Parkers River TTCP SHT20.pdf

PDF 764 KB Posted

Attached to
Parkers River Bridge
Solicitation number
BD-19-1355-TYARM-YADPW-40968
Issued by
Barnstable County, Massachusetts

About this file

This document is a Traffic Control Plan related to the Parkers River Bridge Replacement and Widening project in Massachusetts. The project involves diverting traffic to temporary travel lanes during construction, demolishing the existing bridge, and constructing the remaining portion of the proposed bridge. Key activities include installing temporary barriers, fences, and impact attenuators, turning off existing water gate valves, constructing a new water main, and building sidewalks, curbs, and guardrails.

The document provides details on the construction phasing, with Phase 3 focused on the south portion of the bridge and Phase 4 on the north portion. No specific bid due dates, award information, or contract term details are included in this document.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FED. AID PROJ. NO.

SHEET

NO.

TOTAL

SHEETS

YARMOUTH

MAIN STREET (ROUTE 28)

STATE

MA

PROJECT FILE NO.

T

R T

T C

D

W G

J u n

T

R T

T C

D

W G

J u n

TRAFFIC PHASE 4

SCALE: 1"=30'

TEMPORARY TRAFFIC CONTROL PLAN

SCALE: 1" = 30'

0 60 100

TRAFFIC PHASE 3

SCALE: 1"=30'

PHASE 3

1. DIVERT TRAFFIC TO TEMPORARY TRAVEL LANES ON

NEW SOUTH PORTION OF THE BRIDGE.

2. INSTALL TEMPORARY BARRIER, CHAIN LINK FENCE

AND TEMP. IMPACT ATTENUATORS ON NORTH SIDE OF

THE NEW SOUTH PORTION OF THE BRIDGE.

3. TURN OFF EXISTING 10" WATER GATE VALVES ON

BOTH SIDES OF EXISTING BRIDGE.

4. DEMOLISH REMAINING PORTION OF THE EXISTING

BRIDGE.

5. CONSTRUCT REMAINING PORTION OF THE PROPOSED

BRIDGE.

6. CONSTRUCT PROPOSED WATER MAIN.

7. CONSTRUCT SIDEWALK, CURB AND GUARDRAIL ON

THE NORTH SIDE OF THE ROADWAY.

PHASE 4

1. DIVERT TRAFFIC TO TEMPORARY TRAVEL LANES ON

NEW NORTH PORTION OF THE BRIDGE

2. CONSTRUCT SIDEWALK AND CURB ON THE SOUTH

SIDE OF THE ROADWAY.

3. CONSTRUCT DRIVEWAY ENTRANCES ON THE

SOUTHERN SIDE OF THE ROADWAY.

SIGN

TEMPORARY

IMPACT ATTENUATOR

REFLECTORIZED PLASTIC DRUM

DIRECTION OF TRAVEL

WORK ZONE

TEMP BARRIER

TEMPORARY CHAIN LINK FENCEX

DOUBLE FACED TEMP. CONCRETE

RESTRAINED BARRIER

ADDENDUM NO. 2

REPLACE SHEET NO. 20

DATED 11-JUN-2019