20190724 ADDENDUM 5 Parkers River Bid Tabulation.pdf

PDF 126 KB Posted

Attached to
Parkers River Bridge
Solicitation number
BD-19-1355-TYARM-YADPW-40968
Issued by
Barnstable County, Massachusetts

About this file

This document is an addendum to a bid tabulation for the Parkers River Bridge Complete Replacement and Widening project in the Town of Yarmouth, Massachusetts. The project involves numerous construction items such as excavation, demolition, drainage, water line, paving, curbing, guardrail, landscaping, electrical, and temporary traffic control. The approximate quantities for these items are provided. No specific response date, bid due date, or award date is mentioned. The contract term is not specified.

The bid tabulation lists the unit prices and total prices for each of the 147 construction items. Pricing information is provided, but no details are given regarding pricing terms, set asides, incumbents, funding requirements or sources, or other salient commercial terms.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNIT PRICE (2) TOTAL PRICE (3)

DOLLARS DOLLARS

1 120.1 700 CY UNCLASSIFIED EXCAVATION

2 114.1 1 LS DEMOLITION OF SUPERSTRUCTURE OF BRIDGE NO. Y-01-002 (BNF)

3 140. 790 CY BRIDGE EXCAVATION

4 141. 20 CY CLASS A TRENCH EXCAVATION

5 141.1 40 CY TEST PIT FOR EXPLORATION

6 142. 40 CY CLASS B TRENCH EXCAVATION

7 143. 1500 CY CHANNEL EXCAVATION

8 144. 240 CY CLASS B ROCK EXCAVATION

9 146. 4 EA DRAINAGE STRUCTURE REMOVED

10 150. 105 CY ORDINARY BORROW

11 151. 920 CY GRAVEL BORROW

12 151.1 560 CY GRAVEL BORROW FOR BRIDGE FOUNDATION

13 154. 100 CY SAND BORROW

14 156. 220 TON CRUSHED STONE

15 156.13 55 TON CRUSHED STONE FOR INTEGRAL ABUTMENT PILES

16 156.9 330 TON CRUSHED STONE FOR CHANNEL PAVING FOUNDATION

17 170. 2797 SY FINE GRADING AND COMPACTING - SUBGRADE AREA

18 184.1 28 TON DISPOSAL OF TREATED WOOD PRODUCTS

TOWN OF YARMOUTH

Parkers River Bridge Project

Bridge No. Y-01-002 (BNF)

ROUTE 28 (MAIN STREET) over PARKERS RIVER

Index

ITEM

No.

APPROXIMATE

QUANTITY

UNIT ITEM DESCRIPTION (1)

TOTAL THIS SHEET(1): $_________________________

ADDENDUM No. 5 00410-8 FORM FOR GENERAL BID July 24, 2019

TOWN OF YARMOUTH

Parkers River Bridge Project

Bridge No. Y-01-002 (BNF)

ROUTE 28 (MAIN STREET) over PARKERS RIVER

Index

ITEM

No.

APPROXIMATE

QUANTITY

UNIT ITEM DESCRIPTION (1)

19 201. 5 EA CATCH BASIN

20 202. 3 EA MANHOLE

21 203.1 2 EA SPECIAL MANHOLE

22 220 2 EA DRAINAGE STRUCTURE ADJUSTED

23 221 6 EA FRAME AND COVER

24 222.1 6 EA FRAME AND GRATE - MASSDOT CASCADE TYPE

25 223.2 5 EA FRAME AND GRATE (OR COVER) REMOVED AND DISCARDED

26 227.3 5 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT

27 227.31 420 FT REMOVAL OF DRAINAGE PIPE SEDIMENT

28 227.4 20 SF MASONRY PLUG

29 238.12 46 FT 12 INCH DUCTILE IRON PIPE

30 238.18 20 FT 18 INCH DUCTILE IRON PIPE

31 241.12 80 FT 12 INCH REINFORCED CONCRETE PIPE

32 241.18 45 FT 18 INCH REINFORCED CONCRETE PIPE

33 244.12 6 FT 12 INCH REINFORCED CONCRETE PIPE CLASS V

34 302.06 6 FT 6 INCH DUCTILE IRON WATER PIPE (RUBBER GASKET)

35 303.1 290 FT 10 INCH DUCTILE IRON WATER PIPE (MECHANICAL JOINT)

36 309 2550 LB DUCTILE IRON FITTINGS FOR WATER PIPE

TOTAL THIS SHEET(2): $_________________________

ADDENDUM No. 5 00410-9 FORM FOR GENERAL BID July 24, 2019

TOWN OF YARMOUTH

Parkers River Bridge Project

Bridge No. Y-01-002 (BNF)

ROUTE 28 (MAIN STREET) over PARKERS RIVER

Index

ITEM

No.

APPROXIMATE

QUANTITY

UNIT ITEM DESCRIPTION (1)

37 348.1 60 FT 1 INCH POLYETHYLENE SERVICE PIPE

38 348.2 70 FT 2 INCH POLYETHYLENE SERVICE PIPE

39 350.1 2 EA 10 INCH GATE AND GATE BOX

40 355.1 2 EA 10 INCH GATE AND GATE BOX REMOVED AND STACKED

41 363.1 3 EA 1 INCH CORPORATION COCK

42 367.1 4 EA 10 INCH CAST IRON PLUG

43 371.06 1 EA 6 INCH COUPLING

44 371.1 2 EA 10 INCH COUPLING

45 373.1 85 FT 10 INCH WATER PIPE INSULATION

46 375.1 2 EA 10 INCH INSERTION VALVE AND BOX

47 381.3 3 EA SERVICE BOX ADJUSTED

48 402 100 CY DENSE GRADED CRUSHED STONE FOR SUB-BASE

49 415 893 SY PAVEMENT MICROMILLING

50 440 5300 LB CALCIUM CHLORIDE FOR ROADWAY DUST CONTROL

51 443 5 MGL WATER FOR ROADWAY DUST CONTROL

52 450.23 180 TON SUPERPAVE SURFACE COURSE - 12.5 (SSC - 12.5)

53 450.32 130 TON SUPERPAVE INTERMEDIATE COURSE - 19.0 (SIC - 19.0)

54 450.42 225 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5)

TOTAL THIS SHEET(3): $_________________________

ADDENDUM No. 5 00410-10 FORM FOR GENERAL BID

TOWN OF YARMOUTH

Parkers River Bridge Project

Bridge No. Y-01-002 (BNF)

ROUTE 28 (MAIN STREET) over PARKERS RIVER

Index

ITEM

No.

APPROXIMATE

QUANTITY

UNIT ITEM DESCRIPTION (1)

55 450.61 16 TON SUPERPAVE BRIDGE SURFACE COURSE - 12.5 (SSC-B - 12.5)

56 450.71 16 TON SUPERPAVE BRIDGE PROTECTIVE COURSE - 12.5 (SPC-B - 12.5)

57 451 19 TON HMA FOR PATCHING

58 452 277 GAL ASPHALT EMULSION FOR TACK COAT

59 453 1600 FT HMA JOINT SEALANT

60 472 30 TON HOT MIX ASPHALT FOR MISCELLANEOUS WORK

61 482.3 1710 FT SAWCUTTING ASPHALT PAVEMENT

62 482.31 80 FT SAWING & SEALING JOINTS IN ASPHALT PAVEMENT AT BRIDGES

63 504. 30 FT GRANITE CURB TYPE VA4 - STRAIGHT

64 505. 120 FT GRANITE CURB TYPE VA5 - STRAIGHT

65 506. 550 FT GRANITE CURB TYPE VB - STRAIGHT

66 506.1 30 FT GRANITE CURB TYPE VB - CURVED

67 509. 100 FT GRANITE TRANSITION CURB FOR WHEELCHAIR RAMPS - STRAIGHT

68 514. 4 EA GRANITE CURB INLET - STRAIGHT

69 580. 160 FT CURB REMOVED AND RESET

70 594. 476 FT CURB REMOVED AND DISCARDED

71 620.12 70 FT GUARDRAIL, TL-2 (SINGLE FACED)

72 620.32 12 FT GUARDRAIL - CURVED, TL-2 (SINGLE FACED)

TOTAL THIS SHEET(4): $_________________________

ADDENDUM No. 5 00410-11 FORM FOR GENERAL BID

TOWN OF YARMOUTH

Parkers River Bridge Project

Bridge No. Y-01-002 (BNF)

ROUTE 28 (MAIN STREET) over PARKERS RIVER

Index

ITEM

No.

APPROXIMATE

QUANTITY

UNIT ITEM DESCRIPTION (1)

73 627.1 3 EA TRAILING ANCHORAGE

74 627.82 2 EA GUARDRAIL TANGENT END TREATMENT, TL-2

75 628.24 4 EA TRANSITION TO BRIDGE RAIL

76 630.2 300 FT HIGHWAY GUARD REMOVED AND DISCARDED

77 657. 850 FT TEMPORARY FENCE

78 657.5 850 FT TEMPORARY FENCE REMOVED AND RESET

79 670. 70 FT FENCE REMOVED AND RESET

80 697.1 5 EA SILT SACK

81 698.4 980 SY GEOTEXTILE FABRIC FOR PERMANENT EROSION CONTROL

82 701. 300 SY CEMENT CONCRETE SIDEWALK

83 701.1 130 SY CEMENT CONCRETE SIDEWALK AT DRIVEWAYS

84 702 18 TON HOT MIX ASPHALT WALK SURFACE

85 703 155 TON HOT MIX ASPHALT DRIVEWAY

86 710.3 7 EA BOUND - LETTERED GRANITE

87 712.12 1 LS GRANITE BLOCKS -REMOVED AND STACKED

88 740 24 MO ENGINEERS FIELD OFFICE AND EQUIPMENT (TYPE A)

89 748 1 LS MOBILIZATION

90 767.121 350 FT SEDIMENT CONTROL BARRIER

TOTAL THIS SHEET(5): $_________________________

ADDENDUM No. 5 00410-12 FORM FOR GENERAL BID July 24, 2019

TOWN OF YARMOUTH

Parkers River Bridge Project

Bridge No. Y-01-002 (BNF)

ROUTE 28 (MAIN STREET) over PARKERS RIVER

Index

ITEM

No.

APPROXIMATE

QUANTITY

UNIT ITEM DESCRIPTION (1)

91 769 350 FT PAVEMENT MILLING MULCH UNDER GUARD RAIL

92 799 1 LS LANDSCAPING

93 801.5 1 LS VERIZON DUCT BANK RELOCATION

94 806.2 55 FT 2 INCH ELECTRICAL CONDUIT TYPE RM - GALVANIZED STEEL

95 806.3 120 FT 3 INCH ELECTRICAL CONDUIT TYPE RM - GALVANIZED STEEL

96 808.3 110 FT 3 INCH ELECTRICAL CONDUIT TY RM - STEEL - (PLASTIC COATED)

97 811.2 4 EA ELECTRIC HANDHOLE - SD2.020

98 812.1 4 EA LIGHT STANDARD FOUNDATION PRECAST

99 813.4 770 FT WIRE TYPE 8 NO. 10 DIRECT BURIAL

100 813.52 320 FT WIRE TYPE 10 - #8 GROUNDING AND BONDING

101 813.72 4 EA GROUND ROD 10 FEET LONG

102 813.8 1 LS SERVICE CONNECTION (OVERHEAD)

103 821.101 4 EA DECORATIVE LIGHT POLE 12 FT

104 823.101 4 EA HIGHWAY LIGHTING LUMINAIRE 50 WATT

105 823.70 2 EA HIGHWAY LIGHTING POLE AND LUMINAIRE REMOVED AND RESET

106 832 5 SF

WARNING-REGULATORY AND ROUTE MARKER - ALUMINUM PANEL

(TYPE A)

107 833.7 4 EA DELINEATION FOR GUARD RAIL TERMINI

108 847.1 1 EA

SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST ASSEMBLY -

STEEL

TOTAL THIS SHEET(6): $_________________________

ADDENDUM No. 5 00410-13 FORM FOR GENERAL BID

TOWN OF YARMOUTH

Parkers River Bridge Project

Bridge No. Y-01-002 (BNF)

ROUTE 28 (MAIN STREET) over PARKERS RIVER

Index

ITEM

No.

APPROXIMATE

QUANTITY

UNIT ITEM DESCRIPTION (1)

109 850.41 640 HR ROADWAY FLAGGER

110 852 148 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT

111 853.1 6 EA PORTABLE BREAKAWAY BARRICADE TYPE III

112 853.2 400 FT TEMPORARY BARRIER (TL-2)

113 853.21 420 FT TEMPORARY BARRIER REMOVED AND RESET

114 853.211 190 FT TEMPORARY BARRIER REMOVED AND RESET (BRIDGE)

115 853.33 110 FT TEMPORARY BARRIER - LIMITED DEFLECTION (TL-3)

116 853.501 4 EA TEMPORARY IMPACT ATTENUATOR REMOVED AND RESET

117 853.62 4 EA

TEMPORARY IMPACT ATTENUATOR UNIDIRECTIONAL, REDIRECTIVE

(TL-2)

118 854.016 11900 FT TEMPORARY PAVING MARKINGS - 6 INCH (PAINTED)

119 854.036 2100 FT TEMPORARY PAVING MARKINGS - 6 INCH (TAPE)

120 854.1 1700 SF PAVEMENT MARKING REMOVAL

121 854.5 20 EA RAISED PAVEMENT MARKER REMOVAL

122 856 30 DAY ARROW BOARD

123 856.12 1140 DAY PORTABLE CHANGEABLE MESSAGE SIGN

124 859 7110 DAY REFLECTORIZED DRUM

125 859.1 630 DAY

REFLECTORIZED DRUMS WITH SEQUENTIAL FLASHING WARNING

LIGHTS

126 860.112 130 FT 12 INCH REFLECTORIZED TEMPORARY WHITE LINE (PAINTED)

TOTAL THIS SHEET(7): $_________________________

ADDENDUM No. 5 00410-14 FORM FOR GENERAL BID

TOWN OF YARMOUTH

Parkers River Bridge Project

Bridge No. Y-01-002 (BNF)

ROUTE 28 (MAIN STREET) over PARKERS RIVER

Index

ITEM

No.

APPROXIMATE

QUANTITY

UNIT ITEM DESCRIPTION (1)

127 864.35 30 EA SLOTTED PAVEMENT MARKER TWO-WAY YELLOW/YELLOW

128 866.106 1400 FT 6 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC)

129 867.106 1400 FT 6 INCH REFLECTORIZED YELLOW LINE (THERMOPLASTIC)

130 874.2 1 EA TRAFFIC SIGN REMOVED AND RESET

131 874.4 1 EA TRAFFIC SIGN REMOVED AND DISCARDED

132 901.7 1 LS CONTRACTOR QUALITY CONTROL - CEMENT CONCRETE

133 903. 12 CY 3000 PSI, 1.5 IN., 470 CEMENT CONCRETE

134 941.1 320 FT EXISTING TIMBER PILE REMOVAL

135 942.124 2561 FT STEEL PILE HP 12 X 84

136 948.31 1 EA STATIC - CYCLIC (EXPRESS) LOAD TEST

137 948.4 5 EA DYNAMIC LOAD TEST PREPARATION

138 948.41 5 EA DYNAMIC LOAD TEST BY CONTRACTOR

139 948.5 25 EA PILE SHOES

140 953.3 100 SY EXCAVATION SUPPORT SYSTEM

141 983.2 660 CY RIPRAP

142 983.2 170 CY RIPRAP (MORTARED)

143 983.3 115 CY RIPRAP REMOVED AND RELAID

144 991.1 1 LS CONTROL OF WATER - STRUCTURE NO. Y-01-002 (BNF)

TOTAL THIS SHEET(8): $_________________________

ADDENDUM No. 5 00410-15 FORM FOR GENERAL BID

TOWN OF YARMOUTH

Parkers River Bridge Project

Bridge No. Y-01-002 (BNF)

ROUTE 28 (MAIN STREET) over PARKERS RIVER

Index

ITEM

No.

APPROXIMATE

QUANTITY

UNIT ITEM DESCRIPTION (1)

145 993.1 1 LS TEMPORARY PEDESTRIAN BRIDGE

146 994.1 1 LS TEMPORARY PROTECTIVE SHIELDING BRIDGE NO. Y-01-002 (BNF)

147 995.01 1 LS BRIDGE STRUCTURE, BRIDGE NO. Y-01-002 (BNF)

TOTAL THIS SHEET(9): $_________________________

ADDENDUM No. 5 00410-16 FORM FOR GENERAL BID