSITION IN THIS AREA AS REQUIRED.

4. MOTORIZED DAMPER AND MANUAL VOLUME

DAMPER; TYPICAL. SEE DETAIL B8/25-MH-112.

5. FLOOR PRESSURE SENSOR LOCATED ABOVE

FINISHED CEILING, MOUNTED TO WALL FOR FIRST

FLOOR.

303A

304 305 30 304A

EX-SA DUCT

M

P

THIRD FLOOR HVAC

REVISED PLAN BUILDING 25

CONSULTANTS: ARCHITECT/ENGINEERS:

Revisions: Date:

Drawing Title

VA Health Care System Approval:

Project Title

Location

Date Checked Drawn

Project Number

Building Number

Drawing Number

Drawing # of

Veterans Health

Administration

FCA - REPLACE MECHANICAL

EQUIPMENT IN BUILDINGS 23 & 25

657-20-109JB

www.daengineering.com www.daengineering.com voice (317) 464-9090 2707 Rand Road Indianapolis, Indiana 46241 fax (317) 464-9393

Mechanical, Electrical, and Energy Engineering

DESIGN-AIRE ENGINEERING, INC. JEFFERSON BARRACKS

1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125

07-09-2021 DEH MV

ARCHITURA CORPORATION

9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384

PH: (317) 348-1000

POC: Michael Conly, AIA, NCARB, President

P R O F E S S I O N A L E N G I N E E R

PE-2021014461

HANNAH

ROSE

KIGER

S

TA

TE

OF MI SSOUR

I

25-MH-134

27 36

File details come from the government source that posted it. Updated .