JEFFERSON BARRACKS
FCA - REPLACE
MECHANICAL EQUIPMENT
IN BUILDINGS 23 & 25
US DEPARTMENT OF VETERANS AFFAIRS
VA ST. LOUIS HEALTH CARE SYSTEM
VA PROJECT NUMBER: 657-20-109JB
OVERALL CAMPUS SITE PLAN, BUILDING NUMBER, AND PROJECT LOCATOR
CONTACT INFORMATION
DRAWING INDEX LEGEND
BUILDING NUMBER SHEET TYPE DESIGNATORS
0 = GENERAL
1 = PLANS
2 = ELEVATIONS
3 = SECTIONS
4 = LARGE-SCALE VIEWS
5 = DETAILS
6 = SCHEDULES & DIAGRAMS
7 = USER DEFINED
8 = USER DEFINED
9 = 3D REPRESENTATIONS
DISCIPLINE DESIGNATORS EXAMPLES
GI = GENERAL INFORMATION
GC = GENERAL CONTRACT
GJ = ICRA
GR = PICTURES
CS = CIVIL SITE
AD = ARCHITECTURAL DEMOLITION
AS = ARCHITECTURAL SITE
AE = ARCHITECTURAL ELEMENTS
FLOOR PLANS, ELEVATIONS, DETAILS
AI = ARCHITECTURAL INTERIORS
AG = ARCHITECTURAL GRAPHICS
AF = ARCHITECTURAL FINISHES
AC = ARCHITECTURAL CEILING PLAN
AW = ARCHITECTURAL WAYFINDING
AP = ARCHITECTURAL SPACE PLANNING
FLOOR PLANS & SCHEDULES
AL = ARCHITECTURAL LIFE SAFETY
DRAWINGS
HA = HAZARDOUS MATERIALS
SG = STRUCTURAL GENERAL
SF = STRUCTURAL FRAMING
MD = MECHANICAL DEMOLITION
MG = MECHANICAL GENERAL
MH = MECHANICAL HVAC
MP = MECHANICAL PIPING
PG = PLUMBING MEDICAL GAS
PL = PLUMBING FIXTURES
ED = ELECTRICAL DEMOLITION
EG = ELECTRICAL GENERAL
EL = ELECTRICAL LIGHTING
EP = ELECTRICAL POWER
FLOOR NUMBER ON PLAN SHEETS
SHEET NUMBER
##-XX-###
COR: RANDY GOFFIN
314-652-4100, EXT 68193
RANDY.GOFFIN@VA.GOV
DAE: DAVE HAUN
317-464-9090
DHAUN@DAENGINEERING.COM
G001
GENERAL - COVER SHEET
CONSULTANTS: ARCHITECT/ENGINEERS:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Drawing # of
Veterans Health
Administration
FCA - REPLACE MECHANICAL
EQUIPMENT IN BUILDINGS 23 & 25
657-20-109JB
www.daengineering.com www.daengineering.com voice (317) 464-9090 2707 Rand Road Indianapolis, Indiana 46241 fax (317) 464-9393
Mechanical, Electrical, and Energy Engineering
DESIGN-AIRE ENGINEERING, INC. JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
07-09-2021 DEH MV
ARCHITURA CORPORATION
9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384
PH: (317) 348-1000
POC: Michael Conly, AIA, NCARB, President
P R O F E S S I O N A L E N G I N E E R
PE-2021014461
HANNAH
ROSE
KIGER
S
TA
TE
OF MI SSOUR
I
00-GI-001
23 & 25
BID DOCUMENTS
1 36
ICRA PLAN BUILDING 23
SCALE: 1/8" = 1'-0"
1. PHASE 1 WORK TO BE DONE DURING EVENING HOURS AND/OR OVER WEEKEND HOURS.
2. PHASE 2 WORK TO BE DONE DURING EVENING HOURS AND/OR OVER WEEKEND HOURS.
3. DOOR COVERING TO MEET/EXCEED JEFFERSON BARRACKS ICRA STANDARDS. VERIFY WITH COR.
SPECIALTY NOTES:
A. SECURITY
1. CONTRACTOR SHALL NOT LEAVE DOORS PROPPED OPEN.
2. CONTRACTOR SHALL NOT LEAVE TOOLS OR LADDERS UNATTENDED.
3. CONTRACTOR SHALL NOT LEAVE ELECTRICAL OR DATA PANELS EXPOSED.
B. PHOTOGRAPHY
1. NO PHOTOGRAPHY OF VA PREMISES IS ALLOWED WITHOUT WRITTEN PERMISSION OF THE COR. IF
PERMISSION IS GRANTED BY THE COR, NO PHOTOGRAPHY IS PERMITTED OF PERSONNEL,
PATIENTS, COMPUTER SCREENS, LICENSE PLATES, OR ANY OTHER SENSITIVE MATERIAL AS
DETERMINED BY THE COR.
C. BADGING
1. ALL CONTRACTOR PERSONNEL ARE REQUIRED TO DISPLAY VA BADGE WHEN WORKING ON
STATION.
2. TWO-WEEK NOTICE IS REQUIRED FOR BADGING OF CONTRACTOR PERSONNEL REQUIRING A
FLASH PASS/BADGE ABOVE WAIST.
D. KEYS
1. COORDINATE WITH VA COR FOR ACCESS AND ISSUING OF KEYS.
E. JOBSITE PLAN
1. JOBSITE PLAN MUST BE SUBMITTED PRIOR TO COMMENCEMENT OF WORK
a. INCLUDES
1. ENTRANCES USED
2. MATERIAL MOVEMENT PLAN
3. RESTROOMS TO BE USED
4. LIST OF SUBCONTRACTORS
5. SITE PLAN (LAYDOWN AREA, JOBSITE TRAILER LOCATION, DUMPSTER LOCATION)
6. PERSONNEL ON SITE
F. TRAILER STORAGE
1. CONTRACTORS ARE REQUIRED TO COORDINATE TRAILER STORAGE LOCATION WITH COR.
G. CONTRACTOR SHALL NOTIFY COR OF ANY MATERIAL REMOVED CONTAINING EE# OR MAXIMO
NUMBER.
1. CONTRACTOR SHALL NOTIFY COR OF ANY NEW EQUIPMENT AND/OR SPECIFIC REQUIREMENTS
FOR EQUIPMENT (I.E. SPECIAL OUTLETS, ADEQUATE BREAKER SIZE, ETC.). (MAKE, MODEL,
SERIAL NUMBER)
H. UTILITY SHUTDOWNS
1. MUST BE COORDINATED WITH COR 21 DAYS IN ADVANCE.
I. FIRESTOPPING
1. INSTALL TEMPORARY FIRESTOPPING IN ALL NEW CORE DRILLED PENETRATIONS IN FLOOR AND
WALLS. ENSURE FIRESTOPPING IS MAINTAINED THROUGHOUT CONSTRUCTION UNTIL
PENETRATIONS ARE PERMANENTLY FIRE STOPPED.
K. FIRE ALARM/SPRINKLER
1. IF FIRE ALARM AND/OR SPRINKLER SYSTEM IS DISABLED DURING CONSTRUCTION, HEAT
DETECTION MUST BE PROVIDED. SIEMENS MUST MAKE FINAL TERMINATIONS AND PROGRAM
INTO EXISTING FIRE ALARM SYSTEM.
J. ILSM
1. TEMPORARY FIRE EXTINGUISHERS SHALL BE APPROPRIATELY MOUNTED AND SPACED
DURING CONSTRUCTION FOR HOUSEKEEPING AND SAFETY REQUIREMENTS.
a. TRAVEL DISTANCE FROM ANY POINT OF THE PROTECTED AREA TO THE NEAREST FIRE
EXTINGUISHER SHALL NOT EXCEED 100 FEET.
K. EXIT PATHS MUST BE LITTER/DEBRIS FREE
L. THE CONTRACTOR IS RESPONSIBLE FOR MOVING, STORING AND PROTECTING ALL EXISTING
FURNITURE AND EQUIPMENT IN EACH AREA FOR THE DURATION OF THE PROJECT. FURNITURE
AND EQUIPMENT DAMAGED BY THE CONTRACTOR WILL BE REPLACED OR RESTORED TO
COMPLETE FUNCTIONALITY AND APPEARANCE BY THE CONTRACTOR AT NO COST TO THE VA.
M. THE CONTRACTOR IS RESPONSIBLE FOR MOVING, STORING AND PROTECTING ALL EXISTING
FURNITURE AND EQUIPMENT IN EACH AREA FOR THE DURATION OF THE PROJECT. FURNITURE
AND EQUIPMENT DAMAGED BY THE CONTRACTOR WILL BE REPLACED OR RESTORED TO
COMPLETE FUNCTIONALITY AND APPEARANCE BY THE CONTRACTOR AT NO COST TO THE VA.
MEN
TOILET
G12
STORAGE
G13
WASH
ROOM
G13A
TRASH
ROOM
G13B
BATTERY
STORAGE
G13C
STORAGE
G14
WOMEN
LOCKER
G15
WOMEN
TOILET
G16
MECHANICAL
ROOM
G17
EP
FEC
C O
N N
EC
TI
N G
C O
R R
ID
O
R C
O N
N
EC
TI
N
G C
O R
R
ID
O R
CONFERENCE
ROOM
G04
WORK
ROOM
G05
OFFICE
G01A
DME SUPPLY/
DISTRIBUTION
G01
ELECT
ROOM
G03
MECH.
ROOM
G02
CORRIDOR
H003
ELEVATOR
E-1
STAIRWELL
NO. 1
S1
STAIRWELL
NO. 2
S2
CHARGING
STATION
G07
STORAGE
G08
FES
STORAGE
G09A
FES
STORAGE
G09
SAFETY
OFFICE
G10
MALE
LOCKER
G11
IN-HOUSE
CONSTRUCTION/
STORAGE
G23
PROSTHETICS
STORAGE
G26
CORRIDOR
H002
OI&T
CLOSET
H002A
DOCK
AREA
CORRIDOR
H001
PROSTHETICS
STORAGE
G25
GJ101
ICRA PLAN BUILDING 23
CONSULTANTS: ARCHITECT/ENGINEERS:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Drawing # of
Veterans Health
Administration
FCA - REPLACE MECHANICAL
EQUIPMENT IN BUILDINGS 23 & 25
657-20-109JB
www.daengineering.com www.daengineering.com voice (317) 464-9090 2707 Rand Road Indianapolis, Indiana 46241 fax (317) 464-9393
Mechanical, Electrical, and Energy Engineering
DESIGN-AIRE ENGINEERING, INC. JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
07-09-2021 DEH MV
ARCHITURA CORPORATION
9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384
PH: (317) 348-1000
POC: Michael Conly, AIA, NCARB, President
P R O F E S S I O N A L E N G I N E E R
PE-2021014461
HANNAH
ROSE
KIGER
S
TA
TE
OF MI SSOUR
I
23-GJ-1B1
2 36
H101
H102
H103
109 110 111 112
114 115 116
113A
H103A
112A
123A
106A
112B
H201
H203
212A
210 209
209A
209B
209C 209D
201A
207 205
208A
204D
208B
H301
303A
304 305 306
308A
308B 308C
309 310
312304A 307A
309A
AREA OF WORK
FIRST FLOOR ICRA PLAN BUILDING 25
SCALE: 1/8" = 1'-0"
SECOND FLOOR ICRA PLAN BUILDING 25
SCALE: 1/8" = 1'-0"
THIRD FLOOR ICRA PLAN BUILDING 25
SCALE: 1/8" = 1'-0"
DOOR WITH WALK
OFF MAT
AREA OF WORK
DOOR WITH WALK
OFF MAT
AREA OF WORK
DOOR WITH WALK
OFF MAT
SPECIALTY NOTES:PLAN NOTES:
1. ALL WORK TO BE DONE DURING EVENING
HOURS AND/OR OVER WEEKEND.
2. DOOR COVERING TO MEET/EXCEED
JEFFERSON BARRACKS ICRA STANDARDS.
VERIFY WITH COR.
A. SECURITY
1. CONTRACTOR SHALL NOT LEAVE DOORS PROPPED OPEN.
2. CONTRACTOR SHALL NOT LEAVE TOOLS OR LADDERS UNATTENDED.
3. CONTRACTOR SHALL NOT LEAVE ELECTRICAL OR DATA PANELS EXPOSED.
B. PHOTOGRAPHY
1. NO PHOTOGRAPHY OF VA PREMISES IS ALLOWED WITHOUT WRITTEN PERMISSION OF THE COR.
IF PERMISSION IS GRANTED BY THE COR, NO PHOTOGRAPHY IS PERMITTED OF PERSONNEL,
PATIENTS, COMPUTER SCREENS, LICENSE PLATES, OR ANY OTHER SENSITIVE MATERIAL AS
DETERMINED BY THE COR.
C. BADGING
1. ALL CONTRACTOR PERSONNEL ARE REQUIRED TO DISPLAY VA BADGE WHEN WORKING ON
STATION.
2. TWO-WEEK NOTICE IS REQUIRED FOR BADGING OF CONTRACTOR PERSONNEL REQUIRING A
FLASH PASS/BADGE ABOVE WAIST.
D. KEYS
1. COORDINATE WITH VA COR FOR ACCESS AND ISSUING OF KEYS.
E. JOBSITE PLAN
1. JOBSITE PLAN MUST BE SUBMITTED PRIOR TO COMMENCEMENT OF WORK
a. INCLUDES
1.1. ENTRANCES USED
1.2. MATERIAL MOVEMENT PLAN
1.3. RESTROOMS TO BE USED
1.4. LIST OF SUBCONTRACTORS
1.5. SITE PLAN (LAYDOWN AREA, JOBSITE TRAILER LOCATION, DUMPSTER LOCATION)
1.6. PERSONNEL ON SITE
F. TRAILER STORAGE
1. CONTRACTORS ARE REQUIRED TO COORDINATE TRAILER STORAGE LOCATION WITH COR.
G. CONTRACTOR SHALL NOTIFY COR OF ANY MATERIAL REMOVED CONTAINING EE# OR MAXIMO
NUMBER.
1. CONTRACTOR SHALL NOTIFY COR OF ANY NEW EQUIPMENT AND/OR SPECIFIC REQUIREMENTS
FOR EQUIPMENT (I.E. SPECIAL OUTLETS, ADEQUATE BREAKER SIZE, ETC.). (MAKE, MODEL,
SERIAL NUMBER)
H. UTILITY SHUTDOWNS
1. MUST BE COORDINATED WITH COR 21 DAYS IN ADVANCE.
I. FIRESTOPPING
1. INSTALL TEMPORARY FIRESTOPPING IN ALL NEW CORE DRILLED PENETRATIONS IN FLOOR
AND WALLS. ENSURE FIRESTOPPING IS MAINTAINED THROUGHOUT CONSTRUCTION UNTIL
PENETRATIONS ARE PERMANENTLY FIRE STOPPED.
J. FIRE ALARM/SPRINKLER
1. IF FIRE ALARM AND/OR SPRINKLER SYSTEM IS DISABLED DURING CONSTRUCTION, HEAT
DETECTION MUST BE PROVIDED. SIEMENS MUST MAKE FINAL TERMINATIONS AND PROGRAM
INTO EXISTING FIRE ALARM SYSTEM.
K. ILSM
1. TEMPORARY FIRE EXTINGUISHERS SHALL BE APPROPRIATELY MOUNTED AND SPACED DURING
CONSTRUCTION FOR HOUSEKEEPING AND SAFETY REQUIREMENTS.
L. TRAVEL DISTANCE FROM ANY POINT OF THE PROTECTED AREA TO THE NEAREST FIRE
EXTINGUISHER SHALL NOT EXCEED 100 FEET. ALL EXIT PATHS MUST BE LITTER/ DEBRIS FREE.
M. THE CONTRACTOR IS RESPONSIBLE FOR MOVING, STORING AND PROTECTING ALL EXISTING
FURNITURE AND EQUIPMENT IN EACH AREA FOR THE DURATION OF THE PROJECT. FURNITURE
AND EQUIPMENT DAMAGED BY THE CONTRACTOR WILL BE REPLACED OR RESTORED TO
COMPLETE FUNCTIONALITY AND APPEARANCE BY THE CONTRACTOR AT NO COST TO THE VA.
GJ201
ICRA PLAN BUILDING 25
CONSULTANTS: ARCHITECT/ENGINEERS:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Drawing # of
Veterans Health
Administration
FCA - REPLACE MECHANICAL
EQUIPMENT IN BUILDINGS 23 & 25
657-20-109JB
www.daengineering.com www.daengineering.com voice (317) 464-9090 2707 Rand Road Indianapolis, Indiana 46241 fax (317) 464-9393
Mechanical, Electrical, and Energy Engineering
DESIGN-AIRE ENGINEERING, INC. JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
07-09-2021 DEH MV
ARCHITURA CORPORATION
9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384
PH: (317) 348-1000
POC: Michael Conly, AIA, NCARB, President
P R O F E S S I O N A L E N G I N E E R
PE-2021014461
HANNAH
ROSE
KIGER
S
TA
TE
OF MI SSOUR
I
25-GJ-11232
3 36
GJ201
ICRA CONSTRUCTION DETAILS
CONSULTANTS: ARCHITECT/ENGINEERS:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Drawing # of
Veterans Health
Administration
FCA - REPLACE MECHANICAL
EQUIPMENT IN BUILDINGS 23 & 25
657-20-109JB
www.daengineering.com www.daengineering.com voice (317) 464-9090 2707 Rand Road Indianapolis, Indiana 46241 fax (317) 464-9393
Mechanical, Electrical, and Energy Engineering
DESIGN-AIRE ENGINEERING, INC. JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
07-09-2021 DEH MV
ARCHITURA CORPORATION
9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384
PH: (317) 348-1000
POC: Michael Conly, AIA, NCARB, President
P R O F E S S I O N A L E N G I N E E R
PE-2021014461
HANNAH
ROSE
KIGER
S
TA
TE
OF MI SSOUR
I
00-GJ-003
23/25
ANTE ROOM
ELEVATION
AREA UNDER
FRAMED
PICTURE
OF
C.O.R.
ICRA, ILSM
FIRE WATCH
MISC. FORMS
PAPER
CADDY
GENERAL NOTES:
LOW RISK
OFFICE AREAS
PATIENT RISK GROUPS
MEDIUM RISK HIGH RISK HIGHEST RISK
CARDIOLOGY CCU ANY AREA CARING FOR
ECHOCARDIOGRAPHY
ENDOSCOPY
NUCLEAR MEDICINE
PHYSICAL THERAPY
RADIOLOGY/MRI
RESPIRATORY THERAPY
EMERGENCY ROOM
LABOR & DELIVERY
LABORATORY (SPECIMEN)
NEWBORN NURSERY
OUTPATIENT SURGERY
PEDIATRICS
IMMUNOCOMPROMISED PATIENTS
BURN UNIT
CARDIAC CATH LAB
CENTRAL STERILE SUPPLY
INTENSIVE CARE UNITS
MEDICAL UNIT
PHARMACY
POST ANESTHESIA CARE UNIT
SURGICAL UNITS
NEGATIVE PRESSURE ISOLATION ROOMS
ONCOLOGY
OPERATING ROOMS INCLUDING
C-SECTION ROOMS
LOW RISK GROUP
CONSTRUCTION PROJECT TYPE
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
RISK RELATED GROUP TYPE A TYPE B TYPE C TYPE D
I II II III/IV
II
II III/IV
III/IV
III
III/IV
IV
IV
IV
I
I
II
CONSTRUCTION PROJECT BY PATIENT RISK
IC MATRIX - CLASS OF PRECAUTIONS:
INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK
NOTE:
C
LA
SS
V
1. ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL
AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH
PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS IF INDICATED.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL.
8. ROOM AND/OR SHALL BE THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL
SERVICES DEPARTMENT.
2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
5. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.
6. WET MOP AREA WITH DISINFECTANT.
SO THEY CAN BE VACUUMED USING HEPA VACUUM CLEANER BEFORE LEAVING WORK
SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH
TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS.
SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.
SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH
TIME THEY LEAVE THE WORK SITE.
3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
7. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
CONSTRUCTION
RESTRICTED AREA
THIS IS A
CONST. SUPERVISOR
NAME AND
CELL PHONE
XXXXXX XXXX XXXX
CHILLER PLANT AFTER HOURS
CONTACT PHONE 82329
FIRE EMERGENCY DIAL 911
XXXXXX XXXX XXXX
XXXXXX XXXX XXXX
CLASS IV WORK ITEMS NOTES:
LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.
WITH CONTACT
INFORMATION
TYPICAL ALTERNATIVE
CONSTRUCTION LAYOUT
CLASS IV
CROSS-SECTION 'A-A'
MOBILE CONTAINMENT CARTC
O R
R
ID
O R
H
A L
L W
A Y
CLASS IV
(CONST. BARRIER TYPES)
PRIOR TO ANY CONSTRUCTION
POST CONSTRUCTION
1. OBTAIN APPROVAL BY MCOT TEAM TO REMOVE BARRIERS.
E1
F1
C4 C8
4 36
GR101
PICTURES BUILDING 23 & 25
CONSULTANTS: ARCHITECT/ENGINEERS:
Revisions: Date:
Drawing Title
VA Health Care System Approval:
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Drawing # of
Veterans Health
Administration
FCA - REPLACE MECHANICAL
EQUIPMENT IN BUILDINGS 23 & 25
657-20-109JB
www.daengineering.com www.daengineering.com voice (317) 464-9090 2707 Rand Road Indianapolis, Indiana 46241 fax (317) 464-9393
Mechanical, Electrical, and Energy Engineering
DESIGN-AIRE ENGINEERING, INC. JEFFERSON BARRACKS
1 JEFFERSON BARRACKS DRIVE - ST. LOUIS, MO 63125
07-09-2021 DEH MV
ARCHITURA CORPORATION
9880 Westpoint Drive, Suite #400 Indianapolis, IN 46256-3384
PH: (317) 348-1000
POC: Michael Conly, AIA, NCARB, President
P R O F E S S I O N A L E N G I N E E R
PE-2021014461
HANNAH
ROSE
KIGER
S
TA
TE
OF MI SSOUR
I
EXISTING FC1 - BUILDING 23 EXISTING FC2 - BUILDING 23 EXISTING FC3 - BUILDING 23
EXISTING FC4 - BUILDING 23 EXISTING FC5 - BUILDING 23 EXISTING FC6 - BUILDING 23
EXISTING FC7A - BUILDING 23 EXISTING FC7B - BUILDING 23
EXISTING AHU-1 - BUILDING 25 EXISTING AHU-2 - BUILDING 25
EXISTING AHU-3 - BUILDING 25 EAST ELEVATION
00-GR-001
23 & 25
BID DOCUMENTS
A1 A3 A5 A7
C1 C3 C5 C7 C9
E1 E3
A9
NORTHEAST ELEVATIONE5 ELECTRICAL CONTROLS & STARTERE7