BASEMENT HAZARDOUS MATERIAL REMOVAL PLAN
SCALE: 1/8" = 1'-0"
PLAN NOTES:
1. PHASE 1 WORK TO BE DONE WEEKNIGHT HOURS AND OVER WEEKEND HOURS.
2. PHASE 2 WORK TO BE DONE WEEKNIGHT HOURS AND OVER WEEKEND HOURS.
3. REMOVE ALL EXISTING MINERAL FIBER CEILING PADS IN THIS ROOM. AFTER ALL ABATEMENT
IN COMPLETED, INSTALL NEW MINERAL FIBER CEILING TILES BACK INTO EXISTING GRID.
4. CHILLED WATER SUPPLY AND/OR RETURN PIPING THAT REQUIRES ABATEMENT; SEE
SPECIFICATIONS.
5. LPS OR CR PIPING THAT REQUIRES ABATEMENT; SEE SPECIFICATIONS.
6. ROOM G05 MOLD REMEDIATION.
MEN
TOILET
G12
STORAGE
G13
WASH
ROOM
G13A
TRASH
ROOM
G13B
BATTERY
STORAGE
G13C
STORAGE
G14
WOMEN
LOCKER
G15
WOMEN
TOILET
G16
MECHANICAL
ROOM
G17
EP
FEC
C O
N N
EC
TI
N G
C O
R R
ID
O
R C
O N
N
EC
TI
N
G C
O R
R
ID
O R
CONFERENCE
ROOM
G04
WORK
ROOM
G05
OFFICE
G01A
DME SUPPLY/
DISTRIBUTION
G01
ELECT
ROOM
G03
MECH.
ROOM
G02
CORRIDOR
H003
ELEVATOR
E-1
STAIRWELL
NO. 1
S1
STAIRWELL
NO. 2
S2
CHARGING
STATION
G07
STORAGE
G08
FES
STORAGE
G09A
FES
STORAGE
G09
SAFETY
OFFICE
G10
MALE
LOCKER
G11
IN-HOUSE
CONSTRUCTION/
STORAGE
G23
PROSTHETICS
STORAGE
G26
CORRIDOR
H002
OI&T
CLOSET
H002A
DOCK
AREA
CORRIDOR
H001
PROSTHETICS
STORAGE
G25
SPECIALTY NOTES:
A. SECURITY
1. CONTRACTOR SHALL NOT LEAVE DOORS PROPPED OPEN.
2. CONTRACTOR SHALL NOT LEAVE TOOLS OR LADDERS UNATTENDED.
3. CONTRACTOR SHALL NOT LEAVE ELECTRICAL OR DATA PANELS EXPOSED.
B. PHOTOGRAPHY
1. NO PHOTOGRAPHY OF VA PREMISES IS ALLOWED WITHOUT WRITTEN PERMISSION OF THE
COR. IF PERMISSION IS GRANTED BY THE COR, NO PHOTOGRAPHY IS PERMITTED OF
PERSONNEL, PATIENTS, COMPUTER SCREENS, LICENSE PLATES, OR ANY OTHER SENSITIVE
MATERIAL AS DETERMINED BY THE COR.
C. BADGING
1. ALL CONTRACTOR PERSONNEL ARE REQUIRED TO DISPLAY VA BADGE WHEN WORKING ON
STATION.
2. TWO-WEEK NOTICE IS REQUIRED FOR BADGING OF CONTRACTOR PERSONNEL REQUIRING A
FLASH PASS/BADGE ABOVE WAIST.
D. KEYS
1. COORDINATE WITH VA COR FOR ACCESS AND ISSUING OF KEYS.
E. JOBSITE PLAN
1. JOBSITE PLAN MUST BE SUBMITTED PRIOR TO COMMENCEMENT OF WORK
a. INCLUDES
1. ENTRANCES USED
2. MATERIAL MOVEMENT PLAN
3. RESTROOMS TO BE USED
4. LIST OF SUBCONTRACTORS
5. SITE PLAN (LAYDOWN AREA, JOBSITE TRAILER LOCATION, DUMPSTER LOCATION)
6. PERSONNEL ON SITE
F. TRAILER STORAGE
1. CONTRACTORS ARE REQUIRED TO COORDINATE TRAILER STORAGE LOCATION WITH COR.
G. CONTRACTOR SHALL NOTIFY COR OF ANY MATERIAL REMOVED CONTAINING EE# OR
MAXIMO NUMBER.
1. CONTRACTOR SHALL NOTIFY COR OF ANY NEW EQUIPMENT AND/OR SPECIFIC
REQUIREMENTS FOR EQUIPMENT (I.E. SPECIAL OUTLETS, ADEQUATE BREAKER SIZE, ETC.).
(MAKE, MODEL, SERIAL NUMBER)
H. UTILITY SHUTDOWNS
1. MUST BE COORDINATED WITH COR 21 DAYS IN ADVANCE.
I. FIRESTOPPING
1. INSTALL TEMPORARY FIRESTOPPING IN ALL NEW CORE DRILLED PENETRATIONS IN FLOOR
AND WALLS. ENSURE FIRESTOPPING IS MAINTAINED THROUGHOUT CONSTRUCTION UNTIL
PENETRATIONS ARE PERMANENTLY FIRE STOPPED.
K. FIRE ALARM/SPRINKLER
1. IF FIRE ALARM AND/OR SPRINKLER SYSTEM IS DISABLED DURING CONSTRUCTION,
HEAT DETECTION MUST BE PROVIDED. SIEMENS MUST MAKE FINAL TERMINATIONS AND
PROGRAM INTO EXISTING FIRE ALARM SYSTEM.
J. ILSM
1. TEMPORARY FIRE EXTINGUISHERS SHALL BE APPROPRIATELY MOUNTED AND SPACED
DURING CONSTRUCTION FOR HOUSEKEEPING AND SAFETY REQUIREMENTS.
a. TRAVEL DISTANCE FROM ANY POINT OF THE PROTECTED AREA TO THE NEAREST FIRE
EXTINGUISHER SHALL NOT EXCEED 100 FEET.
L. EXIT PATHS MUST BE LITTER/DEBRIS FREE.
M. THE CONTRACTOR IS RESPONSIBLE FOR MOVING, STORING AND PROTECTING ALL EXISTING
FURNITURE AND EQUIPMENT IN EACH AREA FOR THE DURATION OF THE PROJECT.
FURNITURE AND EQUIPMENT DAMAGED BY THE CONTRACTOR WILL BE REPLACED OR
RESTORED TO COMPLETE FUNCTIONALITY AND APPEARANCE BY THE CONTRACTOR AT NO
COST TO THE VA.
GENERAL PLAN NOTES:
1. CONTRACTOR TO ABATE ALL MOLD IN THE PHASE AREAS.
2. ALL PIPING THAT HAS BEEN ABATED TO HAVE NEW PIPE INSULATION INSTALLED. SEE
SPECIFICATION SECTION 230711 AND SCHEDULE ON THIS SHEET, UNDER THIS CONTRACT.
3. INDICATES START/STOP POINT OF REMOVAL.
SCOPE OF WORK
The contractor shall follow all applicable MDNR, EPA, and OSHA rules and regulations. The Contractor shall install plywood barriers and/or lock doors with sufficient signage to isolate the work area in order to prevent access by unauthorizes personnel. Barriers shall be constructed in accordance with MDNR rules and regulations.
Contractor shall provide all worker paperwork to Geo-Enviro Consultants, Inc.'s on-site project manager at the beginning of the shift on the first day of the project. If additional workers arrive during the duration of the project, their paperwork shall also be provided to the Geo-Enviro Consultants, Inc.'s project manager. For asbestos workers and supervisors, this includes copies of their current MDNR license, training certificate, physical, and fit test for each person. All persons involved shall have his/her MDNR “hard card” license on-site each and every day said person is on-site. Any and all workers who do not provide the required documentation shall not be admitted to the project site by the Geo-Enviro Consultants, Inc. project manager.
The asbestos abatement materials include the removal of pipe system insulation and fittings.
Lead-Based paint to be abated includes white paint on plaster ceilings and walls, blue paint on concrete walls and yellow ceramic tile.
Mold remediation to include the cleaning of all surfaces and the removal and disposal of all ceiling tiles in Rooms G04 and G05 ONLY.
All asbestos abatement work shall utilize wet methods.
Tented mini-containment areas shall consist of critical seals and one layer of 6-mil poly on the floors, walls, and ceiling of the tent.
Each tented mini-containment work area shall include critical seals over all doorways, windows, and ventilation system openings. Negative air pressure may be provided by HEPA vacuum cleaning equipment (remaining ibn operation for the duration of the project) and negative air may be discharged to the interior or exterior of the building. Contractor shall install a 1-chamber airlock to each tented containment work area for the worker entry/exit. A remote 5-chamber decon with negative air machine attached to the dirty room and exhausting outside the building shall be constructed.
For tented mini-containment work areas, the contractor shall employ a double disposable suiting procedure. The outer “dirty” suit shall be removed immediately prior to exiting a mini-containment, and a new “clean” outer suit shall be donned immediately prior to entering another mini-containment.
Full containment work areas shall consist of critical seals, two layers of 4-mil poly on the walls, and one layer of 6-mil poly on the ceiling. An attached 5-chamber decon and 2-chamber waste out shall be constructed at the entry to the full containment work area.
The contractor shall provide a manometer for the full containment work area to ensure that a negative pressure of 0.02” w.c. is maintained throughout the duration of the project. All negative air exhaust tubing shall be vented outside the work area.
All waste shall be adequately wet and double-bagged. Waste containers shall be labeled and leak-proof. All waste with sharp-edged components (e.g. nails, screws, metal lath, floor tile, etc.)
shall be placed into drums for disposal. All equipment and double-bagged/labeled waste shall be transported from the work area directly to an enclosed, lockable, signed, and poly-lined dumpster. All double-bagged and labeled waste shall be transported from the work area in a covered gondola. No waste shall be left within the building overnight.
All electrical systems shall be shut down and locked out. All electrical power within the work areas shall be “ground-fault protected” utilizing Ground Fault Circuit Interrupters. The contractor is required to handle all electrical shutdowns. Temporary lighting contractor's responsibility and shall be provided as necessary.
The owner will assist the contractor with electrical shutdowns and HVAC isolation within the work area. The building owner shall be responsible for maintaining appropriate life safety code requirements, including fire protection, for the building for the duration of the project.
After all abatement and cleaning activities are complete in any particular work area, the contractor shall apply a lock-down encapsulant on all materials in which asbestos or asbestos-contaminated materials were removed. This shall be conducted prior to clearance air sampling. Clearance air samples shall be collected when the cleanliness of the work area is to the satisfaction of the on-site project manager, and the required amount of hangtime has elapsed.
In all areas of abatement, contractor shall be responsible for investigating all rooms adjacent to all work areas during teardown activities. If any debris of any kind is identified in any room adjacent to an abatement work area, the contractor shall be responsible for the cleanup of that debris utilizing HEPA-vacuuming and wet methods.
Clearance is to be performed by aggressive TEM sampling methods and will be provided by Geo-Enviro Consultants, Inc's on-site project manager.
NOTES - GENERAL
1. Work will be completed following all applicable requirements.
2. The owner will not accept any change orders based on the contractor's failure to recognize unique conditions.
3. All permits and fees that need to be filled are the responsibility of the contractor. A copy of these permits and receipts shall be supplied to the owner's representative prior to start of work.
4. The owner will assist in the coordination for hooking up electrical equipment, if needed. The contractor will be responsible for supplying a licensed electrician.
5. The contractor is to use only MDNR-licensed workers.
6. The contractor's MDNR-licensed supervisor must be on-site at all times.
7. The contractor is responsible for supplying electrical power to the work area from the existing electrical panel as shown on the plans.
8. The contractor shall be responsible for supplying adequate protection for workers.
9. The contractors shall comply with applicable building and safety requirements.
10.Walk-off mats shall be required at all entrances to work areas.
11.The contractors may be responsible for additional project management and air sampling, and any additional associated costs (including sampling) incurred due to contractor delays and/or contractor failure to perform.
LEAD ABATEMENT NOTES:
1. ALL LEAD-BASED PAINT SHALL BE REMOVED FROM THE SURFACES OF
CONCRETE WALLS, PLASTER WALLS, AND PLASTER CEILINGS IN THE
MARKED AREAS IDENTIFIED.
MOLD REMEDIATION NOTES:
1. REMOVE AND DISPOSE ALL LAY-IN CEILING TILES IN ROOM G04 AND
G05 AS GENERAL CONSTRUCTION DEBRIS.
2. CLEAN ALL SURFACES (FLOORS, CEILING STRUCTURE, AND WALLS) IN
ROOM G05.
ASBESTOS ABATEMENT NOTES:
1. ABATEMENT CONTRACTOR SHALL REMOVE ALL ASBESTOS-CONTAINING
MATERIALS IN THE MARKED AREAS IDENTIFIED (PIPE SYSTEM INSULATION AND
FITTINGS).
2. ABATEMENT CONTRACTOR TO UTILIZE GLOVE BAG METHODS, AS NEEDED, TO
ABATE ASBESTOS CONTAINING LAGGING IN ORDER TO DISCONNECT AND REMOVE
FAN COIL UNITS.
3. ABATEMENT CONTRACTOR SHALL REMOVE PIPE WRAP AND PIPE FITTINGS VIA
GLOVE BAG METHODS ACCORDING TO APPLICABLE RULES AND REGULATIONS OR
GROSS REMOVAL WITHIN A FULL CONTAINMENT.
INFORMATION CONCERNING THE LOCATION(S) AND SIZES OF EXISTING MECHANICAL EQUIPMENT, ELECTRICAL EQUIPMENT, PIPING, PLUMBING AND DUCTWORK WAS OBTAINED FROM ORIGINAL
DESIGN DRAWINGS AND/OR CURSORY FIELD OBSERVATION, HOWEVER, ACTUAL "ASBUILT"
DRAWINGS WERE NOT AVAILABLE, CERTAIN INFORMATION CONCERNING THE LOCATION OF THE
EXISTING MECHANICAL EQUIPMENT, ELECTRICAL EQUIPMENT, PIPING, PLUMBING AND DUCTWORK HAS BEEN ASSUMED IN THIS DRAWING. THE EXACT LOCATION(S) AND DIRECTION OF FLOW OF ALL EXISTING WORK IS UNKNOWN. REASONABLE EFFORT HAS BEEN MADE TO ACCURATELY DEPICT THE
EXISTING CONDITIONS, HOWEVER, ALL EXISTING WORK MUST BE VERIFIED IN THE FIELD TO
DETERMINE THE EXACT LOCATIONS, DIRECTIONS OF FLOW, DEPTH, SIZE, ETC.. PRIOR TO STARTING CONSTRUCTION. ANY CONFLICT BETWEEN THESE PLANS AND ACTUAL FIELD CONDITIONS SHALL BE
REPORTED IMMEDIATELY TO THE ENGINEER FOR VERIFICATION AND/OR CORRECTION.
FIELD VERIFY:
1. ASBESTOS-CONTAINING PIPE INSULATION - APPROXIMATELY 550 LINEAR FEET.
2. ASBESTOS-CONTAINING PIPE FITTINGS - APPROXIMATELY 25 TOTAL.
ASBESTOS ABATEMENT ESTIMATE:
GJ101
BASEMENT HAZARDOUS MATERIAL
REMOVAL PLAN BUILDING 23
CONSULTANTS: ARCHITECT/ENGINEERS:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Drawing # of
Veterans Health
Administration
FCA - REPLACE MECHANICAL
EQUIPMENT IN BUILDINGS 23 & 25
657-20-109JB
www.daengineering.com www.daengineering.com voice (317) 464-9090 2707 Rand Road Indianapolis, Indiana 46241 fax (317) 464-9393
Mechanical, Electrical, and Energy Engineering
DESIGN-AIRE ENGINEERING, INC. JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
07-09-2021 DEH MV
ARCHITURA CORPORATION
9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384
PH: (317) 348-1000
POC: Michael Conly, AIA, NCARB, President
P R O F E S S I O N A L E N G I N E E R