20190611 PSE Parkers PLANS - FINAL.pdf
PDF 26 MB Posted
- Attached to
- Parkers River Bridge
- Solicitation number
- BD-19-1355-TYARM-YADPW-40968
- Issued by
- Barnstable County, Massachusetts
About this file
This document appears to be the final construction plans for the Parkers River Bridge Complete Replacement and Widening project located in Massachusetts. The project is being managed by the state.
The plans outline the complete replacement and widening of the Parkers River Bridge. No specific item quantities or response dates are provided. The document does not mention any site visits, bidders meetings, award dates, or contract term.
The plans do not contain any details regarding pricing, set asides, incumbents, funding sources or requirements, or other salient commercial information.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X X
20'
20'
M
DBYL
DBWL
BWL
SWL
CW
SL
DYLEx
DWLEx
DYL
BYL
DWL
SYL
JB
CB
FP
GP
MB
WELL
EHH
GG
BHL #
MW #
TP #
MHB
TPL or GUY
UFB
UPDL
ULT
UPL
WG
PM
GENERAL SYMBOLS
EXISTING PROPOSED DESCRIPTION
JERSEY BARRIER ON BRIDGE OR JERSEY BARRIER
CATCH BASIN
CATCH BASIN CURB INLET
FLAG POLE
GAS PUMP
MAIL BOX
POST SQUARE
POST CIRCULAR
WELL
ELECTRIC HANDHOLE
FENCE GATE POST
GAS GATE
BORING HOLE
MONITORING WELL
TEST PIT
HYDRANT
LIGHT POLE
COUNTY BOUND
GPS POINT
CABLE MANHOLE
DRAINAGE MANHOLE
ELECTRIC MANHOLE
GAS MANHOLE
MISC MANHOLE
SEWER MANHOLE
TELEPHONE MANHOLE
WATER MANHOLE
MASSACHUSETTS HIGHWAY BOUND
MONUMENT
STONE BOUND
TOWN OR CITY BOUND
TRAVERSE OR TRIANGULATION STATION
TROLLEY POLE OR GUY POLE
TRANSMISSION POLE
UTILITY POLE W/ FIREBOX
UTILITY POLE WITH DOUBLE LIGHT
UTILITY POLE W / 1 LIGHT
UTILITY POLE
BUSH
TREE
STUMP
SWAMP / MARSH
WATER GATE
PARKING METER
OVERHEAD CABLE/WIRE
CURBING
CONTOURS
UNDERGROUND DRAIN PIPE (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND ELECTRIC DUCT (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND GAS MAIN (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND SEWER MAIN (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND TELEPHONE DUCT (DOUBLE LINE 24 INCH AND OVER)
UNDERGROUND WATER MAIN (DOUBLE LINE 24 INCH AND OVER)
BALANCE STONE WALL
GUARD RAIL - STEEL POSTS
GUARD RAIL - WOOD POSTS
CHAIN LINK OR METAL FENCE
WOOD FENCE
HAY BALES/SILT FENCE
TREE LINE OR LIMIT OF CLEARING AND GRUBBING
SAWCUT LINE
TOP OR BOTTOM OF SLOPE
LIMIT OF EDGE OF PAVEMENT OR COLD PLANE AND OVERLAY
BANK OF RIVER OR STREAM
BORDER OF WETLAND
100 FT WETLAND BUFFER
200 FT RIVERFRONT BUFFER
STATE HIGHWAY LAYOUT
TOWN OR CITY LAYOUT
COUNTY LAYOUT
RAILROAD SIDELINE
TOWN OR CITY BOUNDARY LINE
PROPERTY LINE OR APPROXIMATE PROPERTY LINE
EASEMENT
PAVEMENT MARKINGS SYMBOLS
EXISTING PROPOSED DESCRIPTION
PAVEMENT ARROW - WHITE
LEGEND "ONLY" - WHITE
STOP LINE
CROSSWALK
SOLID WHITE LINE
SOLID YELLOW LINE
BROKEN WHITE LINE
BROKEN YELLOW LINE
DOTTED WHITE LINE
DOTTED YELLOW LINE
DOTTED WHITE LINE EXTENSION
DOTTED YELLOW LINE EXTENSION
DOUBLE WHITE LINE
DOUBLE YELLOW LINE
TRAFFIC SYMBOLS
EXISTING PROPOSED DESCRIPTION
SIGNAL POST AND BASE (ALPHA-NUMERIC DESIGNATION NOTED)
MAST ARM, SHAFT AND BASE (ARM LENGTH AS NOTED)
HIGH MAST POLE OR TOWER
SIGN AND POST
SIGN AND POST (2 POSTS)
MAST ARM WITH LUMINAIRE
OPTICAL PRE-EMPTION DETECTOR
CONTROL CABINET, GROUND MOUNTED
CONTROL CABINET, POLE MOUNTED
FLASHING BEACON CONTROL AND METER PEDESTAL
LOAD CENTER ASSEMBLY
PULL BOX 12"x12" (OR AS NOTED)
ELECTRIC HANDHOLE 12"x24" (OR AS NOTED)
TRAFFIC SIGNAL CONDUIT
ABBREVIATIONS
GENERAL
AADT ANNUAL AVERAGE DAILY TRAFFIC
ABAN ABANDON
ADJ ADJUST
APPROX. APPROXIMATE
A.C. ASPHALT CONCRETE
ACCM PIPE ASPHALT COATED CORRUGATED METAL PIPE
BIT. BITUMINOUS
BC BOTTOM OF CURB
BD. BOUND
BL BASELINE
BLDG BUILDING
BM BENCHMARK
BO BY OTHERS
BOS BOTTOM OF SLOPE
BR. BRIDGE
CB CATCH BASIN
CBCI CATCH BASIN WITH CURB INLET
CC CEMENT CONCRETE
CCM CEMENT CONCRETE MASONRY
CEM CEMENT
CI CURB INLET
CIP CAST IRON PIPE
CLF CHAIN LINK FENCE
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CSP CORRUGATED STEEL PIPE
CO. COUNTY
CONC CONCRETE
CONT CONTINUOUS
CONST CONSTRUCTION
CR GR CROWN GRADE
DHV DESIGN HOURLY VOLUME
DI DROP INLET
DIA DIAMETER
DIP DUCTILE IRON PIPE
DW STEADY DON'T WALK - PORTLAND ORANGE
DWY DRIVEWAY
ELEV (or EL.)
ELEVATION
EMB EMBANKMENT
EOP EDGE OF PAVEMENT
EXIST (or EX)
EXISTING
EXC EXCAVATION
F&C FRAME AND COVER
F&G FRAME AND GRATE
FDN. FOUNDATION
FLDSTN FIELDSTONE
GAR GARAGE
GD GROUND
GG GAS GATE
GI GUTTER INLET
GIP GALVANIZED IRON PIPE
GRAN GRANITE
GRAV GRAVEL
GRD GUARD
HDW HEADWALL
HMA HOT MIX ASPHALT
HOR HORIZONTAL
HYD HYDRANT
INV INVERT
JCT JUNCTION
L LENGTH OF CURVE
LB LEACH BASIN
LP LIGHT POLE
LT LEFT
MAX MAXIMUM
MB MAILBOX
MH MANHOLE
MHB MASSACHUSETTS HIGHWAY BOUND
MIN MINIMUM
NIC NOT IN CONTRACT
NO. NUMBER
PC POINT OF CURVATURE
PCC POINT OF COMPOUND CURVATURE
P.G.L. PROFILE GRADE LINE
PI POINT OF INTERSECTION
POC POINT ON CURVE
POT POINT ON TANGENT
PRC POINT OF REVERSE CURVATURE
PROJ PROJECT
PROP PROPOSED
PSB PLANTABLE SOIL BORROW
PT POINT OF TANGENCY
PVC POINT OF VERTICAL CURVATURE
PVI POINT OF VERTICAL INTERSECTION
PVT POINT OF VERTICAL TANGENCY
PVMT PAVEMENT
PWW PAVED WATER WAY
TRAFFIC SIGNAL
CAB. CABINET
CCVE CLOSED CIRCUIT VIDEO EQUIPMENT
DW STEADY DON'T WALK
FDW FLASHING DON'T WALK
FR FLASHING CIRCULAR RED
FRL FLASHING RED LEFT ARROW
FRR FLASHING RED RIGHT ARROW
FY FLASHING CIRCULAR AMBER
FYL FLASHING AMBER LEFT ARROW
FYR FLASHING AMBER RIGHT ARROW
G STEADY CIRCULAR GREEN
GL STEADY GREEN LEFT ARROW
GR STEADY GREEN RIGHT ARROW
GSL STEADY GREEN SLASH LEFT ARROW
GSR STEADY GREEN SLASH RIGHT ARROW
GV STEADY GREEN VERTICAL ARROW
OL OVERLAP
PED PEDESTRIAN
PTZ
PAN, TILE, ZOOM
R STEADY CIRCULAR RED
RL STEADY RED LEFT ARROW
RR STEADY RED RIGHT ARROW
TR SIG TRAFFIC SIGNAL
TSC TRAFFIC SIGNAL CONDUIT
W STEADY WALK
Y STEADY CIRCULAR AMBER
YL STEADY AMBER LEFT ARROW
ABBREVIATIONS (cont.)
GENERAL
R RADIUS OF CURVATURE
R&D REMOVE AND DISPOSE
RCP REINFORCED CONCRETE PIPE
RD ROAD
RDWY ROADWAY
REM REMOVE
RET RETAIN
RET WALL RETAINING WALL
ROW RIGHT OF WAY
RR RAILROAD
R&R REMOVE AND RESET
R&S REMOVE AND STACK
RT RIGHT
SB STONE BOUND
SHLD SHOULDER
SMH SEWER MANHOLE
ST STREET
STA STATION
SSD STOPPING SIGHT DISTANCE
SHLO STATE HIGHWAY LAYOUT LINE
SW SIDEWALK
T TANGENT DISTANCE OF CURVE/TRUCK %
TAN TANGENT
TEMP TEMPORARY
TC TOP OF CURB
TOS TOP OF SLOPE
TYP TYPICAL
UP UTILITY POLE
VAR VARIES
VERT VERTICAL
VC VERTICAL CURVE
WCR WHEEL CHAIR RAMP
WG WATER GATE
WIP WROUGHT IRON PIPE
WM WATER METER/WATER MAIN
X-SECT CROSS SECTION
FED. AID PROJ. NO.
SHEET
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
H
D L E
G E
N D
D
W G
J u n
H
D L E
G E
N D
D
W G
J u n
GENERAL NOTES & LEGEND
NOTES:
1. HORIZONTAL CONTROL IS BASED ON THE MASSACHUSETTS STATE PLANE COORDINATE SYSTEM NAD 1983(1996) VIA RTK
GPS UTILIZING MAINE TECHNICAL SOURCE BASE STATION. VERTICAL CONTROL IS BASED ON NAVD 88 VIA RTK GPS
UTILIZING MAINE TECHNICAL SOURCE BASE STATION.
2. THE EXISTING BASE MAPPING IS BASED ON FIELD SURVEY, PERFORMED BY BRYANT ASSOCIATES, OF BOSTON, MA IN
APRIL 2012 AND APRIL 2015. ALL HORIZONTAL AND VERTICAL LOCATIONS OF EXISTING FEATURES CRITICAL TO THE
DETERMINATION OF CONSTRUCTION DETAILS AND/OR FOR DETERMINATION OF SPECIFIC LIMITS OF WORK SHALL BE
VERIFIED BY THE CONTRACTOR IN THE FIELD PRIOR TO INITIATING CONSTRUCTION AND SUBMISSION OF APPLICABLE
SHOP DRAWINGS, IF REQUIRED PER CONTRACT SPECIFICATIONS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN
WRITING OF ANY EXISTING CONDITIONS IDENTIFIED AS A RESULT OF THIS EFFORT WHICH IMPACT WORK DETAILED ON
THESE DOCUMENTS IMMEDIATELY FOLLOWING COMPLETION OF THE SURVEY VERIFICATION.
3. DETAIL FOR THESE PLANS HAS BEEN GENERATED FROM FIELD SURVEY. THE CONTRACTOR SHALL VERIFY ALL
INFORMATION SHOWN IN THESE PLANS TO ENSURE THAT CONSTRUCTION CAN PROCEED AS INTENDED.
4. UTILITIES: LOCATION OF M.H., G.G., W.G., ETC. ARE APPROXIMATE AND ARE SHOWN ONLY AS AN AID TO ASSIST BIDDERS
IN DETERMINING LOCATIONS OF EXISTING UTILITIES AND SUBSURFACE STRUCTURES. THE CONTRACTOR IS
RESPONSIBLE FOR MAKING FIELD INVESTIGATIONS AND OBTAINING INFORMATION FROM UTILITY COMPANIES AND
INDIVIDUALS TO PINPOINT THE EXACT LOCATION AND ELEVATIONS OF ALL SUBSURFACE UTILITIES AND STRUCTURES. IT
IS THE CONTRACTOR'S RESPONSIBILITY THAT ALL DISCREPANCIES SHOULD BE BROUGHT TO THE ATTENTION OF THE
ENGINEER PRIOR TO PERFORMING ANY WORK.
5. WHERE NOTED, ADJUSTMENT OR REMOVAL OF GAS, TELEPHONE, AND ELECTRICAL STRUCTURES SHALL BE BY OTHERS.
ALSO, WHERE NOTED (R&S), REMOVE & STACK, OR (R&R), REMOVE & RESET, OF UTILITY POLES SHALL BE BY OTHERS.
6. GRANITE CURB: EXISTING CURB MARKED AS (R&R) SHALL BE RESET ALONG PROPOSED CURBING IF, IN THE OPINION OF
THE ENGINEER, IT IS IN GOOD CONDITION AND REUSABLE. OTHERWISE, IT SHALL BE DISCARDED BY THE CONTRACTOR
AS PER DIRECTION OF THE ENGINEER.
7. EXISTING DRAINAGE PIPES LABELED TO BE ABANDONED SHALL BE PLUGGED.
8. ALL CEMENT CONCRETE COLLAR JOINTS AROUND MANHOLES, WATER AND GAS GATES, HYDRANTS, UTILITY POLES, SIGNS, AND TRAFFIC SIGNAL POSTS SHALL BE SEALED WITH A 3/4" X 1/2" PREMOLDED FILLER AND MASTIC.
9. PAVEMENT: IN AREAS TO BE WIDENED, THE EXISTING PAVEMENT SHALL BE SAW CUT TO OBTAIN A STABLE VERTICAL
FACE. THE BOTTOM OF THE PROPOSED GRAVEL SHALL MEET OR EXCEED THE DEPTH OF THE BOTTOM GRAVEL UNDER
THE EXISTING PAVEMENT. BEFORE ANY HOT MIX ASPHALT MATERIALS ARE PLACED, THE STABLE VERTICAL FACE OF
THE EXISTING PAVEMENT SHALL BE CLEANED AND COATED WITH AN RS-1 EMULSION.
10. WITHIN AREAS OF RESURFACING OR RECONSTRUCTION, ALL EXISTING DRAINAGE MANHOLES, CATCH BASINS, SEWER
MANHOLES, AND WATER MANHOLES SHALL BE ADJUSTED TO THE PROPOSED LINE AND GRADE UNLESS OTHERWISE
NOTED ON THE PLANS.
11. ALL EXISTING WATER GATES TO BE RETAINED WITHIN AREAS OF RESURFACING OR RECONSTRUCTION SHALL BE
ADJUSTED TO PROPOSED LINE AND GRADE UNLESS OTHERWISE NOTED ON THE PLANS.
12. ALL PRIVATELY OWNED STRUCTURES (SIGNS, LIGHT, ETC.) LABELED R&R (BO) SHALL BE REMOVED AND RESET BY
OTHERS.
13. DRAINAGE ELEVATIONS ARE PROVIDED FOR DESIGN PURPOSES ONLY. THE CONTRACTOR SHALL VERIFY BY TEST PIT, THE LOCATIONS OF EXISTING UTILITIES WHICH MAY CONFLICT WITH THE PROPOSED DRAINAGE DESIGN. ANY FIELD
ADJUSTMENTS REQUIRED WILL BE MADE AS APPROVED OR DIRECTED BY THE ENGINEER. ONLY AFTER THE
CONTRACTOR VERIFIES ELEVATIONS FOR THE CONSTRUCTABILITY OF THE DRAINAGE SYSTEM SHALL ANY STRUCTURES
BE ORDERED. ANY FIELD ADJUSTMENTS TO LINE & GRADE UP TO A DEPTH OF 5' SHALL BE INCLUDED IN THE COST OF
THE PIPE. PIPE EXCAVATION GREATER THAN 5' WILL BE PAID UNDER CLASS B TRENCH EXCAVATION.
14. THE TERMS MICROMILLING AND COLD PLANE REFER TO THE ITEM PAVEMENT MICRO-MILLING.
JB
CB
FP
GP
MB
WELL
EHH
GG
BHL #
MW #
TP #
MHB
TPL or GUY
UFB
UPDL
ULT
UPL
G G
FED. AID PROJ. NO.
SHEET
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
H
D T
Y P
I C
A L D
W G
J u n
H
D T
Y P
I C
A L D
W G
J u n
TYPICAL SECTION
NOTE:
NEW GRAVEL BORROW SHALL BE USED IF EXISTING SUB-BASE IS
DETERMINED TO BE UNSUITABLE PER THE REQUIREMENTS OF MASSDOT
STANDARD SPECIFICATION SUBSECTION 170.60 AND M1.03.0 AND AS
DIRECTED BY THE ENGINEER.
GENERAL NOTES:
1. WHERE CURB IS TO BE SET IN PROP. AREAS OF
COLD PLANE & OVERLAY AND SIDEWALK
RECONSTRUCTION, REFER DETAIL ON SHEET 15
AND MASSDOT HIGHWAY STANDARD DETAIL
106.3.0.
2. SEE BRIDGE PLANS FOR BRIDGE DETAILS AND
ADDITIONAL INFORMATION.
3. PROP. GUARDRAIL SHALL BE STEEL BEAM
HIGHWAY W BEAM AND THRIE BEAM, AS
INDICATED ON THE PLANS.
4. FOR VARYING SLOPES AND GRADES, SEE
GRADING & TIE PLANS FOR DETAILS.
5. FOR SIDEWALK AT DRIVEWAY SECTIONS,
REFER TO MASSDOT HIGHWAY STANDARD
DETAILS E 107.6.0 AND 107.7.0.
6. ALL SIDEWALKS SHALL BE CONSTRUCTED WITH
MAXIMUM CROSS-SLOPES OF 1.5%, WITH A
CONSTRUCTION TOLERANCE OF 0.5% +/-.
7. FOR LANE STRIPING DETAILS, SEE SIGN &
PAVEMENT MARKING PLAN ON SHEET 24.
PAVEMENT NOTES:
PROPOSED FULL DEPTH PAVEMENT
SURFACE: 1.75" SUPERPAVE SURFACE COURSE 12.5
(SSC-12.5) (POLYMER MODIFIED)
OVER
INTERMEDIATE: 2.5" SUPERPAVE INTERMEDIATE COURSE
19.0 (SIC-19.0) OVER
BASE: 4.5" SUPERPAVE BASE COURSE 37.5
(SBC-37.5) OVER
SUBBASE: 4" DENSE GRADED CRUSHED STONE FOR
SUBBASE OVER
SUBGRADE: 8" GRAVEL BORROW TYPE b.
PROPOSED COLD PLANE & PAVEMENT OVERLAY
SURFACE: 1.75" SUPERPAVE SURFACE COURSE 12.5
(SSC-12.5) (POLYMER MODIFIED)
COLD PLANE: COLD PLANE VARIABLE DEPTH TO MEET
PROPOSED GRADING
PROPOSED HMA DRIVEWAY
SURFACE: 3-1/2" HOT MIX ASPHALT (1-1/2"
HOT MIX ASPHALT SURFACE COURSE
MATERIAL OVER 2" HOT MIX ASPHALT
BOTTOM COURSE MATERIAL)
FOUNDATION: 8" GRAVEL BORROW, TYPE b.
PROPOSED AND TEMPORARY HMA SIDEWALK/RAMP
SURFACE: 2-1/2" HOT MIX ASPHALT (1-1/4" HOT MIX
ASPHALT SURFACE COURSE
OVER 1-1/4" HOT MIX ASPHALT BOTTOM
COURSE MATERIAL).
FOUNDATION: 8" GRAVEL BORROW, TYPE b.
PROPOSED CEMENT CONCRETE SIDEWALK
SURFACE: 4" CEMENT CONCRETE AIR ENTRAINED
4000 PSI,
", 610
FOUNDATION: 8" GRAVEL BORROW, TYPE b.
PROPOSED CEMENT CONCRETE SIDEWALK AT DRIVEWAY
SURFACE: 6" CEMENT CONCRETE AIR ENTRAINED
4000 PSI,
", 610
FOUNDATION: 8" GRAVEL BORROW, TYPE b.
PROPOSED HMA PARKING LOT
SURFACE: 3-1/2" HOT MIX ASPHALT (1-1/2"
HOT MIX ASPHALT SURFACE COURSE
MATERIAL OVER 2" HOT MIX ASPHALT
BOTTOM COURSE MATERIAL).
FOUNDATION: RETAIN EXISTING FOUNDATION
MATERIAL, FINE GRADE AND COMPACT
BEFORE PAVING.
TACK COAT FOR SUPERPAVE PAVEMENT STRUCTURES
TACK COAT: BITUMEN (AS-1) APPLIED AT A UNIFORM
RATE OF:
0.06 to 0.8 GAL/SY FOR PAVED SURFACES
0.07 to 0.9 GAL/SY FOR MILLED SURFACES
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
H
D T
Y P
I C
A L D
W G
J u n
H
D T
Y P
I C
A L D
W G
J u n
TYPICAL SECTION
NOTE:
NEW GRAVEL BORROW SHALL BE USED IF EXISTING SUB-BASE IS
DETERMINED TO BE UNSUITABLE PER THE REQUIREMENTS OF MASSDOT
STANDARD SPECIFICATION SUBSECTION 170.60 AND M1.03.0 AND AS
DIRECTED BY THE ENGINEER.
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
H
D P
L A
N D
W G
J u n
H
D P
L A
N D
W G
J u n
CONSTRUCTION PLAN
SCALE: 1" = 20'
0 50 100
HIGHWAY GUARD DETAILS TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
SEE DRAINAGE AND UTILITY PLAN
AND DRAINAGE AND UTILITY DETAILS
DRAINAGE DETAILS
SEE DRAINAGE AND UTILITY PLAN
AND DRAINAGE AND UTILITY DETAILS
NOTES:
1. CONTRACTOR SHALL COORDINATE RESTORATION OF LANDSCAPING, FENCING, AND
SIDEWALKS WITH PROPERTY OWNERS. ALL DISTURBED GRASS AREAS SHALL BE
RESTORED WITH 4" LOAM AND SEED.
2. SIDEWALK AND DRIVEWAY RAMPS SHALL MEET ADA/AAB REQUIREMENTS.
3. ALL PROPOSED SIDEWALKS SHALL BE CEMENT CONCRETE UNLESS OTHERWISE NOTED.
4. ALL CURBING SHALL SHALL BE GRANITE TYPE VB UNLESS OTHERWISE NOTED.
5. INSTALL PAVEMENT MILLING MULCH AT GUARDRAIL. SEE DETAIL ON SHEET 26 AND
STANDARD CONSTRUCTION DETAILS FOR MORE INFORMATION.
6. FOR DETAILS ON ADA/AAB ACCESSIBLE RAMP AND DRIVEWAY ENTRANCE
CONSTRUCTION, SEE SHEET 16.
7. FOR TEMPORARY PEDESTRIAN BRIDGE DETAILS, SEE TEMPORARY TRAFFIC CONTROL
PLANS AND BRIDGE PLANS.
8. FOR DRIVEWAY LIMIT, SEE GRADING & TIE PLANS.
9. REFER TO TEMPORARY TRAFFIC CONTROL PLANS FOR LOCATION OF TEMPORARY
PEDESTRIAN WALKWAY CONNECTING TO THE TEMPORARY PEDESTRIAN BRIDGE.
10. REFER TO BRIDGE PLANS FOR PROPOSED RIP RAP LIMITS AND DETAILS.
11. LIMIT OF WORK STATIONS ARE TO THE PROPOSED TEMPORARY CROSS WALKS. REFER
TO TEMPORARY TRAFFIC CONTROL PLANS FOR ADDITIONAL INFORMATION.
12. REPAIR DAMAGED STONE DUST SURFACES IN KIND.
13. FOR WATER, GAS, AND TELEPHONE RELOCATIONS, REFER TO THE DRAINAGE AND
UTILITY PLANS.
14. REMOVE EXISTING PARKING AREA PAVEMENT. FINE GRADE AND COMPACT EXISTING
GRAVEL BASE BEFORE PAVING.
EROSION CONTROL:
1. PROVIDE SEDIMENT CONTROL BARRIER (TEMP, COMPOST FILTER TUBES) AT PROPOSED
BOTTOM OF SLOPES AND AS DIRECTED BY THE ENGINEER. SEE CONTRACT SPECIAL
PROVISIONS FOR MORE INFORMATION.
FOR PROFILE, SEE SHEET NO. 7
TRAILING ANCHORAGE STA 138+08 RT TO 138+19
GUARDRAIL CURVED - TL-2 (SINGLE FACED) STA 138+19 RT TO 138+31 RT
TRANSITION TO BRIDGE RAIL STA 138+31 RT TO 138+65 RT
TRAILING ANCHORAGE STA 137+95 LT TO 138+06
GUARDRAIL, TL-2 STA 138+06 LT TO 138+31 LT
TRANSITION TO BRIDGE RAIL STA 138+31 LT TO 138+65 LT
TRANSITION TO BRIDGE RAIL STA 139+16 LT TO 139+50 LT
GUARDRAIL, TL-2 (SIGNAL FACED) STA 139+50 LT TO 139+86 LT
GUARDRAIL TANGENT END TREATMENT, TL-2 STA 139+86 LT TO 140+24 LT
TRANSITION TO BRIDGE RAIL STA 139+16 RT TO 139+50 RT
GUARDRAIL, TL-2 (SINGLE FACED) STA 139+50 RT TO 139+63 RT
TRAILING ANCHORAGE STA 139+63 RT TO 139+74 RT
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
H
D T
E M
P P
L A
N D
W G
J u n
H
D T
E M
P P
L A
N D
W G
J u n
TEMPORARY CONDITIONS PLAN
SCALE: 1" = 20'
0 50 100
HIGHWAY GUARD DETAILS TRAFFIC SIGNAL CONDUIT
NONE
WATER SUPPLY ALTERATIONS
SEE DRAINAGE AND UTILITY PLAN
AND DRAINAGE AND UTILITY DETAILS
AND SEE PLAN BELOW
DRAINAGE DETAILS
EROSION CONTROL:
1. PROVIDE TEMP, COMPOST FILTER TUBES AT PROPOSED BOTTOM OF SLOPES AND AS
DIRECTED BY THE ENGINEER. SEE CONTRACT SPECIAL PROVISIONS FOR MORE
INFORMATION.
NONENONE
NOTE:
1. PROPOSED TEMP PEDESTRIAN WALKWAY SHALL HAVE PAINT
STRIPES ONLY THROUGH EXISTING PAVED PARKING AREAS.
SEE TEMPORARY TRAFFIC CONTROL PLANS.
NAVD 88
BASE ELEV
-15.00
-10
-15
-10
136+00
137+00
138+00
139+00
140+00 141+00 141+50
PROP.
WEST ABUTMENT
PROP. EAST
ABUTMENT
PROP.
BRIDGE NO. Y-01-002 OVER PARKERS RIVER
M.H.W. EL. 2.05
DOWNSTREAM
M.L.W. EL. -0.7
DOWNSTREAM
EXIST. RIVER BED
PROP. RIPRAP AND
CRUSHED STONE
EXIST. ABUTMENT
SHALL BE REMOVED
(SEE BRIDGE PLANS)
CL BRG. EAST ABUT.
STA. 139+07.25
CL BRG. WEST ABUT.
STA. 138+73.58
EXIST. GRADE
PROP. APPROACH SLAB (TYP.)
PROP. LOW CHORD
EL. 3.54
P R
O P
E
L E
V
E X
I S
T
E
L E
V
BENCHMARK
POINT #54
TBM SQ CUT FND
EL = 6.18
STA. 139+15.32, 28.66' LT
BENCHMARK
POINT #1647
BRASS RIVET
EL = 5.92
STA. 138+66.10, 20.45' RT
EXIST LOW CHORD
EL = 3.54
PROP. PROFILE GRADE
MATCH
EXISTING
LOW POINT ELEV = 5.56
LOW POINT STA = 137+94.47
PVI STA = 137+97.00
PVI ELEV = 5.47
A.D. = 0.92%
K = 88.74
82' VC
P V
C
E L E
V
P V
T
E L E
V
M.H.H.W. EL. 2.4
DOWNSTREAM
L I M
I T
O
F
C
O L D
P L A
N E
V E
R L A
Y
S T
A
L I M
W
O R
K
S T
A
N
E
L I M
W
O R
K
S T
A
N
E
-0.43%
0.49%
0.43%
STA. 2+00 CHANNEL BASELINE =
STA. 138+90.41 CONSTRUCTION BASELINE
LIMITS OF COLD PLANE & OVERLAY
STA 142+00 TO STA 142+30
LIMITS OF COLD PLANE & OVERLAY
STA 135+30 TO STA 135+60
L I M
C
O L D
P L A
E
R L A
Y
L I M
F
U L L
D
E P
T H
C O
N S
T R
U C
T I O
N
S T
A
L I M
C
O L D
P L A
E
R L A
Y
S T
A
L I M
F
U L L
D
E P
T H
C O
N S
T R
U C
T I O
N
L I M
C
O L D
P L A
E
R L A
Y
S T
A
MATCH EXISTING
HOR. SCALE IN FEET
VER. SCALE IN FEET
20 40
4 4 8
FED. AID PROJ. NO.
SHEET
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
H
D P
R O
F I L E
D
W G
J u n
H
D P
R O
F I L E
D
W G
J u n
PROFILE - ROUTE 28
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
H
D C
U R
B T
I E
D
W G
J u n
H
D C
U R
B T
I E
D
W G
J u n
CURB TIE PLAN
SCALE: 1" = 20'
0 50 100
CURVE TABLE (FACE OF CURB)
CURVE RADIUS LENGTH TANGENT
DELTA
3702.40'
2012.62'
361.48'
134.71'
94.65'
19.61'
67.36'
47.33'
9.81'
2° 05' 05"
2° 41' 40"
3° 06' 29"
LEGEND:
xx x
DRIVEWAY NUMBER
CURVE NUMBER
4 2052.62' 243.02' 121.65' 6° 47' 01"
M
A
T
C
H
L
I N
E
S
A
B
O
V
E
S
M
A
T
C
H
L
I N
E
S
L
O
W
S
BASELINE TIES
SCALE: 1"=100'
NOTES:
1. THE CONSTRUCTION BASELINE IS ALSO THE 1933 RECORD BASELINE.
2. REFER TO BRIDGE PLANS FOR CHANNEL GRADING AND DETAILS ASSOCIATED WITH PROPOSED RIPRAP.
SURVEY INFORMATION:
1. FIELD SURVEY PERFORMED ON 4/2012 AND 4/2015 BY BRYANT ASSOCIATES, 90 CANAL STREET, BOSTON, MA, 02114.
WORK WAS CONTRACTED BY LOUIS BERGER AND PERFORMED IN ACCORDANCE WITH MASSDOT GUIDELINES.
2. EXISTING CONDITIONS DRAWING SUPPLIED BY BRYANT ASSOCIATES IN ACCORDANCE WITH MASSDOT GUIDELINES.
3. LOT LINES DEPICTED ON THIS PLAN ARE APPROXIMATE, AND FURTHER INVESTIGATION IS REQUIRED TO DETERMINE
ACCURATE BOUNDARIES
4. SURVEY DATA AS SHOWN ON THE PLANS, FOR ADDITIONAL INFORMATION, SEE FIELD BOOK NO. 212031.
5. WETLAND LIMITS DELINEATED BY LOUIS BERGER, 03/27/2015.
6. THE LENGTHS SHOWN REFER TO THE LENGTHS FROM THE 1933 RECORD LAYOUT PLAN (LAYOUT NO. 2977). THE PCC
FOR THE 2032.62' RADIUS CURVE IS LOCATED AT STATION 134+89.11.
1 431.40' 23.47' 11.74' 3° 07' 01"
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
H
D G
R A
D I N
G D
W G
J u n
H
D G
R A
D I N
G D
W G
J u n
GRADING PLAN
SCALE: 1" = 20'
0 50 100
LEGEND:
xx
DRIVEWAY NUMBER (SEE SHEET 16 FOR DRIVEWAY LOCATION TABLE)
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
H
D D
R A
I N
A G
E D
W G
J u n
H
D D
R A
I N
A G
E D
W G
J u n
SCALE: 1" = 20'
0 50 100
DRAINAGE & UTILITY PLAN
TYPE STATION
STRUCTURE
NUMBER
SIZE
5.151 137+94.47
STD
CBCI
137+65.91
138+00.00
10.94' RT
137+94.47
138+32.40
10.30' RT
138+54.70
51.45' RT
5.21
5.34
5.15
5.43
4.91
-0.07: IN (W)
-0.53: IN (W)
139+28.95
5.72
STDCBCI
STDCB
4' DIA
STD
DMH
CBCI
0.67: OUT (S)
0.04: OUT (E)
1.53: OUT (N)
1.50: IN AT
(EXIST MH)
0.55: OUT (N)
-0.10: OUT (S)
-0.56: OUT (E)
DMH
DMH
6.24
1.44: OUT (N)
139+54.35
0.00' RT
1.30: IN (S)
139+29.43
DMH
5.72
DMH 1.27: OUT (W) 4' DIA
1.07: OUT (W)
STD
DRAINAGE STRUCTURE TABLE
CBCI
139+37.59
33.48' LT
1.17: OUT (N)
RIM
ELEV
INVERT
OUT
6.13 6' DIA
INVERT
IN
5' DIA
DOGHOUSE
MH
4' DIA
OVER EXIST
PIPE
1.10: IN (S)
1.10: IN (E)
0.52: IN (N)
0.06: IN (W)
0.52: IN (S)
NOTES:
1. ALL EXISTING UNDERGROUND UTILITIES CROSSING PARKERS RIVER ARE TO BE
RELOCATED DURING CONSTRUCTION.
2. PAVEMENT MARKINGS ARE NOT SHOWN FOR CLARITY.
3. PROPOSED 6" GAS LINE WILL BE TEMPORARY CAPPED DURING THE
CONSTRUCTION OF THE BRIDGE BY NATIONAL GRID AND NATIONAL GRID WILL PLACE
NEW 6" GAS LINE IN THE FINAL LOCATION. CONTRACTOR SHALL COORDINATE WITH
NATIONAL GRID FOR THE PLACEMENT OF THE PROPOSED GAS MAIN AT VARIOUS
PHASES.
4. 10" WATERMAIN WILL BE TEMPORARILY CAPPED DURING CONSTRUCTION. SERVICE
SHALL BE MAINTAINED IN HYDRANT AND SERVICE CONNECTIONS AT ALL TIMES. REFER
TO WATERMAIN DETAILS ON SHEET NO. 13 FOR ADDITIONAL INFORMATION.
5. THE EXISTING 10" WATERMAIN UNDER THE RIVER WAS DETERMINED TO BE ABANDONED
BY THE TOWN OF YARMOUTH.
6. CUT AND PLUG EXISTING 10" WATERMAIN AND REMOVE WATERMAIN UNDER ROADWAY
AND RIVER TO LIMITS SHOWN STA. 138+40 LT - 139+20 RT.
7. ALL ELECTRIC STRUCTURES AFFECTED BY PROPOSED REGRADING ARE TO BE
ADJUSTED TO THE NEW GRADES BY OTHERS UNLESS OTHERWISE SPECIFIED.
8. CONTRACTOR TO COORDINATE RELOCATION OF UTILITY POLES WITH EVERSOURCE.
SEE TEMP CONDITIONS PLAN FOR TEMP UTILITY POLE LOCATIONS.
9. CATCH BASINS SHALL CONFORM TO MASSDOT HIGHWAY STANDARD DETAILS 201.4.0
(PRECAST CONC.), 201.9.0 & 201.9.1 (HOOK LOCK CASCADE GRATE), AND WITH A 4 FOOT
SUMP. SEE SHEET 12 AND 14 FOR MORE DETAILS.
10. SEE BRIDGE PLANS FOR ADDITIONAL DETAILS REGARDING UTILITY LOCATIONS,
SLEEVES, SUPPORTS, AND CONNECTIONS.
11. WATERMAIN SHALL BE INSULATED WITH 2" CLOSED CELLFOAM AND STAINLESS STEEL
JACKET THROUGHOUT BRIDGE CROSSING AND WHEREVER WATERMAIN IS ABOVE
FROST LINE.
12. FOR WATERMAIN DETAILS, SEE SHEET 13.
13. CONTRACTOR SHALL VERIFY EXIST. WATERMAIN PIPE MATERIAL AT TIE IN LOCATIONS
PRIOR TO ORDERING MATERIALS FOR CONSTRUCTION OF WATERMAIN AND RELATED
ITEMS.
14. THE PROPOSED VERIZON DUCT BANK WILL BE TEMPORARILY SUPPORTED FROM THE
PROPOSED PEDESTRIAN BRIDGE AND SHIFTED OVER TO THE PERMANENT LOCATION
(UNDER THE BRIDGE DECK) FOLLOWING THE CONSTRUCTION OF THE INTEGRAL
ABUTMENT CONSTRUCTION AND PRIOR TO THE PLACEMENT OF THE BRIDGE BACK WALL.
CONTRACTOR TO COORDINATE WITH VERIZON.
15. REMOVE EXISTING 10" WATER MAIN UNDER SIDEWALK AND ACROSS BRIDGE TO LIMITS
SHOWN STA. 137+70 LT TO 140+35 LT
16. EXISTING SERVICE CONNECTIONS (2 EACH) TO BE ABANDONED IN PLACE.
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
H
D D
R A
I N
A G
E D
W G
J u n
H
D D
R A
I N
A G
E D
W G
J u n
SCALE: 1" = 10'
0 20 30 40
VERIZON TELEPHONE CONDUIT NOTES:
PHASE 1
1. THE CONTRACTOR SHALL PLACE THREE (3) 4-INCH DIAMETER TEMPORARILY RELOCATED CONDUITS AS SHOWN ON THE PLANS. VERIZON WILL BE RESPONSIBLE FOR BREAKING INTO THE EXISTING
CONCRETE DUCT BANK AND IDENTIFYING FOUR (4) EMPTY CONDUITS FOR CONNECTING TO. ONCE THE EMPTY CONDUITS ARE IDENTIFIED, VERIZON WILL BE RESPONSIBLE FOR CONNECTING THE
THREE (3) CONDUITS TO THEM. A FOURTH CONDUIT WILL BE INSTALLED AT A LATER DATE.
2. THE CONDUITS PLACED OVER THE TEMPORARY PEDESTRIAN BRIDGE SHALL BE 4-INCH IPS TELEPHONE FIBERGLASS CONDUIT IN CONFORMANCE WITH AMERICAN U-TEL STANDARDS (440 946-6027). THE
LENGTH OF FIBERGLASS CONDUIT SHALL BE APPROXIMATELY 75 FEET. THE REMAINING CONDUIT UP TO THE EXISTING DUCT BANK CONNECTIONS SHALL BE INDUSTRY STANDARD TYPE “C”, 4- INCH HEAVY
WALL PVC, CONFORMING TO GTS 8342, AT&T 8546, OR PTS-77 OR NEMA TC 10 REQUIREMENTS WITH A MINIMUM WALL THICKNESS OF 0.149 INCHES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
FURNISHING AND INSTALLING ALL CONDUIT EXCEPT FOR THE CONNECTIONS TO EXISTING CONDUITS. VERIZON WILL BE RESPONSIBLE FOR RUNNING SERVICE THROUGH TWO OF THE CONDUITS AND ONE
WILL BE LEFT AS A SPARE.
3. ONCE THE CONDUITS ARE IN PLACE, THE CONTRACTOR SHALL BACKFILL ALONG THE TRENCH AND SHALL PROVIDE AN HMA SURFACE IN PAVED AREAS AND LOAM AND SEED IN NON PAVED AREAS.
PHASE 2
1. UPON CONSTRUCTION OF THE BRIDGE ABUTMENTS (SOUTH SIDE) AND PLACEMENT OF THE DECK BEAMS, THE CONTRACTOR SHALL OPEN THE TRENCH TO EXPOSE THE ENTIRE LENGTH OF RECENTLY
PLACED CONDUIT UP TO THE POINT WHERE THEY CONNECT TO THE EXISTING DUCT BANK. ONCE THE CONDUIT IS EXPOSED, VERIZON WILL BE RESPONSIBLE FOR PICKING UP THE THREE CONDUITS AND
SHIFTING THEM OVER TO THE PERMANENT BRIDGE LOCATION. THE CONTRACTOR SHALL INSURE THAT THE REQUIRED CONDUIT SUPPORT ELEMENTS ARE IN PLACE PRIOR TO THE CONDUIT BEING
MOVED. DURING THIS OPERATION, THE CONTRACTOR SHALL INSTALL ONE ADDITIONAL CONDUIT MEETING THE REQUIREMENTS OUTLINED IN NOTE 2. THIS WILL RESULT IN FOUR (4) CONDUITS OVER THE
PROPOSED BRIDGE (2 ACTIVE AND 2 SPARE). THE CONTRACTOR SHALL BACKFILL THE TRENCH AND REPAIR DISTURBED SURFACES IN-KIND OR TO THE FINAL PROPOSED CONDITION.
2. THE CONTRACTOR SHALL INSURE THAT ALL CONDUIT SLEEVES AND APPURTANCES ARE PLACED AROUND THE CONDUITS IN CONFORMANCE WITH THE DETAILS IN THESE PLANS FOR THE END PLACEMENT ON
THE PROPOSED BRIDGE.
3. CONTRACTOR SHALL NOTIFY VERIZON 14 DAYS BEFORE ANY CONDUIT WORK IS TO TAKE PLACE.
4. NO BACKFILLING OF DUCT BANKS SHALL BE ALLOWED UNTIL VERIZON HAS APPROVED THE WORK.
PART PLAN
SCALE: 1" = 10'
DRAINAGE & UTILITY PLAN
GENERAL NOTES:
1. REFER TO SHEET 10 FOR ADDITIONAL INFORMATION ASSOCIATED WITH DRAINAGE, WATER, AND GAS
RELOCATIONS.
2. REFER TO SHEET 17 - 18 FOR LIGHTING DETAILS, BRIDGE PLAN SHEET 19 OF 65.
LIGHTING FIXTURE SCHEDULE
4 - LIGHTING STANDARD/LUMINAIRE NUMBER
2 - CIRCUIT NUMBER
A - FIXTURE TYPE
50 - LUMINAIRE WATTAGE
0 - DEGREE OF TILT
3 - NUMBER OF CABLES
#10 - SIZE OF CABLE IN AWG
#8 GND - #8 AWG GROUND WIRE
LIGHTING AND POWER DISTRIBUTION NOTATIONS
A-50-0
4-2
3 #10 & #8 GND
(NIC) NOT IN CONTRACT, FOR INFORMATION ONLY
DRAINAGE & UTILITY DETAILS
FED. AID PROJ. NO.
SHEET
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
H
D D
R A
I N
A G
E D
E T
L S
D
W G
J u n
H
D D
R A
I N
A G
E D
E T
L S
D
W G
J u n
FED. AID PROJ. NO.
SHEET
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
H
D D
R A
I N
A G
E D
E T
L S
D
W G
J u n
H
D D
R A
I N
A G
E D
E T
L S
D
W G
J u n
FED. AID PROJ. NO.
SHEET
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
H
D D
R A
I N
A G
E D
E T
L S
D
W G
J u n
H
D D
R A
I N
A G
E D
E T
L S
D
W G
J u n
CONSTRUCTION DETAILS
FED. AID PROJ. NO.
SHEET
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
H
D D
E T
A I L S
D
W G
J u n
H
D D
E T
A I L S
D
W G
J u n
CONSTRUCTION DETAILS
FED. AID PROJ. NO.
SHEET
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
H
D D
E T
A I L S
D
W G
J u n
H
D D
E T
A I L S
D
W G
J u n
LIGHTING DETAILS
FED. AID PROJ. NO.
SHEET
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
H
D D
E T
A I L S
D
W G
J u n
H
D D
E T
A I L S
D
W G
J u n
LIGHTING DETAILS
FED. AID PROJ. NO.
SHEET
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
H
D D
E T
A I L S
D
W G
J u n
H
D D
E T
A I L S
D
W G
J u n
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
T
R T
T C
D
W G
J u n
T
R T
T C
D
W G
J u n
TRAFFIC PHASE 2
SCALE: 1"=30'
TRAFFIC PHASE 1
SCALE: 1"=30'
TEMPORARY TRAFFIC CONTROL PLAN
SCALE: 1" = 30'
0 60 100
1. ALL TEMPORARY TRAFFIC CONTROL WORK SHALL CONFORM TO THE LATEST EDITION OF THE "MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES" (MUTCD) AND ALL REVISIONS.
2. ALL SIGN LEGENDS, BORDERS AND MOUNTING SHALL BE IN ACCORDANCE WITH THE MUTCD.
3. TEMPORARY CONSTRUCTION SIGNING AND ALL OTHER TRAFFIC CONTROL DEVICES SHALL BE IN PLACE PRIOR TO THE START OF
ANY WORK.
4. TEMPORARY CONSTRUCTION SIGNING, BARRICADES AND ALL OTHER NECESSARY WORK ZONE TRAFFIC CONTROL DEVICES
SHALL BE REMOVED FROM THE HIGHWAY OR COVERED WHEN THEY ARE NOT REQUIRED FOR CONTROL OF TRAFFIC.
5. SIGNS AND SIGN SUPPORTS LOCATED ON OR NEAR THE TRAVELED WAY AND REFLECTORIZED PLASTIC DRUMS WITH LIGHTING
DEVICES MOUNTED ON THEM, SHALL PASS THE CRITERIA SET FORTH IN NCHRP REPORT 350, "RECOMMENDED PROCEDURES
FOR THE SAFETY PERFORMANCE EVALUATION OF HIGHWAY FEATURES".
6. CONTRACTORS SHALL NOTIFY EACH ABUTTER AT LEAST 30 DAYS IN ADVANCE OF THE START OF ANY WORK THAT WILL REQUIRE
THE TEMPORARY CLOSURE OF ACCESS, SUCH AS CONDUIT INSTALLATION, EXISTING PAVEMENT EXCAVATION, TEMPORARY
DRIVEWAY PAVEMENT PLACEMENT AND SIMILAR OPERATIONS. SEE ALSO SPECIAL PROVISIONS.
7. THE FIRST TEN PLASTIC DRUMS OF A TAPER SHALL BE MOUNTED WITH SEQUENTIAL FLASHING LIGHTS.
8. THE ADVISORY SPEED LIMIT, IF REQUIRED, SHALL BE DETERMINED BY THE ENGINEER.
9. DISTANCE ARE A GUIDE AND MAY BE ADJUSTED IN THE FIELD BY THE ENGINEER.
10. MAXIMUM SPACING OF TRAFFIC DEVICES IN A TAPER (DRUMS OR CONES) IS EQUAL IN FEET TO THE SPEED LIMIT IN MPH.
11. MINIMUM LANE WIDTH IS TO BE 11 FEET UNLESS OTHERWISE NOTED. MINIMUM LANE WIDTH TO BE MEASURED FROM THE EDGE
OF DRUMS OR MEDIAN BARRIER. PROVIDE 1 FOOT STRIPED SHOULDER ADJACENT TO BARRIERS.
12. ALL SIGNS SHALL BE MOUNTED ON THEIR OWN STANDARD SIGN SUPPORTS.
13. CONTRACTOR MAY REMOVE SECTION OF BARRIER FOR ACCESS TO WORK ZONE. WHEN BARRIER IS REMOVED, TYPE III
BARRICADE SHALL BE INSTALLED. BARRIER SHALL BE REPLACED AFTER WORK HOURS.
14. PROVIDE TEMPORARY PAVEMENT TRANSITION ROADWAY FROM NEW BRIDGE TO EXISTING GRADE (15% MAX. GRADE).
15. PORTABLE CHANGEABLE MESSAGE SIGNS (PCMS) TO BE USED ONE MONTH PRIOR TO THE START OF CONSTRUCTION STAGE 1.
MESSAGES AND LOCATION TO BE DETERMINED BY THE ENGINEER. SEE SAMPLE MESSAGES ON THIS SHEET.
16. THE CONTRACTOR SHALL CONDUCT HIS HOURS OF OPERATIONS IN CONFORMANCE WITH THE SPECIAL PROVISIONS.
17. THE CONTRACTOR SHALL FULLY RESTRICT ACCESS TO AREAS JUDGED DANGEROUS FOR EITHER PEDESTRIAN OR VEHICULAR
TRAFFIC WITH JERSEY BARRIERS, CHAIN LINK FENCING, OR OTHER MEANS APPROVED BY THE ENGINEER.
18. TEMP. PAVEMENT MARKINGS SHALL BE OF LEAD-FREE PAINT. LANES AND SHOULDERS SHALL BE MEASURED FROM/TO THE
CENTERLINE OF EACH MARKING.
19. PRIOR TO REDIRECTING TRAVEL LANES, THE CONTRACTOR SHALL MODIFY ROADWAY EDGES WITH HMA, CUTTING OF CURBING
AND SIDEWALK AREAS, OR OTHER MEANS NECESSARY TO LEVEL THE ROADWAY FOR SAFE PASSAGE OF MOTORISTS.
20. SEE BRIDGE PLANS FOR ADDITIONAL INFORMATION.
21. SEE CONSTRUCTION DETAILS FOR TEMP, HMA SIDEWALK
22. THE TEMP PED WALKWAY THROUGH THE PAVED PARKING LOT SHALL BE DELINEATED BY 6" REFLECTORIZED WHITE LINE
(PAINTED) TO THE DIMENSIONS AND LOCATION SHOWN ON THE PLANS.
23. LOCATE PLASTIC DRUMS TO ENSURE ACCESS TO ABUTTING PROPERTIES FOR VEHICLES, BUSES AND DELIVERY TRUCKS
DURING ALL PHASES.
24. VEHICULAR ACCESS THROUGH A MINIMUM OF ONE CURB CUT SHALL BE MAINTAINED AT ALL TIMES TO ABUTTING PROPERTIES
WHE ABUTTING BUSINESSES ARE OPEN. CURB CUT ACCESS THROUGH BOTH CURB CUTS TO 679/681 ROUTE 28 (LOBSTER BOAT
RESTAURANT) SHALL BE MAINTAINED DURING THEIR BUSINESS HOURS FOR THE MEMORIAL DAY WEEKEND (NOON ON FRIDAY
THROUGH MEMORIAL DAY) AND FROM JUNE 15TH THROUGH LABOR DAY.
GENERAL TRAFFIC CONTROL NOTES
1. CONSTRUCT TEMPORARY PEDESTRIAN BRIDGE
ADJACENT TO THE SOUTH SIDE OF EXISTING BRIDGE.
2. INSTALL PROPOSED DRAINAGE OUTLET AND ASSOCIATED
MANHOLES.
3. INSTALL PROPOSED TELEPHONE CONDUIT SYSTEM
SUPPORTED ON TEMPORARY PEDESTRIAN BRIDGE.
4. CONSTRUCT TEMP ADA RAMPS AND HANDRAIL AT EACH
END OF THE TEMP. PEDESTRIAN BRIDGE.
5. INSTALL PROPOSED 6" GAS MAIN TEMPORARILY CAPPED
AT BRIDGE AND SERVICE CONNECTION REFER TO UTILITY
PLANS.
6. CONSTRUCT TEMPORARY 6 FOOT WIDE CROSSWALKS
AND TEMPORARY ADA ACCESSIBLE WHEELCHAIR RAMPS.
7. INSTALL TEMPORARY PAINTED PEDESTRIAN WALKWAY.
8. REMOVE SIDEWALK AND CURB ON THE NORTH SIDE OF
THE EXISTING BRIDGE. INSTALL TEMP HMA PAVEMENT.
9. INSTALL TEMPORARY UTILITY POLE AND OVERHEAD WIRE
RELOCATIONS.
PHASE 1
PHASE 2
1. DIVERT TRAFFIC TO TEMPORARY TRAVEL LANES AND
INSTALL TEMPORARY BARRIER AND TEMP IMPACT
ATTENUATORS AND CHAIN LINK FENCE.
2. INSTALL SUPPORT OF EXCAVATION AND DEMOLISH
SOUTH PORTION OF EXISTING BRIDGE.
3. CONSTRUCT SOUTH PORTION OF PROPOSED BRIDGE.
4. SHIFT VERIZON DUCT BANK FROM TEMPORARY
PEDESTRIAN BRIDGE TO FINAL LOCATION ON THE
PROPOSED BRIDGE.
5. INSTALL GAS LINE OVER BRIDGE AND CONNECT TO THE
LOCATIONS WHERE IT WAS CAPPED IN PHASE 1 (BO)
MESSAGE #1
MESSAGE #2
ROAD
WORK
AHEAD
BE
PREPARED
TO STOP
SIGN
TEMPORARY
IMPACT ATTENUATOR
REFLECTORIZED PLASTIC DRUM
DIRECTION OF TRAVEL
WORK ZONE
DOUBLE FACED TEMP. CONCRETE
RESTRAINED BARRIER
TEMP BARRIER
TEMPORARY CHAIN LINK FENCEX
SEE GEN. TRAF. CTRL. NOTE 15
MESSAGE #1
MESSAGE #2
CONST
BEGINS
XX/XX
EXPECT
DELAYS
BEFORE CONSTRUCTION STARTS
DURING CONSTRUCTION
SAMPLE VMS MESSAGES
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
T
R T
T C
D
W G
J u n
T
R T
T C
D
W G
J u n
TRAFFIC PHASE 4
SCALE: 1"=30'
TEMPORARY TRAFFIC CONTROL PLAN
SCALE: 1" = 30'
0 60 100
TRAFFIC PHASE 3
SCALE: 1"=30'
PHASE 3
1. DIVERT TRAFFIC TO TEMPORARY TRAVEL LANES ON
NEW SOUTH PORTION OF THE BRIDGE.
2. INSTALL TEMPORARY BARRIER, CHAIN LINK FENCE
AND TEMP. IMPACT ATTENUATORS ON NORTH SIDE OF
THE NEW SOUTH PORTION OF THE BRIDGE.
3. TURN OFF EXISTING 10" WATER GATE VALVES ON
BOTH SIDES OF EXISTING BRIDGE.
4. DEMOLISH REMAINING PORTION OF THE EXISTING
BRIDGE.
5. CONSTRUCT REMAINING PORTION OF THE PROPOSED
BRIDGE.
6. CONSTRUCT PROPOSED WATER MAIN.
7. CONSTRUCT SIDEWALK, CURB AND GUARDRAIL ON
THE NORTH SIDE OF THE ROADWAY.
PHASE 4
1. DIVERT TRAFFIC TO TEMPORARY TRAVEL LANES ON
NEW NORTH PORTION OF THE BRIDGE
2. CONSTRUCT SIDEWALK AND CURB ON THE SOUTH
SIDE OF THE ROADWAY.
3. CONSTRUCT DRIVEWAY ENTRANCES ON THE
SOUTHERN SIDE OF THE ROADWAY.
SIGN
TEMPORARY
IMPACT ATTENUATOR
REFLECTORIZED PLASTIC DRUM
DIRECTION OF TRAVEL
WORK ZONE
TEMP BARRIER
TEMPORARY CHAIN LINK FENCEX
DOUBLE FACED TEMP. CONCRETE
RESTRAINED BARRIER
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
T
R T
T C
D
W G
J u n
T
R T
T C
D
W G
J u n
TEMPORARY TRAFFIC CONTROL PLAN
SCALE: 1" = 30'
0 60 100
TRAFFIC PHASE 5
SCALE: 1"=30'
PHASE 5
1. MOVE VEHICULAR AND PEDESTRIAN TRAFFIC TO
PERMANENT ROADWAY AND SIDEWALK.
2. REMOVE TEMPORARY PEDESTRIAN BRIDGE.
3. REMOVE ALL TEMPORARY STRIPING FOR TEMPORARY
CROSSWALKS AND TEMPORARY PEDESTRIAN
WALKWAY.
4. TEMPORARY PAVING MARKINGS ON THE TOP SURFACE
OF PAVEMENT PRIOR TO FINAL STRIPING APPLICATION
SHALL BE TAPE.
5. FINAL PAVING OF PARKING AREAS.
6. CONSTRUCT FINAL PAVEMENT LAYER.
7. INSTALL FINAL STRIPING PER SIGN & PAVEMENT
MARKING PLAN SHEET 24.
SIGN
TEMPORARY
IMPACT ATTENUATOR
REFLECTORIZED PLASTIC DRUM
DIRECTION OF TRAVEL
WORK ZONE
TEMP BARRIER
TEMPORARY CHAIN LINK FENCEX
DOUBLE FACED TEMP. CONCRETE
RESTRAINED BARRIER
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
T
R T
T C
D
W G
J u n
T
R T
T C
D
W G
J u n
CONSTRUCTION SIGN SUMMARY
CONSTRUCTION SIGN SUMMARY
MOUNTED ON
TYPE III
BARRICADE
24 18 3.0 EA = 3.0 EA R9-11(R)
24 18 1 3.0 EA = 3.0 EA R9-11(L)
24 12 4 2.0 EA = 8.0 EA R9-9
24 24 4 4.0 EA = 16.0 EA W13-1P (30)
36 36 1 9.0 EA = 9.0 EA W24-1 (R)
36 36 1 9.0 EA = 9.0 EA W24-1 (L)
36 36 2 9.0 EA = 18.0 EA W20-1
36 36 2 9.0 EA = 18.0 EA W5-1
36 36W11-2
24 12W16-7P
48 36MA-R2-10a
36 48MA-R2-10E
4 9.0 EA = 36.0 EA
4 2.0 EA = 8.0 EA
2 12.0 EA = 24.0 EA
2 12.0 EA = 24.0 EA
FHWA STANDARD HIGHWAY
SIGNS MANUAL
FHWA STANDARD
HIGHWAY SIGNS
MANUAL
FURNISHED
WITH
SIGN
MASSDOT STANDARD SIGNS
MASSDOT STANDARD SIGNS
MASSDOT STANDARD SIGNS
MASSDOT STANDARD SIGNS
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
T
R T
T C
D
W G
J u n
T
R T
T C
D
W G
J u n
TRAFFIC TYPICAL DETAILS
LONGITUDINAL DROP-OFF DETAIL
NOT TO SCALE
LATERAL DROP-OFF DETAIL
NOT TO SCALE
TWO LANE ROAD
ONE LANE ALTERNATING TRAFFIC WITH POLICE DETAIL
NOT TO SCALE
TWO LANE ROAD
SHOULDER AND TRAVEL LANE CLOSED
NOT TO SCALE
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
T
R S
I G
N
P A
P
L A
N D
W G
J u n
T
R S
I G
N
P A
A
N D
W G
J u n
SIGN & PAVEMENT MARKING PLAN
SCALE: 1" = 20'
0 50 100
PERMANENT SIGN SUMMARY
R8-1 24 30
1 5.0 SF = 5.0 SF P-5
FHWA STANDARD HIGHWAY
SIGNS MANUAL
FHWA STANDARD
HIGHWAY SIGNS
MANUAL
SCALE: 1" = 20'
0 50 100
1. IF DISCREPANCIES EXIST BETWEEN THE NUMBER OF PLANTS DRAWN ON THE PLANTING PLAN
AND THE NUMBER OF PLANTS IN THE PLANT SCHEDULE, THE PLANTING PLAN SHALL GOVERN.
2. ALL NEW PLANT MATERIAL SHALL CONFORM TO THE MINIMUM GUIDELINES ESTABLISHED FOR
NURSERY STOCK PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN, INC. IN
ADDITION, ALL NEW PLANT MATERIAL FOR THE PROJECT SHALL BE OF SPECIMEN QUALITY.
3. ALL NEW PLANTS TO BE BALLED AND BURLAPPED OR CONTAINER-GROWN, UNLESS
OTHERWISE NOTED ON THE PLANT SCHEDULE.
4. THE CONTRACTOR SHALL SUPPLY ALL NEW PLANT MATERIAL IN QUANTITIES SUFFICIENT TO
COMPLETE THE PLANTING SHOWN ON THE DRAWINGS.
5. ANY PROPOSED SUBSTITUTIONS OF PLANT SPECIES SHALL BE MADE WITH PLANTS OF
EQUIVALENT OVERALL FORM, HEIGHT, BRANCHING HABIT, FLOWER, LEAF, COLOR, FRUIT AND
CULTURE, AND ONLY AFTER WRITTEN APPROVAL OF THE ENGINEER.
6. ALL NEW PLANTS SHALL BE TAGGED AND APPROVED BY THE ENGINEER AT THE NURSERY
PRIOR TO DIGGING OR DELIVERY TO THE SITE.
7. STAKE LOCATION OF ALL PROPOSED PLANTING FOR APPROVAL BY ARCHITECT PRIOR TO THE
COMMENCEMENT OF PLANTING.
8. NEW SHRUBS AND GROUND COVER SHALL BEAR THE SAME RELATIONSHIP TO GRADE AS IT
BORE TO PREVIOUS GRADE. TREES SHALL BE SET 3" HIGHER THAN PREVIOUS GRADE. NO
TREES SHALL BE PLANTED BEFORE ACCEPTANCE OF ROUGH GRADING.
9. ALL PLANT BEDS TO RECEIVE THREE INCHES (3") OF BARK MULCH AS PER SPECIFICATIONS, EXCLUDING, AREAS PLANTED WITH AMERICAN BEACHGRASS.
10. CONTRACTOR SHALL PROVIDE FULL DEPTHS OF LOAM AS NOTED ON DETAILS AND AS
SPECIFIED, FOR ALL PLANTING WITH THE EXCEPTION OF THE AMERICAN BEACHGRASS. SEE
DETAILS FOR ADDITIONAL INFORMATION.
11. CONTRACTOR SHALL COORDINATE LOCATION OF ALL UTILITIES (LINES, DUCTS, CONDUITS, SLEEVES, FOOTINGS, ETC.) WITH LOCATIONS OF PROPOSED LANDSCAPE ELEMENTS (WALLS, FENCE, FOOTINGS, TREE ROOTBALLS, PROPOSED LIGHTING FOOTINGS, ETC.). CONTRACTOR
SHALL REPORT ANY DESCREPANCIES TO ARCHITECT PRIOR TO CONTINUING WORK.
12. LIMIT OF WORK LINE IS NOTED ON DRAWINGS. CONTRACTOR IS RESPONSIBLE FOR ALL
DAMAGE DUE TO OPERATIONS INSIDE AND OUTSIDE OF THE CONTRACT LIMIT LINE. ANY
AREAS OUTSIDE THE LIMIT OF WORK THAT ARE DISTURBED SHALL BE RESTORED TO ITS
ORIGINAL CONDITION AT NO ADDITIONAL COST TO THE OWNER.
13. IN AREAS WHERE EXISTING PAVEMENTS ARE REMOVED AND ARE PROPOSED AS TURF, THE
CONTRACTOR SHALL REMOVE THE PAVEMENT AND BASE, PROVIDE FILL AND 6" TOPSOIL
PRIOR TO SEEDING.
14. SEE CIVIL DRAWINGS FOR GRADING.
15. SEE PAVEMENT MILLING MULCH INTERFACE DETAIL FOR SETBACK FROM GAURD RAIL
PLANT SCHEDULE
SYM QTY BOTANICAL NAME COMMON NAME SIZE SPACING NOTES
DECIDUOUS TREE
CC 1 Crataegus crus-galli var. inermis Thornless Cockspur Hawthorn 3" CAL. n/a Spring dig only
SHRUBS
JH Juniperus horizontalis 'Blue Chip' Creeping Juniper
PF Potentilla fruticosa Shrubby Cinquefoil
48" O.C.
30" O.C.
2 GAL.
3 GAL.
GROUNDCOVER
AU 139 Arctostaphylos uva-ursi Bearberry 1 GAL. 30" O.C.
BEACHGRASSES
1 CC
55 AU
537 AB
783 AB
645 AB
267 AB
10 JH 24 PF 8 JH
84 AU
LEGEND
PROPOSED
DECIDUOUS TREE
CC
PROPOSED
SHRUBS
BEACH
GRASSES
LA-2
LA-2
AB 2,232 Ammophila abrevigulata American Beachgrass
November thru April planting only; place 3 culms per hole
Bare root 18" O.C.
LA-2
LA-2
PLANTING NOTES:
LA-2
LA-2
PROPOSED
GROUND COVER
LA-2
LA-2
SEED MIX
LA-2
SEED MIX
LA-2
SEED MIX
LA-2
SEED MIX
LA-2
FED. AID PROJ. NO.
SHEET
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
L D
P
L A
N D
W G
J u n
L D
P
L A
N D
W G
J u n
LANDSCAPE PLAN
LA-2
LA-2
LA-2
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
L D
D
E T
A I L D
W G
J u n
L D
D
E T
A I L D
W G
J u n
SEED MIX
SCALE: 1'-1/2"=1'-0"
SEED MIX
SCREENED LOAM,
ROLLED THICKNESS
COMPACTED
SUBGRADE
CONTINUOUS BED OF PLANTING SOIL
BETWEEN GROUNDCOVER
GROUNDCOVER PLANTING
SCALE: 1'-1/2"=1'-0"
GROUNDCOVER
3" MULCH
PLANTING MIX
COMPACTED
SUBGRADE
EXCAVATE HOLE TO REQUIRED DEPTH AND
BACKFILL WITH APPROVED PLANT MIX, PER
SPECIFICATIONS
REMOVE PLANT FROM POT OR ROLL BURLAP
BACK FROM TOP 1/3 OF ROOTBALL BEFORE
BACKFILLING.
UNTIE ROPE FROM TRUNK, SCARIFY ROOTS ON
CONTAINER GROWN SHRUBS
PLACE ROOT BALL 2" ABOVE SURROUNDING
GRADE
CONTINUOUS BED OF
PLANTING SOIL
BETWEEN SHRUBS
3" DEPTH MULCH (PULL BACK AWAY FROM BASE
OF SHRUB)
PLACE ROOTBALL ON COMPACTED SUBGRADE
SLOW RELEASE FERTILIZER
SHRUB PLANTING
SCALE: 1'-1/2"=1'-0"
EQ. EQ. EQ.
5'Ø
DECIDUOUS TREE PLANTING
SCALE: N.T.S.
INSTALL TREE PLUMB
TOP OF ROOTBALL SHALL BEAR SAME
RELATIONSHIP TO FINISHED GRADE AS TO
PREVIOUS EXISTING GRADE
ROOT FLARE SHALL BE EXPOSED; MULCH
SHOULD NOT TOUCH TREE TRUNK
PLACE BALL ON SUBSOIL. REMOVE AND DISCARD
BURLAP EXCEPT UNDER BALL. REMOVE AND
DISCARD ALL SYNTHETIC SOIL WRAPPING
MATERIALS (TREATED BURLAP, NYLON TWINE,
WIRE BASKETS, ETC.)
3'' BARK MULCH
DECOMPACTED SUBGRADE
EXCAVATE HOLE TO DIAMETER 3X WIDER THAN
ROOTBALL. BACKFILL HOLE WITH PLANTING
SOIL MIX
SLOW RELEASE FERTILIZER
EXCAVATE SUBSOIL AS REQUIRED
TO PLACE ROOTBALL TO PROPER ELEVATION.
PLACE ROOTBALL DIRECTLY ON COMPACTED OR
UNDISTURBED SUBSOIL.
FIR POST
GALVANIZED STEEL NUTS (2)
GALVANIZED STEEL EYEBOLT
GALVANIZED STEEL GUY WIRE
GALVANIZED STEEL WASHER
EYEBOLT ENLARGEMENT
NOT TO SCALE
3" DIMENSION
2" X 4" X 10' FIR POSTS; 3 PER TREE EQUALLY
SPACED AROUND TREE; ALL POSTS SHALL BE
PLUMB AND HAVE SAME HEIGHT ABOVE FINISH
GRADE; ORIENT 3": DIMENSION PERP. TO TRUNK
13 GAUGE GALVANIZED MALLEABLE WIRE CABLE
LOOPED AROUND TRUNK AND THROUGH
EYEBOLT; ENCASE WIRE AROUND TRUNK IN
REINFORCED RUBBER HOSE; SECURE BY
TWISTING TAUTLY.
BORE 3/8" HOLE THROUGH 2" DIMENSION OF
EACH POST, 6" FROM TOP OF POST, TO ACCEPT
1/4" X 4" GALVANIZED STEEL EYEBOLT; PROVIDE
GALVANIZED STEEL WASHER AND 2 BOLTS FOR
EACH EYEBOLT
SECTION
18" TYP.
T
Y P
PLAN
PROPOSED GRADE
18" TYP.
BEACHGRASS CULMS
(3)PER HOLES
SCALE: 3/4"=1'-0"
BEACHGRASS PLANTING
COMPACTED
SUBGRADE
SAND
LANDSCAPE DETAILS
COMMONWEALTH OF MASSACHUSETTS
MassDOT, Highway Division
G E
N E
R A
L
N
O T
E S
D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
R I N
G S
D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
R I N
G S
D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
G
N E
R A
L
P
L A
N D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
C R
O S
S
S
E C
T I O
N D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
E
V A
T I O
N D
W G
J u n
E L E
V A
T I O
N D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
D
M O
L I T
I O
N D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
(WIDTH OF SIDEWALK AT FINAL STAGE)
R
O S
S
S
E C
T I O
N D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
U N
D A
T I O
N
P
L A
N D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
T
A I L S
D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
U T
M E
A
N
A
E
V A
T I O
N S
D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
U T
M E
A
N
A
E
V A
T I O
N S
D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
U T
M E
T
A I L S
D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
U T
M E
T
A I L S
D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
W
L L
D
E T
A I L S
D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
E C
A S
T
D
E T
A I L S
D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
E C
A S
T
H
I G
H W
Y
U A
R D
R A
I L
T
R A
N S
I T
I O
N D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
M
S
C E
L L A
N E
O U
S
D
E T
A I L S
D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
F F
E R
D A
M
S
T A
G I N
G D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
F F
E R
D A
M
S
T A
G I N
G D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
F F
E R
D A
M
S
T A
G I N
G D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
SCALE: 1" = 10'
0 20 30 40
R
H A
N N
E L
G
R A
D I N
G D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
LEGEND
RIPRAP
NOTES:
1. RIPRAP SLOPES SHALL BE 1.5H:1V UNLESS OTHERWISE NOTED.
E
V A
T I O
N D
W G
J u n
E L E
V A
T I O
N D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
A M
I N
G
P
L A
N D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
T
A I L S
D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
T
A I L S
D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
S
P E
R S
T R
U C
T U
T
A I L S
D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
P E
R S
T R
U C
T U
T
A I L S
D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
I D
A
N D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
I L I T
Y
D
E T
A I L S
D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
E C
A S
T
H
I G
H W
Y
A
R D
R A
I L
T
R A
N S
I T
I O
N D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
T
L
B
R I D
I L D
W G
J u n
S
F i n a l
S t r u c t u r a l
S u b m i t t a l
S
A p r i l
0-10-20-30-40-50
137+07
0 10 20 30 40 50
CUT: 12.81 SF
FILL: 0.00 SF
GRAVEL: 11.40 SF
R
T
R
T
R
T
2.00%
.2
E X
L O
EXIST GROUND (TYP)
PROP VERIZON DUCT (BO)
ELEVATION TBD
CUT: 20.84 SF
FILL: 0.00 SF
GRAVEL: 15.74 SF
L T
R
T
L T
R
T
R
T
E X
L O
E X
L O
EXIST GROUND (TYP)
R
T
CUT: 17.14 SF
FILL: 0.00 SF
GRAVEL: 7.52 SF
R
T
L T
L T
R
T
E X
L O
E X
L O
EXIST GROUND (TYP)
FED. AID PROJ. NO.
SHEET
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
H
D S
E C
T I O
N S
D
W G
J u n
H
D S
E C
T I O
N S
D
W G
J u n
HOR. SCALE IN FEET
VER. SCALE IN FEET
4 4 8
4 4 8
SECTIONS
137+40.14
0-10-20-30-40-50
CUT: 16.79 SF
FILL: 0.00 SF
GRAVEL: 14.50 SF
L T
L T
L T
2.00%
5.8 8%
E X
L O
EXIST GROUND (TYP)
.7
1.50%
E X
L O
R
T
R
T
E X
L O
L T
L T
L T
CUT: 28.43 SF
FILL: 0.00 SF
GRAVEL: 18.84 SF
137+91.63
0 10 20 30 40 50
CUT: 51.38 SF
FILL: 0.00 SF
GRAVEL: 27.84 SF
R
T
R
T
R
T
2.00%
.6
EXIST GROUND (TYP)
PROP VERIZON DUCT (BO)
ELEVATION TBD
PROP 6" GAS (BO)
ELEVATION TBD
FED. AID PROJ. NO.
SHEET
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
H
D S
E C
T I O
N S
D
W G
J u n
H
D S
E C
T I O
N S
D
W G
J u n
SECTIONS
HOR. SCALE IN FEET
VER. SCALE IN FEET
4 4 8
PROP 6" GAS (BO)
ELEVATION TBD
PROP VERIZON DUCT (BO)
ELEVATION TBD
PROP VERIZON DUCT (BO)
ELEVATION TBD
PROP 10" WATER MAIN
ELEVATION TBD
PROP 10" WATER MAIN
EXIST GROUND (TYP)
CUT: 96.29 SF
FILL: 0.30 SF
GRAVEL: 46.53 SF
CUT: 85.30 SF
FILL: 11.14 SF
GRAVEL: 37.53 SF
R
T
R
T
R
T
R
T
R
T
L T
L T
L T
L T
E X
L O
E X
L O
P R
O P
L O
A
L T
P R
O P
L O
A
L T
L T
L T
PROP RIPRAP
PROP CRUSHED STONE
P T
H
PROP 6" GAS (BO)
L T
R
T
2.00%
E X
L O
P R
O P
L O
A
L T
P R
O P
L O
A
L T
PROP 3" RGS
ELEC CONDUIT
EXIST GROUND (TYP)
R
T
L T
FED. AID PROJ. NO.
SHEET
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
H
D S
E C
T I O
N S
D
W G
J u n
H
D S
E C
T I O
N S
D
W G
J u n
SECTIONS
HOR. SCALE IN FEET
VER. SCALE IN FEET
139+50
0 10 20 30 40 500-10-20-30-40-50-60
PROP VERIZON DUCT (BO)
ELEVATION TBD
PROP VERIZON DUCT (BO)
ELEVATION TBD
PROP 10" WATER MAIN
ELEVATION TBD
PROP 10" WATER MAIN
R
T
R
T
R
T
R
T
R
T
L T
L T
L T
L T
1.50%
2.00%5.7 8%
2.00%
1.50%
E X
L O
E X
L O
E X
L O
EXIST GROUND (TYP)
0.00%
L T
0.00%
R
T
L T
PROP 6" GAS (BO)
ELEVATION TBD
140+44
0 10 20 30 40 50 600-10-20-30-40-50-60
CUT: 20.61 SF
FILL: 0.00 SF
GRAVEL: 7.73 SF
R
T
L T
L T
MATCH EXISTINGMATCH EXISTING
5.4 2% 1.50%
1.50%
E X
L O
E X
L O
EXIST GROUND (TYP)
R
T
FED. AID PROJ. NO.
SHEET
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
H
D S
E C
T I O
N S
D
W G
J u n
H
D S
E C
T I O
N S
D
W G
J u n
SECTIONS
HOR. SCALE IN FEET
VER. SCALE IN FEET
1+60
-12
-8
-4
-12
-8
-4
0 10 20 30 40 500-10-20-30-40
1.5
0.75
RIP-RAP
CRUSHED STONE
MHW 2.05
L T
L T
EXIST GROUND (TYP)
P T
H
SEE BRIDGE PLANS FOR COFFER DAM STAGING
AND RIPRAP CHANNEL GRADING PLAN
1.5
RIP-RAP
CRUSHED STONE
CUT: 402.60 SF
RIP RAP: 247.01 SF
CRUSHED STONE: 60.66 SF
R
T
R
T
R
T
L T
L T
L T
EXIST GROUND (TYP)
P T
H
P T
H
R
T
L T
FED. AID PROJ. NO.
SHEET
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
H
D S
E C
T I O
N S
D
W G
J u n
H
D S
E C
T I O
N S
D
W G
J u n
CHANNEL SECTIONS
HOR. SCALE IN FEET
VER. SCALE IN FEET
1.5
1 CRUSHED STONE
1.5
RIP-RAP
CUT: 419.42 SF
RIP RAP: 273.73 SF
CRUSHED STONE: 68.43 SF
MHW 2.05
L T
L T
L T
R
T
R
T
R
T
EXIST GROUND (TYP)
P T
H
P T
H
S
L
O
R
I E
S
S
L
O
R
I
E
S
RIP-RAP
CRUSHED STONE
R
I
P
R
A
P
C
R
U
S
H
O
N
E
CUT: 328.83 SF
RIP RAP: 274.11 SF
CRUSHED STONE: 78.40 SF
MHW 2.05
R
T
L T
L T
R
T
R
T
EXIST GROUND (TYP)
P T
H
P T
H
FED. AID PROJ. NO.
SHEET
NO.
TOTAL
SHEETS
YARMOUTH
MAIN STREET (ROUTE 28)
STATE
MA
PROJECT FILE NO.
H
D S
E C
T I O
N S
D
W G
J u n
H
D S
E C
T I O
N S
D
W G
J u n
CHANNEL SECTIONS
HOR. SCALE IN FEET
VER. SCALE IN FEET
File details come from the government source that posted it. Updated .