About this file
This document is a Traffic Control Plan related to the Parkers River Bridge Replacement and Widening project in Massachusetts. The project involves diverting traffic to temporary travel lanes during construction, demolishing the existing bridge, and constructing the remaining portion of the proposed bridge. Key activities include installing temporary barriers, fences, and impact attenuators, turning off existing water gate valves, constructing a new water main, and building sidewalks, curbs, and guardrails.
The document provides details on the construction phasing, with Phase 3 focused on the south portion of the bridge and Phase 4 on the north portion. No specific bid due dates, award information, or contract term details are included in this document.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FED. AID PROJ. NO.
SHEET
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
T
R T
T C
D
W G
J u n
T
R T
T C
D
W G
J u n
TRAFFIC PHASE 4
SCALE: 1"=30'
TEMPORARY TRAFFIC CONTROL PLAN
SCALE: 1" = 30'
0 60 100
TRAFFIC PHASE 3
SCALE: 1"=30'
PHASE 3
1. DIVERT TRAFFIC TO TEMPORARY TRAVEL LANES ON
NEW SOUTH PORTION OF THE BRIDGE.
2. INSTALL TEMPORARY BARRIER, CHAIN LINK FENCE
AND TEMP. IMPACT ATTENUATORS ON NORTH SIDE OF
THE NEW SOUTH PORTION OF THE BRIDGE.
3. TURN OFF EXISTING 10" WATER GATE VALVES ON
BOTH SIDES OF EXISTING BRIDGE.
4. DEMOLISH REMAINING PORTION OF THE EXISTING
BRIDGE.
5. CONSTRUCT REMAINING PORTION OF THE PROPOSED
BRIDGE.
6. CONSTRUCT PROPOSED WATER MAIN.
7. CONSTRUCT SIDEWALK, CURB AND GUARDRAIL ON
THE NORTH SIDE OF THE ROADWAY.
PHASE 4
1. DIVERT TRAFFIC TO TEMPORARY TRAVEL LANES ON
NEW NORTH PORTION OF THE BRIDGE
2. CONSTRUCT SIDEWALK AND CURB ON THE SOUTH
SIDE OF THE ROADWAY.
3. CONSTRUCT DRIVEWAY ENTRANCES ON THE
SOUTHERN SIDE OF THE ROADWAY.
SIGN
TEMPORARY
IMPACT ATTENUATOR
REFLECTORIZED PLASTIC DRUM
DIRECTION OF TRAVEL
WORK ZONE
TEMP BARRIER
TEMPORARY CHAIN LINK FENCEX
DOUBLE FACED TEMP. CONCRETE
RESTRAINED BARRIER
ADDENDUM NO. 2
REPLACE SHEET NO. 20
DATED 11-JUN-2019
File details come from the government source that posted it. Updated .