This is an Industry Day presentation for a Request for Information (RFI) regarding UH-60M Black Hawk Commercial Modification, held on February 19, 2026, at Auburn University Research and Innovation Campus. The presentation was delivered by the Utility Helicopters Project Office (UHPO) under the Department of the Army Materiel Command Contracting Command Redstone Arsenal. The RFI is solely for market research to inform Government acquisition strategy and does not constitute a commitment to procure goods or services or to award a contract. COL Ryan Nesrsta (Project Manager) and LTC Aaron Kia (Product Manager) led the discussion on the Government's objectives and response requirements.

The Government seeks to identify and assess commercial solutions to modernize and sustain the fielded UH-60M Black Hawk helicopter fleet while supporting Army Aviation transformation at scale. The Statement of Work scope includes aircraft induction/depopulation, paint removal and reapplication, preventative maintenance, structural installs (10.65 LBL Beam, FS 320 Frame, FS 379 Frame), Maintenance Work Order installations (CIRCM, FANS, BFT2, EAWIS, IAFTS, AN/AAQ-22 FLIR), and component overhauls (engine, main transmission, main rotor blades, swashplate, rotary wing spindle head, hydraulic pump, landing gear, and engine power unit). The Government requires 12-24 UH-60M aircraft deliveries per year with focus on manufacturing capability and capacity. Respondents must use the provided Excel response template (marked "Final") addressing baseline information, partnership preferences, facilities (three most suitable locations with aircraft bay definitions), cost estimates based on 30,000 direct labor hours and $7.1 million material costs per aircraft, risk assessment (top three risks/opportunities), and crisis management/business continuity plans. Responses must be submitted by March 26, 2026. The Government indicated that detailed requirements are undefined at this time and seeks vendor input on current capabilities, recommended solutions, critical risks, and opportunities rather than prescriptive solutions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UHPO

UH-60M Black Hawk Commercial Modification Request for Information Industry Day 19 February 2026

DISTRIBUTION STATEMENT A: Approved for Public Release. Distribution is unlimited.

Notes view: 0

This brief is Unclassified

Distribution Statement A: Approved for Public Release. Distribution is Unlimited.

Information provided by the Government is preliminary in nature and subject to change

DISTRIBUTION STATEMENT A: Approved for Public Release. Distribution is Unlimited.

Administrative Remarks Acknowledgement – Auburn University Research and Innovation Campus Safety Brief / Facility Orientation

Introductions COL Ryan Nesrsta, Project Manager LTC Aaron Kia, Product Manager Rules of Engagement:

Unclassified discussions only To ensure uniform assumptions, no one-on-one meetings with USG No audio/visual recordings; information presented today will be posted on sam.gov No product pitches (let’s be respectful of everyone’s time) Questions: queue up behind a microphone and wait to be called upon by the moderator during designated Q&A

Agenda

TimeActivityPresenter
0830-0900Registration
0900-0915Welcome & AdminDamian Cason
0915-0930Opening RemarksCOL Ryan Nesrsta
0930-1015SOW Overview and Q&ALTC Aaron Kia
1015-1030Break
1030-1130Response Template and Q&ALTC Aaron Kia
1130-1135Closing RemarksCOL Ryan Nesrsta
1135-1230Business Collaboration
1230Facility Closure

Notes view: 3

COL Ryan Nesrsta Project Manager, UHPO Opening Remarks

Notes view: 4

UH-60M Black Hawk Capabilities Walk-Around

OVERVIEW

The H-60M Black Hawk serves as the Army’s medium-lift helicopter supporting air assault, aeromedical evacuation, and special operation units. The H-60 has multi-mission capabilities used to perform tactical transport, utility, search and rescue, airborne assault, command and control, medical evacuation, aerial resupply, disaster relief, and firefighting missions.

CAPABILITIES

The H-60M 22,500 lbs. helicopter carries a payload of 11 troops, a cargo hook capacity of 9,000 lbs., max speed of 151 kts (174 mph), and a max cruise range of 275 nautical miles.

Survivability Upturned Exhaust Range, Endurance & Reliability Improved Turbine Engine Autonomy & Safety Strategic Autonomous Flight Enabler Autonomy & Safety Optimally Piloted Capability Mission Effectiveness Avionics Updates Mission Effectiveness & Survivability

EAGLE-M/MAGNA

Mission Effectiveness & Safety

DVEPS

Adaptability & Maintainability Extended Modular Nose Mission Effectiveness & Safety Heads-Up, Eyes-Out Capability Interoperability Next Gen C2 Mission Effectiveness LE Systems Scalability & Adaptability Networked Mission Systems Digital Backbone Range & Endurance Increased Fuel Capacity Payload Capacity Structural Upgrades Survivability Survivability Enhancements

LTC Aaron Kia Product Manager, Recapitalization Statement of Work Overview and Q&A

Notes view: 6

Objective: To identify and assess commercial solutions to modernize and sustain the fielded UH-60M Black Hawk helicopter fleet and support Army Aviation transformation at scale.

Strategic Goal: Leverage commercial capabilities and investments to improve aircraft performance, increase fleet readiness, and stabilize the industrial base.

Key Drivers:

Manufacturing Capability: Ensuring the industrial base can deliver a conforming product Supply Chain Resilience: Mitigating risks associated with parts availability and obsolescence Affordability: Seeking cost-effective solutions to perform modifications at scale while reducing the total lifecycle costs Program Vision: To create a stable, long-term industrial partnership that can consistently deliver mission-ready aircraft back to the fleet, ensuring operational dominance for decades to come.

Program Overview

Notes view: 7

Solely for market research to inform government acquisition strategy The Government has not determined the final acquisition approach, and a contract will not be awarded on the basis of this RFI Information will not be used for subsequent evaluation or source selection

The statement of work represents a draft requirement to assess industry capabilities The brevity of the SOW and Response Template reflect the level of detail requested in responses The Government is not prescribing solutions but rather is seeking insight into what is achievable Capabilities, partnership preferences, and views on risks and opportunities The Government is interested in feedback from system and component-level vendors

General approach to RFI response:

Benchmark responses with current capabilities or recommended solution for meeting the requirement Emphasize critical risks and opportunities that have the greatest impact on a successful program Request for Information Overview

Out-of-scope Evaluation criteria and performance metrics Contracting vehicles and timelines Modernization gaps/priorities/solutions

Notes view: 8

Statement of Work ASER Technical Bulletin Aircraft Induction/Depop Remove and Reapply Paint Inspect and Repair Preventative Maintenance 1 & 2 Reassembly and Flight Test

Structural Installs

10.65 LBL Beam

FS 320 Frame FS 379 Frame

MWO Installs:

Common IR Countermeasure (CIRCM) Federated Advanced Navigation System (FANS) Blue Force Tracker 2 (BFT2) Encrypted Aircraft Wireless Intercom System (EAWIS) Internal Auxiliary Fuel Tank System (IAFTS) AN/AAQ-22 Forward Looking Infrared (FLIR) System

Component Overhaul:

Engine Main Transmission Main Rotor Blades Swashplate Primary Servo Assembly Rotary Wing Spindle Head Hydraulic Pump Fixed Landing Gear Engine Power Unit Propulsion Shaft

Overarching requirement:

12-24 UH-60M aircraft deliveries per year Scope is focused on manufacturing capability and capacity to apply ASER TB & select MWOs Assumes solution development, integration, and testing is completed via separate contract(s)

Simplified to differentiate supplier capabilities and assess potential risks Provides opportunity for system and component level suppliers to respond independently

Notes view: 9

Questions regarding Statement of Work / Scope

QuestionsAnswers
Engineering Topics:

Direct and indirect engineering support functions Deviation/Discrepancy reconciliation Configuration Authority Material Review Board Quality Assurance / Quality Control standards and oversight (AS9100, DCMA) Training certification (A&P) Airworthiness (FAA vs AWR) Innovation Opportunities (automation, digital engineering) Detailed requirements are undefined at this time

Respond with current capabilities and/or recommended solution to meet the requirement

Characterize major differences between current and estimated requirements as a risk or opportunity

Example: Describe your Quality Management System

The vendor should reply with current quality certification (i.e. ISO 9001, AS 9100, etc) If you identify quality certification standards as a critical risk, consider highlighting it in the Risk Assessment tab Highlight the effort required to meet higher quality certification standards Highlight the opportunity of delivering a conforming product at recommended quality certification standard

Examples:

- AS9100

- Dynamic Component Sources of Supply Notes view: 10

Questions regarding Statement of Work / Scope

QuestionsAnswers
Logistics Topics:

Logs and Records Weight and Balance Induction schedules Facilities and Transportation Component replacement (overhaul, GFE, or CFE) Component overhaul standard (zero-time) Supply chain disruptions, obsolescence, parts availability Long-lead or high-value strategic spares Detailed requirements are undefined at this time

Respond with current capabilities and/or recommended solution to meet the requirement

Characterize major differences between current and estimated requirements as a risk or opportunity

Example: Component Repairs and Overhaul – contractor shall overhaul / zero-time the components

The vendor should reply with how they plan on accomplishing the requirement Does the vendor currently have the capability to conduct the repair / overhaul in-house?

Does the vendor prefer to partner with industry to outsource the overhaul (i.e. CFE)?

Does the vendor prefer sourcing the component from the Government (i.e. GFE)?

If you identify component repair, overhaul, or sourcing as a critical risk, consider highlighting it in the Risk Assessment tab.

Examples:

- AS9100

- Dynamic Component Sources of Supply Notes view: 11

BREAK

LTC Aaron Kia Product Manager, Recapitalization Response Template and Q&A

Notes view: 13

The excel template is required for each response (use the version marked “Final”) Responses should be formatted for relevance and brevity Supplemental information may be submitted as a secondary document Respondents may include a cover sheet to assert data rights [YELLOW] – Baseline Information Covers organizational, technical, and financial topics Identify major risks that could threaten program success [GREEN] – Partnership Preferences Highlight vendor preferences and past experience with these partnership models May respond to more than one partnership model RFI Response Workbook

Questions regarding Response format/template

QuestionsAnswers
Data Rights & Analysis

How will data be used?

How will data be protected? Assert appropriate data rights using a cover sheet USG will comply with DODI 5230.24 to protect proprietary information Data will inform the Government’s Acquisition Strategy Cost Analysis:

Range vs Point estimates Labor category definitions Point estimate for composite labor rate Project support staff and supervisors of direct/touch employees should be included in program management Number of employees refer to Full Time Equivalent (FTE) that would support the program Cost assumptions: 30,000 direct labor hours, $7.1M material costs per A/C Facilities Multiple Location/Facilities Aircraft Bay definition Report three most suitable facilities where the bulk of aircraft activities will occur; cumulative summary of multiple facilities in a single location is acceptable An A/C bay is a dedicated space/position for performing work on a single aircraft

PartnershipsPartnerships are notional and should reflect vendor preferences or recommendations
Crisis management and business continuity planGeneric reference to assess resilience and continuity of operations in response to unforeseen events (i.e. labor strikes, supply chain disruptions, natural disaster, etc.)
Risk AssessmentEmphasize top 3 risks or opportunities

Open Forum Q&A

COL Ryan Nesrsta Project Manager, UHPO Closing Remarks

Notes view: 17

Information presented today will be documented and updated on sam.gov Vendors may request access to CUI references IAW RFI Instructions Response deadline is March 26, 2026

Informal Opportunity for Business Collaboration Closing Time NLT 1230

Return lanyards to the registration table Closing Admin Thank you for your participation!

http://facebook.com/peoaviation https://www.linkedin.com/company/peo-aviation https://www.dvidshub.net/unit/PEO-A http://www.army.mil/peoaviation https://x.com/peoaviation

Notes view: 19 image3.jpeg oleObject2.bin image4.emf image5.png image2.png oleObject91.bin image40.emf oleObject4.bin image6.emf oleObject3.bin image41.png image42.png image43.png image44.png image45.png image46.png image47.png image48.emf image49.png image50.png image19.png image20.png image21.svg image22.png image23.png image24.png image25.png image26.png image27.png image28.emf oleObject54.bin image15.png image16.png image17.png image18.png oleObject92.bin oleObject1.bin image1.emf oleObject66.bin image30.emf

File details come from the government source that posted it. Updated .