Addendum 2 Parkers River.pdf
PDF 664 KB Posted
- Attached to
- Parkers River Bridge
- Solicitation number
- BD-19-1355-TYARM-YADPW-40968
- Issued by
- Barnstable County, Massachusetts
About this file
This document is an Addendum No. 2 issued by the Town of Yarmouth Department of Public Works for the Invitation For Bid on the Parkers River Bridge Complete Replacement and Widening project. The addendum makes several changes, including removing and replacing drawing sheets, updating prevailing wage information, adding missing bid form pages, providing the geotechnical report as an attachment, and modifying various bid requirements and conditions. The project is located in Massachusetts.
The addendum clarifies bid evaluation criteria, updates the timeframe for contract award, provides details on utility work to be performed by others, and makes other revisions to the supplementary conditions. Pricing terms, set-asides, funding sources, and other salient information are not provided in this addendum, which focuses on administrative and technical changes to the bid documents.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO.2
Town of Yarmouth Department of Public Works 99 Buck Island Road West Yarmouth , MA 02673
DATE ISSUED: June 24, 2019 TO: All Respondents of Record SUBJECT: Invitation For Bid:
Parkers River Bridge Complete Replacement and Widening
ADDENDUM NO.2
1. Plans: Remove Sheet No. 20 dated l1-Jun-2019 and replace with new sheet No.
20 dated 21-Jrn-2019.
2. Introduction to Invitation f,'or Bids page 1.2; Under Prevailing wage section please cross out "request number 20171213-042 and insert " request number 20190613-035".
3. Section 00410-Form for General Bid. Pages 00410-6 through 00410-15 were accidently omitted from the Invitation for bid documents. Please include these pages.
4. Attachment K. Geotech Report is attachment K and is part of the IFB documents
5. Introduction to Bidders Page 00100-7, Article 14 Base of Bid 14.1 Letter E;
Please cross out "the lowest eligible bid" and insert " the lowest Responsible and Responsive bidder whose evaluation is in the best interest ofthe project."
6. Introduction to Bidders Page 00100-10 Article 21.2; please cross out "within 15 day" and insert "within 10 business days"
7. Introduction to Bidders Page 00100-10 Article 23.2 Massachusetts Prevailing
Wage Rates; Please cross out the last sentence " The Wage Rate Determination is included in Part II ofthe Supplementary Conditions.' Insert "The Prevailing Wage Rates pages with Wage request Number 20190613-035 are attachment A."
8. USDA form AD-1048; Please remove pages 1 & 2 with expiration date of 1213112018 and replace with USDA Form AD-1048 pages 1 & 2 with expiration date of 4130/2022.
9. Supplementary Conditions 00800; Page 008001, Article 1 SC-1.01, please delete "through Division 16."
10. Supplementary Conditions 00800; Page 00800-4, Please add "SC.7.02 D-
Reference to MassDOT Special provisions Sp-3 work schedule".
1l. Supplementary Conditions 00800; Page 00800-4; Please Remove SC.7.08
12. Supplementary Conditions 00800; Page 00800-5; please add "Article 8 SC-8.01
The following work by others is estimated as National Grid new gas main and associated services, Verizon underground Fiber Optic and Utility pole relocations and associated wire transfers.
13. Supplementary Conditions 00800; Page 00800-7, Article 14, Please add; SC-
14.01 MassDOT special provisions for curb cut access.
Addendum #2 Page I
14. Supplementary Conditions 00800; Page 00800-7, Article 15, SC-l5.0l,Please cross out Tighe & Bond and insert Louis Berger U.S. Inc.
15. Supplementary Conditions 00800; Page 00800-10 Article 19, SC-19.014, Please add in the first sentence after funds provided by " DER, MA Division of Ecological Restorations, NOAA:National Oceanic and Atmospheric Administration, NRCS: Natural Resource Conservation Service"
Please sign below as receipt of ADDENDUM NO. 2 and include this page with your submission.
We have received and acknowledge ADDENDUM NO. 2 as part of IFB- Parkers River Bridge Complete Replacement and Widening
Company Name:
Authorized Signature: Date:
Addendum #2Page2