This document is a Performance Work Statement (PWS) for a federal contract opportunity to provide Command Post (CP) trailers in support of the 2025 Presidential Inauguration. The contractor shall provide 17 trailers (12 at 8'x20', 3 at 8'x28', and 2 at 10'x40') with power generators, heating, furniture, fixtures, and equipment to be used as CPs for inaugural events. The period of performance is from contract award through removal of the last CP trailer by 8:00 pm on January 22, 2025. The contractor is responsible for coordinating delivery schedules, generator refueling, and trailer placement with the Joint Task Force - National Capital Region (JTF-NCR). The agency issuing this solicitation is the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Sam Houston. All questions must be submitted by email no later than November 10, 2024, with answers posted by November 12, 2024.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MED Tent #2

Parade/Street Cordon CP (Trailer #5) With MED LNO RTE Control Checkpoint #1 (Trailer #6) MED Tent #6

RTE Control CP (Trailer #10) Dispersal Control CP (Trailer #11) RTE Control Checkpoint #2 (Trailer #7) RTE Control Checkpoint #3 (Trailer #8)

PAO Trailer MED Tent #5 Assembly Control CP (Trailer #1)

(T) Eclipse Merge Point CP (Trailer #4) Moved to NW side of intersection due to construction Float Assembly CP (Trailer #3) Horse Assembly CP (Trailer #2) Moved to C & 12th

(T) (L’Enfant Plaza) MED Tent #1

MED Tent #3

MED Tent #4

MED Tent #7

Warming Tent #5 (Dispersal Control)

Warming Tent #1 (PAO) Trailers will be emplaced 7-9 JAN 25 to allow time for IT installation in preparation for 12JAN25 COMMEX.

Trailers will be removed NLT 22 JAN 25 PAO-Media Tent will be set in place for 12 JAN 25 DoD Dress RXL

ALL Remaining Tents will be placed on their respective sites prior to 1600 19 JAN 25

PARADE ROUTE CP, TRAILER, & TENT LOCATIONS

(CURRENT DRAFT)

RTE Control Checkpoint #4 (Trailer #9)

CUI

LEGEND

CPs/Checkpoints/Trailers

Medical Tents

Warming Tents

Parade Route

Warming Tent #6 (Horse Dispersal)

Warming Tent #4 (Merge/Float)

Warming Tent #2 (Horse Assembly)

Warming Tent #3 (Float Assembly)

MED Tent #2

LEGEND:

CONSTRUCTION NOTES:

J-4 Engineering Division MCPO Sederback 5 November 2024

NOT TO SCALE

N

- Trailer should be minimum 4 ft from barriers

Handicap Ramp

REMARKS:

Generator Placement Delivery Date

07JAN25

Recovery Date

21JAN25

PROPOSED WASHINGTON MONUMENT PACKAGE 2025

ASSEMBLY CONTROL CP (TRAILER #1),

WARMING TENT #1 (PAO), MED TENT #1

CP 8’x28’

Med Tent

WT

#1 NE side of Washington Monument

CUI

L’Enfant Plaza

HORSE ASSEMBLY CP (TRAILER #2)

Warming tent #2 (PIC)

Generator Placement

NOT TO SCALE

L'Enfant Plaza SW S of First Intersection, 200’ S of DOE

-Construction will continue until March 2025. The is no northbound access to Independence Ave.

L’Enfant Plaza

RCP 8’x20’

Trailer Doors Facing

Trailer Tongue Facing

US Department of Energy Min 200’ from DOE

J-4 Engineering Division MCPO Sederback

Port-a-Lav

Delivery Date

07JAN25

Recovery Date

21JAN25

Warming Tents (PIC)

Large warming tent on parking lot provided by PIC

FLOAT ASSEMBLY CP (TRAILER #3),

Warming Tent #3 (PIC) NE corner of C St. and 4th St., SW

4th Street C Street

NOT TO SCALE

Parking Lot

CP

8’ x 20’

Trailer Doors Facing

Trailer Tongue Facing Voice Of America

5 November 2024

Generator Placement

Delivery Date

07JAN25

POC: TBD

Warming tent (PIC)

Jefferson Drive

4th Street

- Trailer and tents are placed on the gravel

CONSTRUCTION NOTES:

J-4 Engineering Division MCPO Sederback 5 November 2024

REMARKS:

- MED Tent added on 27 September Parade Recon Generator Placement

NOT TO SCALE

N

MERGE POINT CP (TRAILER #4),

WARMING TENT #4, MED TENT #4

NW Corner of 4th St. and Jefferson Drive SW Trailer Doors Facing

CP

MALL

07JAN25

WT

MED #2

PARADE/STREET CORDON (TRAILER #5)

Port-a-Lav

CONSTRUCTION NOTES:

1. Trailer will be minimum 14 ft from handicap ramp on 4th St.

J-4 Engineering Division

SW corner Pennsylvania Ave. and 4th St., NW Pennsylvania Ave.

4th Street

Electrical Manhole Brick Cross Walk

Doors Facing

Trailer Tongue Facing Canadian Embassy John Marshall Park

John Marshall Park P P

CP

10’ x 40’ Delivery Date

07JAN25

ROUTE CONTROL CHECKPOINT #1 (TRAILER #6)

CONSTRUCTION NOTES:

1. CP Trailer will be placed specifically at:

- CP shall be parallel with the curb and the corner
shall be square with the tree

J-4 Engineering Division

NE corner of Pennsylvania Ave. and 7th St. NW.

Pennsylvania Ave.

7th Street

CP

- Allow access from handicap ramp and stairs in front of each CP.

2. Do not block steps on Indiana Plaza

3. RCP will be place center on wall by 7th street

Light Pole

Tree

Doors Facing

Retaining Wall Navy Memorial Indiana Plaza crosswalk crosswalk

ROUTE CONTROL CHECKPOINT #2 (TRAILER #7)

CONSTRUCTION NOTES:

1. CP Trailer will be placed specifically at:

- Corner of the CP shall be at manhole, not blocking hole J-4 Engineering Division

10th St. NW on N Side Pennsylvania Ave.

Pennsylvania Ave.

10th Street manhole

N Brick Cross Walk

- Allow access from handicap ramp and manhole

2. Trailer will be minimum 8 ft from handicap ramp located at 10th street

Light Pole

Doors Facing

Trailer Tongue

Recovery Date

ROUTE CONTROL CHECKPOINT #3 (Trailer #8), PAO TRAILER & MED TENT #6

LEGEND:

CONSTRUCTION NOTES:

J-4 Engineering Division MCPO Sederback 5 November 2024 Generator Placement

13th St., NW on N Side Pennsylvania Ave.

Pennsylvania Ave.

13th

- Allow access from handicap ramp andFreedom Plaza
- Align Trailer with east wall of Freedom Plaza

-Possibility of placing trailer and tents on the road

Light Poles

Trailer Doors Facing

Man Hole

RCP

Retaining Wall

Facing Freedom Plaza

8’ X 20’

PAO

8’ X 20’

MED 6

Tent

06JAN25

Recovery Date

21JAN25

Trailers Delivery Date

07JAN25

ROUTE CONTROL CHECKPOINT #4 (TRAILER #9)

& MED TENT #7

LEGEND:

Jersey Barriers J-4 Engineering Division MCPO Sederback 5 November 2024 Generator Placement

NOT TO SCALE

SW corner of E St NW. and 15th St. NW, S of Sherman Park

CONSTRUCTION NOTES:

- Allow access from handicap ramp andstairs in front of each CP.
-Med 6 is in the street between light poles 2 and 3

Stairs

Light Poles 15th

E Street

STAIRS

Wing Walls

Facing

Med 7

06JAN25

Recovery Date

21JAN25

Trailers Delivery Date

07JAN25

POCs:

Parade: TBD

Cordon: TBD

MED: TBD

CP 8’ x 20

ROUTE CONTROL COMMAND POST

(TRAILER #10), MED TENT #8

5 November 2024 Generator Placement

NOT TO SCALE

NE Corner of 15th and New York Ave NW, in front of Truist Bank

15th Street

New York Ave.

BANK

Facing

Trailer Tongue

Bank door

MED 8

DISPERSAL CONTROL CP (TRAILER #11)

& WARMING TENT #5

CP Trailer will be placed specifically at curb lane in front of bank entrance, 5 November 2024

REMARKS:

Generator Placement

NOT TO SCALE

H St. and Pennsylvania, S of Murrow Park

CP 8x20

18th

07JAN25