Pages from 15B Tilikum Crossing - Volume 1.pdf

PDF 9 MB Posted

Attached to
STREETCAR REPLACEMENT PROJECT SUPPORT
Solicitation number
00002742
Issued by
Oregon

About this file

This is a design and technical documentation file for the Tilikum Crossing streetcar project prepared for the City of Portland, Bureau of Transportation (PBOT). The document provides detailed technical specifications and design parameters for streetcar vehicles intended to support Portland's streetcar replacement project. The file contains engineering drawings, vehicle specifications, and technical performance requirements that establish the baseline design standards for new streetcar procurement and manufacturing. The documentation appears to serve as a reference standard for proposers responding to PBOT's solicitation for technical evaluation, support, and analysis of streetcar vehicle design and manufacturing capabilities.

The technical specifications outlined in this volume establish the performance, dimensional, and operational requirements that potential contractors must understand and address in their proposals. Key focus areas include vehicle design standards, safety systems, operational capabilities, and compliance with local infrastructure requirements specific to Portland's streetcar network. This documentation serves as an essential reference for evaluating proposer qualifications and their ability to provide expert technical support in streetcar vehicle design, manufacturing oversight, and project delivery. Proposers must demonstrate thorough understanding of these specifications and capability to manage complex vehicle procurement and manufacturing processes aligned with PBOT's project objectives and standards.

View the file

Other files

File Type Posted
USC Vehicle Dynamic Envelope.pdf PDF
Inekon TRIO Vehicle dynamic envelope.pdf PDF
Addendum 09 RFP00002649 Extend Close Date (2).pdf PDF
Addendum 06 RFP00002649 Question and Answer (2).pdf PDF
Streetcar Facility Site Plan -May 2012.pdf PDF
Yard track entry and transfer.pdf PDF
Gibbs extension track profiles.pdf PDF
Original 2001 track profiles.pdf PDF
00002742 QBS-RFP Streetcar Replacement Project Support.pdf PDF
Addendum 03 Attachment 1 Dimensional Consistency Drawings.pdf PDF
Addendum 08 RFP00002649 Question and Answer (2).pdf PDF
Addendum 03 RFP00002649 Question and Answer (2).pdf PDF
Thurman Floorplan.pdf PDF
Portland Stcar Loop IFB Vol 1 shts 10-115.pdf PDF
Anticlimber drawing 0000471 Rev A.pdf PDF
USC layout drawings.pdf PDF
Addendum 05 RFP00002649 - Note to File (number skipped in sequence).txt TXT text file
Addendum 07 RFP00002649 Question and Answer (2).pdf PDF
00002742 Exhibit D - GS RFP 00002649 Streetcar Vehicles Parts and Tools.pdf PDF
South Bldg - Selected As-Built Drawings.pdf PDF
MontgomeryParkStreetcarExtension-alignment.pdf PDF
Coupler SP1520157VEN-02.pdf PDF
Addendum 02 RFP00002649 RFP Clarifications (2).pdf PDF
Addendum 01 RFP00002649 Update Pre-Proposal Information (2).pdf PDF
Addendum 04 RFP00002649 Update Documents and QA (2).pdf PDF
North Bldg - Selected As-Built Drawings.pdf PDF
Riverplace extension track profiles.pdf PDF
Eastside expansion - trackwork.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .